Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3

Files3

Search terms highlighted
Eversource rate increase is on 2 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
1 part match

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 55 of 77

    GXENG2026:CT ENGINEERING TOOLS + EQUIP | This project is for the purchase of capital tools used by engineering employees to perform their daily jobs throughout the year. GXTD26:2026 CT D SS Capital Tool Annual | This project is for the purchase of capital tools used by station operations employees to perform their daily jobs throughout the year. Emergent Equipment Failures - Line EMERGENT EQUIPMENT FAILURES - LINE-L4 CD02504:Enfield 12C Conversion | This project is resulting from the unexpected failure of the Enfield 12C-2X 115/27.6 kV transformer at Enfield 12C substation. Rather than replacing the failed transformer with another 115/27.6 kV transformer, the decision was made to proceed with converting the entire Enfield -Windsor Locks 27.6 kV system to 23 kV. This Distribution Line project is the first of two-distribution line projects to be established to convert the Enfield Windsor Locks 27.6 kV system to 23 kV. Substation Project CS00709 – Enfield 12C-2X Emergent Transformer Replacement has already been established for the conversion of the 27.6 kV substation equipment at Enfield 12C. This project will convert the Enfield 12C48 27.6 kV circuit to 23 kV and eliminate the Suffield 36M 27.6/23 kV substation. It will also reconfigure the 12C47 circuit at 27.6 kV until the Windsor Locks 14K transformer replacement project is established and completed. A new 14K8 circuit will be constructed under this project to offload the 12C48 circuit and eliminate all contingency overloads in the area. FAILED EQUIPMENT DB-DQ ANNUAL ARDB2M:DB PLANNED OBS ANNUAL CHES | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL CHESHIRE ARDB3H:DB PLANNED OBS ANNUAL HARTFORD | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL HARTFORD ARDB4D:DB PLANNED OBS ANNUAL MADISON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL MADISON ARDB4M:DB PLANNED OBS. ANNUAL MIDDLETOWN | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL MIDDLETOWN ARDB4N:DB PLANNED OBS. ANNUAL NEW LONDON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL NEW LONDON ARDB5D:DB PLANNED OBS ANNUAL DANIELSON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL DANIELSON ARDB5T:DB PLANNED OBS ANNUAL TOLLAND | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL TOLLAND ARDB5W:DB PLANNED OBS ANNUAL DANIELSON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL DANIELSON DQDB2M:UG FAILED EQT CHES/NB ANNUAL | DIRECT-BURIED FAILED EQUIPMENT CHES/NB ANNUAL DQDB3H:DB FAILED EQUIP HARTFORD ANNUAL | DIRECT-BURIED FAILED EQUIPMENT HARTFORD AWC ANNUAL DQDB4D:DB FAILED EQUIPMENT MADISON - ANNUA | DIRECT-BURIED FAILED EQUIPMENT MADISON - ANNUAL DQDB4M:DB FAILED EQUIPMENT MIDDLETOWN - AN | DIRECT-BURIED FAILED EQUIPMENT MIDDLETOWN - ANNUAL DQDB4N:DB FAILD EQUIPMENT NEW LONDON - ANN | DIRECT-BURIED FAILED EQUIPMENT NEW LONDON - ANNUAL DQDB5D:DB FAILED EQUIPMENT DANIELSON-ANNUA | DIRECT-BURIED FAILED EQUIPMENT DANIELSON-ANNUAL DQDB5W:DB FAILED EQUIPMENT DANIELSON-ANN | DIRECT-BURIED FAILED EQUIPMENT DANIELSON-ANN FAILED EQUIPMENT OH-DQ ANNUAL AROH1B:OH PLANNED OBS ANNUAL NEWTOWN | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL NEWTOWN AROH1N:OH PLANNED OBS ANNUAL NORWALK | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL NORWALK AROH1S:OH PLANNED OBS ANNUAL STAMFORD | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL STAMFORD AROH2M:OH PLANNED OBS ANNUAL CHES | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL CHESHIRE AROH2W:OH PLANNED OBS ANNUAL WTBY | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL WATERBURY AROH3H:OH PLANNED OBS ANNUAL HARTFORD | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL HARTFORD AROH4D:OH PLANNED OBS ANNUAL MADISON | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL MADISON AROH4M:OH PLANNED OBS ANNUAL E HAMPTON | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL EAST HAMPTON AROH4N:OH PLANNED OBS ANNUAL NEW LONDON | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL NEW LONDON AROH5D:OH PLANNED OBS ANNUAL DANIELSON | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON AROH5T:OH PLANNED OBS ANNUAL TOLLAND | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL TOLLAND
  2. Part 56 of 77

    AROH5W:OH PLANNED OBS ANNUAL DANIELSON | OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON DQ2L:SYSTEM REPAIRS/OBSOL TORR CLP | SYSTEM REPAIRS/OBSOLETE EQUIPMENT TORRINGTON CLP DQ2M:SYSTEM REPAIRS/OBSOL CHESHIRE/N.B. | SYSTEM REPAIRS/OBSOLETE EQUIPMENT CHESHIRE/NEW BRITAIN DQ3H:SYSTEM REPAIRS/OBSOL HARTFORD | SYSTEM REPAIRS/OBSOLETE EQUIPMENT HARTFORD DQ4D:SYSTEM REPAIRS/OBSOL MADISON | SYSTEM REPAIRS/OBSOLETE EQUIPMENT MADISON DQ4M:SYSTEM REPAIRS/OBSOL E HAMPTON | SYSTEM REPAIRS/OBSOLETE EQUIPMENT EAST HAMPTON DQ4N:SYSTEM REPAIRS/OBSOL N LONDON | SYSTEM REPAIRS/OBSOLETE EQUIPMENT NEW LONDON DQ5D:SYSTEM REPAIRS/OBSOL DANIELSON | SYSTEM REPAIRS/OBSOLETE EQUIPMENT DANIELSON DQ5T:SYSTEM REPAIRS/OBSOL TOLLAND | SYSTEM REPAIRS/OBSOLETE EQUIPMENT TOLLAND DQ5W:SYSTEM REPAIRS/OBSOL DANIELSON | SYSTEM REPAIRS/OBSOLETE EQUIPMENT DANIELSON DQOH2M:OH FAILED EQT CHESHIRE/NB ANNUAL | OVERHEAD FAILED EQUIPMENT CHESHIRE/NB ANNUAL DQOH3H:OH FAILED EQUIP HARTFORD AWC-ANNUAL | OVERHEAD EQUIPMENT FAILED HARTFORD AWC DQOH4D:OH FAILD EQUIPMENT MADISON-ANNUAL | OVERHEAD FAILED EQUIPMENT MADISON-ANNUAL DQOH4M:OH FAILD EQUIPMENT E HAMPTON-ANNUAL | OVERHEAD FAILED EQUIPMENT EAST HAMPTON-ANNUAL DQOH4N:OH FAILED EQUIPMENT NEW LONDON - AN | OVERHEAD FAILED EQUIPMENT NEW LONDON - ANNUAL DQOH5D:OH FAILED EQUIPMENT DANIELSON-ANNUA | OVERHEAD FAILED EQUIPMENT DANIELSON-ANNUAL DQOH5T:OH FAILED EQUIPMENT TOLLAND ANNUAL | OVERHEAD FAILED EQUIPMENT TOLLAND -ANNUAL FRDQOH:PROJECTION PROJECT - REPAIRS/OBS OH | PROJECTION PROJECT - REPAIRS/OBSOLETE EQUIPENT OVERHEAD IFOH4D:OH INSPECTION FAILED EQUIPMENT MADI | OVERHEAD INSPECTION FAILED EQUIPMENT MADISON IFOH4M:OH INSPECTION FAILED EQUIPMENT E HA | OVERHEAD INSPECTION FAILED EQUIPMENT EAST HAMPTON IFOH4N:OH INSPECTION FAILED EQUIPMENT NEW | OVERHEAD INSPECTION FAILED EQUIPMENT NEW LONDO IFOH5D:OH INSPECTION FAILED EQUIPMENT DANI | OVERHEAD INSPECTION FAILED EQUIPMENTDANIELSON FAILED EQUIPMENT UG-DQ ANNUAL ARUG1B:UG PLANNED OBS ANNUAL NEWTOWN | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL NEWTOWN ARUG2M:UG PLANNED OBS ANNUAL CHES | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL CHESHIRE ARUG3H:UG PLANNED OBS ANNUAL HARTFORD | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL HARTFORD ARUG4D:UG PLANNED OBS ANNUAL MADISON | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL MADISON ARUG4M:UG PLANNED OBS. ANNUAL E Hampton | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL EAST HAMPTON ARUG4N:UG PLANNED OBS ANNUAL NEW LONDON | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL NEW LONDON ARUG5D:UG PLANNED OBS ANNUAL DANIELS | UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON DQUG2M:UG FAILED EQT CHES/NB ANNUAL | UNDERGROUND FAILED EQUIPMENT CHESHIRE/NB ANNUAL DQUG3H:UG FAILED EQUIPMENT HARTFORD ANNUAL | UNDERGROUND FAILED EQUIPMENT HARTFORD ANNUAL DQUG4N:UG FAILED EQUIPMENT NEW LONDON - AN | UNDERGROUND FAILED EQUIPMENT NEW LONDON - ANNUAL DQUG5D:UG FAILED EQUIPMENT DANIELSON -ANNU | UNDERGROUND FAILED EQUIPMENT DANIELSON -ANNUAL Emergent Equipment Failures - Substation EMERGENT EQUIPMENT FAILURES - SUBSTATION-L4 CS00709:Enfield 12C Failed Transformer | This project is for the emergent replacement of the 12C-2X transformer and associated equipment at Enfield 12C Substation in Enfield, CT DSEQ26:2026 CT D SS Emergent Annual | This annual is for the replacement or removal of broken or failed equipment not identified specifically during the budget cycle but are identified through monitoring the system throughout the year. Work materializes due to inspections, system events, etc. FREQPFSS:FORECAST PROJ FOR SS FAILED TRANSFO | PROJECT FOR SUBSTATION FAILED EQUIPMENT Environmental ENVIRONMENTAL - SUBSTATION CS00245:S Meadow 1A - Replace OCB's | South Meadow 1A - Replace 38 Oil Circuit Breakers with vacuum breakers. CS00422:NW Hartford Bus Rehab Rel. Ph2 | This project is the second phase of bus rehabilitation at the Northwest Hartford 2N distribution substation located in Hartford, CT to replace aging reactors and switches.
  3. Part 57 of 77

    FRENVISS:FORECAST PROJ FOR ENVIRON SS | FORECAST PROJECT FOR SUBSTATION ENVIRONMENTAL PROJECTS PCB TRANSFORMER REPLACEMENT PRGRM 102118:PCB TRANSFORMER REPL PROGRAM | This program funds the replacement of transformers that have a high content of polychlorinated biphenyls (PCBs). PCBs are harmful to humans and the environment. If a transformer with PCBs leaks, or spills for any reason (car accident, etc) then the PCBs can enter the environment and cause damage. PCBs were used in transformers as an insulating means but have been phased out due to their health and environmental risks. This project pertains to high volume work orders not to exceed $500K and covers the entire state of CT. Capital work orders initiated against this annual project must include total costs less than or equal to $500K. Any work order exceeding $500K will require a separate Project Authorization Form (PAF) and Delegation of Authority (DOA) approval. Insurance Claim/Keep Cost INSURANCE CLAIM/KEEP COST-L4 FRINS9A:PROJECTION PROJECT FOR 9A INSURANCE | PROJECTION PROJECT FOR 9A INSURANCE CLAIMS INSDB2M:DB INSURANCE CLAIM CHESHIRE/N.B. AN | DIRECT BURIED INSURANCE CLAIM CHESHIRE/N.B. ANNUAL INSDB3H:DB INSURANCE CLAIM HARTFORD ANNUAL | DIRECT BURIED INSURANCE CLAIM HARTFORD ANNUAL INSDB4D:DB INSURANCE CLAIM MADISON ANNUAL | DIRECT BURIED INSURANCE CLAIM MADISON ANNUAL INSDB4M:DB INSURANCE CLAIM E HAMPTON ANNUA | DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL INSDB4N:DB INSURANCE CLAIM NEW LONDON ANNUA | DIRECT BURIEDINSURANCE CLAIM NEW LONDON ANNUAL INSDB5D:DB INSURANCE CLAIM DANIELSON ANNUAL | DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL INSDB5W:DB INSURANCE CLAIM DANIELSON ANNU | DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL INSOH1B:OH INSURANCE CLAIM NEWTOWN-ANNUAL | DIRECT BURIED INSURANCE CLAIM NEWTOWN ANNUAL INSOH1N:OH INSURANCE CLAIM NORWALK-ANNUAL | OVERHEAD INSURANCE CLAIM NORWALK-ANNUAL INSOH1S:OH INSURANCE CLAIM STAMFORD-ANNUAL | OVERHEAD INSURANCE CLAIM STAMFORD-ANNUAL INSOH2L:INS CLAIM TORR-ANNUAL | OVERHEAD INSURANCE CLAIM TORRINGTON-ANNUAL INSOH2M:INS CLAIM CHES/NB-ANNUAL | OVERHEAD INSURANCE CLAIM CHESHIRE-ANNUAL INSOH2W:INS CLAIMWTBY-ANNUAL | OVERHEAD INSURANCE CLAIM TORRINGTON-ANNUAL INSOH3H:OH INSURANCE CLAIM HARTFORD ANNUAL | OVERHEAD INSURANCE CLAIM HARTFORD-ANNUAL INSOH4D:OH INSURANCE CLAIM MADISON - ANNUAL | OVERHEAD INSURANCE CLAIM MADISON - ANNUAL INSOH4M:OH INSURANCE CLAIM MIDDLETOWN - ANN | OVERHEAD INSURANCE CLAIM MIDDLETOWN-ANNUAL INSOH4N:OH INSURANCE CLAIM NEW LONDON - ANN | OVERHEAD INSURANCE CLAIM NEW LONDON-ANNUAL INSOH5D:OH INSURANCE CLAIM DANIELSON-ANNUAL | OVERHEAD INSURANCE CLAIM DANIELSON-ANNUAL INSOH5T:OH INSURANCE CLAIM TOLLAND ANNUAL | OVERHEAD INSURANCE CLAIM TOLLAND-ANNUAL INSOH5W:OH INSURANCE CLAIM DANIELSON-ANNU | OVERHEAD INSURANCE CLAIM DANIELSON-ANNUAL INSUG4D:UG INSURANCE CLAIM MADISON - ANNUAL | UNDERGROUND INSURANCE CLAIM MADISON-ANNUAL INSUG4M:UG INSURANCE CLAIM E Hampton- ANN | UNDERGROUND INSURANCE CLAIM EAST HAMPTON-ANNUAL INSUG4N:UG INSURANCE CLAIM NEW LONDON - ANN | UNDERGROUND INSURANCE CLAIM NEW LONDON-ANNUAL INSUG5D:UG INSURANCE CLAIM DANIELSON-ANNUAL | UNDERGROUND INSURANCE CLAIM DANIELSON-ANNUAL Lighting NON ROADWAY LIGHTING - DA ANNUAL DA3L:NON-ROADWAY LIGHTING CT | NON-ROADWAY LIGHTING REPAIRS ROADWAY LIGHTING - D7 ANNUAL D73L:ROADAY LIGHTING CT | REPAIR ROADWAY LIGHTING FRD7:PROJECTION PROJECT D7 ROADWAY LIGHT | PROJECTION PROJECT D7 ROADWAY LIGHTING Line Relocations/Act of Public Authority LINE RELOCATIONS-DH ANNUAL DH1B:LINE RELOCATIONS NEWTOWN | LINE RELOCATIONS ANNUAL NEWTOWN DH1N:LINE RELOCATIONS NORWALK | LINE RELOCATIONS ANNUAL NORWALK DH1S:LINE RELOCATIONS STAMFORD | LINE RELOCATIONS ANNUAL STAMFORD DH2L:LINE RELOCATIONS TORR CLP | LINE RELOCATIONS ANNUAL TORRINGTON DH2M:LINE RELOCATIONS CHESHIRE/N.B. | LINE RELOCATIONS ANNUAL CHESHIRE/NEW BRITAIN DH2W:LINE RELOCATIONS WATERBURY | LINE RELOCATIONS ANNUAL WATERBURY
  4. Part 58 of 77

    DH3H:LINE RELOCATIONS HARTFORD | LINE RELOCATIONS ANNUAL HARTFORD DH4D:LINE RELOCATIONS MADISON | LINE RELOCATIONS ANNUAL MADISON DH4M:LINE RELOCATIONS E Hampton | LINE RELOCATIONS ANNUAL EAST HAMPTON DH4N:LINE RELOCATIONS N LONDON | LINE RELOCATIONS ANNUAL NEW LONDON DH5D:LINE RELOCATIONS DANIELSON | LINE RELOCATIONS ANNUAL DANIELSON DH5T:LINE RELOCATIONS TOLLAND | LINE RELOCATIONS ANNUAL TOLLAND FRDH:PROJECTION PROJECT FOR DH ANNUAL | PROJECTION PROJECT FOR LINE RELOCATIONS LINE RELOCATIONS/ACT OF PUBLIC AUTHORITY-L4 CD01603:CDOT 80-128 I-84 Ex17 Line Relocati | This project is being established to cover the costs associated with relocation of electric facilities in conflict with state highway project 80-128 in the town of Middlebury, CT. The scope includes relocation of the Bunker Hill 12B33 backbone with 3,125’ of 3 phase 556 TW, to be routed onto a new road, Chase Parkway Extension, to be built as part of the state highway project. The project also includes several small laterals with 1 # 1/0 TW totaling 1,600’. CD02453:Replace Center St Bridge, Meriden | This project is a line relocation for a bridge replacement on Center St, Meriden and to replace the PMH5 pair maual switch gear with an ISG auto pair. CD02495:CDOT #320-008 Windsor Locks RR | This project is for the relocation of electrical facilities along Main St in Windsor Locks to the opposite side of Rt 159 to accommodate for the expansion of the railroad facilities along the state road. The railroad is adding another track in its ROW and has requested Eversource to relocate its facilities to the opposite side of the road to allow for adequate clearances from the railroad facilities. Eversource will relocate the 14K6 circuit from the east side of Rt 159 to the west side of the road by rebuilding approximately 3,600 ft of circuit backbone with 477 TW. One manhole outside of Windsor locks 14K substation will need to be relocated due to the proximity with the proposed railroad track. This will affect the 14K6 and 14K9 getaway cables and associated riser poles. CD02503:Chestnut Hill Rd Reconstruction | The town of Oxford is realigning Chestnut Tree Hill Road both horizontally and vertically with a full depth reconstruction with an average depth of 20” within the roadway area and additional excavation along the shoulder area for approximately 1.5 miles from the intersection of Chestnut Tree Hill Road Ext to Route 67. Due to road widening, a double circuit pole line, the 11N85 and 11N88 out of Beacon Falls 11N Substation, will need to be relocated along the affected roadway. CD02650:CTDOT 34-324 | Project CD02650 was established to address the relocation request of Eversource underground (UG) and overhead (OH) facilities by the city of Danbury. This CTDOT project involves improving traffic conditions on the roadway as well as upgrading the stormwater drainage system along Lee Mac Ave, Shelter Rock Rd, South St, and Coalpit Hill Rd. The following Triangle 11A circuits will have sections relocated in order to accomplish this request: 11A50, 11A54, 11A71, and 11A77. FRSPRELC:FORECAST PROJECTS FOR SPEC PROJ REL | FORECAST PROJECT FOR SPECIFIC PROJECTS FOR RELOCATION THIRD PARTY ATTACHMENTS 495802:Third Party Attachment Make Ready | THIS PROJECT TRACKS THE MAKE READY COSTS FOR THE FIBERTECH COMPANIES TO ATTACH THEIR CABLE TO OUR POLES. Meters - Electric METERS - ELECTRIC-L4 CTMTR26:CT Annual Meter Project for 2026 | This project is for the purchase of electric meters in Connecticut for 2026. The overall meter capital program is designed to provide accurate, reliabile, and cost effective metering plant operation. Pre-Cap Line Transformers PRE-CAP LINE TRANSFORMERS-L4 DT7C:TRANSFORMERS CL&P | This project is for the purchase and capitalization of distribution transformers. New Customer-ED Customer Driven COMPLEX SERVICE-DN ANNUAL DN1B:NEW/EXISTING CUSTMRS NEWTOWN | NEW/EXISTING CUSTOMERS ANNUAL NEWTOWN
  5. Part 59 of 77

    DN1N:NEW/EXISTING CUSTMRS NORWALK | NEW/EXISTING CUSTOMERS ANNUAL NORWALK DN1S:NEW/EXISTING CUSTMRS STAMFORD | NEW/EXISTING CUSTOMERS ANNUAL STAMFORD DN2L:NEW/EXISTING CUSTMRS TORR CLP | NEW/EXISTING CUSTOMERS ANNUAL TORRINGTON DN2M:NEW/EXISTING CUSTMRS CHESHIRE/N.B. | NEW/EXISTING CUSTOMERS ANNUAL CHESHIRE/NEW BRITAIN DN2W:NEW/EXISTING CUSTMRS WATERBURY | NEW/EXISTING CUSTOMERS ANNUAL WATERBURY DN3H:NEW/EXISTING CUSTMRS HARTFORD | NEW/EXISTING CUSTOMERS ANNUAL HARTFORD DN4D:NEW/EXISTING CUSTMRS MADISON | NEW/EXISTING CUSTOMERS ANNUAL MADISON DN4M:NEW/EXISTING CUSTMRS E HAMPTON | NEW/EXISTING CUSTOMERS ANNUAL EAST HAMPTON DN4N:NEW/EXISTING CUSTMRS N LONDON | NEW/EXISTING CUSTOMERS ANNUAL NEW LONDON DN5D:NEW/EXISTING CUSTMRS DANIELSON | NEW/EXISTING CUSTOMERS ANNUAL DANIELSON DN5T:NEW/EXISTING CUSTMRS TOLLAND | NEW/EXISTING CUSTOMERS ANNUAL TOLLAND DN5W:NEW/EXISTING CUSTMRS DANIELSON | NEW/EXISTING CUSTOMERS ANNUAL DANIELSON FRDN:Forecast Project Complex Services | NEW/EXISTING CUSTOMERS ANNUAL CUSTOMER DRIVEN-L4 PT4D:TEMPORARY WORK - MADISON | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES MADISON PT4M:TEMPORARY WORK - E HAMPTON (HELCO) | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES EAST HAMPTON PT4N:TEMPORARY WORK - NEW LONDON (HELCO) | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES NEW LONDON PT5D:TEMPORARY WORK - DANIELSON | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES DANIELSON PT5W:TEMPORARY WORK - DANIELSON | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES DANIELSON PW2M:PRIVATE WORK - CHESHIRE | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES CHESHIRE PW3H:PRIVATE WORK - HARTFORD | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES HARTFORD PW4D:PRIVATE WORK - MADISON | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES MADISON PW4M:PRIVATE WORK - MIDDLETOWN (HELCO) | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES MIDDLETOWN PW4N:PRIVATE WORK - NEW LONDON (HELCO) | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES NEW LONDON PW5D:PRIVATE WORK - DANIELSON | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES DANIELSON PW5T:PRIVATE WORK - TOLLAND | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES TOLLAND SIMPLE SERVICE-DV ANNUAL DV2M:SERVICES CHESHIRE/N.B. | SIMPLE SERVICES ANNUAL CHESHIRE/NEW BRITAIN DV3H:SERVICES HARTFORD | SIMPLE SERVICES ANNUAL HARTFORD DV4M:SERVICES MIDDLETOWN | SIMPLE SERVICES ANNUAL MIDDLETOWN DV4N:SERVICES NEW LONDON | SIMPLE SERVICES ANNUAL NEW LONDON DV5T:SERVICES TOLLAND | SIMPLE SERVICES ANNUAL TOLLAND DV5W:SERVICES DANIELSON | SIMPLE SERVICES ANNUAL DANIELSON SPECIFIC PROJECTS-NEW SRVCE
  6. Part 60 of 77

    CD00454:Hartford Hospital - Construct New S | The main campus at Hartford Hospital is supplied by a customer owned substation (Substation 1) located on Retreat Avenue near the intersection of Maple Avenue. The substation is located inside a two-story brick building. The top floor of the building contains Eversource equipment consisting of two 23 KV primary feeders (109, 151), two ceiling mounted disconnect switches, and two 23 KV - 11 KV, 10/12.5 MVA auto transformers. The first floor of the building contains Hartford Hospital equipment consisting of double-ended 11 KV bus with a normally closed bus tie breaker (such that the 109 and 151 feeders operate in parallel). Other buildings throughout the main campus are supplied by the Hartford Hospital 11 KV distribution feeders. Two of these feeders are stepped down to 4.16 KV to supply a Co-generation facility on campus. Campus peak demand is estimated at 11 MVA and co-gen capability is estimated at 8 MVA.Hartford Hospital is proposing to construct a new Substation 1. Previously, the plan was to demolish the existing Hall Wilson Lab building located adjacent to the existing substation and construct a new substation on the vacated site. However, the Hartford City Government prevented the demolition of that building forcing a redesign of the upgrade in 2021. Hartford Hospital plans to replace the two existing 10/12.5 MVA auto transformers with two 15 MVA auto transformers to support future load growth on campus. The land in front of the utility building where the new transformers will be located will be the future site of both Hartford Hospital’s and Eversource’s switch gear and metering. This project proposes to install ISG switchgear and primary metering cabinets to supply the new substation, and to remove all Eversource owned equipment (feeder cables, switches, and transformers) associated with the existing substation. CD00818:Relocate Meriden Record Journal Sw. | Meriden is redeveloping the Meriden Record Journal site to a mixed use of commercial/retail/residential. As part of the redevelopment, the customer has requested that the existing 315D PMH-5 automatic switchgear pair be relocated. As part of the relocation, Eversource will upgrade the switchgear to an ISG 4-way auto pair to provide service to the new development and allow for additional underground loops to supply future development in the area. CD00992:New Road in Bristol, Relocate and S | The project relocates the four circuits in the duct bank located on private property to the proposed new underground structures on the new road and in the underground structures on Riverside Avenue. We are requesting the City to install 12-conduit duct bank structure in the new road. With this number of conduits, Eversource can supply the new customer load and relocate two of the four circuits out of the private property duct bank. These same circuits would supply the proposed switchgear, which will supply the new customers off the new road. CD01506:New Service – 210 Long Ridge Rd 111 | A customer will be constructing a new development at 210 Long Ridge Rd in Stamford, CT. The project will consist of a 4-story assisted living facility with 200 individual residential units and a partial garage on the lower level. To serve this load, the customer has requested 4 separate 3000 Amp services at 120/208V. This project will provide electrical service to the new customer by using a set of PME-9/12 switchgears fed from the Cedar Heights 4R17 and 4R14 circuits.
  7. Part 61 of 77

    CD01591:Corbin Drive - Darien - New Service | This project is upgrading the 13S5 feeder in Darien and providing service to a new development that is being constructed in the first zone of the feeder. The circuit upgrade is necessary because the added load will cause an overload on the feeder. The new service project consists of 10 3-story and 1 5-story mixed-use buildings and 3 basement level garages. There will be a combination of office, restaurant, and retail spaces on the ground floor and apartments on the 2nd and 3rd floors. One building will consist of 4 townhouses only. The new service will be developed in two phases. Phase 1 will include 3 buildings and Phase 2 will include 7 buildings. Service will be provided using riser to pad scheme. CD01935:Hiawatha Village Westport | Hiawatha Lane in Westport CT is a residential area that houses approximately 10 customers. However, beyond this road is a residential complex (Avalon) that has more than 265 residents, also the former Cervalis property. These properties are served by Eversource from the Compo 23K17 feeder and the Norwalk 9S26 feeder.The purpose of this project is to accommodate a new 150-unit luxury housing complex that will eliminate the existing 10 houses currently on Hiawatha Lane. CD02065:100 Clinton Ave - New Services | 100 Clinton Ave is a new residential development in Stamford, Ct. The new development consists of 2 buildings – Block A and Block B. There will have in total of 471 residential apartments, EV charging stations and parking facilities. The estimated new load is 1.8 MW. Eversource may need to upgrade its facilities to serve the customer. CD02265:Brainerd Place New Service | Brainerd Place is a new commercial/ residential development in Portland, CT. It is located at the corner of Main Street and Marlborough Road in Portland. The new development will have 25 commercial areas and 362 residential apartments. The expected new load is 3.8 MW. CD02339:CT Transit-26 Elm Ct-New Service | Eversource is required to provide service to customers in its territory upon request. Based on a new load request of 6.5 MVA from CT Transit for EV bus charging stations, Eversource may need to upgrade its facilities to serve the customer. CD02346:35 Bacon Rd, Enfield NS | Project CD02346 – 35 Bacon Rd, Enfield New Service was established to cover the costs associated with supplying a new service to the customer. A new 820,000 ft warehouse is being constructed at 35 Bacon Rd, Enfield. The facility will be primary metered and placed in an existing radial primary feed. An additional riser will be constructed beyond the primary meter to create a looped supply. An estimated 4,700 ft of 4/0 Al cable to be installed by Eversource after the customer constructs the infrastructure. Work will consist of installing primary cable and a new loop supplying the new primary meter connected to the 2 existing transformers. CD02383:7A79 – Newfield Street – New Servic | Newfield Street is a new residential development in Middletown, CT. It is located on Newfield Street, across from Congdon Street in Middletown. The new development will have 488 residential apartments. The expected new load is 1.7 MW. CD02423:XL Center Service Upgrade | Project CD02423 – XL Center Service Upgrade – is established to provide additional power to this existing customer. The new load is projected at 3MVA. CD02437:Colony St, Meriden Mixed Use Dev | A developer is rehabbing five existing mixed use buildings on Colony St, Meriden. The buildings will have apartments on upper floors and retail at street level. The buildings are currently fed by the N194 network in Meriden._x000D__x000D_ _x000D__x000D_ The buildings will be all electric for heating, cooling, water heating and cooking. Heating will be a combination of heat pumps and resistance elements. _x000D__x000D_
  8. Part 62 of 77

    CD02462:Tilcon NS on Black Rock 11H Sub | Tilcon at Loon Lake Road in Plainville is requesting a new 5 MVA service. They are requesting a primary meter service with one connection point. CD02497:New Service Uline Plainfield | Uline J6 is a new commercial warehouse building located on Plainfield Pike, Plainfield, CT. The current construction design has projected a new load of 2679kW, or 71 Amps, which will be added to circuits 13B10 and 13B21 out of Frybrook 13B substation. Without system upgrades, the existing 13B10 and 13B21 circuits in the area do not have the capacity to support this commercial warehouse. CD02505:Tomasso Loon Lake Rd Plainville NS | Tomasso has purchased 95 areas off Look Lake Road in Plainville. Their plan is to install approximately six buildings for a total estimated load of 21 MVA. CD02522:6A3 New Load Berlin Tpke | A large mixed use development is being built on the Berlin Tpke on the 6A3._x000D__x000D_ Developer provided loads are as follows: club house (110 kVA), hotel or bank (230 kVA), retail (125 kVA), and five apartment buildings (591 kVA each). The total load is 3,420 kVA._x000D__x000D_ The first phase includes the club house (110kVA) and two apartment buildings (591kVA each). _x000D__x000D_ CD02528:74 Broad St– New Service | A new customer will be constructing a new 8-story residential/commercial building at 74 Broad St, Stamford, CT. The building will consist of 280 residential apartment units. Spaces for parking garage, amenities, restaurant will be located throughout the footprint of the building. The total area of the building is 435,269 sf.To serve the building load the customer is requesting a total of (4) 3,000A 120/208V residential services for the base building loads and commercial spaces. The customer’s load letter estimates their demand to be 3.3 MVA.Eversource is required to provide service to customers in its territory upon request and may need to upgrade/extend its facilities to serve the customer. CD02572:Amazon Distribution Warehouse Wtbry | This project is being established to cover the costs associated with providing service to the new proposed Amazon Distribution Warehouse which will be located in the city of Waterbury. The preliminary anticipated load is estimated to be about 9.6 MW. CD02573:Refeed 490 Capital Ave, Hartford | Project CD02573 is established to provide a new Distribution service to the customer, Capital District Energy Commission (CDEC). Currently, CDEC is connected to the Transmission System, but Eversource Transmission project 144531 removes the supply to the customer with a completion date of Q4 2026. This project will determine the distribution design for supplying this customer. CD02614:1700 Asylum Ave Apts NS | Project CD02614 – 1700 Asylum Ave Apartments - is established to provide power to a new customer. This customer has a projected load of 3.76MVA. CD02648:1679 King St, Enfield NS | This project is being established account for the costs associated with a new service. A 420,000 ft2 warehouse is being constructed at 1679 King St, Enfield with cold storage, automation, and robotics for an estimated 8.6 MVA load. The existing electrical facilities along King St do not have the capacity to serve this size load. Also, due to the size of the projected load, 2 circuits will be required to supply the facility. CD02667:Nordic Spa Portland CT | Project CD02667 was established to address a Nordic Spa new service coming on the 21H15 circuit in Portland CT. CD02682:11H77 Contingency Overload NS | The purpose of the project is to address the circuit overload which occurs during contingency with the 7L90 circuit in New Britain. The 11H77 circuit feeds 2,574 customers out of the Blackrock substation in New Britain. During contingency with the 7L90 circuit, the 11H77 circuit picks up the 7L90-72S Zone through the 7L90-92T. This brings the normal rating of the 11H77 circuit to 121% and emergency rating to 87%.
  9. Part 63 of 77

    CD02721:25 Holy Dr, Newington NS | This project is for a 10 MVA new service. The site is currently supplied by the 4A1 circuit. The 10 MVA load will be supplied by switch gear, fed by the 4A1 and 4A11 from the Newington 4A substation. Both circuits can now supply 5 MVA, but neither can back up the other in contingency. CD02747:1499 Silas Deane Hwy, Rocky Hill NS | CD02747 is created to provide power to an Electric Vehicle (EV) charging station, at 1499 Silas Deane Hwy in Rocky Hill, CT on the 3R03 circuit. The 3R03 circuit does not have capacity to support the requested 2,700 KVA load addition. CD02755:Install New Service & Repl. Swgr | Project CD02755 has been established to address new service to two rehabilitated office buildings in Norwalk. These offices 201 and 101 Merritt 7 will be converted to residential buildings consisting of 150 units in each building for a total of 300 new residential customers. FRNEWSVC:FORECAST PROJECT FOR NEW SERVICE | FORECAST PROJECT FOR BUDGETING NEW SERVICE Distributed Generation DISTRIBUTED GENERATION-L4 CD02167:Endurant, N.Colony Rd, Meriden | This project was established for Endurant Meriden, which is in the Central Division, in the Cheshire AWC, in the town of Meriden.Endurant Meriden is proposing a 4.9 MW battery energy storage system (BESS) at 508A N Colony Road, Meriden CT which is currently fed from the Hanover St 12F44 feeder. This BESS will adhere to a charging schedule to prevent exceeding the thermal limits of any conductors on the Eversource distribution system. A distribution impact study determined that the proposed battery has no negative impact on voltage or thermal violations on the distribution system if the battery adheres to the charge and discharge limits. Peak Load / Capacity-ED Distribution Line Capacity OVERLOADS-SPECIFIC PROJECTS CD01451:Ridgefield 22N Contingency Overload | This project has been established to address the contingency overloads on several circuits at the Ridgefield 22N S/S. This proposal involves the 22N2, 22N3, 22N4 & 22N5 circuits. Substation Project CS00637 was established to create two additional breaker positions at Ridgefield to help alleviate the current overloads at Ridgefield 22N.The 22N2 feeds 1679 customers in the Ridgefield area. The circuit has a peak load of 250A and a summer normal rating of 450A. The 22N2 exceeds it summer normal rating for a 22N A2 bus fault in which the 22N4 & 22N5 loses power and the 22N2 picks up some of their load. The 22N2-2 zone has 815 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3 feeds 1,992 customers in the Ridgefield/Wilton area. The circuit has a peak load of 422A and a summer normal rating of 490A. This puts the 22N3 at 86% of normal load. The 22N3 exceeds it summer normal rating for the contingent loss of the 22N4 or the 22N7. The 22N3-2 zone has 698 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3-91T loop scheme is currently disabled during summer peak periods to guard against overloading the circuit. The 22N4 feeds 1,900 customers in the Ridgefield area. The circuit is currently overloaded with a peak load of 378A and a summer normal rating of 423A. This puts the 22N4 at 89% of normal load and exceeds the 80% of UG summer normal criteria. Project CD01558 was created to resolve the UG issues for the 22N4 and 22N1. The portion of the project to replace 750 AL UG cable between MH#10 and riser pole# 550-23 was halted due to leaking transformers and deteriorated structure in Vault#9. Project CD01810 was created to replace the leaking transformers with a UTC, replace the deteriorated structure and replace the remaining 22N4 cable with 1000 CU. CD02381:Convert 15L46 to 23kV & getaway wor | Bokum 15L is being converted from 27.6kV to 23kv and adding more capacity.
  10. Part 64 of 77

    CD02440:14R31 ROW Rebuild | CD02440 seeks to address reliability issues and aging infrastructure on the 14R31 ROW near Goshen, CT. The 14R31 circuit is responsible for feeding the 33M1, 33M2, 37J1, & 42J1 circuits, which when combined, serve over 3,100 customers. The identified portion of the 14R31 ROW is comprised of roughly 39,000’ of 3-ph 1/0 ACSR conductor. The identified segment includes 152 poles with an average age of 45 years. The 14R31 ROW has experienced 4 reliability related outages in the last 4 years and has seen multiple instances where the segment of 1/0 ACSR was burnt down due to overload under contingency. CD02459:Bokum 15L12, 15L68, 15L69 23kv geta | Bokum 15L substation is going through an expansion to increase capacity. The station voltage is now 27.6 kV, and this project will convert the voltage to 23 kV. The two existing transformers, 15L-1X and 15L-2X, will be replaced with 62.5 MVA transformers, a third 62.5 MVA transformer (15L-3X) will be added to the bus. All 3 transformers will be 115 kV to 23 kV._x000D__x000D_ The new 15L-3X transformer is on site as well as the 23 kV switchgear, the plan is to energize the new 15L- 3X transformer and build a new duct bank for the 15L12 and 15L68 across Bokum Road and connect the 15L12, 15L68, and 15L69 circuits to their new breaker positions._x000D__x000D_ 15L12 currently comes out of the station at 27.6 kV and gets stepped down to 23 kV through two sets of 3,000 kVA poletop autos on Essex Road. The 15L12 out of the station will be converted to 23 kV and the two sets of 3,000 kVA autos will be removed. The existing getaway cable is 3-1/C 750 kcmil Cu cable in three 3-inch ducts. This cable will be replaced with 1000 kcmil Cu cable._x000D__x000D_ The 15L68 is stepped down from 27.6 kV to 23 kV through a 29 MVA auto inside the station and bifurcates east and north. The 15L68 going east over the Connecticut River to the New London District will remain the 15L68. The 15L68 going north to Deep River will become the 15L69. There is no work required outside the fence on the 15L68 circuit other than replacing the parallel 500 kcmil Cu getaway cable going east with 1000 kcmil Cu. _x000D__x000D_ The Bokum 15L substation is in the Madison Area Work Center in the Eastern Region._x000D__x000D_ CD02470:28M1 Contingent Overload | CD02470 seeks to address a contingent overload within the 28M1-2 zone when supporting the 11A53-70S zone. The 28M1 is fed out of Middle River 28M sub in Danbury CT. The 28M1-2 zone is comprised entirely of 336 AAC T.W. beginning at P#1172 and extends until the 28M1-50Z on P#372. The 336 AAC T.W. serves as the primary limiting factor with a normal limit of 460A and an emergency rating of 520A. Under contingency with the 28M1 picking up the 11A53-70S zone, the 28M1-2 reaches 104% of its normal limit. CD02473:11A55 Contingency Overload | This project was created to address a contingency overload created on the 11A55 breaker zone when recovering the 11A51-70S zone. The 11A55 is fed out of the Triangle 11A substation in Danbury, CT. The existing limiting factor is the 500 CU PILC, from MH 2 to riser pole 8491 on Federal Rd, Danbury, CT. This project will investigate solutions to either redistribute load or increase the existing load limit for this zone. CD02513:Uncasville 1Q01 Getaway Overload Pr | The purpose of this project is to prevent a contingency overload on the Uncasville 1Q01 feeder. The contingency overload is caused by a 3.7 MVA load swap between the Williams Street 9L09 feeder and the Uncasville 1Q01 feeder that was requested by Substation Engineering to relieve a capacity issue at Williams 9L substation. This overload will occur on the 1Q01 getaway cable and the downstream OH conductors up to a bifurcation point while picking up the 1Q6 during contingency.

As listed on the current system

Supplement for New App [Filed: 11/18/2026]

This filing on the current system (opens in a new tab)