Application supplement
Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 58 of 77
DH3H:LINE RELOCATIONS HARTFORD | LINE RELOCATIONS ANNUAL HARTFORD DH4D:LINE RELOCATIONS MADISON | LINE RELOCATIONS ANNUAL MADISON DH4M:LINE RELOCATIONS E Hampton | LINE RELOCATIONS ANNUAL EAST HAMPTON DH4N:LINE RELOCATIONS N LONDON | LINE RELOCATIONS ANNUAL NEW LONDON DH5D:LINE RELOCATIONS DANIELSON | LINE RELOCATIONS ANNUAL DANIELSON DH5T:LINE RELOCATIONS TOLLAND | LINE RELOCATIONS ANNUAL TOLLAND FRDH:PROJECTION PROJECT FOR DH ANNUAL | PROJECTION PROJECT FOR LINE RELOCATIONS LINE RELOCATIONS/ACT OF PUBLIC AUTHORITY-L4 CD01603:CDOT 80-128 I-84 Ex17 Line Relocati | This project is being established to cover the costs associated with relocation of electric facilities in conflict with state highway project 80-128 in the town of Middlebury, CT. The scope includes relocation of the Bunker Hill 12B33 backbone with 3,125’ of 3 phase 556 TW, to be routed onto a new road, Chase Parkway Extension, to be built as part of the state highway project. The project also includes several small laterals with 1 # 1/0 TW totaling 1,600’. CD02453:Replace Center St Bridge, Meriden | This project is a line relocation for a bridge replacement on Center St, Meriden and to replace the PMH5 pair maual switch gear with an ISG auto pair. CD02495:CDOT #320-008 Windsor Locks RR | This project is for the relocation of electrical facilities along Main St in Windsor Locks to the opposite side of Rt 159 to accommodate for the expansion of the railroad facilities along the state road. The railroad is adding another track in its ROW and has requested Eversource to relocate its facilities to the opposite side of the road to allow for adequate clearances from the railroad facilities. Eversource will relocate the 14K6 circuit from the east side of Rt 159 to the west side of the road by rebuilding approximately 3,600 ft of circuit backbone with 477 TW. One manhole outside of Windsor locks 14K substation will need to be relocated due to the proximity with the proposed railroad track. This will affect the 14K6 and 14K9 getaway cables and associated riser poles. CD02503:Chestnut Hill Rd Reconstruction | The town of Oxford is realigning Chestnut Tree Hill Road both horizontally and vertically with a full depth reconstruction with an average depth of 20” within the roadway area and additional excavation along the shoulder area for approximately 1.5 miles from the intersection of Chestnut Tree Hill Road Ext to Route 67. Due to road widening, a double circuit pole line, the 11N85 and 11N88 out of Beacon Falls 11N Substation, will need to be relocated along the affected roadway. CD02650:CTDOT 34-324 | Project CD02650 was established to address the relocation request of Eversource underground (UG) and overhead (OH) facilities by the city of Danbury. This CTDOT project involves improving traffic conditions on the roadway as well as upgrading the stormwater drainage system along Lee Mac Ave, Shelter Rock Rd, South St, and Coalpit Hill Rd. The following Triangle 11A circuits will have sections relocated in order to accomplish this request: 11A50, 11A54, 11A71, and 11A77. FRSPRELC:FORECAST PROJECTS FOR SPEC PROJ REL | FORECAST PROJECT FOR SPECIFIC PROJECTS FOR RELOCATION THIRD PARTY ATTACHMENTS 495802:Third Party Attachment Make Ready | THIS PROJECT TRACKS THE MAKE READY COSTS FOR THE FIBERTECH COMPANIES TO ATTACH THEIR CABLE TO OUR POLES. Meters - Electric METERS - ELECTRIC-L4 CTMTR26:CT Annual Meter Project for 2026 | This project is for the purchase of electric meters in Connecticut for 2026. The overall meter capital program is designed to provide accurate, reliabile, and cost effective metering plant operation. Pre-Cap Line Transformers PRE-CAP LINE TRANSFORMERS-L4 DT7C:TRANSFORMERS CL&P | This project is for the purchase and capitalization of distribution transformers. New Customer-ED Customer Driven COMPLEX SERVICE-DN ANNUAL DN1B:NEW/EXISTING CUSTMRS NEWTOWN | NEW/EXISTING CUSTOMERS ANNUAL NEWTOWNPart 59 of 77
DN1N:NEW/EXISTING CUSTMRS NORWALK | NEW/EXISTING CUSTOMERS ANNUAL NORWALK DN1S:NEW/EXISTING CUSTMRS STAMFORD | NEW/EXISTING CUSTOMERS ANNUAL STAMFORD DN2L:NEW/EXISTING CUSTMRS TORR CLP | NEW/EXISTING CUSTOMERS ANNUAL TORRINGTON DN2M:NEW/EXISTING CUSTMRS CHESHIRE/N.B. | NEW/EXISTING CUSTOMERS ANNUAL CHESHIRE/NEW BRITAIN DN2W:NEW/EXISTING CUSTMRS WATERBURY | NEW/EXISTING CUSTOMERS ANNUAL WATERBURY DN3H:NEW/EXISTING CUSTMRS HARTFORD | NEW/EXISTING CUSTOMERS ANNUAL HARTFORD DN4D:NEW/EXISTING CUSTMRS MADISON | NEW/EXISTING CUSTOMERS ANNUAL MADISON DN4M:NEW/EXISTING CUSTMRS E HAMPTON | NEW/EXISTING CUSTOMERS ANNUAL EAST HAMPTON DN4N:NEW/EXISTING CUSTMRS N LONDON | NEW/EXISTING CUSTOMERS ANNUAL NEW LONDON DN5D:NEW/EXISTING CUSTMRS DANIELSON | NEW/EXISTING CUSTOMERS ANNUAL DANIELSON DN5T:NEW/EXISTING CUSTMRS TOLLAND | NEW/EXISTING CUSTOMERS ANNUAL TOLLAND DN5W:NEW/EXISTING CUSTMRS DANIELSON | NEW/EXISTING CUSTOMERS ANNUAL DANIELSON FRDN:Forecast Project Complex Services | NEW/EXISTING CUSTOMERS ANNUAL CUSTOMER DRIVEN-L4 PT4D:TEMPORARY WORK - MADISON | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES MADISON PT4M:TEMPORARY WORK - E HAMPTON (HELCO) | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES EAST HAMPTON PT4N:TEMPORARY WORK - NEW LONDON (HELCO) | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES NEW LONDON PT5D:TEMPORARY WORK - DANIELSON | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES DANIELSON PT5W:TEMPORARY WORK - DANIELSON | ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES DANIELSON PW2M:PRIVATE WORK - CHESHIRE | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES CHESHIRE PW3H:PRIVATE WORK - HARTFORD | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES HARTFORD PW4D:PRIVATE WORK - MADISON | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES MADISON PW4M:PRIVATE WORK - MIDDLETOWN (HELCO) | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES MIDDLETOWN PW4N:PRIVATE WORK - NEW LONDON (HELCO) | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES NEW LONDON PW5D:PRIVATE WORK - DANIELSON | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES DANIELSON PW5T:PRIVATE WORK - TOLLAND | ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES TOLLAND SIMPLE SERVICE-DV ANNUAL DV2M:SERVICES CHESHIRE/N.B. | SIMPLE SERVICES ANNUAL CHESHIRE/NEW BRITAIN DV3H:SERVICES HARTFORD | SIMPLE SERVICES ANNUAL HARTFORD DV4M:SERVICES MIDDLETOWN | SIMPLE SERVICES ANNUAL MIDDLETOWN DV4N:SERVICES NEW LONDON | SIMPLE SERVICES ANNUAL NEW LONDON DV5T:SERVICES TOLLAND | SIMPLE SERVICES ANNUAL TOLLAND DV5W:SERVICES DANIELSON | SIMPLE SERVICES ANNUAL DANIELSON SPECIFIC PROJECTS-NEW SRVCEPart 60 of 77
CD00454:Hartford Hospital - Construct New S | The main campus at Hartford Hospital is supplied by a customer owned substation (Substation 1) located on Retreat Avenue near the intersection of Maple Avenue. The substation is located inside a two-story brick building. The top floor of the building contains Eversource equipment consisting of two 23 KV primary feeders (109, 151), two ceiling mounted disconnect switches, and two 23 KV - 11 KV, 10/12.5 MVA auto transformers. The first floor of the building contains Hartford Hospital equipment consisting of double-ended 11 KV bus with a normally closed bus tie breaker (such that the 109 and 151 feeders operate in parallel). Other buildings throughout the main campus are supplied by the Hartford Hospital 11 KV distribution feeders. Two of these feeders are stepped down to 4.16 KV to supply a Co-generation facility on campus. Campus peak demand is estimated at 11 MVA and co-gen capability is estimated at 8 MVA.Hartford Hospital is proposing to construct a new Substation 1. Previously, the plan was to demolish the existing Hall Wilson Lab building located adjacent to the existing substation and construct a new substation on the vacated site. However, the Hartford City Government prevented the demolition of that building forcing a redesign of the upgrade in 2021. Hartford Hospital plans to replace the two existing 10/12.5 MVA auto transformers with two 15 MVA auto transformers to support future load growth on campus. The land in front of the utility building where the new transformers will be located will be the future site of both Hartford Hospital’s and Eversource’s switch gear and metering. This project proposes to install ISG switchgear and primary metering cabinets to supply the new substation, and to remove all Eversource owned equipment (feeder cables, switches, and transformers) associated with the existing substation. CD00818:Relocate Meriden Record Journal Sw. | Meriden is redeveloping the Meriden Record Journal site to a mixed use of commercial/retail/residential. As part of the redevelopment, the customer has requested that the existing 315D PMH-5 automatic switchgear pair be relocated. As part of the relocation, Eversource will upgrade the switchgear to an ISG 4-way auto pair to provide service to the new development and allow for additional underground loops to supply future development in the area. CD00992:New Road in Bristol, Relocate and S | The project relocates the four circuits in the duct bank located on private property to the proposed new underground structures on the new road and in the underground structures on Riverside Avenue. We are requesting the City to install 12-conduit duct bank structure in the new road. With this number of conduits, Eversource can supply the new customer load and relocate two of the four circuits out of the private property duct bank. These same circuits would supply the proposed switchgear, which will supply the new customers off the new road. CD01506:New Service – 210 Long Ridge Rd 111 | A customer will be constructing a new development at 210 Long Ridge Rd in Stamford, CT. The project will consist of a 4-story assisted living facility with 200 individual residential units and a partial garage on the lower level. To serve this load, the customer has requested 4 separate 3000 Amp services at 120/208V. This project will provide electrical service to the new customer by using a set of PME-9/12 switchgears fed from the Cedar Heights 4R17 and 4R14 circuits.Part 61 of 77
CD01591:Corbin Drive - Darien - New Service | This project is upgrading the 13S5 feeder in Darien and providing service to a new development that is being constructed in the first zone of the feeder. The circuit upgrade is necessary because the added load will cause an overload on the feeder. The new service project consists of 10 3-story and 1 5-story mixed-use buildings and 3 basement level garages. There will be a combination of office, restaurant, and retail spaces on the ground floor and apartments on the 2nd and 3rd floors. One building will consist of 4 townhouses only. The new service will be developed in two phases. Phase 1 will include 3 buildings and Phase 2 will include 7 buildings. Service will be provided using riser to pad scheme. CD01935:Hiawatha Village Westport | Hiawatha Lane in Westport CT is a residential area that houses approximately 10 customers. However, beyond this road is a residential complex (Avalon) that has more than 265 residents, also the former Cervalis property. These properties are served by Eversource from the Compo 23K17 feeder and the Norwalk 9S26 feeder.The purpose of this project is to accommodate a new 150-unit luxury housing complex that will eliminate the existing 10 houses currently on Hiawatha Lane. CD02065:100 Clinton Ave - New Services | 100 Clinton Ave is a new residential development in Stamford, Ct. The new development consists of 2 buildings – Block A and Block B. There will have in total of 471 residential apartments, EV charging stations and parking facilities. The estimated new load is 1.8 MW. Eversource may need to upgrade its facilities to serve the customer. CD02265:Brainerd Place New Service | Brainerd Place is a new commercial/ residential development in Portland, CT. It is located at the corner of Main Street and Marlborough Road in Portland. The new development will have 25 commercial areas and 362 residential apartments. The expected new load is 3.8 MW. CD02339:CT Transit-26 Elm Ct-New Service | Eversource is required to provide service to customers in its territory upon request. Based on a new load request of 6.5 MVA from CT Transit for EV bus charging stations, Eversource may need to upgrade its facilities to serve the customer. CD02346:35 Bacon Rd, Enfield NS | Project CD02346 – 35 Bacon Rd, Enfield New Service was established to cover the costs associated with supplying a new service to the customer. A new 820,000 ft warehouse is being constructed at 35 Bacon Rd, Enfield. The facility will be primary metered and placed in an existing radial primary feed. An additional riser will be constructed beyond the primary meter to create a looped supply. An estimated 4,700 ft of 4/0 Al cable to be installed by Eversource after the customer constructs the infrastructure. Work will consist of installing primary cable and a new loop supplying the new primary meter connected to the 2 existing transformers. CD02383:7A79 – Newfield Street – New Servic | Newfield Street is a new residential development in Middletown, CT. It is located on Newfield Street, across from Congdon Street in Middletown. The new development will have 488 residential apartments. The expected new load is 1.7 MW. CD02423:XL Center Service Upgrade | Project CD02423 – XL Center Service Upgrade – is established to provide additional power to this existing customer. The new load is projected at 3MVA. CD02437:Colony St, Meriden Mixed Use Dev | A developer is rehabbing five existing mixed use buildings on Colony St, Meriden. The buildings will have apartments on upper floors and retail at street level. The buildings are currently fed by the N194 network in Meriden._x000D__x000D_ _x000D__x000D_ The buildings will be all electric for heating, cooling, water heating and cooking. Heating will be a combination of heat pumps and resistance elements. _x000D__x000D_Part 62 of 77
CD02462:Tilcon NS on Black Rock 11H Sub | Tilcon at Loon Lake Road in Plainville is requesting a new 5 MVA service. They are requesting a primary meter service with one connection point. CD02497:New Service Uline Plainfield | Uline J6 is a new commercial warehouse building located on Plainfield Pike, Plainfield, CT. The current construction design has projected a new load of 2679kW, or 71 Amps, which will be added to circuits 13B10 and 13B21 out of Frybrook 13B substation. Without system upgrades, the existing 13B10 and 13B21 circuits in the area do not have the capacity to support this commercial warehouse. CD02505:Tomasso Loon Lake Rd Plainville NS | Tomasso has purchased 95 areas off Look Lake Road in Plainville. Their plan is to install approximately six buildings for a total estimated load of 21 MVA. CD02522:6A3 New Load Berlin Tpke | A large mixed use development is being built on the Berlin Tpke on the 6A3._x000D__x000D_ Developer provided loads are as follows: club house (110 kVA), hotel or bank (230 kVA), retail (125 kVA), and five apartment buildings (591 kVA each). The total load is 3,420 kVA._x000D__x000D_ The first phase includes the club house (110kVA) and two apartment buildings (591kVA each). _x000D__x000D_ CD02528:74 Broad St– New Service | A new customer will be constructing a new 8-story residential/commercial building at 74 Broad St, Stamford, CT. The building will consist of 280 residential apartment units. Spaces for parking garage, amenities, restaurant will be located throughout the footprint of the building. The total area of the building is 435,269 sf.To serve the building load the customer is requesting a total of (4) 3,000A 120/208V residential services for the base building loads and commercial spaces. The customer’s load letter estimates their demand to be 3.3 MVA.Eversource is required to provide service to customers in its territory upon request and may need to upgrade/extend its facilities to serve the customer. CD02572:Amazon Distribution Warehouse Wtbry | This project is being established to cover the costs associated with providing service to the new proposed Amazon Distribution Warehouse which will be located in the city of Waterbury. The preliminary anticipated load is estimated to be about 9.6 MW. CD02573:Refeed 490 Capital Ave, Hartford | Project CD02573 is established to provide a new Distribution service to the customer, Capital District Energy Commission (CDEC). Currently, CDEC is connected to the Transmission System, but Eversource Transmission project 144531 removes the supply to the customer with a completion date of Q4 2026. This project will determine the distribution design for supplying this customer. CD02614:1700 Asylum Ave Apts NS | Project CD02614 – 1700 Asylum Ave Apartments - is established to provide power to a new customer. This customer has a projected load of 3.76MVA. CD02648:1679 King St, Enfield NS | This project is being established account for the costs associated with a new service. A 420,000 ft2 warehouse is being constructed at 1679 King St, Enfield with cold storage, automation, and robotics for an estimated 8.6 MVA load. The existing electrical facilities along King St do not have the capacity to serve this size load. Also, due to the size of the projected load, 2 circuits will be required to supply the facility. CD02667:Nordic Spa Portland CT | Project CD02667 was established to address a Nordic Spa new service coming on the 21H15 circuit in Portland CT. CD02682:11H77 Contingency Overload NS | The purpose of the project is to address the circuit overload which occurs during contingency with the 7L90 circuit in New Britain. The 11H77 circuit feeds 2,574 customers out of the Blackrock substation in New Britain. During contingency with the 7L90 circuit, the 11H77 circuit picks up the 7L90-72S Zone through the 7L90-92T. This brings the normal rating of the 11H77 circuit to 121% and emergency rating to 87%.Part 63 of 77
CD02721:25 Holy Dr, Newington NS | This project is for a 10 MVA new service. The site is currently supplied by the 4A1 circuit. The 10 MVA load will be supplied by switch gear, fed by the 4A1 and 4A11 from the Newington 4A substation. Both circuits can now supply 5 MVA, but neither can back up the other in contingency. CD02747:1499 Silas Deane Hwy, Rocky Hill NS | CD02747 is created to provide power to an Electric Vehicle (EV) charging station, at 1499 Silas Deane Hwy in Rocky Hill, CT on the 3R03 circuit. The 3R03 circuit does not have capacity to support the requested 2,700 KVA load addition. CD02755:Install New Service & Repl. Swgr | Project CD02755 has been established to address new service to two rehabilitated office buildings in Norwalk. These offices 201 and 101 Merritt 7 will be converted to residential buildings consisting of 150 units in each building for a total of 300 new residential customers. FRNEWSVC:FORECAST PROJECT FOR NEW SERVICE | FORECAST PROJECT FOR BUDGETING NEW SERVICE Distributed Generation DISTRIBUTED GENERATION-L4 CD02167:Endurant, N.Colony Rd, Meriden | This project was established for Endurant Meriden, which is in the Central Division, in the Cheshire AWC, in the town of Meriden.Endurant Meriden is proposing a 4.9 MW battery energy storage system (BESS) at 508A N Colony Road, Meriden CT which is currently fed from the Hanover St 12F44 feeder. This BESS will adhere to a charging schedule to prevent exceeding the thermal limits of any conductors on the Eversource distribution system. A distribution impact study determined that the proposed battery has no negative impact on voltage or thermal violations on the distribution system if the battery adheres to the charge and discharge limits. Peak Load / Capacity-ED Distribution Line Capacity OVERLOADS-SPECIFIC PROJECTS CD01451:Ridgefield 22N Contingency Overload | This project has been established to address the contingency overloads on several circuits at the Ridgefield 22N S/S. This proposal involves the 22N2, 22N3, 22N4 & 22N5 circuits. Substation Project CS00637 was established to create two additional breaker positions at Ridgefield to help alleviate the current overloads at Ridgefield 22N.The 22N2 feeds 1679 customers in the Ridgefield area. The circuit has a peak load of 250A and a summer normal rating of 450A. The 22N2 exceeds it summer normal rating for a 22N A2 bus fault in which the 22N4 & 22N5 loses power and the 22N2 picks up some of their load. The 22N2-2 zone has 815 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3 feeds 1,992 customers in the Ridgefield/Wilton area. The circuit has a peak load of 422A and a summer normal rating of 490A. This puts the 22N3 at 86% of normal load. The 22N3 exceeds it summer normal rating for the contingent loss of the 22N4 or the 22N7. The 22N3-2 zone has 698 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3-91T loop scheme is currently disabled during summer peak periods to guard against overloading the circuit. The 22N4 feeds 1,900 customers in the Ridgefield area. The circuit is currently overloaded with a peak load of 378A and a summer normal rating of 423A. This puts the 22N4 at 89% of normal load and exceeds the 80% of UG summer normal criteria. Project CD01558 was created to resolve the UG issues for the 22N4 and 22N1. The portion of the project to replace 750 AL UG cable between MH#10 and riser pole# 550-23 was halted due to leaking transformers and deteriorated structure in Vault#9. Project CD01810 was created to replace the leaking transformers with a UTC, replace the deteriorated structure and replace the remaining 22N4 cable with 1000 CU. CD02381:Convert 15L46 to 23kV & getaway wor | Bokum 15L is being converted from 27.6kV to 23kv and adding more capacity.Part 64 of 77
CD02440:14R31 ROW Rebuild | CD02440 seeks to address reliability issues and aging infrastructure on the 14R31 ROW near Goshen, CT. The 14R31 circuit is responsible for feeding the 33M1, 33M2, 37J1, & 42J1 circuits, which when combined, serve over 3,100 customers. The identified portion of the 14R31 ROW is comprised of roughly 39,000’ of 3-ph 1/0 ACSR conductor. The identified segment includes 152 poles with an average age of 45 years. The 14R31 ROW has experienced 4 reliability related outages in the last 4 years and has seen multiple instances where the segment of 1/0 ACSR was burnt down due to overload under contingency. CD02459:Bokum 15L12, 15L68, 15L69 23kv geta | Bokum 15L substation is going through an expansion to increase capacity. The station voltage is now 27.6 kV, and this project will convert the voltage to 23 kV. The two existing transformers, 15L-1X and 15L-2X, will be replaced with 62.5 MVA transformers, a third 62.5 MVA transformer (15L-3X) will be added to the bus. All 3 transformers will be 115 kV to 23 kV._x000D__x000D_ The new 15L-3X transformer is on site as well as the 23 kV switchgear, the plan is to energize the new 15L- 3X transformer and build a new duct bank for the 15L12 and 15L68 across Bokum Road and connect the 15L12, 15L68, and 15L69 circuits to their new breaker positions._x000D__x000D_ 15L12 currently comes out of the station at 27.6 kV and gets stepped down to 23 kV through two sets of 3,000 kVA poletop autos on Essex Road. The 15L12 out of the station will be converted to 23 kV and the two sets of 3,000 kVA autos will be removed. The existing getaway cable is 3-1/C 750 kcmil Cu cable in three 3-inch ducts. This cable will be replaced with 1000 kcmil Cu cable._x000D__x000D_ The 15L68 is stepped down from 27.6 kV to 23 kV through a 29 MVA auto inside the station and bifurcates east and north. The 15L68 going east over the Connecticut River to the New London District will remain the 15L68. The 15L68 going north to Deep River will become the 15L69. There is no work required outside the fence on the 15L68 circuit other than replacing the parallel 500 kcmil Cu getaway cable going east with 1000 kcmil Cu. _x000D__x000D_ The Bokum 15L substation is in the Madison Area Work Center in the Eastern Region._x000D__x000D_ CD02470:28M1 Contingent Overload | CD02470 seeks to address a contingent overload within the 28M1-2 zone when supporting the 11A53-70S zone. The 28M1 is fed out of Middle River 28M sub in Danbury CT. The 28M1-2 zone is comprised entirely of 336 AAC T.W. beginning at P#1172 and extends until the 28M1-50Z on P#372. The 336 AAC T.W. serves as the primary limiting factor with a normal limit of 460A and an emergency rating of 520A. Under contingency with the 28M1 picking up the 11A53-70S zone, the 28M1-2 reaches 104% of its normal limit. CD02473:11A55 Contingency Overload | This project was created to address a contingency overload created on the 11A55 breaker zone when recovering the 11A51-70S zone. The 11A55 is fed out of the Triangle 11A substation in Danbury, CT. The existing limiting factor is the 500 CU PILC, from MH 2 to riser pole 8491 on Federal Rd, Danbury, CT. This project will investigate solutions to either redistribute load or increase the existing load limit for this zone. CD02513:Uncasville 1Q01 Getaway Overload Pr | The purpose of this project is to prevent a contingency overload on the Uncasville 1Q01 feeder. The contingency overload is caused by a 3.7 MVA load swap between the Williams Street 9L09 feeder and the Uncasville 1Q01 feeder that was requested by Substation Engineering to relieve a capacity issue at Williams 9L substation. This overload will occur on the 1Q01 getaway cable and the downstream OH conductors up to a bifurcation point while picking up the 1Q6 during contingency.Part 65 of 77
CD02618:15L69 Contingency Overload | This project proposes to solve a contingent overload between the Bokum 15L69 circuit and the Haddam 11C12 circuit. A load study showed that the Haddam 11C12 adds a load of 277A and causes the Bokum 15L69 ROW to experience a 120% overload at normal and 100% at emergency. FROVRLDS:FORECAST OVERLOADS BUDGET PROJECT | FORECAST BUDGET PROJECT FOR SPECIFIC PROJECT OVERLOADS VOLTAGE CORRECTION-DK ANNUAL DK1B:MAINTAIN VOLTAGE NEWTOWN | MAINTAIN VOLTAGE ANNUAL NEWTOWN DK1N:MAINTAIN VOLTAGE NORWALK | MAINTAIN VOLTAGE ANNUAL NORWALK DK1S:MAINTAIN VOLTAGE STAMFORD | MAINTAIN VOLTAGE ANNUAL STAMFORD DK2L:MAINTAIM VOLTAGE TORR CLP | MAINTAIN VOLTAGE ANNUAL TORRINGTON DK2M:MAINTAIN VOLTAGE CHESHIRE/N.B. | MAINTAIN VOLTAGE ANNUAL CHESHIRE DK2W:MAINTAIN VOLTAGE WATERBURY | MAINTAIN VOLTAGE ANNUAL WATERBURY DK3H:MAINTAIN VOLTAGE HARTFORD | MAINTAIN VOLTAGE ANNUAL HARTFORD DK4D:MAINTAIN VOLTAGE MADISON | MAINTAIN VOLTAGE ANNUAL MADISON DK4M:MAINTAIN VOLTAGE E Hampton | MAINTAIN VOLTAGE ANNUAL EAST HAMPTON DK4N:MAINTAIN VOLTAGE N LONDON | MAINTAIN VOLTAGE ANNUAL N LONDON DK5T:MAINTAIN VOLTAGE TOLLAND | MAINTAIN VOLTAGE ANNUAL TOLLAND DK5W:MAINTAIN VOLTAGE DANIELSON | MAINTAIN VOLTAGE ANNUAL DANIELSON FRDK:DKCT Projection Forecast Project | DKCT Forecast project Substation Capacity SUBSTATION OVERLOADS-SPEC PROJ CS00364:Falls Village 9A XFMR Reliability | The project eliminates the single contingency load loss (SCLL) conditions for Falls Village 9A, Salisbury 21J, and North Canaan 5L, located in Falls Village, Salisbury, and North Canaan, CT, respectively. CS00365:Bokum 15L Transformer & Reconfig SS | The project converts Bokum 15L substation from a 27.6kV to 23kV and adds a third transformer and switchgear, including primary and secondary line protection. CS00382:Southington 4C Add Transformer | This project adds a third 115-13.8kV transformer rated 62.5MVA to Southington 4C Substation to address potential load growth that could result in future overloading of the existing bulk transformers. CS00383:Hopewell 22R Replace Xfrmr | This project addresses the current and future distribution load growth at Hopewell 22R Substation located in Glastonbury, CT. It replaces the 2X and 3X transformers with the Eversource 62.5 MVA standard. CS00392:Beacon Falls 11N Replace Xfrmr | This project replaces the Beacon Falls substation 1X and 2X transformers with the Eversource 62.5 MVA standard. CS00603:West Side 7A SS Overload | This project addresses substation capacity deficiencies at the 115-13.2kV West Side Substation located in Middletown, CT. CS00636:Saybrook 22D Conversion | To convert both the 22D-1X and 22D-2X from 27-6.kV to 23kV at Saybrook, the taps inside the transformers will need to be changes. This will require draining the oil, changing taps, and refilling oil. The lightning arresters and potential transformers will also need to be removed and replaced. CS00676:UConn System Upgrade #900 | The objectives are to reliably and cose-effectively accommodate the near term and long term UConn peak load forecasts and address asset condition concerns. CS00683:Berlin 6A Incr Capacity | This project will increase the load carrying capacity (LCC) of Berlin 6A substation. It will replace the 52 year-old 46.7 MVA 6A-1X and the 50 year-old 46.7 MVA 6A-2X to increase the substation LCC by replacing them with two 115-13.8kV 62.5 MVA transformers and associated transformer foundations. CS00703:Westbrook 20S Conversion | This project is to support the conversion of Westbrook 20S substation, located in Westbrook, CT, from 27.6kV to 23kV. FROVRLSS:FORECAST PROJ FOR OVERLOAD SUBSTATI | FORECAST PROJECT FOR SUBSTATION OVERLOADS Regulatory Commitments-ED Regulatory Commitments-Other 4.8KV GROUNDINGPart 66 of 77
468601:4.8KV GROUNDING FOR CODE COMPLIANCE | CORRECT GROUNDING ON 4.8KV DELTA EQUIPMENT IN THE STATE OF CONNECTICUT TO BRING TO PRESENT CODE, AS REQUIRED BY DPUC ORDER. TRMSN DISTR RELIABILTY PERFRM CD02192:12J5 - Reliability Improvements | As part of Eversource’s plan to address the worst performing circuits (WPC) in Connecticut, project CD02192 was created to focus on the high impact zones of the 12J5 circuit. CD02193:12J4 WPC - Reliability Improvement | CD02193 focuses on infrastructure replacement to improve the reliability of the 12J4 circuit.The 12J4 is a 13.8 kV circuit out of Mansfield 12J, serving 3143 customers in Ashford and Willington. The 12J4 was ranked #9 on the worst performing circuits list in CT. CD02193 addresses the five high impact zones on the 12J4 where Eversource has experienced outages within the past four years. CD02207:11C14 WPC Reliability Improvement | CD02207 focuses on infrastructure replacement and creating a loop to improve the reliability of the 11C14 circuit.The 11C14 is a 23 kV circuit out of Haddam 11C, serving 3052 customers in Chester, Haddam, Higganum, Killingworth, and Middletown. The 11C14 was ranked #1 on the worst performing circuits list in CT. CD02207 addresses high impact zones on the 11C14 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. CD02208:15L68 WPC Reliability Improvement | CD02208 focuses on infrastructure replacement and vegetation management, which includes trimming and removals.The 15L68 is a 23 kV circuit out of Bokum 15L in Old Saybrook which is split between the Madison and New London districts and supplies a total of 5,184 customers. The district jurisdictional boundary is the Connecticut River. The 15L68 serves 2,309 customers in the Madison district and supplies the towns of Old Saybrook, Essex, Deep River, Ivoryton, and Westbrook. In the New London district, the 15L68 serves 2,875 customers and supplies the towns of Lyme, Old Lyme, East Lyme, Hadlyme, and East Haddam. The 15L68 was ranked #5 on the worst performing circuits list in CT. CD02208 addresses three high impact zones on the 15L68 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. CD02213:12Y9 WPC Reliability Improvement | Project CD02213 focuses on infrastructure replacement to improve the reliability of the 12Y9 circuit.The 12Y9 is a 13.8 kV circuit out of the Rocky River 12Y S/S and serves 2,758 customers in Sherman and New Milford. The 12J5 was ranked #7 on the worst performing circuits list in CT. CD02213 addresses four high impact zones on the 12Y9 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. CD02214:30R8 WPC Reliability Improvement | Project CD02214 focuses on infrastructure replacement to improve the reliability of the 30R8 circuit.The 30R8 is a 23 kV circuit out of the Green Hill 30R S/S and serves 3,791 customers in the Killingworth, Madison, and Clinton areas of Connecticut. The 30R8 was ranked #3 on the worst performing circuits list in CT. CD02214 addresses four high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming.Part 67 of 77
CD02215:35L9 WPC Reliability Improvement | Project CD02215 focuses on infrastructure replacement to improve the reliability of the 35L9 circuit.The 35L9 is a 13.8 kV circuit out of the Stepstone 35L S/S and serves 2,234 customers in Guilford, Connecticut. The 35L9 was ranked #9 on the worst performing circuits list in CT. CD02215 addresses two high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. FRTDRP:FORECAST PROJECT FOR TDRP PROJS | FORECAST PROJECTS FOR TDRP PROJECTS Reliability-ED Distribution Line Reliability RELIABILITY IMPROVE-DR ANNUAL DR1B:OH RELIAB IMPROVE NEWTOWN | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEWTOWN DR1N:OH RELIAB IMPROVE NORWALK | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NORWALK DR1S:OH RELIAB IMPROVE STAMFORD | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL STAMFORD DR2L:OH RELIAB IMPROVE TORR CLP | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TORRINGTON DR2M:OH RELIAB IMPROVE CHESHIRE/N.B | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL CHESHIRE DR2W:OH RELIAB IMPROVE WATERBURY | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL WATERBURY DR3H:OH RELIAB IMPROVE HARTFORD | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL HARTFORD DR4D:OH RELIAB IMPROVE MADISON | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL MADISON DR4M:OH RELIAB IMPROVE E Hampton | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL EAST HAMPTON DR4N:OH RELIAB IMPROVE NEW LONDON | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEW LONDON DR5D:OH RELIAB IMPROVE DANIELSON | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON DR5T:OH RELIAB IMPROVE TOLLAND | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TOLLAND DR5W:OH RELIAB IMPROVE Danielson | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON FRDR:PROJECTION PROJECT DR ANNUAL | PROJECTION PROJECT DR ANNUAL RELIABILITY IMPROVE SPEC PROJ CD02116:Roxbury Rd Reconductoring | CD02116 addresses reliability concerns and aging infrastructure for the 21K2 & 21K3 backbone on Roxbury Rd in Southbury. These circuits both originate at Bates Rock 21K substation and operate at 13.8kV. This segment of double circuit pole line consists of predominately 1970 vintage infrastructure and is responsible for hosting a combined 2250 customers. There have been 3 outages along this segment of the 21K2 and 6 outages on this segment of the 21K3. Additionally, this segment of the 21K3 experienced a burn down due to ringed spacer cable and a lightning strike. The proposed work suggests reconductoring on the 21K2 and 21K3. This work involves reconductoring the 21K2 with 6,800’ of 556 spacer cable from P#S43 to P# S3 and reconductoring the 21K3 with 7,000’ of aerial cable from P#S42 to P# C3798. In addition, the side tap originating at P# S22 will be swapped from the 21K3 to 21K2 circuit creating a complete express for the 21K3 from the station to P#12176. The reconductoring of these segments will increase future reliability and load growth through the replacement of aging infrastructure, existing ringed spacer cable and the installation of upgraded overhead conductor. CD02405:12C4 Equip Conversion and Replace | This project adresses deficiencies on the Enfield 12C4 circuit. Ringed spacer cable was found on N. River St., Whitworth St., and Alden Ave. The project replaces this cable prone to failure. To reduce several large customer zones on the 12C4 feeder, a 4.8kV portion of the circuit will be converted to 23kV to allow for recloser installation. CD02480:30R15-Reconductor 336 ringed SC wit | The 336 AL spacer cable is vintage and is ringed. This area has very poor reliability and has had eleven (11) interruptions over the last four years. Removing the 336 AL ringed spacer cable and installing 477 AL tree wire will improve the performance of this circuit.
As listed on the current system
Supplement for New App [Filed: 11/18/2026]