Application supplement
Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 68 of 77
CD02723:Town Scorecard – Eastern Region | Project CD02723 was established to address the Town Scorecard Initiative which identifies the top 10 SADI and SAFI worst performing towns in Eversource, CT. CD02749:UCONN Health Protection Coord | Project CD02749 was established to address reliability concerns impacting operations at UConn Health in Farmington, CT. The affected infrastructure is served by the 1C01 overhead feeder, which supplies power to several critical facilities, including UConn Health Center, UConn Health Warehouse, UConn Fire Safety Complex, State of Connecticut Medical Examiner’s Office, Town of Farmington Sewer Pumping Station, and various hospital support buildings, such as parking areas and the UConn Health Childcare Center. FRSPRELI:FORECAST SPEC REL IMPROVEMENTS | FORECAST PROJECT FOR SPECIFIC RELIABILTY IMPROVEMENT PROJECTS S/S ELIMINATION-LINE WORK CD00654:Eliminate 4.8 kV 12F-6X Islanded SS | Hanover 12F-6X Substation is located in Meriden, Connecticut, and consists of a single, 5/6.25 MVA transformer that supplies three, 4.8 kV circuits (12F2, 12F4 and 12F5) and 1,793 customers.The 12F-6X transformer and 4.8 kV switchgear was installed in 1957. If the 5/6.25 MVA transformer were to fail, then 1,793 customers would be out of power for +/- 24 hours until a mobile transformer was installed. There are no other 4.8 kV sources in the area that can be used to restore customers.Hanover 12F-6X Substation and much of its associated overhead distribution system is 60+ years old.1,793 customers on 12F-6X will be converted and transferred to new 13.8 kV circuit 12F50 and existing 13.8 kV circuit 12F52. 700 feet of 1000 MCM Cu and 4,900 feet of 556 AL TW will be installed to create the 12F50 backbone. Twenty, single phase, bare copper laterals with six or fewer transformers will be reconductored with 1/0 ASCR TW and converted to 13.8 kV.New recloser loop schemes will be created to split the number of customers per zone to approximately 500. Three new recloser loop schemes on the 12F50 which will be backed up by the 12F44, 12F52 and 12F55. The three loops will employ multiple reclosers creating six zones to limit the customer count. The six zones will have 142, 226, 241, 477, 479 and 550 customers. A new field tie with the 12F49, and an existing tie with the 12F51, will back up the 453 customers in the first zone of the 12F50.The new feeder, 12F50, will take some load from the 12F55 to mitigate a contingency overload condition that exists on the 12F55.A large, 958 customer zone on the 12F52 will be eliminated by creating a new recloser loop with the 12F50. The resulting zones will have 456 and 502 customers.The replacement of the 12F2, 1000 kcmil AL get-a-way cable (500 feet) with 1000 Cu mitigates a contingency overload on the 12F52. FRSSLNWK:S/S Elim-Line Work Forecast Project | FORECAST PROJECTS FOR OVERHEAD WORK TO ELIMINATE SUBSTATIONS. Network Reliability NETWORK XFMR + PROTECTOR REPL CD00412:CL&P Repl Net. Xfmrs Blanket | This project is for replacement of inoperable/condemned/failed network transformers and network transformer protectors. UG CABLE & EQUIPMNT REPLACEMNT CD02229:145 PILC Cable Replacement | Project CD02229 is being established to replace the remaining paper-insulated lead covered (PILC) cable on the South Meadow 145 circuit. This project is part of an overall strategy to address poor performing PILC cable in the underground distribution system. CD02393:NW Hartford 2N18 PILC Cbl Repl | Project CD02393 is being established to replace the 19,803’ of paper-insulated lead covered (PILC) cable on the Northwest Hartford 2N18 circuit. This project is part of an overall strategy to address poor performing PILC cable in the underground distribution system FRUGCBLR:FORECAST PROJECT FOR NETWORK CBL RE | FORECAST BUDGET PROJ FOR NETWORK CABLE REPLACEMENTS UG Network AutomationPart 69 of 77
CD01276:New Switchgear for SMH Waterbury | This project proposes installation of a set of 4-way solid dielectric switchgear on the line side of the existing feed to the existing switchgear at St Mary's Hospital 201B.The existing switchgear at St Mary's Hospital 201B is owned by the customer, but operated by Eversource, based on an agreement made years ago. This switchgear must be operated periodically, since both incoming feeders at St Mary's Hospital 201B are network feeders.Procedure NB-150 (in CT) discourages utility employees from operating customer-ownedhigh-voltage equipment. Because it does not own or maintain this equipment, the utility does not know its condition, nor can the utility be responsible for it. Installation of the new switchgear enables the utility to disconnect, test, and ground its system at switchgear it owns and maintains, without the need to access or operate non-utility-owned equipment. CD01537:25 Laurel St Htfd - Automate Svc | The primary electric service at 25 Laurel Street in Hartford consists of two manual PMH-5 switches (309B) which serve seven pad-mounted transformers (3,850 KVA Connected) and 607 customers (586 residential / 21 commercial). The manual switches are fed by two underground feeders (47N9 - normal, 47N7 - alternate) out of Southwest Hartford 47N substation (23 KV).In the past five years, these customers have experienced three feeder outages averaging approximately 150 minutes/outage.This project proposes to automate the service to this location by replacing the manual switches with automatic switches.The expected benefits upon completion of this project include improved reliability and customer satisfaction. CD02059:Man to Auto Tuttle Rd Middletown | This project was established to address the manual switchgear at Tuttle Rd., Middletown. This project will replace one of the two existing PMH-9 switchgear units with a new DSCADA capable PME-9 switch, to be operated as a single unit auto-transfer switch. This proposal will automate 121 customers on Tuttle Rd., Middletown.The preferred feeder is the Westside 7A79 circuit and the alternate feeder is the Westside 7A71 circuit. The 7A71 has the capacity to accept the automatic transfer from the 7A79 without causing overload.This project is part of an overall program to eliminate manual switchgear in order to eliminate the need to manually transfer customers to their alternative source for loss of the preferred source. CD02092:Make 13H93 & 13H94 Non-Network | This project is being established to convert the Noera 13H93 and 13H94 feeders into non-network feeders. This will allow the 13H93 and 13H94 feeders to have multi-grounded primary connections, such as automatic switchgear or line-to-ground connected load, without the exposure of high voltage that can happen if a network feeder were to fault and a network protector failed to open.The Palace Theater 225P and UCONN 256D switchgear are both automatic switchgear that have the Noera 13H94 circuit as the alternate source. Under a separate project, the preferred source to these switchgear locations will become a non-network feeder via transfer to the Freight 11W44 circuit.The scope of this project includes transferring the two existing network transformers on the N185 network from the 13H94 & 13H93 to the Freight 11W43 and 11W76 respectively. This will require extending the 11W76 to manhole 147 on E Main St., a distance of 1,320’. The total load on the N185 network is less than 300kVA. The 11W43 and 11W76 has the capacity to accept the added load without causing overload. CD02107:Switch Gear Autom 21P1 Kirkland Pl | This project replaces a manual PMH 3 pair switch gear, located on Kirtland Place, Meriden, with an automatic PME 5 pair. PMH gear is live front while PME switch gear is dead front and is DSCADA capable offering both safety and operational flexibility.The switch gear is fed by the East Meriden 21P1 and the backup is the 21P4. 121 customers are fed from this switchgear.Part 70 of 77
CD02543:Chelsea Piers Switchgear Isolation | This project addresses single point failures on feeders (Glenbrook 1K08 & 1K18) feeding NBC. A splice failed on the overhead system on Maher Rd causing an outage at the NBC facility during the Olympics. On post event investigation, it was deemed necessary to eliminate single point failures by isolating customer owned switchgear feeding Chelsea Piers with Vista Green 422’s to avoid future failures. UNDERGROUND STRUCTURE ISSUE 101610:REPAIR & REPL OF CL&P UG STRUCTURES | REPAIR & REPLACE MANHOLE AND VAULT (STRUCTURE) ROOFS AND DUCTLINE DUE TO OBSOLESCENCE &/OR WEAR & TEAR. CD01821:Greenwich Ave Structural Upgrade | The Town of Greenwich is planning a streetscape project along Greenwich Avenue where they will reconstruct sidewalks and completely repave Greenwich Avenue from Putnam Avenue to Railroad Avenue. The Town has made it quite clear to all subsurface utility owners that all underground infrastructure must be installed or upgraded as necessary prior to their planned project. After careful review of Eversource’s existing infrastructure, it was determined that 2 manhole enlargements, 4 service box enlargements, and 5 lateral duct banks should be installed given the opportunity described above. The locations that were chosen for manhole enlargements are locations where there is insufficient room to properly splice and rack the three 27.6 kV feeders within the manhole, and to properly support the secondary mains and limited crab joints. The service box enlargements are required for potential service upgrades. The lateral duct bank extensions are required for two purposes. First, these ducts will accept additional or replacement secondary cable as required for network secondary voltage service. Second, each new duct bank will be extended to a side street where there is the potential to install a primary voltage loop cable that may eventually be used to convert the existing network to load loops from the existing open wire overhead distribution system. CD02332:Tresser Blvd Duct Bank | During a new service project, the contractors encountered blocked/ insufficient conduits between MH#700 and MH#731 on Tresser Blvd when trying to tap 1G02 feeder to the customer’s switchgear on Tresser Blvd. Repairs were attempted but to no avail. Furthermore, blocked ducts were encountered in the past in other sections of the duct bank on Tresser Blvd between Canal Street and Elm Street. A more accessible feeder (1G19) was used to complete the new service project. However, the fear is that should the need arise to install cable in this area in the future, it cannot be done because of issues with the duct bank.This project is being initiated to install a new 8-position duct bank along Tresser Blvd between Canal Street and Elm Street to facilitate future needs. CD02511:Manchester Bridge Conduit Replace | The project is for electrical conduit replacement on two Manchester bridges that are over the I-384 highway. The State notified the Civil Engineering team of steel conduit bank deficiencies. CD02580:Stamford Vault 292 Replacement | This project replaces vault #292 which is in the roadway at the very busy junction of North St. and Summer St. in Stamford, CT. An inspection revealed that vault #292 deteriorated extensively. CD02619:Cedar Heights Rd Shallow Duct Bank | This project has been created to address the shallow duct bank that occurred on Cedar Heights Rd in Stamford CT during work performed under CD00728.Part 71 of 77
CD02691:Franklin Drive 1B Duct-bank Repair | This project address the replacement of deteriorated steel conduits that are location within an existing duct-bank with a horizontal 2 x 4 array on Main Street in Torrington, CT. This duct-bank spans the Naugatuck River and is located under the bridge. These conduits presently penetrates through a concrete support structure of the bridge which is adjacent to manholes MH# 9 and MH# 21 and has a span length of 110' with very limited room. The age of the duct-bank is over 65 years old and due to its exposure to a harsh environment, these conduits within the duct-bank have deteriorated to the point of either having large, elongated holes in their perimeter or they have deteriorated to the point of becoming separated into two pieces. Substation Reliability GENERAL MODERNIZATION CS00023:GOODWIN LANE 22 - REMOVE SUBSTATION | This project is to complete equipment removals, environmental monitoring, remediation, and site restoration for the de-energized Goodwin Lane 22 substation located in East Hartford, CT. CS00070:Naugatuck 19K - Remove Substation | This project is to perform control house demolition, concrete foundation and pad removal, soil excavation, environmental remediation, groundwater monitoring, civil removal work, and site restoration for the de-energized Naugutuck 19K substation located in Naugutuck, CT. CS00072:Guilford 29F - Remove Substation | This project is to complete site removals and environmental remediation for the de-energized Guilford 29F substation located in Guilford, CT. CS00105:Meadow 28J - Remove Substation | This project is to complete equipment and structure removals, environmental monitoring, remediation, and site restoration for the de-energized Meadow 28J substation located in Branford, CT. CS00119:Oakville 17Q - Remove Deenergized S | This project is to perform soil excavations, environmental remediation, concrete foundation and pad removal, shed removal, and site restoration for the de-energized Oakville 17Q substation located in Watertown, CT. CS00269:Race Hill 15D - Remove S/S | This project is to complete removals, environmental remediation, and site restoration for the de-energized Race Hill 15D substation located in Madison, CT. CS00412:Newtown 12N Station Modernization | This project is to replace nine 23kV oil circuit breakers (OCBs) at Newtown 12M substation located in Newtown, CT. The OCBs may cause harm to the environment if leakage occurs, or spills occur during maintenance. CS00450:Clayton CT 21W Remove 21W-1X XF | This project is to decommission and retire the de-energized Clayton Court 21W substation located in New Britain, CT. CS00451:Carver 19R-1X and Oil Removal | This project is to complete equipment removals and to complete environmental testing for the de-energized Carver 19R substation in New Britain, CT. CS00490:Farmington 23L Remove SS | This project is to complete the equipment removal and environmental assessments for the de-energized Farmington 23L substation located in New Britain, CT. CS00541:Card 11F Battery Monitor | Card 11F Battery Monitor CS00567:Berlin 6A Replace Switch | This project is to replace failing Motor Operated Disconnect (MOD) Switches and obsolete load tap changer (LTC) controls at the Berlin 6A substation, located in Berlin, CT. Replacement of these switches and LTC controls will improve system reliability and operator safety. CS00569:RBIP - Rplc Battery Install Program | This project is establishing a program that will replace aging substation batteries and chargers across the Eversource system. Proactively replacing older substation batteries will ensure the continued reliabile operation of Distribution substations. CS00605:Baldwin 13F SS Access Upgrade | This project upgrades physical access to the Baldwin 13F substation, located in Waterbury, CT. CS00608:Flax Hill 24A Battery Monitor | Flax Hill 24A Battery Monitor CS00610:Shaws Hill 24H Battery Monitor | Shaws Hill 24H Battery MonitorPart 72 of 77
CS00612:Thomaston 2B Battery Monitor | Thomaston 2B Battery Monitor CS00613:West Side 7A Battery Monitor | West Side 7A Battery Monitor CS00625:S. Meadow 1A Equipment Removal | This project is for the removal of the de-energized 1A112-1X and1A101/111-1X transformers at South Meadow 1A Substation, located in Hartford, CT. CS00634:N Canaan 5L Rplc Recloser & Feeder | This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset conditions. CS00637:Ridgefield 22N Add Feeders | This project is expanding the existing 13.8kV switchgear and adding two new feeders to the Ridgefield 22N substation, located in Ridgefield, CT. The expanded switchgear and new feeders will relieve overloading on the existing feeders and are needed to supply the existing and future projected load. CS00651:Riverside 2R RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Riverside Drive 2R substation, located in East Hartford, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00652:Westport 27F RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Westport 27K substation, located in Westport, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00653:Beacon Falls 11N RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Beacon Falls 11N substation, located in Beacon Falls, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00654:Portland 21H RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Portland 21H substation, located in Portland, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00673:Van Dyke 12 Rplc Upgrd Cap Bank | This project will replace the 1215 1K, 1215-2K, and 1215-3K 6MVAR open air capacitor banks at Van Dyke 12 substation located in Hartford, CT with two new 6MVAR metal-enclosed capacitor banks to improve asset condition and customer reliability. CS00681:Portland 21H ElectroMech Relay REL | This project will upgrade existing electromechanical relays currently in operation at the Portland 21H substation located in Portland, CT. All electromechanical and obsolete microprocessor relays will be replaced with microprocessor-based relays. CS00682:Portland 21H H14-1X H15-1X Removals | This project is for the removal of the 21H14-1X and 21H15-1X auto transformers at Portland 21H substation located in Portland, CT. CS00689:CT D-SS AED Install Program | This project will install Automated External Defibrillators (AED) in Distribution substation control houses located in Connecticut. An AED is used as a lifesaving device in the event of a heart attack or sudden cardiac arrest.Part 73 of 77
CS00694:115 kV Relay & Ctrl Encl Install | This project includes modification of yard manhole, installation of two riser poles, installation of underground duct bank, and modification of the current switchgear to remove Transmission protection to be migrated to the new Relay and Control Enclosure. FRSSGNMZ:FORECAST PROJ FOR SS GEN MODERNIZAT | FORECAST PROJECT FOR SUBSTATION GENERAL MODERNIZATION S/S TRANSFORMER RELIABILITY CS00286:Franklin Dr Replace Xfrmr | This project is for the replacement of the 1B-4X and 1B-5X transformers, the relocation of the 1B-4X1-2 circuit switcher, and associated new cabling, steel structures, and foundations at the Franklin Drive 1B substation located in Torrington, CT. The two existing transformers were installed in 1953 and have exceeded a standard transformer's life expectancy. CS00396:Stevenson 14A Upgrade Xfrmr & Swgr | This project is to replace aging equipment and convert the existing 27.6-8.32kV distribution system to a 23kV distribution sstem to provide long term reliable power to distribution loads being fed from the Stevenson 14A substation located in Monroe, CT. CS00404:Todd 30L Mobile Position | The project is for the installation of a mobile transformer position and associated feeder activation at the Todd 30L Substation in Wolcott, CT. CS00533:Salisbury 21J Replace Xfmr | The project objective is to replace the 13MVA 69kV-13.2kV transformer 21J-1X with a new Eversource standard 40MVA 115/69kV-13.2kV transformer equipped with a modern LTC. The Salisbury 21J-1X is an Eversource standard size transformer which reduces the number of spare transformers required to be available for the Connecticut distribution system.This project will also replace outdated electromechanical protection systems on the 21J-1X transformer and 13.2kV A1 bus to update these systems to the latest Eversource standards.This relaying is 50 years old, is at the end of its service life and total of eight electromechanical relays will be replaced as part of this project. CS00544:N Canaan 5L Replace Xfmr | This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset conditions. CS00606:Glenbrook 1K Replace Transformer | This project is for the asset condition replacement of the existing 62-year old 115kV:13.2kV, 46.7MVA transformer 1K-2X at Glenbrook substation in Stamford, CT. The transformer is near its end of life. CS00665:73MX Mobile Xfmr Refurbishment | This project is to refurbish the 73MX mobile transformer unit. The unit is out of service. FRSSXFMR:SS Transformer Reliability Forecast | Substation Transformer Reliability Forecast Project SS DSCADA LTC Controls CS00677:Haddam 11C DSCADA LTC | This project will replace the Load Tap Changer (LTC) control scheme on the 11C-2X and 11C-3X transformers at the Haddam 11C substation located in Haddam, CT. FRSSDSCA:Forecast SS DSCADA LTC Netwk Auto G | Forecast project for DSCADA - LTC Network Auto Grid SUBSTATION RELIABILITY-L4 DSCN26:2026 CT D SS Planned Annual | This annual is to improve customer reliability for capital work not identified specifically during the budget cycle but is a result of monitoring the system throughout the year. SWITCHGEAR CS00189:Triangle 11A - Rpl Bus w/ Swgr | This project will rebuild the 13.8kV distribution end of the Triangle 11A substation in Danbury, CT by installing new enclosed, double bus, metal clad switchgear. The rehabilitation of the substation is required to replace aging substation equipment, address bus clearance needs, and update protection and control relays and System Control and Data Acquisition (DSCADA) interfaces for metering, control, and monitoring.Part 74 of 77
CS00491:Chippen Hill 15U Replace SWGR | The project will replace the existing metal clad switchgear at the Chippen Hill substation located in Bristol, CT. The switchgear is being replaced to due to the history of operational and maintenance issues caused by a sunken foundation which made the switchgear come out of alignment. CS00503:E. Meriden 21P Replace SWGR | This project is for the replacement of the 13.8kV switchgear with associated circuit breakers, protection relays, conduits, cabling, and foundations at East Meriden 21P substation. The foundation has begun to sink unevenly causing the switchgear to come out of alignment. This has caused difficulties when racking circuit breakers in and out of the cubicles. FRSSSWGR:FORECAST PROJECT FOR SS SWITCHGEAR | FORECAST PROJECT FOR SUBSTATION SWITCHGEAR RELAY System Resiliency/Expanded Reliability ENHANCED TREE REMOVAL CTREL26:Reliability Tree Removal REL Prgrm | The project focuses on removal of trees in poor performing isolated device zones to improve system reliability and resiliency. ETR2026:Enhanced Tree Removal ETR Program | The ETR project strategically removes trees to proactively improve system reliability and mitigate long term costs for the distribution cycle trimming programs. Tree removals, in conjunction with cycle pruning, drive improved reliability performance. ENHANCED TREE TRIMMING ETTCF26:ETT Customer Focused 2026 | The Customer Focus Enhanced Tree Trimming project addresses system reliability by providing greater clearances and removing risk limbs and trees that are outside of the normal maintenance trim zone in areas of emergent reliability concerns. POLE INTEGRITY PROGRAM CD02444:2025 Pole Integrity | This initiative replaces or reinforces wood poles found during the annual pole inspections that cannot remain in service due to loss of strength from decay or insect infestation. This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm damages. CD02449:2025 Frontier Pole Shifts | The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource equipment onto Frontier Defective Pole Replacements. As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the equipment transfer. CD02545:2026 Pole Integrity | This project captures the cost necessary to replace wooden poles that were found during the 2025 annual pole inspections. These poles cannot remain in service due to loss of strength from decay or insect infestation.This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm damages. P CD02546:2026 Frontier Pole Shifts | The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource facilities onto Frontier Defective Poles that will be replaced in the year 2026.As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the equipment transfer. RIGHT OF WAY LINESPart 75 of 77
CD01246:Fry Brook 13B21/13B27 ROW Pole Repl | The Fry Brook 13B21/13B27 ROW is an approximately 3-mile express feed from the substation to the towns of Plainfield and Killingly. 13B21 serves 3,607 customers and 13B27 serves 1,963 customers. For a double circuit fault from the substation to Plainfield Road 100% of customers are automatically restored. This is accomplished via ties with 13B10, 15C8 and 30Y10. While travelling along I-395 several crossarms were observed to be cocked and/or racked and upon a physical walk through, much more damage was recorded. A majority of the poles are 66+ years old and most crossarms were replaced in 1973. All crossarms are installed with bow braces. The project will perform 100% pole and conductor replacement from the substation to the Moosup 19Y Substation north of Route 14.The aim of this project is to install a new double circuit pole line adjacent to the existing pole line where easement restrictions allow, with all new 50-foot class 1 poles, 556 ACSR TW and 2/2/2 construction. CD01308:Saybrook 22D Triple Circuit ROW | This project addresses two right-of-way (ROW) issues in the Town of Old Saybrook. The first issue is a triple circuit pole line south of Saybrook 22D station extending 2,700 ft from Elm St to Ingham Hill Rd, Saybrook. This triple circuit pole line consists of the 15L46, 15L70, and 22D4 Circuits with 1,450 ft of pole line through a marsh. The Bokum 15L46 (27.6kV) supplies Cedar La 41L and Westbrook 20S. The Bokum 15L70 (27.6kV) backs-up the 15L46. Westbrook 20S is backed up by Green Hill 30R9 and Cedar La 41L is backed up by Bokum 15L5 and Saybrook 22D4. Having three circuits on one pole line that is difficult to access creates a risk extended abnormality should reliability issues occur. The second issue is a split pole top (vertical corner construction) on the Bokum 15L70 (27.6kV) circuit located in the Bokum-Old Saybrook ROW between I-95 and a marsh. This circuit supplies the Saybrook 22D-2X Substation Transformer. The existing conductor spans ~500 ft over I-95 and then goes for another 850 ft over a marsh. This project will replace this structure with three new steel structures (to Transmission Crossing Specs) due to the lengthy spans of 3ph 556 ACSR wire and the hazard it will create if the lines were downed across I-95. The project will resolve both issues by relocating the circuits along town roads. CD01720:ROW 006 Remediation | Eversource has completed drone patrols of all distribution ROWs and has categorized all findings into five priority levels. ROW 006 had 76 total findings, 3 priority 1 poles, 26 priority 2 poles, 42 priority 3 poles, 4 priority 4 poles, and 1 priority 5 pole. This project will maintain the ROW and rebuild in place with steel poles and 556 tree wire. CD02211:13K57, 32P3 ROW Removal | This project is for the removal of the 13K57 and 32P3 obsolete and de-energized ROWs in Stonington, CT. These ROWs are hazardous assets that have resulted in customer complaints and have warranted repairs to inoperative circuits. CD02376:2025 ROW Priority 3 Poles - Central | This project will address 103 priority 3 damages found during ROW drone inspections. All ROW poles will be replaced with Class 1 or larger steel poles. CD02377:2024 ROW Priority 3 Poles - Eastern | Approximately 500 linear miles of Distribution ROW were inspected by drones in Connecticut. The damage found was recorded and prioritized. This project will address 55 Priority 3 findings. All ROW poles will be replaced with Class 1 or larger steel poles. CD02631:2026 ROW Priority 3 Poles | Approximately 500 linear miles of Distribution ROW were inspected by drones in Connecticut. The damage found was recorded and prioritized. This project will address 34 Priority 3 findings. All ROW poles will be replaced with Class 1 or larger steel poles. FRPROW:Projection Proj for ROW | Projection Project for Right of Way Lines SMART SWITCHES PROGRAMPart 76 of 77
CD01278:12C4-71S Smart Switch Program | Project CD01278 will sectionalize a 2,397 customer zone located beyond the Enfield 12C4-71S into smaller automatic zones. With these changes, customers will experience increased reliability. CD01921:Willamantic 14S31 Smart Switch Proj | This project will install an automatic loop scheme between the 14S31 and 14S32 circuits. By automating the loop scheme, power can be restored to customer quickly. CD02007:2B5 Smart Switch | Project CD02007 seeks to address large customer zones on the 2B5 circuit in Thomaston, CT. The 2B5 currently has two zones over 500 customers. The first zone is the 2B5-70S which hosts 511 customers. This zone has experienced three outages over the last four years. The second zone is the 2B5-60R which hosts 681 customers and has experienced two outages over the last four years. This project suggests the installation of two new sectionalizing devices to reduce large customer zones. One device, a radial recloser, will be installed on P# 830, Main St. Plymouth. This device will reduce the 2B5-70S zone from 511 to 145 customers and will simultaneously create a new 366 customer zone. The second device, a smart switch, will be installed in the 1B5-60R zone on P# 1181 along N Harwinton Ave, Plymouth. The installation of this device will reduce the 2B5-60R zone from 681 customers to 319 customers while also creating a new zone of 362 customers. With these changes, customers will experience increased reliability. CD02008:12J38 Smart Switch | This project is being established to address two large customer zones on the 12J38 circuit in Mansfield, CT. The 12J38-71S zone has 693 customers at risk and this project proposes adding a smart switch in the 12J38-71S zone, dividing it into a 365 and 328 customer zones. The 12J38-71S zone has experienced seven outages in the last four years. The 12J38-80M zone has 648 customers at risk which will be divided into zones of 286 and 362 customer zones. The zone reduction will be performed by adding a new recloser and reprogramming the existing 12J38-80M as a smart switch. The 12J38-80M zone has experienced one outage in the last four years. With these changes, customers will experience increased reliability. CD02201:Large Customer Zones RWO Central | The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02201 addresses 13 large customer zones in the Central Division with the installation of 24 viper reclosers. CD02318:2025 Large Customer Zones RWO West | The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02318 addresses 8 large customer zones in the Western Division with the installation of 15 viper reclosers. CD02319:2025 Eastern Large Customer Zone >1 | The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02319 addresses 3 large customer zones in the Eastern Division with the installation of 4 viper reclosers. CD02340:2024 Trip Saver Program | Project CD02340 proposes to install Trip Savers at 1155 fused lateral locations in Connecticut to reduce the number of outages caused by transient type events (Tree, Animal, Lightning, Patrolled Nothing Found).A Trip Saver is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum interrupter recloser. The Trip Saver is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. It also can eliminate momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would otherwise trip to prevent a lateral fuse cutout from operating in response to a transient fault.Part 77 of 77
CD02475:2025 Western Large Cusomer Zone 900 | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02475 addresses circuit zones that serves 900 - 999 customers. CD02519:2025 Htfd Lg Customer Zones SS | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02519 addresses circuit zones that serves more than 500 customers. CD02520:2025 Norwalk AWC Smart Switch RWO | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project 2520 address zones that are ranked in the top 100 in terms of customer interruptions in the Norwalk AWC. CD02521:Vacufuses Program 2025 | Project CD02521 proposes to install Vacufuses on Distribution transformer locations in Connecticut to reduce the number of outages caused by transient type events (Limbs, Animal, Lightning, Patrolled Nothing Found)._x000D__x000D_ _x000D__x000D_ A Vacufuse is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum_x000D__x000D_ interrupter recloser. The Vacufuse is designed to eliminate the sustained interruption that occurs when a transformer fuse cutout operates in response to a transient fault. This device will save outages and reduce trips by troubleshooters by reclosing after a transient fault occurs. CD02538:2025 Eastern-New London SS CI Rank | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02538 addresses circuit zones ranked in the top 100 due to customer outages over the past 4 years. CD02542:2025 Cent. Cheshire AWC SS (CI) - 1 | Smart Switch projects address circuit zones that serve more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that will lose power during a single outage. Project CD02542 addresses circuit zones that serve more than 500 customers and is ranked in the top 100 based on customers interrupted over the past 4 years. CD02562:2025 Single Phase Recloser Project | Project CD02562 proposes to install Viper SP single phase reclosers at fused lateral locations in Connecticut to reduce the number of outages caused by transient type events (Limbs, Animal, Lightning, Patrolled Nothing Found).A Viper SP recloser is a pole mounted electronically controlled interrupter recloser with full SCADA control and visibility utilizing an SEL 351 control. The Viper SP recloser is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. It also can eliminate momentary circuit interruptions that occur when a substation circuit breaker or source-side line rec
As listed on the current system