Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 8 of 77
CD00858 | 12H16 Contingency Load Relief | Operations | Peak Load/Capacity | 286-CD00858 CD00860 | 11F10 Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 287-CD00860 CD00861 | Service Change 165 Capital Ave Htfd | Operations | New Customer | 288-CD00861 CD00862 | New Service Grist Mill Village Bd A | Operations | New Customer | 289-CD00862 CD00864 | Reloc Green Hill 30R14&30R15 Getaw | Operations | Peak Load/Capacity | 290-CD00864 CD00865 | Extend 23KV to Supply Niagara Plant | Operations | New Customer | 291-CD00865 CD00870 | 2018 Smart Swch Prog 12F47-74S Zone | Operations | SMART SWITCHES PROGRAM | 292-CD00870 CD00872 | 2018 Smart Switch Program 11H75 Zon | Operations | SMART SWITCHES PROGRAM | 293-CD00872 CD00873 | 1B10 - 2018 Smart Switch Installati | Operations | SMART SWITCHES PROGRAM | 294-CD00873 CD00874 | 2018 Smart Switch Program 11H62 | Operations | SMART SWITCHES PROGRAM | 295-CD00874 CD00876 | 15D1-161R SmartSwitch Pr/30R14-162R | Operations | SMART SWITCHES PROGRAM | 296-CD00876 * | CD00880 | 2018 Smart Switch Program 22R1 | Operations | SMART SWITCHES PROGRAM | 297-CD00880 CD00881 | Noera 13H2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 298-CD00881 CD00882 | 32R1 remove underbridge cable | Operations | Distribution Line Reliability | 299-CD00882 CD00884 | 2018 Smart Switch_Berlin 6A8_Alt. T | Operations | SMART SWITCHES PROGRAM | 300-CD00884 CD00885 | 2018 Smart Switch Program 11Y1 | Operations | SMART SWITCHES PROGRAM | 301-CD00885 CD00886 | 2018 Smart Switch Program 36F2 | Operations | SMART SWITCHES PROGRAM | 302-CD00886 CD00887 | 2018 Smart Switch Program 36F6 | Operations | SMART SWITCHES PROGRAM | 303-CD00887 CD00888 | Re-feed Essex Industrial Park | Operations | POLE INTEGRITY PROGRAM | 304-CD00888 CD00889 | 1B12 - Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 305-CD00889 CD00890 | 2B6 - Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 306-CD00890 CD00891 | Extend 24J2 - Creation @ 24J5 and 2 | Operations | Peak Load/Capacity | 307-CD00891 | 307-CD00891-SP03 CD00892 | 2018 Smart Switch Program 15C8 | Operations | SMART SWITCHES PROGRAM | 308-CD00892 * | CD00893 | 2018 Smart Switch Program 23Q8 | Operations | SMART SWITCHES PROGRAM | 309-CD00893 CD00897 | Tie Between 21H14 and 22R4 | Operations | SMART SWITCHES PROGRAM | 310-CD00897 CD00898 | Mystic-Shunock Loops For MBI Improv | Operations | Regulatory Commitments-Other | 311-CD00898 CD00899 | 2A14/15 ROW Resiliency | Operations | RIGHT OF WAY LINES | 312-CD00899 CD00902 | 3814 Reconduct @ Trader Joe/Phoenix | Operations | New Customer | 313-CD00902 CD00903 | Reconductor Convert Chesnut Hill Rd | Operations | Distribution Line Reliability | 314-CD00903 CD00904 | Bridge Cable Replace - Multiple Loc | Operations | Network Reliability | 315-CD00904 CD00905 | Replace P&LC on 1B06 | Operations | Network Reliability | 316-CD00905 * | CD00906 | 47N2 Smart Switch Assignment | Operations | SMART SWITCHES PROGRAM | 317-CD00906 CD00907 | Wheeler Village Dr., Sog - Install | Operations | URD/DB Cable Reliability | 318-CD00907 CD00908 | 2018 Smart Switch Program 11Y6 | Operations | SMART SWITCHES PROGRAM | 319-CD00908 CD00909 | Reverknolls DB Replacement | Operations | URD/DB Cable Reliability | 320-CD00909 CD00911 | West Goshen 20U Substation Eliminat | Operations | Distribution Line Reliability | 321-CD00911 * | CD00912 | Replace of Underbridge Cable 3A09 | Operations | POLE INTEGRITY PROGRAM | 322-CD00912 CD00916 | South End 1G DG1 Sensors | Operations | Network Reliability | 323-CD00916 * | CD00917 | Uncasville 1Q6 I-395 Brdg Cable Rep | Operations | Network Reliability | 324-CD00917 CD00918 | Northwest Hartford 2N DGI Sensors | Operations | Network Reliability | 325-CD00918 CD00919 | Shepaug 13A Install Regulation | Operations | Peak Load/Capacity | 326-CD00919 CD00922 | Quarry Dock Rd, Cable Replacement | Operations | URD/DB Cable Reliability | 327-CD00922Part 9 of 77
CD00923 | 2018 Smart Switch Program 19Y1 | Operations | SMART SWITCHES PROGRAM | 328-CD00923 CD00924 | Bulls Bridge Distribution wk for T | Operations | Peak Load/Capacity | 329-CD00924 CD00925 | Convert South Leonard Ave 5 kV Feed | Operations | Distribution Line Reliability | 330-CD00925 | 330-CD00925-SP01 | 330-CD00925-SP02 | 330-CD00925-SP03 CD00926 | 13H96-13H99 Recloser Loop Scheme | Operations | SMART SWITCHES PROGRAM | 331-CD00926 CD00928 | Freight 11W DGI Sensors | Operations | Network Reliability | 332-CD00928 | 332-CD00928-SP01 CD00931 | Middletown-Rosecommon Dr_DB Cbl Rep | Operations | URD/DB Cable Reliability | 333-CD00931 CD00932 | CDOT - Norw Westport Ave Rd Widenin | Operations | Line Relocations/Act of Public Authority | 334-CD00932 CD00937 | 12N19 Overload Correction | Operations | Peak Load/Capacity | 335-CD00937 CD00941 | Relocate Bushy Plains Rd Pole line | Operations | Line Relocations/Act of Public Authority | 336-CD00941 CD00942 | CDOT 14-185 Int 95 Brdg over rt 1 | Operations | Line Relocations/Act of Public Authority | 337-CD00942 CD00943 | Black Rock 11H DGI Sensors | Operations | Network Reliability | 338-CD00943 CD00944 | Cos Cob 11R DGI Sensors | Operations | Network Reliability | 339-CD00944 | 339-CD00944-SP01 CD00945 | Farmington 1C DGI Sensors | Operations | Network Reliability | 340-CD00945 | 340-CD00945-SP01 CD00946 | 1K10/13S7 Contingency Overload | Operations | Network Reliability | 341-CD00946 CD00947 | Westside 7A DGI Sensors | Operations | Network Reliability | 342-CD00947 CD00948 | Williams 9L DGI Sensors | Operations | Network Reliability | 343-CD00948 CD00949 | New Customer on 3R12 overload (LNG) | Operations | New Customer | 344-CD00949 * | CD00951 | 725 Bedford Street - New Service | Operations | New Customer | 345-CD00951 CD00954 | Stamford Ice Skating Rink New Serv | Operations | New Customer | 346-CD00954 CD00955 | Westport Overload Project | Operations | Peak Load/Capacity | 347-CD00955 CD00958 | Championship Drive - DB Line Exten | Operations | New Customer | 348-CD00958 CD00959 | New Brtn 5kv Conversion - 21W Porti | Operations | Regulatory Commitments-Other | 349-CD00959 CD00960 | Hillcroft Apartments Create Loop | Operations | URD/DB Cable Reliability | 350-CD00960 CD00964 | 1G28 Contingency Overload | Operations | Peak Load/Capacity | 351-CD00964 | 351-CD00964-SP03 CD00969 | Campville Row pole replacements | Operations | RIGHT OF WAY LINES | 352-CD00969 CD00970 | Back up Westbrook Sub 20S | Operations | ISLANDED SUBSTATION PROGRAM | 353-CD00970 CD00971 | 12J4-12J33 R.O.W. Rebuild | Operations | RIGHT OF WAY LINES | 354-CD00971 CD00976 | Eliminate Manual Switchgear I84 PF | Operations | Network Reliability | 355-CD00976 CD00978 | New Brtn Conv Farmington 23L Sub. | Operations | Regulatory Commitments-Other | 356-CD00978 CD00979 | Convert 19R2 | Operations | Regulatory Commitments-Other | 357-CD00979 CD00984 | 26 Russell St. New Brtn - New Svc | Operations | New Customer | 358-CD00984 CD00986 | Cable inject Trinity Ave, Glastonbu | Operations | URD/DB Cable Reliability | 359-CD00986 CD00987 | Pole Integrity - 2018 | Operations | POLE INTEGRITY PROGRAM | 360-CD00987 CD00988 | Shift Eqpt - Frontier Reject Poles | Operations | POLE INTEGRITY PROGRAM | 361-CD00988 CD00991 | Flax Hill New Feeder 24A19 | Operations | New Customer | 362-CD00991 CD00994 | Switchgear Replacement at Electric | Operations | Network Reliability | 363-CD00994 CD00997 | Colonial Drive Cable Replacement | Operations | URD/DB Cable Reliability | 364-CD00997 CD01004 | Improve Customer Zone Count 7A71, 7 | Operations | SMART SWITCHES PROGRAM | 365-CD01004 CD01005 | Mitigate Osprey Outages Eastern Reg | Operations | Environmental | 366-CD01005 CD01006 | Smart Switch Program 6A3 | Operations | SMART SWITCHES PROGRAM | 367-CD01006 | 367-CD01006-SP03 * | CD01007 | Smart Switches Program 11H76 | Operations | SMART SWITCHES PROGRAM | 368-CD01007 | 368-CD01007-SP03Part 10 of 77
CD01008 | 12B35 Smart Switch | Operations | SMART SWITCHES PROGRAM | 369-CD01008 | 369-CD01008-SP03 CD01009 | 15C8, 13B10, 13B21 New Loops | Operations | Regulatory Commitments-Other | 370-CD01009 | 370-CD01009-SP03 CD01010 | Scitico 27H8 Contingency Overload | Operations | Peak Load/Capacity | 371-CD01010 CD01012 | 14H3 Smart Switch | Operations | SMART SWITCHES PROGRAM | 372-CD01012 CD01013 | 24A14 - Putnam Rd Ext New Canaan Cb | Operations | URD/DB Cable Reliability | 373-CD01013 CD01014 | Cromwell Hills URD DB Cable Rpl Rd | Operations | URD/DB Cable Reliability | 374-CD01014 CD01015 | Middletown_Cedar Village_DB Cbl Rpl | Operations | URD/DB Cable Reliability | 375-CD01015 CD01017 | 12B37-2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 376-CD01017 CD01019 | 131 Hollow Tree Ridge Rd., Reloc Fa | Operations | New Customer | 377-CD01019 CD01021 | 49S2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 378-CD01021 CD01023 | 21P4 Smart Switch | Operations | SMART SWITCHES PROGRAM | 379-CD01023 | 379-CD01023-SP03 CD01024 | Norwalk 9S 5kV Elimination | Operations | Distribution Line Reliability | 380-CD01024 CD01026 | Beacon Falls 11N83 & 11N84 Reliab | Operations | RIGHT OF WAY LINES | 381-CD01026 CD01031 | 4C19 Smart Switch | Operations | SMART SWITCHES PROGRAM | 382-CD01031 | 382-CD01031-SP03 CD01032 | 3R01 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 383-CD01032 | 383-CD01032-SP03 CD01036 | 11J41-71S Smart Switch Prog 2018 | Operations | SMART SWITCHES PROGRAM | 384-CD01036 CD01037 | TDRP Tunnel 12S4 | Operations | Regulatory Commitments-Other | 385-CD01037 CD01038 | Green Hill 30R Balancing | Operations | Peak Load/Capacity | 386-CD01038 CD01039 | Mystic 13K1 TDRP | Operations | Regulatory Commitments-Other | 387-CD01039 CD01040 | Smart Switch 3A12 | Operations | SMART SWITCHES PROGRAM | 388-CD01040 | 388-CD01040-SP03 CD01045 | TDRP 2017 Project_Dooley 30K11 | Operations | Regulatory Commitments-Other | 389-CD01045 CD01046 | TDRP 2017 Project_Dooley 30K13 | Operations | Regulatory Commitments-Other | 390-CD01046 | 390-CD01046-SP03 CD01047 | Lakeview 31A Contingency Loading | Operations | Peak Load/Capacity | 391-CD01047 | 391-CD01047-SP03 CD01048 | Mianus 16Q Contingency Load Relief | Operations | Peak Load/Capacity | 392-CD01048 | 392-CD01048-SP03 CD01050 | Atlantic Station South Tower | Operations | New Customer | 393-CD01050 CD01053 | Install SWGR For Meriden Common PH2 | Operations | New Customer | 394-CD01053 | 394-CD01053-SP01 | 394-CD01053-SP02 | 394-CD01053-SP03 CD01056 | 3A11/49S1-New Recloser Loop Scheme | Operations | Distribution Line Reliability | 395-CD01056 CD01057 | W. Hyderdale Dr Gosh DB Cable Repl | Operations | URD/DB Cable Reliability | 396-CD01057 CD01059 | Stamford New Service – 245 Atlantic | Operations | New Customer | 397-CD01059 CD01060 | West Ave OH Relocation | Operations | Line Relocations/Act of Public Authority | 398-CD01060 | 398-CD01060-SP03 CD01061 | May St Naugatuck Extend 3 phase | Operations | New Customer | 399-CD01061 CD01062 | New Service Kesser Torah Estates | Operations | New Customer | 400-CD01062 CD01065 | Mystic 13K4 OL Upon Loss of A3 Bus | Operations | Peak Load/Capacity | 401-CD01065 | 401-CD01065-SP03 CD01066 | Rockville 14W Cable Upgrades & Offl | Operations | Peak Load/Capacity | 402-CD01066 | 402-CD01066-SP03 CD01067 | Replace Tri-colored Netwk Secondary | Operations | Regulatory Commitments-Other | 403-CD01067 CD01071 | 13F66 & 68 Loop Scheme Modification | Operations | Distribution Line Reliability | 404-CD01071 CD01077 | CT Studio South Windsor | Operations | New Customer | 405-CD01077 CD01082 | 5R4 Robin Dr Bark DB Cable Replac | Operations | URD/DB Cable Reliability | 406-CD01082 * | CD01087 | Hytone Farm | Operations | New Customer | 407-CD01087 | 407-CD01087-SP03 * | CD01091 | Back up for Buckingham 31K | Operations | ISLANDED SUBSTATION PROGRAM | 408-CD01091Part 11 of 77
CD01092 | Replace Duct Bank - Reserve Rd., Ht | Operations | Network Reliability | 409-CD01092 CD01093 | Alternate Source For Essex 16M | Operations | ISLANDED SUBSTATION PROGRAM | 410-CD01093 CD01094 | 14S&39M Stranded Substation Backup | Operations | ISLANDED SUBSTATION PROGRAM | 411-CD01094 CD01095 | Load Relief 48C9 Contingency Overlo | Operations | Peak Load/Capacity | 412-CD01095 CD01097 | 21H15-Automatic Zone Alternate Sour | Operations | SMART SWITCHES PROGRAM | 413-CD01097 | 413-CD01097-SP03 CD01102 | CDOT 152-158 Route 85 Waterford | Operations | Line Relocations/Act of Public Authority | 414-CD01102 CD01103 | Triangle 11A72 Auto Loop Scheme Ins | Operations | SMART SWITCHES PROGRAM | 415-CD01103 | 415-CD01103-SP03 CD01105 | Stone Gate Circle DB Reconductori | Operations | URD/DB Cable Reliability | 416-CD01105 CD01107 | Heritage Village Southbury Reliabil | Operations | Distribution Line Reliability | 417-CD01107 CD01109 | CDOT 155-171 | Operations | Line Relocations/Act of Public Authority | 418-CD01109 CD01111 | Tie Between 22R1 and 22R6 | Operations | Regulatory Commitments-Other | 419-CD01111 CD01113 | ASML Facility Expansion | Operations | New Customer | 420-CD01113 CD01114 | Plymouth Industrial Park | Operations | URD/DB Cable Reliability | 421-CD01114 CD01116 | Economy Spring New Service Aircraft | Operations | New Customer | 422-CD01116 CD01117 | Stmfrd – Greenwich Ave – Rel. Facil | Operations | Line Relocations/Act of Public Authority | 423-CD01117 | 423-CD01117-SP03 CD01119 | Stamford New Service – 885 Washingt | Operations | New Customer | 424-CD01119 CD01120 | Cromwell Hills UG FI Repl | Operations | URD/DB Cable Reliability | 425-CD01120 CD01121 | 302P Switchgear Automation | Operations | Network Reliability | 426-CD01121 CD01122 | 1205 Feeder - Eliminate Redundant C | Operations | Network Reliability | 427-CD01122 CD01123 | Center Street 24F Islanded Substati | Operations | Distribution Line Reliability | 428-CD01123 * | CD01126 | 14M7 Loop Scheme and Reliability Up | Operations | RECLOSER CONTROL PROGRAM | 429-CD01126 CD01128 | L&M Hospital New Service Switchgear | Operations | New Customer | 430-CD01128 | 430-CD01128-SP03 CD01129 | Pole Integrity - 2019 | Operations | POLE INTEGRITY PROGRAM | 431-CD01129 | 431-CD01129-SP03 CD01132 | Triangle 11A Repl Cables for SS wor | Operations | Network Reliability | 432-CD01132 | 432-CD01132-SP01 | 432-CD01132-SP02 | 432-CD01132-SP03 CD01136 | Willow Springs Condos Cable Replace | Operations | URD/DB Cable Reliability | 433-CD01136 * | CD01140 | 3A03 Contingency Overload | Operations | Peak Load/Capacity | 434-CD01140 CD01141 | Bloom CT Clean Energy Company | Operations | New Customer | 435-CD01141 CD01142 | Shift Eqpt-Frontier Rejects - 2019 | Operations | POLE INTEGRITY PROGRAM | 436-CD01142 CD01144 | Reroute 35L9 and 35L10 getaways | Operations | Network Reliability | 437-CD01144 CD01145 | Reconductor Chapman Ave, Madison | Operations | POLE INTEGRITY PROGRAM | 438-CD01145 CD01154 | 30R9 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 439-CD01154 CD01155 | Branford 11J45 Smart Switch -TOP 20 | Operations | SMART SWITCHES PROGRAM | 440-CD01155 * | CD01158 | SSRK6.18-12H16-2->500-RWO.2 | Operations | SMART SWITCHES PROGRAM | 441-CD01158 CD01159 | Western Reconductoring-Reject Poles | Operations | POLE INTEGRITY PROGRAM | 442-CD01159 CD01161 | SSRK2.18-21K7-2->1000-RWO.3 | Operations | SMART SWITCHES PROGRAM | 443-CD01161 CD01162 | Verogy - Southington | Operations | New Customer | 444-CD01162 | 444-CD01162-SP01 CD01163 | Verogy - East Windsor | Operations | New Customer | 445-CD01163 | 445-CD01163-SP01 CD01165 | Fry Brook 13B25-70S Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 446-CD01165 CD01166 | Middletown Westside 7A79 Westlake R | Operations | URD/DB Cable Reliability | 447-CD01166 | 447-CD01166-SP03 CD01167 | Smart Switch 36F6 2019 Program | Operations | Regulatory Commitments-Other | 448-CD01167Part 12 of 77
CD01170 | LARGE ZONE 12S2 - TOP 20 | Operations | SMART SWITCHES PROGRAM | 449-CD01170 CD01171 | Green Hill 30R9 SmartSwitch-TOP 20 | Operations | SMART SWITCHES PROGRAM | 450-CD01171 CD01173 | Coal Pit Hill Condos | Operations | URD/DB Cable Reliability | 451-CD01173 CD01174 | 11F9 Smart Switch - TOP 20 | Operations | SMART SWITCHES PROGRAM | 452-CD01174 CD01178 | Nutmeg Ln Reconductoring, Newtown | Operations | Distribution Line Reliability | 453-CD01178 CD01184 | Green Hill 30R8 Getaway Replacement | Operations | Network Reliability | 454-CD01184 CD01185 | SSRK614 18-35L8->1000-RWO 3 | Operations | SMART SWITCHES PROGRAM | 455-CD01185 | 455-CD01185-SP03 CD01186 | SS Prgm 32R1 & 32R3 Large zone Redu | Operations | Regulatory Commitments-Other | 456-CD01186 CD01189 | PCB Transformer Replacement Program | Operations | New Customer | 457-CD01189 CD01190 | SSRK128.18.13B9-70S>1,000-RWO.2 | Operations | SMART SWITCHES PROGRAM | 458-CD01190 CD01191 | Middletown_Eastlake Dr_Loop Desig | Operations | URD/DB Cable Reliability | 459-CD01191 | 459-CD01191-SP01 CD01192 | Greenwich – 11R55 – Reconductor A/C | Operations | Distribution Line Reliability | 460-CD01192 CD01193 | DB Cable Replacement South Mill Dr | Operations | URD/DB Cable Reliability | 461-CD01193 CD01194 | 11R51 and 11R52 PILC Cable Replacem | Operations | Network Reliability | 462-CD01194 CD01197 | 9L08-70S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 463-CD01197 | 463-CD01197-SP03 CD01198 | 9L03-2 Smart Switch Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 464-CD01198 | 464-CD01198-SP03 CD01199 | 9L06-70S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 465-CD01199 | 465-CD01199-SP02 | 465-CD01199-SP03 CD01200 | 9L05-72S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 466-CD01200 | 466-CD01200-SP02 | 466-CD01200-SP03 CD01201 | CDOT Beachside Ave Bridge Rebuild | Operations | URD/DB Cable Reliability | 467-CD01201 CD01203 | 55 Elm St., Hart. - Vault Repairs | Operations | New Customer | 468-CD01203 CD01204 | 11F10 R.O.W Removal | Operations | RIGHT OF WAY LINES | 469-CD01204 CD01206 | Saybrook 22D4-72S Smart Switch Prog | Operations | SMART SWITCHES PROGRAM | 470-CD01206 | 470-CD01206-SP01 CD01207 | Grist Mill Village Building B | Operations | New Customer | 471-CD01207 CD01210 | 12F48 Smart Switches | Operations | SMART SWITCHES PROGRAM | 472-CD01210 CD01211 | Lake Vista, DB Cable Replacement | Operations | URD/DB Cable Reliability | 473-CD01211 CD01212 | Grist Mill Village Building C | Operations | New Customer | 474-CD01212 CD01215 | Greenwich – 22E36 – Reconductor wit | Operations | Distribution Line Reliability | 475-CD01215 CD01217 | 3B13-2 Smart Switch | Operations | SMART SWITCHES PROGRAM | 476-CD01217 CD01218 | 47N8-5 Smart Switch | Operations | SMART SWITCHES PROGRAM | 477-CD01218 CD01219 | 15U2-70S Smart Switch | Operations | SMART SWITCHES PROGRAM | 478-CD01219 CD01220 | Berlin_Berlin SS Support for 6A4 & | Operations | Peak Load/Capacity | 479-CD01220 | 479-CD01220-SP03 CD01221 | 27H1-72S Smart Switch | Operations | SMART SWITCHES PROGRAM | 480-CD01221 CD01222 | SSRK18.18-9S13-80M->1038-RWO.1 | Operations | SMART SWITCHES PROGRAM | 481-CD01222 CD01223 | Bradley Airport Alternate Supply | Operations | New Customer | 482-CD01223 | 482-CD01223-SP01 CD01237 | Bristol Solar One Interconnection | Operations | New Customer | 483-CD01237 CD01239 | Dayville 24K Islanded Substation | Operations | Regulatory Commitments-Other | 484-CD01239 CD01242 | SR - Litchfield Interconnection | Operations | New Customer | 485-CD01242 | 485-CD01242-SP01 | 485-CD01242-SP03 CD01244 | SR N Stonington Interconnection | Operations | New Customer | 486-CD01244 | 486-CD01244-SP01 CD01246 | Fry Brook 13B21/13B27 ROW Pole Repl | Operations | RIGHT OF WAY LINES | 487-CD01246 | 487-CD01246-SP01 * | CD01247 | Branford 11J43 Same Circuit Tie | Operations | SMART SWITCHES PROGRAM | 488-CD01247Part 13 of 77
CD01250 | 4A9-73S Smart Switch | Operations | SMART SWITCHES PROGRAM | 489-CD01250 * | CD01253 | SSRK82.18-29J2-61R>505-RWO.3 | Operations | SMART SWITCHES PROGRAM | 490-CD01253 CD01257 | Windham_Prospect St_ECSU_Create DB | Operations | URD/DB Cable Reliability | 491-CD01257 CD01260 | CT Lateral Reliability (2019 Group) | Operations | Distribution Line Reliability | 492-CD01260 CD01262 | Greenwich 28F– Rel. Facilities for | Operations | Line Relocations/Act of Public Authority | 493-CD01262 CD01264 | 3A11-71S Manchester Smart Switch | Operations | SMART SWITCHES PROGRAM | 494-CD01264 | 494-CD01264-SP03 CD01265 | 2019 Connecticut DB Insp/Fault Indi | Operations | Distribution Line Reliability | 495-CD01265 CD01269 | Man to Auto - 2 N Main St Wtby | Operations | Network Reliability | 496-CD01269 CD01270 | 1291 Albany Ave., Hart. - Replace M | Operations | Distribution Line Reliability | 497-CD01270 CD01271 | SSRK33.18-22M10-81M=>500-COND.2 | Operations | SMART SWITCHES PROGRAM | 498-CD01271 | 498-CD01271-SP01 CD01272 | Stamford New Service – Charter Comm | Operations | New Customer | There are customer contributions of $7.945 netting the pre-construction estimated direct costs to $443,779. The estimated direct costs excluding the customer contribution is $451,724. Actual direct costs exceed the estimate by 8%. A supplemental request is not required per the Project Authorization policy. | 499-CD01272 CD01273 | 21L1-70S Smart Switch | Operations | SMART SWITCHES PROGRAM | 500-CD01273 CD01274 | Newtown 11A73 Smart Switch | Operations | SMART SWITCHES PROGRAM | 501-CD01274 * | CD01280 | Torrington Smart Switch | Operations | SMART SWITCHES PROGRAM | 502-CD01280 CD01282 | SSRK27.18-11S15-2>653-RWO.4 | Operations | SMART SWITCHES PROGRAM | 503-CD01282 * | CD01290 | SSRK28.18-21K11-2>500-RWO.3 | Operations | SMART SWITCHES PROGRAM | 504-CD01290 * | CD01291 | 5 or More Tripp Hollow Rd 30Y10 | Operations | Distribution Line Reliability | 505-CD01291 CD01295 | New Svc CT Rubber Molding Co. Danie | Operations | New Customer | 506-CD01295 CD01296 | 860 Canal Street New Svc Office Bld | Operations | New Customer | 507-CD01296 CD01297 | Parcel 38 – Tresser Blvd Phase 2 | Operations | New Customer | 508-CD01297 CD01298 | CDOT 117-159 Route 35 UG Relocation | Operations | Line Relocations/Act of Public Authority | 509-CD01298 CD01301 | 2020 POLE INTEGRITY | Operations | POLE INTEGRITY PROGRAM | 510-CD01301 | 510-CD01301-SP03 CD01302 | 2020 FRONTIER POLE SHIFTS | Operations | POLE INTEGRITY PROGRAM | 511-CD01302 CD01304 | 3A02/3A09 R.O.W. Structure Replacem | Operations | RIGHT OF WAY LINES | 512-CD01304 CD01306 | 11C14 Back up to 600 customers | Operations | Distribution Line Reliability | 513-CD01306 CD01307 | Airline Trail ROW Relocation | Operations | Line Relocations/Act of Public Authority | 514-CD01307 | 514-CD01307-SP03 CD01308 | Saybrook 22D Triple Circuit ROW | Operations | RIGHT OF WAY LINES | 515-CD01308 | 515-CD01308-SP01 | 515-CD01308-SP02 | 515-CD01308-SP03 CD01310 | Drummers Lane UG Cable Replacement | Operations | URD/DB Cable Reliability | 516-CD01310 CD01312 | Osprey Mitigation 2020 | Operations | Environmental | 517-CD01312 CD01313 | Darien new service - 40 Heights Rd | Operations | New Customer | 518-CD01313 CD01314 | Litchfield Turnpike, Bethany, Recon | Operations | Distribution Line Reliability | 519-CD01314 CD01317 | 32G9-71S Smarth Switch Program | Operations | SMART SWITCHES PROGRAM | 520-CD01317 CD01320 | Deep River Reconductor Kirtland St | Operations | Distribution Line Reliability | 521-CD01320 CD01322 | CT Lateral Reliability (2019 Group | Operations | Distribution Line Reliability | 522-CD01322 CD01323 | CT Lateral Reliability (2019 Group | Operations | Distribution Line Reliability | 523-CD01323 CD01327 | Hamilton Ave Wtby Conv to 13.8kV | Operations | New Customer | 524-CD01327 CD01330 | Line Sensor Upgrade | Operations | Reliability - Other | 525-CD01330Part 14 of 77
CD01333 | Freight 11W76 PILC Cable Replace | Operations | Network Reliability | 526-CD01333 | 526-CD01333-SP01 | 526-CD01333-SP02 | 526-CD01333-SP03 CD01334 | Nautilus Drive UG Loop | Operations | URD/DB Cable Reliability | 527-CD01334 CD01335 | Man to Auto-55 W Main & 7 Kendrick | Operations | Network Reliability | 528-CD01335 CD01340 | Yale Ave 25L Islanded Substation | Operations | Distribution Line Reliability | 529-CD01340 | 529-CD01340-SP03 CD01343 | 11N81 TDRP 2019 Analysis | Operations | Regulatory Commitments-Other | 530-CD01343 CD01348 | URD Wellington Dr Farmington | Operations | URD/DB Cable Reliability | 531-CD01348 CD01350 | 14L5/L6 Contingency Overload | Operations | New Customer | 532-CD01350 CD01355 | Aquarian 3-Phase Extension | Operations | New Customer | 533-CD01355 CD01358 | Baldwin 13F65 Load Relief | Operations | Peak Load/Capacity | 534-CD01358 CD01360 | Niantic 21Y2 Overload | Operations | Peak Load/Capacity | 535-CD01360 CD01362 | Overload West Brookfield 14H Sub | Operations | Peak Load/Capacity | 536-CD01362 CD01363 | CD01363 30R10 1st Contingency Overl | Operations | Peak Load/Capacity | 537-CD01363 CD01368 | Stepstone 35L8 - Green Hill 30R14 T | Operations | Distribution Line Reliability | 538-CD01368 | 538-CD01368-SP03 CD01369 | 2N10 Contingent Overloads | Operations | Peak Load/Capacity | 539-CD01369 CD01370 | Middletown_Westside 7A81_Low Volt. | Operations | Peak Load/Capacity | 540-CD01370 CD01372 | W Brookfield 14H4 Contingency Ovrld | Operations | Peak Load/Capacity | 541-CD01372 | 541-CD01372-SP03 CD01373 | CDOT Project 302-0014 - Glover Ave | Operations | Line Relocations/Act of Public Authority | 542-CD01373 CD01374 | Williams St 9L09 Crystal Ave UG Loo | Operations | URD/DB Cable Reliability | 543-CD01374 CD01377 | Southington 4C12 Contingency Overlo | Operations | Peak Load/Capacity | 544-CD01377 CD01378 | 43F3 Load Relief 90% Normal | Operations | Peak Load/Capacity | 545-CD01378 | 545-CD01378-SP03 CD01379 | 5L02 - Relocation of Right of Way | Operations | RIGHT OF WAY LINES | 546-CD01379 | 546-CD01379-SP03 CD01380 | CT Lateral Reliab (2020 Grp 5) | Operations | Distribution Line Reliability | 547-CD01380 CD01381 | CT Lateral Relib (2020 Group6 | Operations | Distribution Line Reliability | 548-CD01381 CD01382 | SSRK6.19-11A71-80M->1000-RWO.1 | Operations | SMART SWITCHES PROGRAM | 549-CD01382 CD01383 | Charter Communications Phase 2 | Operations | New Customer | 550-CD01383 CD01384 | Harbor Point P Block Phase 2 | Operations | New Customer | 551-CD01384 CD01385 | Reliability Greenwich Network N-2 | Operations | Distribution Line Reliability | 552-CD01385 | 552-CD01385-SP01 | 552-CD01385-SP02 | 552-CD01385-SP03 CD01386 | 2020 CT DB Insp/Fault Ind Repl | Operations | URD/DB Cable Reliability | 553-CD01386 CD01388 | Greenwich-11R55-reconductor A/C | Operations | Distribution Line Reliability | 554-CD01388 CD01390 | DG - LSE Enfield LEG-25504 | Operations | New Customer | 555-CD01390 CD01393 | CD01393 Wind Colebrook South | Operations | New Customer | 556-CD01393 CD01398 | Town of Norfolk, 599 Greenwoods Rd | Operations | New Customer | 557-CD01398 | 557-CD01398-SP01 CD01399 | Cobb Road LLC | Operations | New Customer | 558-CD01399 | 558-CD01399-SP01 CD01406 | Central Line Sensors 3G to 4G | Operations | Reliability - Other | 559-CD01406 CD01407 | Eastern Line Sensor 3G to 4G | Operations | Reliability - Other | 560-CD01407 CD01412 | C-Tec Solar Berlin Landfill | Operations | New Customer | 561-CD01412 | 561-CD01412-SP01 CD01428 | 1K06/ 13S10 Contingency Overload | Operations | Network Reliability | 562-CD01428 | 562-CD01428-SP03 CD01430 | Gateway Commons Phase 2 | Operations | New Customer | 563-CD01430 CD01436 | 2020 CT Trip Saver Program | Operations | Distribution Line Reliability | 564-CD01436 CD01452 | Impact - Lodestart N Canaan | Operations | New Customer | 565-CD01452 | 565-CD01452-SP03Part 15 of 77
CD01459 | Thompson Land Trust - NS | Operations | New Customer | 566-CD01459 | 566-CD01459-SP01 | 566-CD01459-SP03 CD01461 | Verogy, 669 Platt Road, Watertown | Operations | New Customer | 567-CD01461 CD01463 | Man to Auto - 1 School St Waterbury | Operations | Network Reliability | 568-CD01463 CD01465 | Cedar Heights Rd Bridge CDOT 135 | Operations | Line Relocations/Act of Public Authority | 569-CD01465 | 569-CD01465-SP01 | 569-CD01465-SP02 | 569-CD01465-SP03 CD01466 | SSRK622.19-30R9-61R->1024.RWO.2 | Operations | SMART SWITCHES PROGRAM | 570-CD01466 CD01470 | DG Verogy Burlington | Operations | New Customer | 571-CD01470 | 571-CD01470-SP01 CD01473 | DG Impact Study Verogy Enfield | Operations | New Customer | 572-CD01473 CD01478 | 11N88 Seymour Smart Switch | Operations | SMART SWITCHES PROGRAM | 573-CD01478 CD01480 | Main St Bridge Replacement in Stamf | Operations | Line Relocations/Act of Public Authority | 574-CD01480 CD01489 | Convert-Reloc Step-Crown St 12F55 | Operations | Peak Load/Capacity | 575-CD01489 | 575-CD01489-SP03 * | CD01492 | Tunnel 12S1 – Convert Preston Road | Operations | Substation Reliability | 576-CD01492 CD01497 | CTDOT #135-340 - Summer St Intersec | Operations | Line Relocations/Act of Public Authority | 577-CD01497 CD01501 | Bristol Hospital Expansion | Operations | Line Relocations/Act of Public Authority | 578-CD01501 CD01503 | CDOT 96-204 – Intersection Improvem | Operations | Line Relocations/Act of Public Authority | 579-CD01503 | 579-CD01503-SP03 CD01504 | CORRECT OVERLOADS AT 17R AND PEPPER | Operations | Peak Load/Capacity | 580-CD01504 CD01508 | Middletown Pole Rejects Reconductor | Operations | POLE INTEGRITY PROGRAM | 581-CD01508 CD01509 | New Service O&G | Operations | New Customer | 582-CD01509 CD01510 | 27H1 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 583-CD01510 CD01511 | UCONN High Capacity Feeder | Operations | New Customer | 584-CD01511 CD01512 | Westbrook Village URD and System Im | Operations | New Customer | 585-CD01512 CD01514 | Americold New Svc NW Dr. Plainville | Operations | New Customer | 586-CD01514 | 586-CD01514-SP01 * | CD01521 | Newtown Pole Replacements and Recon | Operations | POLE INTEGRITY PROGRAM | 587-CD01521 CD01522 | SSRK21.19-12Y15-2-894-RWO.3 | Operations | SMART SWITCHES PROGRAM | 588-CD01522 CD01523 | CDOT 42-317 Rte 2, East Hartford | Operations | Line Relocations/Act of Public Authority | 589-CD01523 CD01524 | Smart Switch 14L3 | Operations | SMART SWITCHES PROGRAM | 590-CD01524 CD01525 | Smart Switch 24H4 | Operations | SMART SWITCHES PROGRAM | 591-CD01525 | 591-CD01525-SP03 CD01526 | 5 Nabby Rd – DB Cable Replacement | Operations | URD/DB Cable Reliability | 592-CD01526 CD01527 | 47N3-80M Smart Switch | Operations | SMART SWITCHES PROGRAM | 593-CD01527 | 593-CD01527-SP03 CD01534 | State Pier Offshore Wind | Operations | New Customer | 594-CD01534 | 594-CD01534-SP03 CD01536 | Falls Village 4L07-5L Express Feede | Operations | Peak Load/Capacity | 595-CD01536 | 595-CD01536-SP01 | 595-CD01536-SP02 | 595-CD01536-SP03 CD01537 | 25 Laurel St Htfd - Automate Svc | Operations | Network Reliability | 596-CD01537 | 596-CD01537-SP01 CD01540 | SSRK001-19-26E9-72S->575-RWO#1 | Operations | Regulatory Commitments-Other | 597-CD01540 CD01544 | Peaceable 12N17 / 12N14 Overload | Operations | Peak Load/Capacity | 598-CD01544 CD01546 | Convert 20H | Operations | Regulatory Commitments-Other | 599-CD01546 | 599-CD01546-SP01 | 599-CD01546-SP03 CD01547 | Newtown 12M4 TDRP | Operations | Regulatory Commitments-Other | 600-CD01547 CD01549 | Haynes New Service | Operations | New Customer | 601-CD01549 | 601-CD01549-SP03 CD01551 | 2021 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 602-CD01551 | 602-CD01551-SP01 | 602-CD01551-SP02 | 602-CD01551-SP03 CD01558 | Ridgefield 22N4 & 22N1 Normal Overl | Operations | Peak Load/Capacity | 603-CD01558 | 603-CD01558-SP03 CD01559 | 11W47 PILC Cable Replacement | Operations | Network Reliability | 604-CD01559Part 16 of 77
CD01561 | 2021 CT DB Insp/Fault Indicator Rep | Operations | URD/DB Cable Reliability | 605-CD01561 CD01562 | 1st Stamford Pl Switchgear Replace | Operations | Network Reliability | 606-CD01562 CD01563 | Sherwood Isle Connector Duct Damage | Operations | Peak Load/Capacity | 607-CD01563 CD01564 | Convert Thomaston Ave Wtby for NS | Operations | New Customer | 608-CD01564 CD01566 | DG - Impact Study Canterbury School | Operations | New Customer | 609-CD01566 | 609-CD01566-SP03 CD01567 | Riverbank Rd CDOT 135-328 | Operations | Line Relocations/Act of Public Authority | 610-CD01567 | 610-CD01567-SP01 CD01568 | Reconductor Portions of 11A58 & 11A | Operations | Peak Load/Capacity | 611-CD01568 CD01569 | Green Hill 30R ROW | Operations | RIGHT OF WAY LINES | 612-CD01569 CD01571 | 2022 Frontier Pole Shifts | Operations | POLE INTEGRITY PROGRAM | 613-CD01571 | 613-CD01571-SP03 CD01576 | 47N3 Contingency Overload | Operations | Peak Load/Capacity | 614-CD01576 CD01577 | 13F71 Contingency Load Relief | Operations | Peak Load/Capacity | 615-CD01577 CD01585 | 2021 TripSaver Program | Operations | Distribution Line Reliability | 616-CD01585 CD01593 | UCONN Medical Center | Operations | Network Reliability | 617-CD01593 CD01594 | Haddam Qtr Solar | Operations | New Customer | 618-CD01594 | 618-CD01594-SP01 CD01602 | New Svc-451 Steamboat Rd Greenwich | Operations | New Customer | 619-CD01602 CD01607 | Hartford Reverse Risers Rebuilds | Operations | Distribution Line Reliability | 620-CD01607 | 620-CD01607-SP03 CD01612 | Sandy Hook 37F3 Reliability Improve | Operations | Distribution Line Reliability | 621-CD01612 * | CD01621 | Mitigate Historical Osprey Outages | Operations | Distribution Line Reliability | 622-CD01621 | 622-CD01621-SP03 CD01633 | CDOT L034- White St Road Widening | Operations | Line Relocations/Act of Public Authority | 623-CD01633 | 623-CD01633-SP01 | 623-CD01633-SP03 CD01634 | Columbia 20Y1 TDRP_2020 | Operations | Regulatory Commitments-Other | 624-CD01634 | 624-CD01634-SP01 | 624-CD01634-SP03 CD01636 | Columbia 20Y2 2020 TDRP | Operations | Regulatory Commitments-Other | 625-CD01636 | 625-CD01636-SP01 | 625-CD01636-SP03 CD01643 | Clark Indust. Park - DB Cable Repla | Operations | URD/DB Cable Reliability | 626-CD01643 CD01644 | 14M39 TDRP | Operations | Regulatory Commitments-Other | 627-CD01644 | 627-CD01644-SP03 CD01647 | 17R11 TDRP | Operations | Regulatory Commitments-Other | 628-CD01647 | 628-CD01647-SP03 CD01649 | CD01649 21H9 2020 TDRP | Operations | Regulatory Commitments-Other | 629-CD01649 | 629-CD01649-SP03 CD01650 | 30Y10 TDRP | Operations | Regulatory Commitments-Other | 630-CD01650 | 630-CD01650-SP03 CD01651 | Hidden Point Farms 3 Phase Extensio | Operations | Line Relocations/Act of Public Authority | 631-CD01651 CD01652 | Reconductor Ringed portion of 11A53 | Operations | Distribution Line Reliability | 632-CD01652 | 632-CD01652-SP03 CD01653 | 21K3 Ringed Spacer Cable Replacemen | Operations | Distribution Line Reliability | 633-CD01653 CD01663 | CDOT 135-331 High Ridge Rd Bridge | Operations | Line Relocations/Act of Public Authority | 634-CD01663 * | CD01665 | 31C1 Treasure Hill Rd Rel. Improve | Operations | Distribution Line Reliability | 635-CD01665 CD01667 | 13H91 Replace Ringed Spacer Cable | Operations | Distribution Line Reliability | 636-CD01667 | 636-CD01667-SP03 CD01668 | CD01668 21H8 2020 TDRP | Operations | Regulatory Commitments-Other | 637-CD01668 | 637-CD01668-SP03 CD01669 | CT Helper Organization Replace OWS | Operations | Distribution Line Reliability | 638-CD01669 CD01671 | Repl H-Frames In 21P ROW | Operations | RIGHT OF WAY LINES | 639-CD01671 CD01674 | 21K3 Ringed Spacer Cable Replacemen | Operations | Distribution Line Reliability | 640-CD01674 | 640-CD01674-SP03 CD01677 | New Circuit 14K8 | Operations | New Customer | 641-CD01677 | 641-CD01677-SP01 | 641-CD01677-SP03Part 17 of 77
CD01678 | 2021 ROW P1 and P2 Pole Replacement | Operations | RIGHT OF WAY LINES | 642-CD01678 | 642-CD01678-SP01 | 642-CD01678-SP03 CD01679 | Island Wood Estates, Columbia DB lo | Operations | URD/DB Cable Reliability | 643-CD01679 | 643-CD01679-SP03 CD01685 | TDRP Shunock 32P4 | Operations | Regulatory Commitments-Other | 644-CD01685 | 644-CD01685-SP03 CD01687 | ROW 032 Remediation | Operations | RIGHT OF WAY LINES | 645-CD01687 | 645-CD01687-SP03 CD01688 | Stone Bridge Rd 3/5/10 Or More | Operations | Distribution Line Reliability | 646-CD01688 | 646-CD01688-SP03 CD01691 | NBC Tap Rebuild Farmington 1C19 | Operations | Distribution Line Reliability | 647-CD01691 | 647-CD01691-SP03 CD01693 | Relocate 36F5 Auto-Transformers D | Operations | Peak Load/Capacity | 648-CD01693 | 648-CD01693-SP03 CD01694 | Repl Sw 630 Rex Forge Southington | Operations | Network Reliability | 649-CD01694 CD01697 | Beacon Falls 11N83 and 11N84 Reliab | Operations | Distribution Line Reliability | 650-CD01697 | 650-CD01697-SP03 CD01698 | Kingfisher Lane Backyard Feed | Operations | Distribution Line Reliability | 651-CD01698 | 651-CD01698-SP03 CD01701 | ROW 039 Remediation | Operations | RIGHT OF WAY LINES | 652-CD01701 | 652-CD01701-SP03 CD01702 | 21L1 Repl Ringer Spacer Cable | Operations | Distribution Line Reliability | 653-CD01702 | 653-CD01702-SP03 CD01713 | CT Backbone Reliability | Operations | Distribution Line Reliability | 654-CD01713 CD01714 | New Service Gateway Moodus Outpost | Operations | New Customer | 655-CD01714 | 655-CD01714-SP03 CD01715 | Richter Dr DB Cable Replacement | Operations | URD/DB Cable Reliability | 656-CD01715 CD01724 | Farmington 1C Offload Newington 4A | Operations | Peak Load/Capacity | 657-CD01724 | 657-CD01724-SP03 CD01730 | Ringed Portions of Norwalk 9S43 | Operations | Distribution Line Reliability | 658-CD01730 | 658-CD01730-SP03 CD01735 | Pompey Hollow DB Rebuild | Operations | Distribution Line Reliability | 659-CD01735 | 659-CD01735-SP03 CD01742 | 2N14 & 3B06 Pole Reloc (ROW 12&13) | Operations | RIGHT OF WAY LINES | 660-CD01742 | 660-CD01742-SP03 CD01743 | DB Cable Repl Ledgewood Rd Canton | Operations | URD/DB Cable Reliability | 661-CD01743 * | CD01746 | Miller Road 3/5/10 or More | Operations | Distribution Line Reliability | 662-CD01746 | 662-CD01746-SP03 CD01752 | 4R09 TDRP | Operations | Regulatory Commitments-Other | 663-CD01752 | 663-CD01752-SP03 CD01753 | 2022/2023 ROW Priority 3 Poles | Operations | RIGHT OF WAY LINES | 664-CD01753 | 664-CD01753-SP01 | 664-CD01753-SP03 CD01755 | Gales Ferry 11B New Switchgear | Operations | Peak Load/Capacity | 665-CD01755 | 665-CD01755-SP01 | 665-CD01755-SP03 CD01756 | Sandy Lane Village DB Cable Replace | Operations | URD/DB Cable Reliability | 666-CD01756 CD01759 | Noera 13H93 PILC Cable Replacement | Operations | Network Reliability | 667-CD01759 CD01761 | New Service Murdock Ave | Operations | New Customer | 668-CD01761 | 668-CD01761-SP03 CD01766 | 1K16 PILC Cable Replacement | Operations | Network Reliability | 669-CD01766 CD01770 | Rocky River 12Y8 2020 TDRP | Operations | Regulatory Commitments-Other | 670-CD01770 | 670-CD01770-SP03 CD01774 | Viper Switch Installations | Operations | SMART SWITCHES PROGRAM | 671-CD01774 | 671-CD01774-SP01 | 671-CD01774-SP02 | 671-CD01774-SP03 CD01776 | Indepence Solar- New Lond-Colcheste | Operations | New Customer | 672-CD01776 | 672-CD01776-SP01 | 672-CD01776-SP03 CD01778 | Hollis Dr DB Replacement | Operations | URD/DB Cable Reliability | 673-CD01778 CD01780 | 24F1 Replace Ringed Spacer Cable | Operations | Distribution Line Reliability | 674-CD01780 | 674-CD01780-SP03 CD01781 | 5R4 Install New SR and MR | Operations | Distribution Line Reliability | 675-CD01781 | 675-CD01781-SP03 CD01783 | 1K14 PILC Cable Replacement | Operations | Network Reliability | 676-CD01783 CD01788 | Rob Rider Road DB Replacement 12N14 | Operations | URD/DB Cable Reliability | 677-CD01788