  1. Page 2 of 41

    TABLE OF CONTENTS I. INTRODUCTION .......................................................................................................................1 II. PROCEDURAL HISTORY ...........................................................................................................3 III. STANDARD OF REVIEW ............................................................................................................5 IV. OVERVIEW ...............................................................................................................................6 V. GENCONN HAS FULLY SUPPORTED ITS PROPOSED REVENUE REQUIREMENT ....................7 A. THE COMPANY PROPERLY CALCULATED ITS PROPOSED REVENUE REQUIREMENT FOR THE PERIOD COMMENCING JANUARY 1, 2027, THROUGH DECEMBER 31, 2027. ............................7 1. GenConn’s Cost of Capital is Consistent with PURA Precedent and the CfD. .................................... 12 2. Implementation of GenConn’s Actual 50/50 Capital Structure is Required by the Criteria Decision and the CfDs, and Should Be Restored. ................................................................................................. 13 3. The Settlement Agreement Expressly Preserves GenConn’s Right to Propose to Incorporate Its Actual Capital Structure in the Revenue Requirement........................................................................................ 18 4. Conclusion on GenConn’s Capital Structure. ............................................................................... 21 B. GENCONN’S O&M AND A&G COSTS ARE DOCUMENTED AND APPROPRIATE .....................23 C. THE COMPANY’S PROPOSED DEPRECIATION EXPENSE IS REASONABLE ..............................25 1. The Company Aligns Depreciation Expense to the CfD. ................................................................ 25 2. Extension of the CfD is not Germane to the Current AFRR Filing. .................................................... 28 D. GENCONN’S TAXES AND PROPERTY TAXES ARE CALCULATED CONSISTENT WITH ITS TAX AGREEMENTS. .....................................................................................................................30 E. MISCELLANEOUS ITEMS ......................................................................................................33 1. PURA Should Continue the SCR Catalyst Reserve ....................................................................... 33 2. PURA Should Confirm Pre-Approval of Future Capital Projects ..................................................... 34 3. PURA Should Confirm GenConn’s Participation in the ISO-NE Markets in Rate Year 2027 and 2028 for both GenConn Devon and GenConn Middletown Consistent with the 2026 Decision. ................................ 36 VI. CONCLUSION .........................................................................................................................38
  2. Page 3 of 41

    STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY GENCONN ENERGY LLC APPLICATION TO ESTABLISH 2027 REVENUE REQUIREMENTS DOCKET NO. 26-06-02 : : : : : NOVEMBER 2, 2026 BRIEF OF GENCONN ENERGY LLC I. INTRODUCTION GenConn Energy LLC (“GenConn” or the “Company”), 1 the joint venture between The United Illuminating Company (“UI”) and Clearway Energy, Inc., submits this brief to the Public Utilities Regulatory Authority (“PURA”) in support of its Application for Establishment of 2027 Revenue Requirements, filed on June 30, 2026 (the “Application”). As set forth in the Application, supplemented by Pre-Filed Testimony (“Attachment GenConn-01”), responses to interrogatories submitted into the record, testimony at the October 5, 2026 evidentiary hearing, and responses to Late Filed Exhibit (“LFE”) requests, GenConn respectfully requests that PURA establish revenue requirements for GenConn Devon and GenConn Middletown (comprising the consolidated revenue requirement for GenConn in this filing) 2 for the period commencing January 1, 2027 through December 31, 2027; and confirm GenConn’s participation in the ISO-NE markets in rate Capitalized terms not otherwise defined herein have the same definitions as those provided in the Company’s initial filing materials. 1 In PURA’s final decision in Docket No. 09-12-02, Application of GenConn Energy LLC for Establishment of 2010 Revenue Requirements (the “2010 Decision”), PURA determined, at page 18 that it “ultimately approved GenConn Option 2A, which consists of generating facilities at Devon and Middletown.” In the Company’s filing, it refers to “Option 2A” as GenConn (Consolidated) to eliminate confusion with other designations used in this testimony (see Att. GenConn-01, at i). 2 -1-
  3. Page 4 of 41

    year 2027 and 2028 for both GenConn Devon and GenConn Middletown. 3 The Company also requested elimination of certain historical compliance filing requirements related to its market participation, discussed in Section V.E.3, below. As outlined in this Brief, the Company has fully supported its proposed revenue requirement for effect January 1, 2027. The Company’s proposed revenue requirement is supported by a robust record, substantial evidence, and complies with the requirements of General Statutes §§ 16-243u, 16-19, 16-19b and 16-19e. The Company has demonstrated that its costs were reasonable, necessary and prudent. No party or intervenor submitted pre-filed testimony challenging any aspect of the Company’s proposal, and the Company’s evidence therefore stands unrebutted. Most significantly, the Company requests that PURA restore the appropriate use of the Company’s actual capital structure of 50 percent debt and 50 percent equity – the capital structure that PURA committed to use when it established the criteria for the peaking generation solicitation; that PURA approved when it authorized the GenConn projects; that PURA directed the Company to maintain in Docket No. 12-06-19 in the context of a debt refinancing; and that PURA applied in setting the Company’s revenue requirements for more than a decade. The Company also requests that PURA eliminate (or, alternatively, modify) the annual market participation plan requirement, and eliminate the quarterly reporting requirement that is no longer necessary following the transition from the Locational Forward Reserve Market (“LFRM”) market to the Day-Ahead Ancillary Services Initiative (“DASI”) market. The Company respectfully requests The GenConn Devon and GenConn Middletown units participate in the ISO-NE markets consistent with Orders 1 and Section H of the 2026 Decision in Docket No. 25-06-02, GenConn Energy LLC Request to Establish 2026 Revenue Requirement (the “2026 Decision”) (Att. GenConn-01, at 37). From the time the GenConn Option 2A units achieved commercial operation, the units have been called by ISO-NE as needed to provide critical peaking generation and system reliability, particularly when demand for electricity is high (id.). 3 -2-
  4. Page 5 of 41

    that PURA confirm its approval of the Company’s proposed revenue requirement, as updated through the discovery period of the case. II. PROCEDURAL HISTORY On June 16, 2026, PURA issued a Notice of Proceeding (“Notice”) establishing the above- referenced proceeding as a contested case to review GenConn’s application to establish its 2027 revenue requirements, pursuant to General Statutes § 16-243u and PURA’s Decision dated June 25, 2008, in Docket No. 08-01-01, DPUC Review of Peaking Generation Projects (the “Award Decision”). On June 30, 2026, GenConn filed its application for 2027 revenue requirements. The application included Attachments GenConn-01 through GenConn-12, GenConn-CP2 through GenConn-CP6, and GenConn-EP1 through GenConn-EP8. The attachments contained the following information: • GenConn-01 provided the Pre-filed Testimony of Devang Patel, Jacob S. Hurwitz, and Brandon Shatraw. • GenConn-02 provided the 2027 Calculation of Revenue Requirements, and includes SFR Exhibits 1-6, 1A, 1B, 7A Page 1, 7A Page 2, Exhibit 7-Devon, Exhibit 7-Middletown, and Exhibit 8. • GenConn-03 and GenConn-03 Attachment 1 provided the Variable O&M costs and accretions to the SCR catalyst reserves per Order 5 in the 2021 Decision and per Order 4 in PURA’s final decision in Docket No. 25-06-02, Application of GenConn Energy for Establishment of 2026 Revenue Requirements (the “2026 Decision”). • GenConn-04 provided the GenConn Energy Operating fuel costs for the prior year and 2027 forecast. • GenConn-05 provided the GenConn Energy Forward Reserve Market (“FRM”)/Day-ahead Ancillary Services Initiative (“DASI”) revenues for the prior year and 2027 forecast. • GenConn-06 provided the 2027 Proposed Annual Maintenance - Outage Scheduled Days (filed Confidential). -3-
  5. Page 6 of 41

    • GenConn-07 provided the GenConn Devon and GenConn Middletown Monthly CfD invoices (filed Confidential). • GenConn-08 provided, per Order 1 of the 2025 Decision, Speed Probe Detail. • GenConn-09 provided the Settlement Agreement and Joint Stipulation. • GenConn-10 and GenConn-10 Attachment 1 provided, per Order 5 of the 2025 Decision, NERC Relay Testing and Inventory. • GenConn-11 provided, per Order No. 3 in the 2026 Decision, Asset listing and Depreciation Schedule. • GenConn-12 provided the SCR/CO Catalyst Reserve Review (filed Confidential) • GenConn-CP2 provided Project Detail – Speed Probe Replacements. • GenConn-CP3_4 provided Project Detail – Pre-Approval Request – Woodward Control Server/Mark VIe Controls. • GenConn-CP5 provided Project Detail – Pre-Approval Request – Main Turbine Terminal Box HVAC. • GenConn-CP6 provided Project Detail – Pre-Approval Request – Turbine Fuel Nozzles. • GenConn-EP1 provided Project Detail – Generator Testing Unit 16 Devon / Unit 13 Middletown. • GenConn-EP2 provided Project Detail - Stack Testing Devon/Middletown. • GenConn-EP3 provided Project Detail - Unit 16 Heat Trace Fire (Devon Only). • GenConn-EP4 provided Project Detail - Arc Flash Study (Middletown Only). • GenConn-EP5 provided Project Detail - Transformer Testing Middletown Units 14/15. • GenConn-EP6 provided Detail – Replace Inlet Air Filters (Middletown Only). • GenConn-EP7 provided Project Detail – Chiller Roof Safety Rails / Ladder – Carryover from 2024. • GenConn-EP8 provided Project Detail – Chiller Heater Rebuild (Middletown) – Carryover from 2024. -4-
  6. Page 7 of 41

    On September 4, 2026, PURA issued a Procedural Order & Notice of Hearing, stating that “Parties may submit pre-filed testimony on or before Friday, September 25, 2026….” On September 25, 2026, consistent with the Procedural Order & Notice of Hearing, the Company filed correspondence indicating that its pre-filed testimony and exhibits were submitted on June 30, 2026, and it did not intend to submit additional pre-filed testimony. No other party or intervenor submitted pre-filed testimony. On October 5, 2026, PURA held an evidentiary hearing in this proceeding. During the October 5, 2026 evidentiary hearing, 15 LFE requests were issued to the Company, including LFE-001, which provided an update to the Company’s proposed revenue requirement based on changes identified during the discovery process. The Company submitted its responses to the fifteen LFE requests on October 19, 2026. On October 23, 2026, PURA issued a revised procedural schedule cancelling the LFE Hearing. In total, GenConn responded to 108 interrogatories plus supplements, provided one piece of pre-filed written testimony and numerous supporting attachments, and 15 LFEs. III. STANDARD OF REVIEW The standard of review for GenConn’s annual revenue requirement filing is outlined in prior PURA proceedings; as PURA stated in the 2026 Decision: The Authority reviews AFRR applications under its general ratemaking authority. General Statutes § 16-243u requires the Authority to conduct an annual contested rate case in which a peaking generator “shall be entitled to recover its prudently incurred costs of such [peaking] project, including, but not limited to, capital costs, operation and maintenance expenses, depreciation, fuel costs, taxes and other governmental charges and a reasonable rate of return on equity.” As with all rate proceedings, the Authority’s approval of cost recovery must be “consistent with the principles set forth in [General Statutes] sections 16-19, 16-19b and 16-19e.” Id.; GenConn Energy, 348 Conn. at 544. (“The plain meaning of § 16-243u, then, directs PURA to use the principles of [General Statutes] § 16-19e in determining the generator’s appropriate recoverable costs each year, and that amount is used to set the rates.”) Id., at 545. 2026 Decision at 3. Under General Statutes § 16-19(a), PURA is charged with approving rates -5-
  7. Page 8 of 41

    that are “just, reasonable and adequate…” In addition, pursuant to General Statutes § 16-19e(a), PURA is guided by the following principles: (4) that the level and structure of rates be sufficient, but no more than sufficient, to allow public service companies to cover their operating costs including, but not limited to, appropriate staffing levels, and capital costs, to attract needed capital and to maintain their financial integrity, and yet provide appropriate protection to the relevant public interests, both existing and foreseeable…; (5) that the level and structure of rates charged customers shall reflect prudent and efficient management of the franchise operation. See 2026 Decision at 3. In the Company’s filing, and throughout this proceeding, the Company provided support for its requested rates, which are sufficient, but no more than sufficient to cover operating costs. The Company’s evidence is comprehensive and, because no party or intervenor submitted pre-filed testimony contesting it, unrebutted. IV. OVERVIEW In Docket No. 12-07-14, PURA laid out the methodology for reviewing the fixed cost components for a peaking generator’s AFRR. Docket No. 12-07-14, Application of GenConn Energy LLC for Establishment of 2013 Revenue Requirements, Final Decision, Jan. 9, 2013 (the “2013 Decision”). GenConn organized and outlined its projected 2027 AFRR in accordance with PURA’s guidance in the 2013 Decision and consistent with the terms of the Contract for Differences (“CfD”) and Award Decision that the Company’s revenue requirement will be based on its actual capital structure, which is 50 percent equity and 50 percent debt. 4 In this proceeding, GenConn has demonstrated Annual Fixed Revenue Requirements For illustrative purposes only the Company provided a revenue requirement model utilizing a settled structure of 55 percent debt and 45 percent equity (Attachment GenConn-02 (Settlement); see Att. GenConn-01, at iii n.5, 5, 910, 19, n.11). The Company’s proposed revenue requirement is reflected in Attachment GenConn-02, as updated in LFE-001. As explained in discovery and the Company’s initial filing, nothing in the Settlement Agreement prohibits the Company from proposing its current capital structure, which PURA must address on the merits and consistent with longstanding PURA precedent. 4 -6-
  8. Page 9 of 41

    (“AFRR”) of $40,928,261 for the period commencing January 1, 2027 through December 31, 2027 for GenConn Consolidated, consisting of the GenConn Devon revenue requirement of $19,238,680 and the GenConn Middletown revenue requirement of $21,689,581, as presented by the Company in Attachment GenConn-02 on June 30, 2026 and updated in LFE-001 GenConn Attachment 1 (see Att. GenConn-01, at 8-9; LFE-001 GenConn Attachment 1). As outlined below, the Company has fully supported its revenue requirement proposals for rates effective January 1, 2027, which should be approved by PURA as updated throughout the discovery period of the case. GenConn’s revenue requirement includes capital project costs, fixed operations and maintenance (“O&M”) and administrative and general (“A&G”) costs, in the manner set forth in the 2013 Decision, at page 4, and other recoverable costs (Att. GenConn-01, at 9). GenConn provided evidence to support the revenue requirement components through its application, responses to interrogatories, testimony at an evidentiary hearing, and LFE responses. A brief summary of each component and the calculations thereof are provided below. V. GENCONN HAS REQUIREMENT A. FULLY SUPPORTED ITS PROPOSED REVENUE The Company Properly Calculated its Proposed Revenue Requirement for the period commencing January 1, 2027, through December 31, 2027. In its updated revenue requirement, submitted as LFE-001 on October 19, 2026, the Company presented GenConn’s consolidated revenue requirement for January 1, 2027 through December 31, 2027, calculated as $40,928,261, the sum of the revenue requirements for both GenConn Devon of $19,238,680 and GenConn Middletown of $21,689,581 for the 2027 calendar year (LFE-001 Att. 1; RRU-044). Also in LFE-001 GenConn Attachment 1 with the tabs labeled as Exhibits, which conforms to standard filing requirements, separate pro forma financial statements for GenConn Devon and GenConn Middletown were included as Exhibits 2 and 3. -7-
  9. Page 10 of 41

    The Company’s 2027 revenue requirement includes capital project costs, Fixed O&M and A&G costs, in the manner set forth in the 2013 Decision, at page 4, and other recoverable costs (Att. GenConn-01, at 9). The Fixed O&M and A&G cost components are derived using the 2025 actual cost data through December 31, 2025 (id.). The 2025 actual cost data through December 31, 2025 is escalated per the prescribed CPI-U methodology, with projected values for the 2027 rate year (January 1 to December 31, 2027) included in the computation of the 2027 Revenue Requirements (id.). Attachment GenConn-02 includes Excel tabs Exhibit 1, Pages 1-6, Exhibit 2, Pages 1-6 and Exhibit 3, Pages 1-6 provide pro-forma financial statements for GenConn (Consolidated or Option 2A), GenConn Devon and GenConn Middletown, respectively, and provides actual balances as of December 31, 2025 to support the development of the projected Revenue Requirements for the 2027 rate year utilizing the Company’s actual capital structure of debt/equity ratio of 50 percent debt and 50 percent equity, which is appropriate and consistent with the Criteria Decision, PURA precedent, and sound ratemaking principles (id.). Attachment GenConn-02 includes Excel tabs Exhibit 1, Pages 7-8, Exhibit 2, Pages 7-8 and Exhibit 3, Pages 7-8 provide the calculation of Rate Base values for GenConn (Consolidated or Option 2A), GenConn Devon and GenConn Middletown, respectively (id. at 10). Attachment GenConn-02 Exhibit 1A (Consolidated), Exhibit 1A-D and Exhibit 1A-M, provides (per Order No. 3 in Docket No. 14-0617, Application of GenConn Energy LLC for Establishment of 2015 Revenue Requirements (the “2015 Decision”) proforma Income Statements for GenConn (Consolidated or Option 2A), GenConn Devon and GenConn Middletown, respectively (id.). Attachment GenConn-02 Exhibit 1B is submitted per Order No. 10 in the 2025 Decision (id.). The 2025 income statement line items subject to true-up are identified, calculated and included within the pro forma financial statements, -8-
  10. Page 11 of 41

    Attachment GenConn-02 Exhibits 1-3 (id.). Attachment GenConn-02 Exhibit 8 provides (per Order No. 2 in the 2015 Decision) a summary of the consolidated 2025 costs subject to true-up (id.). Attachment GenConn-02 Exhibits 7-Option 2A (Consolidated), Exhibit 7-Devon and Exhibit 7-Middletown “Attachment 6” formats, as required by PURA in Order No. 3 in the 2013 Decision (id. at 11). Exhibit 7A and Exhibit 7A Page 2 provides GenConn CPI-U and CBA Escalators per Order No. 7 in PURA’s decision in Docket No. 17-06-27, Application of GenConn Energy LLC for Establishment of 2018 Revenue Requirements, dated November 29, 2017 (the “2018 Decision”) (id.). Consistent with Order No. 6 from the 2026 Decision Exhibit 7A, Exhibit 7Devon, and Exhibit 7-Middletown, at the column labeled Approved Basis Adjustments provide information on adjustments to the 2008 escalated capped expenses for NERC CIP and Formaldehyde testing (id.). Table 3 from the Company’s initial filing provided descriptions of the Company’s updated revenue requirement exhibits and is provided below: Attachment GenConn-02 Tabs and Description Attachment GenConn-02 Excel Tab Reference Exhibit 1A-Consolidated Exhibit 1A-D Exhibit 1A-M Exhibit 1B Exhibit 1, Pages 1 - 6 Exhibit 1, Pages 7 - 8 Exhibit 2, Pages 1 - 6 Exhibit 2, Pages 7 - 8 Exhibit 3, Pages 1 - 6 Exhibit 3, Pages 7 - 8 Exhibit 4, A-1.0 c Exhibit 4, A-2.0 c,d,m Exhibit 4, B-1.0 c Exhibit 4, B-2.1 c Exhibit 4, WP B-2.1 c Exhibit 4, WP B-3.1 c Exhibit 4, B-4.0 c Description GenConn (Consolidated) – Income Statement GenConn Devon – Income Statement GenConn Middletown - Income Statement Per PURA Order #10 in the 2025 Decision (Docket 24-06-02) GenConn (Consolidated) – Pro forma Financial Statements GenConn (Consolidated) - Average Rate Base GenConn Devon – Pro forma Financial Statements GenConn Devon- Average Rate Base GenConn Middletown – Pro forma Financial Statements GenConn Middletown - Average Rate Base (Consolidated) - Overall Financial Summary GenConn Energy - Gross Revenue Conversion Factor (Consolidated) - Rate Base Summary (Consolidated) - Plant-In-Service by Account (Consolidated) - Allocation of Capital Costs to FERC Accounts (Consolidated) - Adjustment to Reserve for Accumulated Depreciation (Consolidated) - Allowance for Working Capital -9-

As listed on the current system