Interrogatory responses
Answers to questions 27, 28, 29, 30, 31, 32, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46
Files31
RRU-027 GenConn.pdf
PDF · 131 KB · 3 pagesText searchable
Download RRU-027 GenConn.pdfRead the text of RRU-027 GenConn.pdf
RRU-027 Attachment 1.xlsx
Excel · 59 KBText searchable
Download RRU-027 Attachment 1.xlsxRead the text of RRU-027 Attachment 1.xlsx
RRU-028 GenConn.pdf
PDF · 120 KB · 1 pageText searchable
Download RRU-028 GenConn.pdfRead the text of RRU-028 GenConn.pdf
RRU-028 Attachment 1.xlsx
Excel · 137 KBText searchable
Download RRU-028 Attachment 1.xlsxRead the text of RRU-028 Attachment 1.xlsx
RRU-029 GenConn.pdf
PDF · 139 KB · 4 pagesText searchable
Download RRU-029 GenConn.pdfRead the text of RRU-029 GenConn.pdf
RRU-029 Attachment 1 REDACTED.pdf
PDF · 153 KB · 2 pagesText searchable
Download RRU-029 Attachment 1 REDACTED.pdfRead the text of RRU-029 Attachment 1 REDACTED.pdf
RRU-029 Attachment 2 REDACTED.pdf
PDF · 519 KB · 15 pagesText searchable
Download RRU-029 Attachment 2 REDACTED.pdfRead the text of RRU-029 Attachment 2 REDACTED.pdf
RRU-029 Attachment 3 REDACTED.pdf
PDF · 529 KB · 27 pagesText searchable
Download RRU-029 Attachment 3 REDACTED.pdfRead the text of RRU-029 Attachment 3 REDACTED.pdf
RRU-030 GenConn.pdf
PDF · 7 KB · 1 pageText searchable
Download RRU-030 GenConn.pdfRead the text of RRU-030 GenConn.pdf
RRU-030 Attachment 1.xlsx
Excel · 3.2 MBText searchable
Download RRU-030 Attachment 1.xlsxRead the text of RRU-030 Attachment 1.xlsx
RRU-031 GenConn.pdf
PDF · 14 KB · 4 pagesText searchable
Download RRU-031 GenConn.pdfRead the text of RRU-031 GenConn.pdf
RRU-031 Attachment 1.xlsx
Excel · 935 KBText searchable
Download RRU-031 Attachment 1.xlsxRead the text of RRU-031 Attachment 1.xlsx
RRU-032 GenConn.pdf
PDF · 10 KB · 2 pagesText searchable
Download RRU-032 GenConn.pdfRead the text of RRU-032 GenConn.pdf
RRU-034 GenConn.pdf
PDF · 11 KB · 2 pagesText searchable
Download RRU-034 GenConn.pdfRead the text of RRU-034 GenConn.pdf
RRU-034 Attachment 1.pdf
PDF · 2.6 MB · 64 pagesText searchable
Download RRU-034 Attachment 1.pdfRead the text of RRU-034 Attachment 1.pdf
RRU-034 Attachment 2.pdf
PDF · 2.8 MB · 63 pagesText searchable
Download RRU-034 Attachment 2.pdfRead the text of RRU-034 Attachment 2.pdf
RRU-035 GenConn.pdf
PDF · 9 KB · 2 pagesText searchable
Download RRU-035 GenConn.pdfRead the text of RRU-035 GenConn.pdf
RRU-036 GenConn.pdf
PDF · 8 KB · 1 pageText searchable
Download RRU-036 GenConn.pdfRead the text of RRU-036 GenConn.pdf
RRU-037 GenConn.pdf
PDF · 118 KB · 1 pageText searchable
Download RRU-037 GenConn.pdfRead the text of RRU-037 GenConn.pdf
RRU-038 GenConn.pdf
PDF · 9 KB · 2 pagesText searchable
Download RRU-038 GenConn.pdfRead the text of RRU-038 GenConn.pdf
RRU-039 GenConn.pdf
PDF · 11 KB · 2 pagesText searchable
Download RRU-039 GenConn.pdfRead the text of RRU-039 GenConn.pdf
RRU-039 Attachment 1.xlsx
Excel · 219 KBText searchable
Download RRU-039 Attachment 1.xlsxRead the text of RRU-039 Attachment 1.xlsx
RRU-040 GenConn.pdf
PDF · 9 KB · 2 pagesText searchable
Download RRU-040 GenConn.pdfRead the text of RRU-040 GenConn.pdf
RRU-041 GenConn.pdf
PDF · 124 KB · 2 pagesText searchable
Download RRU-041 GenConn.pdfRead the text of RRU-041 GenConn.pdf
RRU-042 GenConn.pdf
PDF · 14 KB · 4 pagesText searchable
Download RRU-042 GenConn.pdfRead the text of RRU-042 GenConn.pdf
RRU-043 GenConn.pdf
PDF · 17 KB · 2 pagesText searchable
Download RRU-043 GenConn.pdfRead the text of RRU-043 GenConn.pdf
RRU-043 Attachment 1.xlsx
Excel · 32 KBText searchable
Download RRU-043 Attachment 1.xlsxRead the text of RRU-043 Attachment 1.xlsx
RRU-044 GenConn.pdf
PDF · 25 KB · 3 pagesText searchable
Download RRU-044 GenConn.pdfRead the text of RRU-044 GenConn.pdf
RRU-045 GenConn.pdf
PDF · 9 KB · 2 pagesText searchable
Download RRU-045 GenConn.pdfRead the text of RRU-045 GenConn.pdf
RRU-046 GenConn.pdf
PDF · 9 KB · 2 pagesText searchable
Download RRU-046 GenConn.pdfRead the text of RRU-046 GenConn.pdf
RRU-046 Attachment 1.xlsx
Excel · 360 KBText searchable
Download RRU-046 Attachment 1.xlsxRead the text of RRU-046 Attachment 1.xlsx
Text of RRU-028 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-029 GenConn.pdf
Extracted from the file · 4 pages · 8,987 characters
Text of RRU-029 Attachment 1 REDACTED.pdf
Extracted from the file · 2 pages · 1,078 characters
Text of RRU-029 Attachment 2 REDACTED.pdf
Extracted from the file · 15 pages · 35,445 characters
Text of RRU-029 Attachment 3 REDACTED.pdf
Extracted from the file · 27 pages · 67,730 characters
Text of RRU-030 GenConn.pdf
Extracted from the file · 1 page · 1,126 characters
Text of RRU-030 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-031 GenConn.pdf
Extracted from the file · 4 pages · 8,845 characters
The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.
Part 1
[Sheet: GenConn-11-Updated] RRU-031 Attachment 1 GenConn Energy LLC | Docket No. 26-06-02 Page 1 of 1 GenConn-11 As of December 31, 2025 | Initial Date | End Date Devon Middletown DEVON Date in Service | Retirement Date | Description | Plant In Service Amount | Depreciation Revision | Date of Depreciaiton Revision | Estimated Useful Life (From Date in Service) (in years) | Accumulated Depreciation (12/31/2025) | Remaining Net Book Value | 30 Year Depr - Annual Depr | Corrected - Annual Depr | Variance In Annual Depr | Estimated Useful Life (From Revision Date) (in years) (RRU-31 (b)) | Accumulated Depreciation (4) NERC CIP V5 Remediation Chiller Access Platforms Portable Diesel Generator Breaker Hookup Demin Pump Skid Weather Proof Enclosure Oil/Ammonia Fill Station Weather Proof Enclosure Turbine Generator Package Platform GE HMI Upgrades SB 310 HP Compressor Blade Row 3-5 Repl (Unit 17-18) Remote Breaker Racking SB 310 HP Compressor Blade Row 3-5 Repl (Unit 15-16) SCR PLC Control Systems Upgrade 4 Cooling Tower Platforms: NERC-CIP Kiosk Cooling Tower Platforms | Yes Alternate AC Feed | Yes Spare Breakers | Yes Speed Probe unit 17 | Yes Speed Probe unit 18 | Yes Eversource Relay Replacement | Yes Speed Probe unit 16 | Yes Chiller Heater Proj- 9700002763 | Yes | RRU-041 (a) (Loss Recorded) | RRU-041 (b) FERC Account | RRU-041 (b) Date Foam Fire Protection No 2026 additions Recorded Retire Old HMI System: 2 Sets of Compr Blades Retire Old SCR PLC System; (2) Sets of Compr Blades Retirement of probe replaced on 9700002726 Retirement of probe replaced on 9700002764 Retirement of relay per Eversource 9700002750 Retirement of U16 probe Retirement of Chiller Heater No 2026 Retirements Recorded MIDDLETOWN Date in Service | Retirement Date | Description | Plant In Service Amount | Depreciation Revision | Date of Depreciaiton Revision | Estimated Useful Life (From Date in Service) (in years) | Accumulated Depreciation (12/31/2025) | Remaining Net Book Value | 30 Year Depr - Annual Depr | Corrected - Annual Depr | Variance In Annual Depr | Estimated Useful Life (From Revision Date) (in years) (RRU-31 (b)) | Accumulated Depreciation (*) Portable Diesel Generator Project NERC CIP V5 Remediation "Medium" Impact Asset Control Room HVAC Access Platforms MTN Turbine Generator Package Platform SPCC Plan Upgrades on Fuel Oil Skid (berm) U14 & U15 Compressor Blade Replacement Compressor Blades SCR PLC System HP Compressor Blade Outage Alturnate AC Feed for Air Compressor NERC CIP Kiosks U12 VBV Inlet Duct Expansion Joint Continuous Emissions Monitoring System | Yes Fuel Forwarding Pump Skid Structure | Yes Battery Replacement | Yes Speed Probe unit 14 | Yes Speed Probe | Yes | RRU-041 (a) (Loss Recorded) | RRU-041 (b) FERC Account | RRU-041 (b) Date Chiller Heater Proj | Yes Speed Probes Unit 12/13 | Yes | TBD Retire MTN Control Room HVAC - 2017 addition Retire U14/15 Compr Blades Retire old HMI Retire Compressor Blades Retire old SCR PLC System Retire/replace U12 VBV Inlet Duct Expansion Joint Retirement of probe replaced on 9700002725 Retirement of battery replaced on 9700002646 Retirement of U13 probe Add 2026 Retirements | Speed Probes Unit 12/13 | TBD RRU-040 RRU-036 (a) | Sum of variances of all individual items identified requiring Depreciation revision - Original 30 year Annual amount was $41,664 and revised annual amount is $73,166 - The variance in annual amounts is $31,501. RRU-036 (b) & RRU-042 (c) | There are no additions / retirmemts in 2026 thus far for GenConn Devon. There is one addition that at GenConn Middletown and will be a part of 2026 actuals. As experienced and adjustment will need to be made to reflect depreciation over the balance of life rather than the default values. Per books depreciation used mid year convention prior to 2021Part 2
Note: | GenConn has consistently based the depreciation of its plant assets on the term of the Contract for Differences (“CfD”). As disclosed in its financial statements, depreciation of property, plant, and equipment is calculated on a straight-line basis over a 30-year period, which reflects the original term of the CfD and the economic life of the facilities. Consistent with this approach, the Company’s accounting treatment has always aligned the useful life of assets with the remaining term of the CfD at the time such assets are placed into service. At the inception of the CfD, assets placed into service were assigned a 30-year useful life. Thereafter, as the CfD term progressed, assets placed into service in subsequent years were assigned useful lives equal to the remaining contractual term (e.g., 29 years, 28 years, etc.). This methodology reflects the fundamental premise that the assets’ service potential, for ratemaking and accounting purposes, is limited to the duration of the CfD. Capital additions have been recorded in the primary FERC Account 101 and generally in subaccount 346 as presented in GenConn-02 Exhibit 4, WP B-2.1 c. Historically, depreciation would begin on the dates plant additions are placed into service whereas the revenue requirement used a mid year convention for pre-approved capital projects. This treatment has been consistently applied in the Company’s books and records, and the revenue requirement approved by PURA has followed the accounting treatment reflected in those books. The Company notes that there have been limited instances in which certain assets were initially recorded in its accounting software using a full 30-year useful life rather than the remaining term of the CfD. These instances were administrative in nature and did not reflect a change in underlying accounting policy. Such items were subsequently corrected to reflect the appropriate remaining useful life consistent with the CfD term. Accordingly, the Company’s books and revenue requirement continue to reflect depreciation expense calculated over the remaining term of the CfD, consistent with GenConn’s longstanding accounting practice and ratemaking treatment. The Company does not currently perform a formal salvage value analysis for these assets. The current depreciation method is aligned to the remaining term of the CfD and there is a defined contract horizon (approximately 13–14 years remaining). Salvage value would typically require assumptions around market conditions, asset condition at end of life, and disposal outcomes, none of which are currently developed. As a result, salvage value has not been incorporated into our depreciation methodology or supporting schedules. The Company assumes that any expected salvage value would be more than offset by cost of removal. This approach is consisten with the Company's recognition of an ARO. [Sheet: Handy Whitman] RRU-031 Attachment 1 GenConn Energy LLC | Page 2 of 3 Docket No. 26-06-02 E-1 | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION | COST TRENDS OF ELECTRIC UTILITY CONSTRUCTION NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100) | NORTH ATLANTIC REGION (1973=100)Part 3
COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS | COST INDEX NUMBERS Line | CONSTRUCTION AND EQUIPMENT | FERC | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 | Jan. 1 | Jul. 1 Total Plant-All Steam Generation Total Plant-All Steam & Nuclear Gen. Total Plant-All Steam & Hydro Gen. Steam Production Plant Total Steam Production Plant Structures & Improvements-Indoor Structures & Improvements-Semi-Outdoor Boiler Plant Equipment-Coal Fired Boiler Plant Equipment-Gas Fired Boiler Plant Piping Installed Turbogenerator Units Accessory Electrical Equipment Misc. Power Plant Equipment Nuclear Production Plant Total Nuclear Production Plant Structures & Improvements Reactor Plant Equipment Hydro Production Plant Total Hydraulic Production Plant Reservoirs, Dams & Waterways Water Wheels, Turbines & Generators Other Production Plant Total Other Production Plant Fuel Holders, Producers & Accessories Gas Turbogenerators Transmission Plant Total Transmission Plant Station Equipment Towers & Fixtures Poles & Fixtures Overhead Conductors & Devices Underground Conduit Underground Conductors & Devices Distribution Plant Total Distribution Plant Poles, Towers & Fixtures Line Transformers Pad Mounted Transformers Services-Overhead Services-Underground Meters Installed Street Lighting-Overhead Mast Arms & Luminaires Installed Street Lighting-Underground ***Forumlas for combining data into a single year cell are hidden between July of the correpsonding year and January of the following year.*** [Sheet: RRU-041 Retirement Calcs] RRU-031 Attachment 1 GenConn Energy LLC | Docket No. 26-06-02 Page 3 of 3 GenConn-11 Page 1 of 1 As of December 31, 2025 | Initial Date | End Date Devon Middletown DEVON Date in Service | Retirement Date | Description | Plant In Service Amount | Depreciation Revision | Date of Depreciaiton Revision | Estimated Useful Life (From Date in Service) (in years) | Accumulated Depreciation (12/31/2025) | Remaining Net Book Value | 30 Year Depr - Annual Depr | Corrected - Annual Depr | Variance In Annual Depr NERC CIP V5 Remediation Chiller Access Platforms Portable Diesel Generator Breaker Hookup Demin Pump Skid Weather Proof Enclosure Oil/Ammonia Fill Station Weather Proof Enclosure Turbine Generator Package Platform GE HMI Upgrades SB 310 HP Compressor Blade Row 3-5 Repl (Unit 17-18) Remote Breaker Racking SB 310 HP Compressor Blade Row 3-5 Repl (Unit 15-16) SCR PLC Control Systems Upgrade 4 Cooling Tower Platforms: NERC-CIP Kiosk Cooling Tower Platforms | Yes Alternate AC Feed | Yes Spare Breakers | Yes Speed Probe unit 17 | Yes Speed Probe unit 18 | Yes Eversource Relay Replacement | Yes Speed Probe unit 16 | Yes | RRU-041© Chiller Heater Proj- 9700002763 | Yes | Original Install Year Cost Index | Replacement Year Cost Index | Handy Whitman Factor | Install Cost (From current install order= Replacement Amount) | Retirement Amount (HW Equation) Foam Fire Protection No 2026 additions RecordedPart 4
Retire Old HMI System: 2 Sets of Compr Blades | Note: Prior to integration into Corporate Accounting Systems, methods utilized included half year convention and cost of plant additions were used to determine retirement values. In some cases identification of orginal cost was included in the analysis. Retire Old SCR PLC System; (2) Sets of Compr Blades Retirement of probe replaced on 9700002726 Retirement of probe replaced on 9700002764 Retirement of relay per Eversource 9700002750 Retirement of U16 probe Retirement of Chiller Heater No 2026 Retirements recorded MIDDLETOWN Portable Diesel Generator Project NERC CIP V5 Remediation "Medium" Impact Asset Control Room HVAC Access Platforms MTN Turbine Generator Package Platform SPCC Plan Upgrades on Fuel Oil Skid (berm) U14 & U15 Compressor Blade Replacement Compressor Blades SCR PLC System HP Compressor Blade Outage Alturnate AC Feed for Air Compressor NERC CIP Kiosks U12 VBV Inlet Duct Expansion Joint Continuous Emissions Monitoring System | Yes Fuel Forwarding Pump Skid Structure | Yes Battery Replacement | Yes Speed Probe unit 14 | Yes | RRU-041 © Speed Probe | Yes | Original Install Year Cost Index | Replacement Year Cost Index | Handy Whitman Factor | Install Cost (From current install order= Replacement Amount) | Retirement Amount (HW Equation) Chiller Heater Proj | Yes Speed Probes Unit 12/13 | Yes | TBD Retire MTN Control Room HVAC - 2017 addition | Note: Prior to integration into Corporate Accounting Systems, methods utilized included half year convention and cost of plant additions were used to determine retirement values. In some cases identification of orginal cost was included in the analysis. Retire U14/15 Compr Blades Retire old HMI Retire Compressor Blades Retire old SCR PLC System Retire/replace U12 VBV Inlet Duct Expansion Joint Retirement of probe replaced on 9700002725 Retirement of battery replaced on 9700002646 Retirement of U13 probe Add 2026 Retirements | Speed Probes Unit 12/13 | To be completed RRU-040 RRU-036 (a) | Sum of variances of all individual items identified requiring Depreciation revision - Original 30 year Annual amount was $41,664 and revised annual amount is $73,166 - The variance in annual amounts is $31,501. RRU-036 (b) & RRU-042 (c) | There are no additions / retirmemts in 2026 thus far for GenConn Devon. There is one addition that at GenConn Middletown and will be a part of 2026 actuals. As experienced and adjustment will need to be made to reflect depreciation over the balance of life rather than the default values. Note: | GenConn has consistently based the depreciation of its plant assets on the term of the Contract for Differences (“CfD”). As disclosed in its financial statements, depreciation of property, plant, and equipment is calculated on a straight-line basis over a 30-year period, which reflects the original term of the CfD and the economic life of the facilities.Part 5
Consistent with this approach, the Company’s accounting treatment has always aligned the useful life of assets with the remaining term of the CfD at the time such assets are placed into service. At the inception of the CfD, assets placed into service were assigned a 30-year useful life. Thereafter, as the CfD term progressed, assets placed into service in subsequent years were assigned useful lives equal to the remaining contractual term (e.g., 29 years, 28 years, etc.). This methodology reflects the fundamental premise that the assets’ service potential, for ratemaking and accounting purposes, is limited to the duration of the CfD. Capital additions have been recorded in the primary FERC Account 101 and generally in subaccount 346 as presented in GenConn-02 Exhibit 4, WP B-2.1 c. Historically, depreciation would begin on the dates plant additions are placed into service whereas the revenue requirement used a mid year convention for pre-approved capital projects. This treatment has been consistently applied in the Company’s books and records, and the revenue requirement approved by PURA has followed the accounting treatment reflected in those books. The Company notes that there have been limited instances in which certain assets were initially recorded in its accounting software using a full 30-year useful life rather than the remaining term of the CfD. These instances were administrative in nature and did not reflect a change in underlying accounting policy. Such items were subsequently corrected to reflect the appropriate remaining useful life consistent with the CfD term. Accordingly, the Company’s books and revenue requirement continue to reflect depreciation expense calculated over the remaining term of the CfD, consistent with GenConn’s longstanding accounting practice and ratemaking treatment. The Company does not currently perform a formal salvage value analysis for these assets. The current depreciation method is aligned to the remaining term of the CfD and there is a defined contract horizon (approximately 13–14 years remaining). Salvage value would typically require assumptions around market conditions, asset condition at end of life, and disposal outcomes, none of which are currently developed. As a result, salvage value has not been incorporated into our depreciation methodology or supporting schedules. The Company assumes that any expected salvage value would be more than offset by cost of removal. This approach is consisten with the Company's recognition of an ARO.
Text of RRU-032 GenConn.pdf
Extracted from the file · 2 pages · 4,410 characters
Text of RRU-034 GenConn.pdf
Extracted from the file · 2 pages · 5,484 characters
Text of RRU-034 Attachment 1.pdf
Extracted from the file · 64 pages · 4,791 characters
Text of RRU-034 Attachment 2.pdf
Extracted from the file · 63 pages · 4,716 characters
Text of RRU-035 GenConn.pdf
Extracted from the file · 2 pages · 3,602 characters
Text of RRU-036 GenConn.pdf
Extracted from the file · 1 page · 2,841 characters
Text of RRU-037 GenConn.pdf
Extracted from the file · 1 page · 1,682 characters
Text of RRU-038 GenConn.pdf
Extracted from the file · 2 pages · 3,446 characters
Text of RRU-039 GenConn.pdf
Extracted from the file · 2 pages · 5,109 characters
Text of RRU-039 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-040 GenConn.pdf
Extracted from the file · 2 pages · 3,906 characters
Text of RRU-041 GenConn.pdf
Extracted from the file · 2 pages · 2,861 characters
Text of RRU-042 GenConn.pdf
Extracted from the file · 4 pages · 9,029 characters
Text of RRU-043 GenConn.pdf
Extracted from the file · 2 pages · 3,764 characters
Text of RRU-043 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-044 GenConn.pdf
Extracted from the file · 3 pages · 5,134 characters
Text of RRU-045 GenConn.pdf
Extracted from the file · 2 pages · 2,821 characters
Text of RRU-046 GenConn.pdf
Extracted from the file · 2 pages · 3,710 characters
Text of RRU-046 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
As listed on the current system
Question(s) Answered 27, 28, 29, 30, 31, 32, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46 (GenConn Energy, LLC) Date Filed: 10/01/2026