Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Late-filed exhibits

Exhibits 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15

Files26

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting

Text of LFE-001 GenConn.pdf

Extracted from the file · 1 page · 535 characters

Words on different pages
No matches
  1. Page 1

    LFE-002 GenConn Energy LLC Witness: Devang Patel Docket No. 26-06-02 Page 1 of 1 Date Submitted: October 19, 2026 LFE-002 Q: Provide the FERC Order Issued September 14, 2026. (Requested of GenConn) LFE-002 A: Please refer to LFE-002 Attachment 1, which provides a copy of the FERC order issued on September 14, 2026 in Docket No. ER26-3176-000. In the order, FERC approved four ISO-NE tariff changes effective October 22, 2026, intended to reduce unexpectedly high DASI costs while preserving reliability: 1. Adjust the Forecast Energy Requirement (FER) demand quantity to better account for expected front-of-the-meter wind and solar production. 2. Establish a floor on the DASI strike price. 3. Establish a $3/MWh minimum Impact Test threshold used in market mitigation. 4. Remove a specific NCPC revenue adjustment. While the Order could impact DASI clearing prices and DASI revenues, it will not change how GenConn participates in the DASI markets. Although market design adjustments may reduce DASI revenues, the LM6000 fleet remains an essential reliability resource whose fast-start characteristics are exactly the capabilities DASI was created to procure.
Words on different pages
Words on different pages

Text of LFE-004 GenConn.pdf

Extracted from the file · 3 pages · 4,954 characters

Words on different pagesRead the text of LFE-004 GenConn.pdf

Text of LFE-005 GenConn.pdf

Extracted from the file · 2 pages · 2,975 characters

Text of LFE-006 GenConn.pdf

Extracted from the file · 2 pages · 4,578 characters

Text of LFE-006 Attachment 1.pdf

Extracted from the file · 115 pages · 296,451 characters

Text of LFE-007 GenConn.pdf

Extracted from the file · 1 page · 1,613 characters

Words on different pagesRead the text of LFE-007 GenConn.pdf

Text of LFE-007 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-007 Attachment 2 (RRU-031 Attachment 1-Corrected).xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-008 GenConn.pdf

Extracted from the file · 1 page · 2,438 characters

Text of LFE-008 Attachment 1.pdf

Extracted from the file · 42 pages · 58,655 characters

Text of LFE-008 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-009 GenConn.pdf

Extracted from the file · 1 page · 1,386 characters

Text of LFE-010 GenConn.pdf

Extracted from the file · 2 pages · 3,322 characters

Words on different pagesRead the text of LFE-010 GenConn.pdf

Text of LFE-010 Attachment 1.pdf

Extracted from the file · 178 pages · 255,354 characters

Text of LFE-011 GenConn.pdf

Extracted from the file · 1 page · 2,796 characters

Words on different pagesRead the text of LFE-011 GenConn.pdf

Text of LFE-011 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-012 GenConn.pdf

Extracted from the file · 1 page · 982 characters

Text of LFE-012 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 2,492 characters

Text of LFE-014 GenConn.pdf

Extracted from the file · 1 page · 351 characters

Text of LFE-014 Attachment 1 (GenConn- CP2 REVISED V2).pdf

Extracted from the file · 8 pages · 12,688 characters

Text of LFE-015 GenConn.pdf

Extracted from the file · 1 page · 1,318 characters

Text of LFE-009 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

LFEs Filed (Avangrid) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 Date Filed: 10/19/2026

This filing on the current system (opens in a new tab)