Late-filed exhibits

Exhibits 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15

Files26

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting

Text of LFE-001 GenConn.pdf

Extracted from the file · 1 page · 535 characters

Words on different pages

Text of LFE-002 GenConn .pdf

Extracted from the file · 1 page · 1,167 characters

Words on different pages
Words on different pages
Words on different pages
  1. Page 1

    LFE-004 GenConn Energy LLC Witness: Devang Patel Docket No. 26-06-02 Page 1 of 3 Date Submitted: October 19, 2026 LFE-004 Q: Provide an estimate of what the cost of an ARO study would be and timeframe for procurement process. (Requested of GenConn) LFE-004 A: The $124,062 incremental adjustment reflected in the ARO schedule resulted from updating the estimated asset removal cost from $1.50 million to $1.57 million. When the revised removal estimate was escalated over the asset's remaining 30-year life using the existing ARO assumptions, the resulting increase in the retirement obligation was $124,062, which is reflected in the Incremental Adjustment column. The adjustment reflects an update to the removal cost estimate and does not represent a change in methodology or asset life assumptions. Please refer to RRU039 Attachment 1. For a facility like GenConn, the cost of an ARO study varies significantly depending on what the specific objective of the study would be. Examples of ARO studies include, but are not limited to the following: 1. Accounting compliance (ASC 410 ARO valuation) • ASC 410 is the U.S. GAAP accounting standard that governs Asset Retirement Obligations (AROs). Specifically, ASC 410-20 requires companies to recognize the future cost of legally required asset retirement, removal, closure, dismantlement, or site restoration activities associated with long-lived assets. 2. Engineering decommissioning cost estimate 3. Net salvage study 4. Full retirement and environmental closure assessment For GenConn, the scope of such a study could be comprised of five progressively more detailed levels. The costs below assume the study covers both GenConn facilities as a portfolio. Level 1: Desktop ARO Screening - Estimated Cost: $10,000-$25,000 Scope includes: • Review permits, leases, and regulatory approvals. • Identify legally enforceable retirement obligations. • Review existing ARO accounting. • Update inflation and discount rate assumptions.
  2. Page 2

    LFE-004 GenConn Energy LLC Witness: Devang Patel Docket No. 26-06-02 Page 2 of 3 Date Submitted: October 19, 2026 • High-level estimate of retirement costs. Level 2: Accounting ARO Valuation - Estimated Cost: $25,000-$50,000 Scope includes everything in Level 1 plus: • Site-specific retirement cost estimates. • Present value calculations. • Probability weighting of alternative scenarios. • Detailed ASC 410 documentation. • Auditor-ready workpapers. Level 3: Engineering Decommissioning Study - Estimated Cost: $50,000-$100,000 Scope includes detailed engineering review including: • LM6000 turbine removal. • Generator removal. • Transformer disposal. • Fuel oil tank closure. • Piping removal. • Electrical equipment demolition. • Foundation treatment. • Site restoration. Level 4: Net Salvage Study - Estimated Cost: $75,000-$150,000 Scope Includes: • Salvage value assessment. • Dismantlement cost estimate. • Net salvage estimate. • ARO review. Level 5: Full Retirement and Environmental Closure Study - Estimated Cost: $150,000$300,000+ Scope includes everything above plus: • Phase I Environmental Site Assessment. • Potential contamination review. • Soil and groundwater assessment. • Closure permit evaluation. • Remediation planning. • Detailed demolition sequencing.
  3. Page 3

    LFE-004 GenConn Energy LLC Witness: Devang Patel Docket No. 26-06-02 Page 3 of 3 Date Submitted: October 19, 2026 Recommendation for GenConn today: As discussed at the evidentiary hearing, there is value in updating the ARO study to ensure that the ARO is aligned with the cost of retirement under the CfD, and to provide sufficient time to smooth any impacts to the ARO resulting from the study. As such, if ordered by PURA, the Company could provide a table-top update of the ARO in the 2028 AFRR filing, subject to cost recovery of those prudent expenditures. On a more long-term basis, with the plants roughly halfway through the 30-year terms of the CfD, and with decision on extending the terms of the CfD pending at this time, the Company recommends developing a combined Level 3 + Level 4 study for filing in approximately five years. This recommendation would place filing of the Level 3 and Level 4 analysis in the final third of the term of the CfD, when a decision on extension may become more applicable. Such a future analysis would include: 1. Net Salvage Analysis 2. ARO Assessment 3. High-Level Decommissioning Estimate The Company estimates that the cost of such an analysis would range from $75,000-$150,000 and take approximately 3 to 6 months, including procurement processes, to complete. Given the cost and current status of the CfDs as approximately halfway through their terms, providing this update to PURA in approximately 5 years would strike an appropriate balance to provide PURA with information to potentially inform an extension decision at a more appropriate point in the term of the CfDs. Please also refer to the Company’s response to LFE-003.

Text of LFE-005 GenConn.pdf

Extracted from the file · 2 pages · 2,975 characters

Text of LFE-006 GenConn.pdf

Extracted from the file · 2 pages · 4,578 characters

Text of LFE-006 Attachment 1.pdf

Extracted from the file · 115 pages · 296,451 characters

Text of LFE-007 GenConn.pdf

Extracted from the file · 1 page · 1,613 characters

Words on different pagesRead the text of LFE-007 GenConn.pdf

Text of LFE-007 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-007 Attachment 2 (RRU-031 Attachment 1-Corrected).xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-008 GenConn.pdf

Extracted from the file · 1 page · 2,438 characters

Text of LFE-008 Attachment 1.pdf

Extracted from the file · 42 pages · 58,655 characters

Text of LFE-008 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-009 GenConn.pdf

Extracted from the file · 1 page · 1,386 characters

Text of LFE-010 GenConn.pdf

Extracted from the file · 2 pages · 3,322 characters

Words on different pagesRead the text of LFE-010 GenConn.pdf

Text of LFE-010 Attachment 1.pdf

Extracted from the file · 178 pages · 255,354 characters

Text of LFE-011 GenConn.pdf

Extracted from the file · 1 page · 2,796 characters

Words on different pagesRead the text of LFE-011 GenConn.pdf

Text of LFE-011 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-012 GenConn.pdf

Extracted from the file · 1 page · 982 characters

Text of LFE-012 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 2,492 characters

Text of LFE-014 GenConn.pdf

Extracted from the file · 1 page · 351 characters

Text of LFE-014 Attachment 1 (GenConn- CP2 REVISED V2).pdf

Extracted from the file · 8 pages · 12,688 characters

Text of LFE-015 GenConn.pdf

Extracted from the file · 1 page · 1,318 characters

Text of LFE-009 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

LFEs Filed (Avangrid) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 Date Filed: 10/19/2026