Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Late-filed exhibits

Exhibits 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15

Files26

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting

Text of LFE-001 GenConn.pdf

Extracted from the file · 1 page · 535 characters

Words on different pages

Text of LFE-002 GenConn .pdf

Extracted from the file · 1 page · 1,167 characters

Words on different pages
Words on different pages

Text of LFE-004 GenConn.pdf

Extracted from the file · 3 pages · 4,954 characters

Words on different pagesRead the text of LFE-004 GenConn.pdf

Text of LFE-005 GenConn.pdf

Extracted from the file · 2 pages · 2,975 characters

Text of LFE-006 GenConn.pdf

Extracted from the file · 2 pages · 4,578 characters

Text of LFE-006 Attachment 1.pdf

Extracted from the file · 115 pages · 296,451 characters

Text of LFE-007 GenConn.pdf

Extracted from the file · 1 page · 1,613 characters

Words on different pagesRead the text of LFE-007 GenConn.pdf

Text of LFE-007 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-007 Attachment 2 (RRU-031 Attachment 1-Corrected).xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-008 GenConn.pdf

Extracted from the file · 1 page · 2,438 characters

Text of LFE-008 Attachment 1.pdf

Extracted from the file · 42 pages · 58,655 characters

Text of LFE-008 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-009 GenConn.pdf

Extracted from the file · 1 page · 1,386 characters

Text of LFE-010 GenConn.pdf

Extracted from the file · 2 pages · 3,322 characters

Words on different pagesRead the text of LFE-010 GenConn.pdf
Words on different pages
  1. Page 146 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 146 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report RESULTS Sample Visual Inspection One field sample was received from the GenConn Middletown Unit 14 SCR. Below are photographs of the flow entrance face and the flow exit face of the element with an as received inspection report. Element ID 2389-1021-0331 Box Markings Sample Markings Flow Direction Marked Other Markings Visual Inspection Notes Product Description Length, mm Blocked Cell Count, as received Blocked Cell Count, after light cleaning Flow Entrance CORMETECH Confidential www.cormetech.com NA GenConn Middletown Unit 14 Yes None Element has damage on exit side CM21MHTtM 446 0 0 Flow Exit | 10 5000 International Drive Durham, North Carolina 27712 USA
  2. Page 147 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 147 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report Results of Laboratory Tests The catalyst performance below is reported under constant 5 ppmvdc ammonia slip and design operating conditions. The lab performance threshold represents the design NOX removal efficiency, as measured in lab apparatus, at which the actual field performance at design operating conditions is expected to reach end-of-life. Field performance is based on a design performance requirement of 85.9% NOX removal efficiency and 5 ppmvdc ammonia slip. In field scale (actual) operation, flow, temperature and ammonia/NOx non-uniformities exist. In the highly controlled laboratory environment these non-uniformities do not exist; therefore, the lab results must be scaled-up to reflect expected field performance. The scale-up factors limit achievable NOX reduction performance in operating SCR systems. The performance threshold value is based on design values for the scale-up factors. The actual threshold may be lower if actual scale-up is less severe, or higher if more severe. Element ID Time On-Line (Hours) Fresh Reference # 2389-2026-0403 0 NOx Removal Efficiency, % at 5 ppmvdc NH3 Slip 94.06 October 2019 Audit # 2389-1021-0331 632 92.84 Threshold (based on design scale-up factors) CORMETECH Confidential www.cormetech.com 85.9 | 11 5000 International Drive Durham, North Carolina 27712 USA
  3. Page 148 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 148 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report The figure below shows the trend in catalyst performance. This audit of the GenConn Middletown Unit 14 SCR catalyst shows a measurable decrease in catalytic potential of the SCR catalyst, as measured by lab-scale testing. Based on the results of this audit, the SCR catalyst installed for GenConn Middletown Unit 14 is above the performance threshold and is projected to continue to meet the field performance requirements of 85.9% NOX reduction at 5 ppmvdc ammonia slip for at least an additional 1,300 operating hours from the date this sample was removed. Due to the low operating hours and that this is the first audit, the life prediction is likely conservative. This prediction assumes that catalyst deactivation will continue at the same rate as measured over the operating hours to date. If this rate of deactivation changes, the prediction of remaining catalyst life will change accordingly; therefore, Cormetech recommends performing regular field performance and laboratory catalyst audits. CORMETECH Confidential www.cormetech.com | 12 5000 International Drive Durham, North Carolina 27712 USA
  4. Page 149 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 149 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report FIELD DATA COMMENTARY A review of field data has three primary purposes. First, the field data can show if any operating parameters are significantly different than the original design of the unit. Second, the field data can show if actual plant performance requirements are more severe than the design. If significant differences are evident in operating parameters or performance requirements, their effect on the performance threshold can be determined. Third, the field data can be used to examine if any factors that adversely impact scale-up are present. Typically the factors that adversely impact scale-up are as follows: • • • • Plugged/ poorly performing Ammonia Injection System resulting in poor mixing of the NH3 prior to the catalyst. Flue gas flow velocity maldistribution. Flue gas flow bypass around the catalyst. Plugged catalyst. Below is a table that compares the field data provided by GenConn Middletown Unit 14 SCR against the design criteria for the installed SCR catalyst: Parameter Flue Gas Temperature (°F) Flue Gas Flow Rate (lb/hr) Inlet NOx (ppmvd @ 15% O2) Outlet NOx (ppmvd @ 15% O2) NOx Reduction Efficiency (%) NH3 Slip (ppmvd @ 15% O2) NH3 Flow Rate (lb/hr) NH3 Supply Concentration (wgt %) Flue Gas O2 Conc. (% vol dry) Catalyst Pressure Drop (in. wg.) Design Value 828 1,088,460 42 5.9 85.9 5 (end of life) 180 (end of life) 19 14.4 5.1 Field Value (oil) 821 286,834 DSCFM 42 (estimated) 2.27 94.5 3.6 135.2 19 14.8 4.8 Field Value (gas) 779 294299 DSCFM 25 (estimated) 1.43 94.3 4.1 84.5 19 15.1 4.7 Permit Limit Outlet NOx = 5.9 ppmvd @ 15% O2 (ULSK), 2.5 ppmvd @15% O2 (Gas) Ammonia Slip = 5 ppm Based on the provided operational data, GenConn Middletown Unit 14 is operating well in the field and meeting permit limits. The measured ammonia slip and flow rate are lower than expected given the other parameters and lab measured activity of the catalyst, indicating good performance. In both oil fired and gas fired conditions, the outlet NOx is being driven well below the permit limit. This increases the NOx reduction efficiency resulting in a higher level of performance than the design of the catalyst. As the catalyst deactivates over time the outlet NO x will need to be maintained closer to the permit requirements to maintain ammonia slip under 5 ppmvdc. CORMETECH Confidential www.cormetech.com | 13 5000 International Drive Durham, North Carolina 27712 USA
  5. Page 150 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 150 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report RECOMMENDATIONS Regular laboratory catalyst testing is recommended to refine the accuracy of the remaining catalyst life prediction. The next audit should occur after an additional 600 hours of operation or three years, whichever is first, from the time the sample for this audit was removed. Continued review of field test data to accurately confirm actual performance requirements, operating conditions, and system scale-up factors, and thereby the appropriate laboratory scale performance threshold is recommended. CORMETECH Confidential www.cormetech.com | 14 5000 International Drive Durham, North Carolina 27712 USA
  6. Page 151 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 151 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report APPENDIX 1: Location of Sample Retrieval The sample retrieval location for GenConn Middletown Unit 14 is shown in the following schematic. Removed 2019 CORMETECH Confidential www.cormetech.com | 15 5000 International Drive Durham, North Carolina 27712 USA
  7. Page 152 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 152 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report APPENDIX 2: Field Records Field records received from GenConn Middletown are reproduced below CORMETECH Confidential www.cormetech.com | 16 5000 International Drive Durham, North Carolina 27712 USA
  8. Page 153 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 153 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report CORMETECH Confidential www.cormetech.com | 17 5000 International Drive Durham, North Carolina 27712 USA
  9. Page 154 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 154 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report APPENDIX 3: Performance Test Standard Procedure Purpose The laboratory performance testing for SCR catalyst is conducted to determine the catalytic potential of a representative sample of SCR catalyst at conditions that closely match the actual operating conditions of the SCR system. The sample should represent a typical cross section of the SCR, and the operating history should be known. The test is conducted in a controlled, laboratory environment on custom-built, rigorously validated SCR catalyst test apparatus allowing accurate determination of performance and comparisons of the sample catalytic potential to the system requirements previously tested catalyst(s). Test Equipment Description The Cormetech Laboratory SCR test reactors consist of three basic systems: • Simulated flue gas generator • SCR catalyst test chamber • Measurement system The purpose of the simulated flue gas generator is to provide a stable controlled supply of heated gas with the required mix of gases at the required flow rate and temperature to the SCR catalyst test chamber. It consists of a bulk flue gas generator, a flue gas modification system, a flue gas heater, a reactive gas injection system, and a flue gas mixer. Bulk Flue Gas Generator -The bulk flue gas is produced by either the combustion of air in a natural gas fired water-cooled combustion chamber, the extraction of nitrogen from air via a membrane system, or the delivery of nitrogen from liquefied nitrogen. This system is adjusted to achieve the overall flue gas flow rate required for the specified test. Flue Gas Modification System – The gas stream produced by the bulk flue gas generator is modified by the addition of oxygen/air and water/steam to achieve the targeted concentrations of water vapor and oxygen in the flue gas stream. Flue Gas Heater – The flue gas stream is heated to the target test temperature by an electric pre-heater. Reactive Gas Injection System – Calibrated mass flow controllers are used to deliver SO2, SO3, NO2, NO, and NH3 into the flue gas stream. CORMETECH Confidential www.cormetech.com | 18 5000 International Drive Durham, North Carolina 27712 USA
  10. Page 155 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 155 of 178 NRG GenConn Middletown Unit 14 January 28, 2020 SCR Catalyst Performance Test Report The table below summarizes the range of process conditions that can be produced by various apparatus in Cormetech’s laboratory. Cormetech’s laboratory maintains multiple testing units, each with varying capabilities for temperature, flow, and gas composition. The unit selected for a given test will depend on the specific requirements for the sample tested. Parameter Gas Temperature Flow rate/Entrance velocity O2 H2O NO NO2 NH3 SO2 SO3 Units o C Nm/s volume % dry volume % ppmvd ppmvd ppmvd ppmvd ppmvd Range 200 – 600 1.25 - 7.05 1 – 20 1-201 0 - 2,000 0 - 20002 0 - 4,000 0 - 2,000 0 – 25 1: Some apparatus have the capability to control water concentration. Other units supply water as a product of combustion. When water concentration is not controlled, Cormetech corrects the results to the target concentration with a standardized correction factor. 2: NO2 addition capability is not available on all test units. Flue Gas Mixer – Following the reactive gas injection, the gases are mixed using a high efficiency static mixing element. The simulated flue gas next enters the SCR test reactor where the SCR test sample or samples are located. Each sample is sealed tightly to the walls of the test chamber to ensure that all of the flue gas passes though the sample[s]. Along the length of the test chamber there are electric heating elements that maintain the specified test temperature. There are test ports located at the entrance to the test reactor and at the exit of each sample layer to extract a sample of flue gas for analysis, measure the static pressure of the flue gas, and monitor the temperature of the catalyst samples and the flue gas. CORMETECH Confidential www.cormetech.com | 19 5000 International Drive Durham, North Carolina 27712 USA

Text of LFE-011 GenConn.pdf

Extracted from the file · 1 page · 2,796 characters

Words on different pagesRead the text of LFE-011 GenConn.pdf

Text of LFE-011 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-012 GenConn.pdf

Extracted from the file · 1 page · 982 characters

Text of LFE-012 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 2,492 characters

Text of LFE-014 GenConn.pdf

Extracted from the file · 1 page · 351 characters

Text of LFE-014 Attachment 1 (GenConn- CP2 REVISED V2).pdf

Extracted from the file · 8 pages · 12,688 characters

Text of LFE-015 GenConn.pdf

Extracted from the file · 1 page · 1,318 characters

Text of LFE-009 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

LFEs Filed (Avangrid) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 Date Filed: 10/19/2026

This filing on the current system (opens in a new tab)