Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Late-filed exhibits

Exhibits 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15

Files26

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting

Text of LFE-001 GenConn.pdf

Extracted from the file · 1 page · 535 characters

Words on different pages

Text of LFE-002 GenConn .pdf

Extracted from the file · 1 page · 1,167 characters

Words on different pages
Words on different pages

Text of LFE-004 GenConn.pdf

Extracted from the file · 3 pages · 4,954 characters

Words on different pagesRead the text of LFE-004 GenConn.pdf

Text of LFE-005 GenConn.pdf

Extracted from the file · 2 pages · 2,975 characters

Text of LFE-006 GenConn.pdf

Extracted from the file · 2 pages · 4,578 characters

Text of LFE-006 Attachment 1.pdf

Extracted from the file · 115 pages · 296,451 characters

Text of LFE-007 GenConn.pdf

Extracted from the file · 1 page · 1,613 characters

Words on different pagesRead the text of LFE-007 GenConn.pdf

Text of LFE-007 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-007 Attachment 2 (RRU-031 Attachment 1-Corrected).xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-008 GenConn.pdf

Extracted from the file · 1 page · 2,438 characters

Text of LFE-008 Attachment 1.pdf

Extracted from the file · 42 pages · 58,655 characters

Text of LFE-008 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-009 GenConn.pdf

Extracted from the file · 1 page · 1,386 characters

Text of LFE-010 GenConn.pdf

Extracted from the file · 2 pages · 3,322 characters

Words on different pagesRead the text of LFE-010 GenConn.pdf
Words on different pages
  1. Page 56 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 56 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report FACILITY OPERATIONAL HISTORY The SCR system at the GenConn Devon Power Unit 17 consists of 1 layer of CM21MHTTM 70 cell catalyst. The unit was originally put into service on June 2010. In July 2010 Unit 17 experienced an event, during which the catalyst was potentially sintered. Elements were shipped to Cormetech for emergency testing. The results of this audit are presented in this report. Based on the results of the July 2010 audits and surface area testing, it was determined that the catalyst was not sintered. On October 23, 2017 on catalyst sample was removed from the field sampler at GenConn Devon Power Unit 17 and returned to Cormetech for laboratory testing. At the time the sample was removed, the audited element had accumulated 728 operating hours. The results of the October 23, 2017 audit are summarized in this report. CORMETECH Confidential www.cormetech.com | 6 5000 International Drive Durham, North Carolina 27712 USA
  2. Page 57 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 57 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report PROCEDURE OVERVIEW 1. One catalyst sample was removed from the field sampler module at the GenConn Devon Power Unit 17 SCR and was shipped to Cormetech’s laboratory. Operating history was recorded by the plant and forwarded to Cormetech. 2. The physical condition of the catalyst was documented by Cormetech. 3. The catalyst was prepared and loaded into an Activity Test Apparatus and then evaluated at the original design conditions for the SCR. The Performance Test Standard Procedure is included in Appendix 3. 4. The results include catalyst potential expressed as NOX removal efficiency at a constant 5 ppmvdc ammonia slip. 5. Test results were compared to design expectations and to the results of the fresh reference and previous audit. Expectations of catalyst deactivation were determined by the time online and experience data of similar gas-fired facilities. 6. A catalyst life prediction is based on the above testing and analysis. 7. Additional data submitted by the plant was reviewed for the field performance of the SCR system. CORMETECH Confidential www.cormetech.com | 7 5000 International Drive Durham, North Carolina 27712 USA
  3. Page 58 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 58 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report FIELD SAMPLING AND UNIT OPERATING CONDITIONS Field Sampling One SCR catalyst sample from GenConn Devon Power Unit 17 was removed and sent to Cormetech's Laboratory for evaluation. The sample retrieval location is shown in Appendix 1. Operating Status Field records supplied by GenConn Devon Power are summarized in the table below. The field records are reproduced in Appendix 2. First Gas-In Date with Catalyst Installed Sample Removal Date November 7, 2017 Total Operating Hours On Catalyst Sample 772 Ultra-Low Sulfur Kerosene Primary Fuel Fired Hours Burning Primary Fuel 635 Secondary Fuel Fired Natural Gas Hours Burning Secondary Fuel 137 Number of Starts and Stops since catalyst was installed 306 CORMETECH Confidential www.cormetech.com June 2010 | 8 5000 International Drive Durham, North Carolina 27712 USA
  4. Page 59 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 59 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report LABORATORY PERFORMANCE TEST CONDITIONS A performance test was conducted on the sample received using the conditions below. These conditions reflect the original design conditions for which there is fresh catalyst test data available for direct comparison. Temperature 442OC (828OF) Entrance Gas Velocity 3.84 Nm/s O2 Inlet NOX CORMETECH Confidential www.cormetech.com 14.4 vol% dry 46.0 ppmvd @ 14.4% O2 (42.0 ppmvdc @ 15% O2) | 9 5000 International Drive Durham, North Carolina 27712 USA
  5. Page 60 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 60 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report RESULTS Sample Visual Inspection One field sample was received from the GenConn Devon Power Unit 17 SCR. Below are photographs of the flow entrance face and the flow exit face of the element with an as received inspection report. Element ID 2388-1026-0463 Box Markings Sample Markings Flow Direction Marked Other Markings Visual Inspection Notes Product Description Length, mm Blocked Cell Count, as received Blocked Cell Count, after light cleaning Flow Entrance CORMETECH Confidential www.cormetech.com 1 of 2 2388-1026-0463 Flow X Calc 3 Yes None Element is in good physical condition CM21MHTtM 70 X 70 cell array 447 0 0 Flow Exit | 10 5000 International Drive Durham, North Carolina 27712 USA
  6. Page 61 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 61 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report Results of Laboratory Tests The catalyst performance below is reported under constant 5 ppmvdc ammonia slip and design operating conditions. The lab performance threshold represents the design NOX removal efficiency, as measured in lab apparatus, at which the actual field performance at design operating conditions is expected to reach end-of-life. Field performance is based on a design performance requirement of 85.9% NOX removal efficiency and 5 ppmvdc ammonia slip. In field scale (actual) operation, flow, temperature and ammonia/NOx non-uniformities exist. In the highly controlled laboratory environment these non-uniformities do not exist; therefore, the lab results must be scaled-up to reflect expected field performance. The scale-up factors limit achievable NOX reduction performance in operating SCR systems. The performance threshold value is based on design values for the scale-up factors. The actual threshold may be lower if actual scale-up is less severe, or higher if more severe. Element ID Time On-Line (Hours) Fresh Reference # 2388-1026-0430 0 NOx Removal Efficiency, % at 5 ppmvdc NH3 Slip 95.5 July 2010 Audit # 2388-1026-0464 <100 94.6 July 2010 Audit # 2388-1026-0460 <100 94.6 November 2017 Audit # 2388-1026-0463 772 93.9 Threshold (based on design scale-up factors) CORMETECH Confidential www.cormetech.com 85.9 | 11 5000 International Drive Durham, North Carolina 27712 USA
  7. Page 62 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 62 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report The figure below shows the trend in catalyst performance. This audit of the GenConn Devon Power Unit 17 SCR catalyst shows a measurable decrease in catalytic potential of the SCR catalyst, as measured by lab-scale testing. Based on the results of this audit, the SCR catalyst installed for GenConn Devon Power Unit 17 is above the performance threshold and is projected to continue to meet the field performance requirements of 85.9% NOX reduction at 5 ppmvdc ammonia slip for at least an additional 3,500 operating hours from the date this sample was removed. This prediction assumes that catalyst deactivation will continue at the same rate as measured over the first 772 operating hours. If this rate of deactivation changes, the prediction of remaining catalyst life will change accordingly; therefore, Cormetech recommends performing regular field performance and laboratory catalyst audits. CORMETECH Confidential www.cormetech.com | 12 5000 International Drive Durham, North Carolina 27712 USA
  8. Page 63 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 63 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report FIELD DATA COMMENTARY A review of field data has three primary purposes. First, the field data can show if any operating parameters are significantly different than the original design of the unit. Second, the field data can show if actual plant performance requirements are more severe than the design. If significant differences are evident in operating parameters or performance requirements, their effect on the performance threshold can be determined. Third, the field data can be used to examine if any factors that adversely impact scale-up are present. Typically the factors that adversely impact scale-up are as follows: Plugged/ poorly performing Ammonia Injection System resulting in poor mixing of the NH3 prior to the catalyst. Flue gas flow velocity maldistribution. Flue gas flow bypass around the catalyst. Plugged catalyst. Below is a table that compares the field data provided by GenConn Devon Power Unit 17 SCR against the design criteria for the installed SCR catalyst: Parameter Flue Gas Temperature (°F) Flue Gas Flow Rate (lb/hr) Inlet NOx (ppmvd @ 15% O2) Outlet NOx (ppmvd @ 15% O2) NOx Reduction Efficiency (%) NH3 Slip (ppmvd @ 15% O2) NH3 Flow Rate (lb/hr) NH3 Supply Concentration (wgt %) Flue Gas O2 Conc. (% vol dry) Catalyst Pressure Drop (in. wg.) Design Value 828 1,088,460 42 5.9 85.9 5 (end of life) 180 (end of life) 19 14.4 5.1 Field Value (oil) 819 N/A 42 (estimated) 4.1 90.2 2.3 163 19 14.6 5.2 Field Value (gas) 819 N/A 25 (estimated) 1.9 92.4 3.5 100 19 14.5 5.2 Permit Limit Outlet NOx = 5.9 ppmvd @ 15% O2 (ULSK), 2.5 ppm vd @15% O2 (Gas) Ammonia Slip = 5 ppm Based on the provided operational data, GenConn Devon Power Unit 17 is operating well in the field and meeting permit limits. The measured ammonia slip and flow rate are lower than expected given the other parameters and lab measured activity of the catalyst, indicating good performance. In both oil fired and gas fired conditions, the outlet NOx is being driven well below the permit limit. This increases the NOx reduction efficiency resulting in a higher level of performance than the design of the catalyst. As the catalyst deactivates over time the outlet NO x will need to be maintained closer to the permit requirements to maintain ammonia slip within permit requirements. CORMETECH Confidential www.cormetech.com | 13 5000 International Drive Durham, North Carolina 27712 USA
  9. Page 64 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 64 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report RECOMMENDATIONS Regular laboratory catalyst testing is recommended to refine the accuracy of the remaining catalyst life prediction. The next audit should occur after an additional 1000 hours of operation or three years, whichever is first, from the time the sample for this audit was removed. Continued review of field test data to accurately confirm actual performance requirements, operating conditions, and system scale-up factors, and thereby the appropriate laboratory scale performance threshold is recommended. CORMETECH Confidential www.cormetech.com | 14 5000 International Drive Durham, North Carolina 27712 USA
  10. Page 65 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 65 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report APPENDIX 1: Location of Sample Retrieval The sample retrieval location for GenConn Devon Power Unit 17 is shown in the following schematic. GenConn Devon Unit 17 Module 3 Module 6 Removed July 2010 Removed November 2017 Removed July 2010 CORMETECH Confidential www.cormetech.com 1 1 2010 2010 3 3 2017 4 2010 2010 Removed July 2010 Removed July 2010 | 15 5000 International Drive Durham, North Carolina 27712 USA

Text of LFE-011 GenConn.pdf

Extracted from the file · 1 page · 2,796 characters

Words on different pagesRead the text of LFE-011 GenConn.pdf

Text of LFE-011 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-012 GenConn.pdf

Extracted from the file · 1 page · 982 characters

Text of LFE-012 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 2,492 characters

Text of LFE-014 GenConn.pdf

Extracted from the file · 1 page · 351 characters

Text of LFE-014 Attachment 1 (GenConn- CP2 REVISED V2).pdf

Extracted from the file · 8 pages · 12,688 characters

Text of LFE-015 GenConn.pdf

Extracted from the file · 1 page · 1,318 characters

Text of LFE-009 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

LFEs Filed (Avangrid) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 Date Filed: 10/19/2026

This filing on the current system (opens in a new tab)