Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Late-filed exhibits

Exhibits 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15

Files26

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting

Text of LFE-001 GenConn.pdf

Extracted from the file · 1 page · 535 characters

Words on different pages

Text of LFE-002 GenConn .pdf

Extracted from the file · 1 page · 1,167 characters

Words on different pages
Words on different pages

Text of LFE-004 GenConn.pdf

Extracted from the file · 3 pages · 4,954 characters

Words on different pagesRead the text of LFE-004 GenConn.pdf

Text of LFE-005 GenConn.pdf

Extracted from the file · 2 pages · 2,975 characters

Text of LFE-006 GenConn.pdf

Extracted from the file · 2 pages · 4,578 characters

Text of LFE-006 Attachment 1.pdf

Extracted from the file · 115 pages · 296,451 characters

Text of LFE-007 GenConn.pdf

Extracted from the file · 1 page · 1,613 characters

Words on different pagesRead the text of LFE-007 GenConn.pdf

Text of LFE-007 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-007 Attachment 2 (RRU-031 Attachment 1-Corrected).xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-008 GenConn.pdf

Extracted from the file · 1 page · 2,438 characters

Text of LFE-008 Attachment 1.pdf

Extracted from the file · 42 pages · 58,655 characters

Text of LFE-008 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-009 GenConn.pdf

Extracted from the file · 1 page · 1,386 characters

Text of LFE-010 GenConn.pdf

Extracted from the file · 2 pages · 3,322 characters

Words on different pagesRead the text of LFE-010 GenConn.pdf
Words on different pages
  1. Page 64 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 64 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report RECOMMENDATIONS Regular laboratory catalyst testing is recommended to refine the accuracy of the remaining catalyst life prediction. The next audit should occur after an additional 1000 hours of operation or three years, whichever is first, from the time the sample for this audit was removed. Continued review of field test data to accurately confirm actual performance requirements, operating conditions, and system scale-up factors, and thereby the appropriate laboratory scale performance threshold is recommended. CORMETECH Confidential www.cormetech.com | 14 5000 International Drive Durham, North Carolina 27712 USA
  2. Page 65 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 65 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report APPENDIX 1: Location of Sample Retrieval The sample retrieval location for GenConn Devon Power Unit 17 is shown in the following schematic. GenConn Devon Unit 17 Module 3 Module 6 Removed July 2010 Removed November 2017 Removed July 2010 CORMETECH Confidential www.cormetech.com 1 1 2010 2010 3 3 2017 4 2010 2010 Removed July 2010 Removed July 2010 | 15 5000 International Drive Durham, North Carolina 27712 USA
  3. Page 66 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 66 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report APPENDIX 2: Field Records Field records received from GenConn Devon Power are reproduced below. CORMETECH Confidential www.cormetech.com | 16 5000 International Drive Durham, North Carolina 27712 USA
  4. Page 67 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 67 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report CORMETECH Confidential www.cormetech.com | 17 5000 International Drive Durham, North Carolina 27712 USA
  5. Page 68 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 68 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report CORMETECH Confidential www.cormetech.com | 18 5000 International Drive Durham, North Carolina 27712 USA
  6. Page 69 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 69 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report APPENDIX 3: Performance Test Standard Procedure Purpose The laboratory performance testing for SCR catalyst is conducted to determine the catalytic potential of a representative sample of SCR catalyst at conditions that closely match the actual operating conditions of the SCR system. The sample should represent a typical cross section of the SCR, and the operating history should be known. The test is conducted in a controlled, laboratory environment on custom-built, rigorously validated SCR catalyst test apparatus allowing accurate determination of performance and comparisons of the sample catalytic potential to the system requirements previously tested catalyst(s). Test Equipment Description The Cormetech Laboratory SCR test reactors consist of three basic systems: Simulated flue gas generator SCR catalyst test chamber Measurement system The purpose of the simulated flue gas generator is to provide a stable controlled supply of heated gas with the required mix of gases at the required flow rate and temperature to the SCR catalyst test chamber. It consists of a bulk flue gas generator, a flue gas modification system, a flue gas heater, a reactive gas injection system, and a flue gas mixer. Bulk Flue Gas Generator -The bulk flue gas is produced by either the combustion of air in a natural gas fired water-cooled combustion chamber, the extraction of nitrogen from air via a membrane system, or the delivery of nitrogen from liquefied nitrogen. This system is adjusted to achieve the overall flue gas flow rate required for the specified test. Flue Gas Modification System – The gas stream produced by the bulk flue gas generator is modified by the addition of oxygen/air and water/steam to achieve the targeted concentrations of water vapor and oxygen in the flue gas stream. Flue Gas Heater – The flue gas stream is heated to the target test temperature by an electric pre-heater. Reactive Gas Injection System – Calibrated mass flow controllers are used to deliver SO2, SO3, NO2, NO, and NH3 into the flue gas stream. CORMETECH Confidential www.cormetech.com | 19 5000 International Drive Durham, North Carolina 27712 USA
  7. Page 70 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 70 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report The table below summarizes the range of process conditions that can be produced by various apparatus in Cormetech’s laboratory. Cormetech’s laboratory maintains multiple testing units, each with varying capabilities for temperature, flow, and gas composition. The unit selected for a given test will depend on the specific requirements for the sample tested. Parameter Gas Temperature Flow rate/Entrance velocity O2 H2O NO NO2 NH3 SO2 SO3 Units o C Nm/s volume % dry volume % ppmvd ppmvd ppmvd ppmvd ppmvd Range 200 – 600 1.25 - 7.05 1 – 20 1-201 0 - 2,000 0 - 20002 0 - 4,000 0 - 2,000 0 – 25 1: Some apparatus have the capability to control water concentration. Other units supply water as a product of combustion. When water concentration is not controlled, Cormetech corrects the results to the target concentration with a standardized correction factor. 2: NO2 addition capability is not available on all test units. Flue Gas Mixer – Following the reactive gas injection, the gases are mixed using a high efficiency static mixing element. The simulated flue gas next enters the SCR test reactor where the SCR test sample or samples are located. Each sample is sealed tightly to the walls of the test chamber to ensure that all of the flue gas passes though the sample[s]. Along the length of the test chamber there are electric heating elements that maintain the specified test temperature. There are test ports located at the entrance to the test reactor and at the exit of each sample layer to extract a sample of flue gas for analysis, measure the static pressure of the flue gas, and monitor the temperature of the catalyst samples and the flue gas. CORMETECH Confidential www.cormetech.com | 20 5000 International Drive Durham, North Carolina 27712 USA
  8. Page 71 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 71 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report The process conditions of the SCR catalyst under test are monitored by the measurement system: Gas Flow Rate – The flue gas flow rate is measured by an averaging pitot tube in the exit of the simulated flue gas generator. The flow rate is also calculated from the mass flow controllers for the various gas constituents as they are added. Finally, an annubar is installed in the exhaust of the reactor which allows another cross-check of the flow rate. For the testing to be determined valid, the flow rate must be within the allowable limits from the target flow rate. Gas Temperature – The temperature of the gas and the catalyst samples is measured by a series of thermocouples throughout the test reactor. For the testing to be determined valid, both the spatial and temporal variability must be within the allowable limits from the specified set point. Component Concentration – The components of the flue gas are determined by the methods described below. Different systems may not have every type of sampling measurement system. NOx – Chemiluminescent NOx Analyzer / Infrared Spectroscopy. Average value at each sampling point recorded for each sampling cycle NH3 – Ion Chromatography/infrared spectroscopy SO2 – Precipitation Method/infrared spectroscopy SO3 – Controlled Condensation; Collective Precipitation Method O2 – Micro-fuel cell and Paramagnetic O2 Analyzer Procedure Description Summary The following stepwise description is a guideline to understand how an audit proceeds from sample receipt to reported results. 1. Upon receipt, each sample is inspected for condition and photographed. The sample dimensions are recorded. 2. The Test Plan is prepared based on the needs of audit. The appropriate test apparatus is selected based on the test requirements and the test is scheduled. 3. Each sample is prepared for testing. [This process includes cleaning the sample, and cutting to the required test sample size.] 4. The reactor is opened, inspected, and prepared for operation. 5. Each catalyst sample is loaded according to the Test Plan and sealed in the reactor. 6. An equipment leak test is performed. CORMETECH Confidential www.cormetech.com | 21 5000 International Drive Durham, North Carolina 27712 USA
  9. Page 72 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 72 of 178 NRG GenConn Devon Power Unit 17 February 7, 2018 SCR Catalyst Performance Test Report 7. The Bulk Flue Gas Generator is started and the test conditions are set for O2%, temperature, and bulk flow rate. 8. NO and NO2 injection is started and then adjusted in order to meet the test conditions. 9. Ammonia, SO2 and SO3 injection is started and then adjusted in order to meet the test conditions. 10. The catalyst is allowed to equilibrate at the test conditions specified. 11. A calibration check is run for the analyzers. 12. For each sampling cycle, the following measurements are taken, as required: Item NOX Concentration Location Measured Multiplexed to measure NOX at each sampling point NH3 Concentration At exit of sample[s] SO2 Concentration Entrance and at each sampling port Entrance and at each sampling port Exit of combustion chamber and multiplexed with NOX Analyzer Exit of combustion chamber SO3 Concentration O2 Concentration Gas Flow Gas Temperature Pressure Drop At each sampling port Entrance and at exit of testing chamber Frequency Average value at each sampling point recorded per each sampling cycle Depends on test method [Multiple analyses recorded] When SO2 oxidation performance is measured When SO2 oxidation performance is measured Continuously controlled and monitored Continuously controlled and monitored Inlet continuously controlled Continuously monitored, recorded as required 13. The results are recorded and checked per Quality Assurance requirements and compared to the Test Plan. 14. The results are reported. CORMETECH Confidential www.cormetech.com | 22 5000 International Drive Durham, North Carolina 27712 USA
  10. Page 73 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 NRG GenConn Devon Power Unit 18 SCR Catalyst Performance Test Report 845 Operating Hours April 2019 Audit Submitted by CORMETECH, INC. Environmental Technologies 5000 International Drive Durham, NC 27712 [phone removed] Max Morris Project Engineer John A. Nivens Sr. Engineering Technician Certifying Laboratory Representative Silas Christian, Laboratory Manager July 17, 2019 CORMETECH CONFIDENTIAL This document and attachments, if any, contain confidential/proprietary information and is submitted without consideration other than the recipient's agreement that it shall not be reproduced, copied, lent, or disposed of directly or indirectly nor used for any purpose other than that for which it is specifically furnished. Page 73 of 178

Text of LFE-011 GenConn.pdf

Extracted from the file · 1 page · 2,796 characters

Words on different pagesRead the text of LFE-011 GenConn.pdf

Text of LFE-011 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-012 GenConn.pdf

Extracted from the file · 1 page · 982 characters

Text of LFE-012 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 2,492 characters

Text of LFE-014 GenConn.pdf

Extracted from the file · 1 page · 351 characters

Text of LFE-014 Attachment 1 (GenConn- CP2 REVISED V2).pdf

Extracted from the file · 8 pages · 12,688 characters

Text of LFE-015 GenConn.pdf

Extracted from the file · 1 page · 1,318 characters

Text of LFE-009 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

LFEs Filed (Avangrid) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 Date Filed: 10/19/2026

This filing on the current system (opens in a new tab)