Text of LFE-001 GenConn.pdf

Extracted from the file · 1 page · 535 characters

Words on different pages

Text of LFE-002 GenConn .pdf

Extracted from the file · 1 page · 1,167 characters

Words on different pages
Words on different pages

Text of LFE-004 GenConn.pdf

Extracted from the file · 3 pages · 4,954 characters

Words on different pagesRead the text of LFE-004 GenConn.pdf

Text of LFE-005 GenConn.pdf

Extracted from the file · 2 pages · 2,975 characters

Text of LFE-006 GenConn.pdf

Extracted from the file · 2 pages · 4,578 characters

Text of LFE-006 Attachment 1.pdf

Extracted from the file · 115 pages · 296,451 characters

Text of LFE-007 GenConn.pdf

Extracted from the file · 1 page · 1,613 characters

Words on different pagesRead the text of LFE-007 GenConn.pdf

Text of LFE-007 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-007 Attachment 2 (RRU-031 Attachment 1-Corrected).xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-008 GenConn.pdf

Extracted from the file · 1 page · 2,438 characters

Text of LFE-008 Attachment 1.pdf

Extracted from the file · 42 pages · 58,655 characters

Text of LFE-008 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-009 GenConn.pdf

Extracted from the file · 1 page · 1,386 characters

Text of LFE-010 GenConn.pdf

Extracted from the file · 2 pages · 3,322 characters

Words on different pagesRead the text of LFE-010 GenConn.pdf
Words on different pages
  1. Page 95 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 NRG GenConn Middletown Unit 12 SCR Catalyst Performance Test Report 671 Operating Hours October 2019 Audit Submitted by CORMETECH, INC. Environmental Technologies 5000 International Drive Durham, NC 27712 [phone removed] Max Morris Project Engineer John A. Nivens Sr. Engineering Technician Certifying Laboratory Representative Silas Christian, Laboratory Manager December 6, 2019 CORMETECH CONFIDENTIAL This document and attachments, if any, contain confidential/proprietary information and is submitted without consideration other than the recipient's agreement that it shall not be reproduced, copied, lent, or disposed of directly or indirectly nor used for any purpose other than that for which it is specifically furnished. Page 95 of 178
  2. Page 96 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 96 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................ 3 PURPOSE ...................................................................................................................................... 4 BACKGROUND .............................................................................................................................. 4 FACILITY OPERATIONAL HISTORY ............................................................................................. 6 PROCEDURE OVERVIEW ............................................................................................................. 7 FIELD SAMPLING AND UNIT OPERATING CONDITIONS ............................................................ 8 LABORATORY PERFORMANCE TEST CONDITIONS .................................................................. 9 RESULTS ..................................................................................................................................... 10 FIELD DATA COMMENTARY....................................................................................................... 13 RECOMMENDATIONS ................................................................................................................. 14 APPENDIX 1: Location of Sample Retrieval .................................................................................. 15 APPENDIX 2: Field Records ......................................................................................................... 16 APPENDIX 3: Performance Test Standard Procedure .................................................................. 17 CORMETECH Confidential www.cormetech.com | 2 5000 International Drive Durham, North Carolina 27712 USA
  3. Page 97 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 97 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report EXECUTIVE SUMMARY The following summarizes the key results for this audit of the NRG GenConn Middletown Unit 12 SCR after 671 operating hours since first gas-in. Observations and Predictions This audit of the GenConn Middletown Unit 12 SCR catalyst shows a measurable decrease in catalytic potential of the SCR catalyst, as measured by lab-scale testing. Based on the results of this audit, the SCR catalyst installed for GenConn Middletown Unit 12 is above the performance threshold and is projected to continue to meet the field performance requirements of 85.9% NOX reduction at 5 ppmvdc ammonia slip for at least an additional 1,300 operating hours from the date this sample was removed. Due to the low operating hours and that this is the first audit, the life prediction is likely conservative. This prediction assumes that catalyst deactivation will continue at the same rate as measured over the operating hours to date. If this rate of deactivation changes, the prediction of remaining catalyst life will change accordingly; therefore, Cormetech recommends performing regular field performance and laboratory catalyst audits. Field Data Commentary Based on the provided operational data, GenConn Middletown Unit 12 is operating well in the field and meeting permit limits. The measured ammonia slip and flow rate are lower than expected given the other parameters and lab measured activity of the catalyst, indicating good performance. In both oil fired and gas fired conditions, the outlet NOx is being driven well below the permit limit. This increases the NOx reduction efficiency resulting in a higher level of performance than the design of the catalyst. As the catalyst deactivates over time the outlet NOx will need to be maintained closer to the permit requirements to maintain ammonia slip under 5 ppmvdc. Recommendations Regular laboratory catalyst testing is recommended to refine the accuracy of the remaining catalyst life prediction. The next audit should occur after an additional 600 hours of operation or three years, whichever is first, from the time the sample for this audit was removed. Continued review of field test data to accurately confirm actual performance requirements, operating conditions, and system scale-up factors, and thereby the appropriate laboratory scale performance threshold is recommended. CORMETECH Confidential www.cormetech.com | 3 5000 International Drive Durham, North Carolina 27712 USA
  4. Page 98 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 98 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report PURPOSE This test is conducted to audit the catalytic potential of an SCR catalyst by measuring the performance of a field catalyst sample that has been in operation for a known duration. The catalytic potential is measured by laboratory scale testing of field samples removed from the SCR. Performance tests are conducted in a controlled, laboratory environment allowing accurate comparisons of field sample catalytic potential to that of fresh catalyst. The deactivation rate is determined by comparing the change in catalytic potential to the operating hours of the sample. Field performance, as indicated by plant-supplied measurements and observations, is also analyzed and discussed relative to the performance of the catalyst samples tested. Measured field performance in conjunction with laboratory measurements of field sample catalytic potential is used to determine actual unit scale-up factors. Utilizing actual unit scale-up factors significantly improves the accuracy of future performance predictions. Further catalyst and/or field operation analysis may be recommended if laboratory test results are inconsistent with any of the following: Cormetech’s experience base of comparable units The plant’s reported field performance, if available The results of previous audits of the unit, if applicable The performance expectations for the unit. BACKGROUND In order to achieve the design performance requirements of a Selective Catalytic Reduction system for a specified timeframe (life) of the SCR catalyst, the catalyst formulation, structure, and volume are specifically designed to accommodate the system operating conditions, the predicted system scale-up factors, and a predicted rate of decrease in catalyst potential over time. If any of the design or operating parameters above is not realized, then the actual duration that the design performance requirements can be met may deviate from the design life. The individual contribution of each parameter on actual life is described below. In actual practice, one or more of these parameters may deviate from design and either counteract or complement each other. Performance Requirements: If the actual plant performance requirements are more severe than the design performance requirements, actual life will be less than design life. An example of this would be a unit that is required to achieve a higher NOx reduction than the unit was designed for. Operating Conditions: Flue gas flow rate, inlet NOX levels, temperature, oxygen content, and water content impact catalytic potential. If the catalyst is at an operating condition where the potential is lower than design, actual life will be less than design life. Scale-Up Factors: The full NOX reduction potential of the catalyst is not attained in the field due to non-ideal flow distribution, temperature distribution, ammonia to NOX molar ratio distribution, CORMETECH Confidential www.cormetech.com | 4 5000 International Drive Durham, North Carolina 27712 USA
  5. Page 99 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 99 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report catalyst blockage, and/or flue gas bypass. Collectively, these non-ideal conditions are accounted for with ‘system scale-up factors’. If the overall actual system scale-up factors are more severe than the design scale-up factors, then the potential of the SCR system to meet a given performance requirement is reduced. Catalyst Deactivation Rate: Catalytic potential decreases over time. This catalyst deactivation rate has a direct impact on actual life. If the deactivation rate is more than design, then actual life is effectively reduced. If the deactivation rate is less than design, the actual life is effectively increased. If the performance requirements, operating conditions, and/or scale-up factors are more severe than the initial design, less margin remains for catalyst deactivation. Therefore, actual life will be less than design life. At any given time and operating condition, the SCR system performance is dictated by the NOX reduction potential of the catalyst and the system scale-up factors. These factors reduce performance from the catalytic potential to the performance achievable in the operating SCR system. Performance tests are purposefully conducted in a controlled environment, free from the scaleup factors that adversely affect SCR system performance, and at repeatable operating conditions, so that changes in catalytic potential may be evaluated accurately. Catalyst deactivation is determined by testing the field catalyst sample at the same operating conditions as the fresh sample. In conjunction with performance test results, analysis of field SCR system performance data can confirm the field performance requirements, the plant operating conditions, and actual system scale-up factors. Cormetech’s SCR catalyst design and testing experience enables analysis of the actual versus design values of performance requirements, operating conditions, system scale-up, and catalyst deactivation to predict future catalyst performance. CORMETECH Confidential www.cormetech.com | 5 5000 International Drive Durham, North Carolina 27712 USA
  6. Page 100 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 100 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report FACILITY OPERATIONAL HISTORY The SCR system at the GenConn Middletown Unit 12 consists of 1 layer of CM21MHTTM 70 cell catalyst. The unit was originally put into service on April 2011. On October 1, 2019 one catalyst sample was removed from the field sampler at GenConn Middletown Unit 12 and returned to Cormetech for laboratory testing. At the time the sample was removed, the audited element had accumulated 671 operating hours. The results of the December 6, 2019 audit are summarized in this report. CORMETECH Confidential www.cormetech.com | 6 5000 International Drive Durham, North Carolina 27712 USA
  7. Page 101 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 101 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report PROCEDURE OVERVIEW 1. One catalyst sample was removed from the field sampler module at the GenConn Middletown Unit 12 SCR and was shipped to Cormetech’s laboratory. Operating history was recorded by the plant and forwarded to Cormetech. 2. The physical condition of the catalyst was documented by Cormetech. 3. The catalyst was prepared and loaded into an Activity Test Apparatus and then evaluated at the original design conditions for the SCR. The Performance Test Standard Procedure is included in Appendix 3. 4. The results include catalyst potential expressed as NOX removal efficiency at a constant 5 ppmvdc ammonia slip. 5. Test results were compared to design expectations and to the results of the fresh reference. Expectations of catalyst deactivation were determined by the time on-line and experience data of similar gas-fired facilities. 6. A catalyst life prediction is based on the above testing and analysis. 7. Additional data submitted by the plant was reviewed for the field performance of the SCR system. CORMETECH Confidential www.cormetech.com | 7 5000 International Drive Durham, North Carolina 27712 USA
  8. Page 102 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 102 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report FIELD SAMPLING AND UNIT OPERATING CONDITIONS Field Sampling One SCR catalyst sample from GenConn Middletown Unit 12 was removed and sent to Cormetech's Laboratory for evaluation. The sample retrieval location is shown in Appendix 1. Operating Status Field records supplied by GenConn Middletown are summarized in the table below. The field records are reproduced in Appendix 2. First Gas-In Date with Catalyst Installed Sample Removal Date October,1,2019 Total Operating Hours On Catalyst Sample 671 Ultra-Low Sulfur Kerosene Primary Fuel Fired Hours Burning Primary Fuel 593 Secondary Fuel Fired Natural Gas Hours Burning Secondary Fuel 78 Number of Starts and Stops since catalyst was installed 296 CORMETECH Confidential www.cormetech.com 4/14/2011 | 8 5000 International Drive Durham, North Carolina 27712 USA
  9. Page 103 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 103 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report LABORATORY PERFORMANCE TEST CONDITIONS A performance test was conducted on the sample received using the conditions below. These conditions reflect the original design conditions for which there is fresh catalyst test data available for direct comparison. Temperature 442OC (828OF) Entrance Gas Velocity 3.76 Nm/s O2 Inlet NOX CORMETECH Confidential www.cormetech.com 14.4 vol% dry 46.0 ppmvd @ 14.4% O2 (42.0 ppmvdc @ 15% O2) | 9 5000 International Drive Durham, North Carolina 27712 USA
  10. Page 104 of 178

    GenConn Energy LLC Docket No. 26-06-02 LFE-010 Attachment 1 Page 104 of 178 NRG GenConn Middletown Unit 12 December 6, 2019 SCR Catalyst Performance Test Report RESULTS Sample Visual Inspection One field sample was received from the GenConn Middletown Unit 12 SCR. Below are photographs of the flow entrance face and the flow exit face of the element with an as received inspection report. Element ID 2389-1021-0339 Box Markings Sample Markings Flow Direction Marked Other Markings Visual Inspection Notes Product Description Length, mm Blocked Cell Count, as received Blocked Cell Count, after light cleaning Flow Entrance CORMETECH Confidential www.cormetech.com NA GenConn Middletown unit 12 Yes None Element is in good physical condition CM21MHTtM 447 0 0 Flow Exit | 10 5000 International Drive Durham, North Carolina 27712 USA

Text of LFE-011 GenConn.pdf

Extracted from the file · 1 page · 2,796 characters

Words on different pagesRead the text of LFE-011 GenConn.pdf

Text of LFE-011 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of LFE-012 GenConn.pdf

Extracted from the file · 1 page · 982 characters

Text of LFE-012 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 2,492 characters

Text of LFE-014 GenConn.pdf

Extracted from the file · 1 page · 351 characters

Text of LFE-014 Attachment 1 (GenConn- CP2 REVISED V2).pdf

Extracted from the file · 8 pages · 12,688 characters

Text of LFE-015 GenConn.pdf

Extracted from the file · 1 page · 1,318 characters

Text of LFE-009 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

LFEs Filed (Avangrid) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15 Date Filed: 10/19/2026

This filing on the current system (opens in a new tab)