Presentation for 10-22-2026 meeting

CorrespondenceFiled by Eversource Energy1 file
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 3 of 12

    Differentiated Pricing Resource diversity required to meet system requirements ▪ Supportive policies and fewer siting challenges have made solar leading new resource in New England ▪ “BTM” Solar production has meaningfully altered system-wide summer load profile (~2 GW peak reduction) ▪ Peak load reduction potential of standalone PV increasingly exhausted ISO-NE New Online Capacity (Nameplate MW) 2021-2025 Natural Gas ISO-NE Load (July 2-3, 2026) Other Wind Load w/estimated BTM PV generation Peak Load Actual Load 6,300 out of 6,600 MW from solar Solar
  2. Page 4 of 12

    Differentiated Pricing Majority of estimated storage benefits ultimately based on capacity performance ▪ PURA/DEEP Value of DER Report attributed majority of value from paired or storage resources to capacity-based values 250 $/MWh 200 Capacity Capacity DRIPE Avoided Transmission Avoided Distribution 150 100 50 Energy Energy DRIPE Avoided Emissions 0 BTM PV FTM PV BTM PV + BESS Energy-Based BESS Fuel Cell EE Capacity-Based ▪ kW-based performance payments are more reliable pricing approach for aligning compensation with intended benefits
  3. Page 5 of 12

    Differentiated Pricing Paired BESS operation may be inconsistent under other incentive structures ▪ Operation of BESS resources can be variable when operating requirements or price signals are flexible – Maximizing revenue from compensation adders or peak energy pricing doesn’t require firm delivery Actual PV + Storage Output (MA facilities - July 2-3, 2026) Facility output (MW) System Load (MW) ▪ Reliance on additional generation resources and T&D infrastructure less likely to be reduced without consistent performance
  4. Page 6 of 12

    Differentiated Pricing Customizing target output periods to maximize locational value ▪ Variation in load profiles across circuits and seasons means uniform criteria may not maximize benefits ▪ Providing individual direction for system owners to target specific periods is efficient method to begin optimizing system benefits – Directly basing compensation on anticipated system benefits better addressed through Non-Wires Solutions approaches
  5. Page 7 of 12

    Differentiated Pricing FTM facilities provide largest near-term opportunity ▪ Current rate designs and programs already incentivize performance of paired BESS for BTM facilities – TOU rates available to both residential and commercial customers within current program designs – BTM BESS can be utilized to mitigate demand charges for current commercial customers – Energy Storage Solutions Program provides further incentives for BTM BESS at customer premises ▪ Rate designs can continue to evolve to further encourage management of BTM resources – – Reducing export compensation rates will encourage customers to align energy output with individual consumption Program MW 46.9 145.9 Advanced TOU rate offerings expected to be enabled by future metering and billing investments ▪ FTM resources are significant majority of lower cost 275.9 commercial clean energy program enrollment NRES Netting NRES Buy-All SCEF
  6. Page 8 of 12

    Differentiated Pricing Comprehensive “Connecticut” MPF proposal should be developed ▪ Interest and questions on conceptual “Eversource Proposal” are welcomed ▪ Further development of several program design elements and key terms would benefit from stakeholder collaboration: – Performance criteria – Metering configurations and charging restrictions – Interaction with flexible interconnection and RTAC capabilities – Rate setting and project economics – Boundaries of project-specific peak periods ▪ Seeking consensus proposals within working group environment could expedite development of successful program designs
  7. Page 9 of 12

    Residential Program Design Eliminating meter requirements is feasible with alternative incentive structure ▪ Support programs designed to operate without additional production metering – Eliminating additional meters would reduce costs and streamline program enrollment/PTO – Reliance on 3rd party data sources remains discouraged for efficient program operations ▪ Delivering limited additional incentives or charges through $/kW payments for netting projects is reasonable alternative in absence of reliable production data – Payments would continue to be processed outside billing systems, mitigating significant implementation requirements – Majority of tariff value would remain performance-based bill reduction/on-bill credit – Buy-all project compensation should remain based upon utility-owned meter data Equivalent Incentive Amounts $/kWh $/kW-mo % total value* Low-Income Adder $0.0350 $4.15 11.2% Distressed Municipality Adder $0.0175 $2.08 5.9% Solar Energy Adjustment $(0.0325) $(3.86) (13.2%) *w/full retail rate
  8. Page 10 of 12

    Residential Program Design Adjusting RPS requirements may deliver comparable value to customers ▪ Reporting only excess generation would significantly reduce volume of REC sales and program cost reductions – Impact could be 40 percent reduction to REC proceeds from successor program based on average customer profile – Historical data unreliable basis of estimates due to volume of skipped production meters ▪ Exercising authority to adjust RPS requirements may realize similar long-term benefits for Connecticut consumers with reduced administration – NEPOOL reporting, REC sales and transfers, Class I RPS applications would all be eliminated Sample calculations (RRES 2026) Installed program capacity 394 MW Annual estimated generation 517,716 MWh Annual retail load 24,946,181 MWh RPS Class I requirement 25% Class I reduction (2.07%) Adjusted RPS Class I requirement 22.93%
  9. Page 11 of 12

    Non-Residential Program Design Recommend limited bid preferences/adders aligned with intended outcomes ▪ Tie preferences to intended outcomes – Preferences should be limited to clearly defined policy objectives – Clear definitions that can be reasonably administered Selected Large Zero Emission Bid Preferences Canopy/ Carport None Landfill/ Brownfield ▪ Ensure preference support measurable outcomes without distorting competition – Significant majority of Large NRES projects rely on DM preference to secure selection – Limited insight into benefits for DMs or lost opportunities to other communities Distressed Municipality ▪ Consider ratepayer cost impacts – The addition of adders or preferences that allow bidding above price caps have the potential to increase program costs – Any consideration of adders should be justified by demonstrable benefits.
  10. Page 12 of 12

    Non-Residential Program Design Project maturity requirements to maximize clean energy deployment ▪ Prefer a fully executed interconnection agreement – An executed IA provides a strong, objective indicator of interconnection status and project maturity ▪ Consider alternative interconnection milestones – Other milestones may demonstrate meaningful progress towards interconnection without lowering a maturity standard – Should be considered where an executed IA would unnecessarily exclude otherwise viable projects ▪ Balance project readiness with program participation – Requirements should serve to reduce the risk of selecting projects unlikely to advance on timely basis – Preserve opportunities for viable projects facing interconnection timelines or processes outside their control ▪ Establish clear, consistently applied criteria – Define qualifying milestones and documentation requirements in advance – Clear requirements support uniform evaluation of project readiness and transparent program administration