OCC-Synapse presentation

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 1 of 13

    Office of Consumer Counsel Presentation For 26-06-04 Technical Meeting October 22, 2026 Presenters: Tim Woolf, Erin Malone, Jack Green, Kayla Cherry, Alex Wang (OCC) www.synapse-energy.com | ©2026 Synapse Energy Economics Inc. All rights reserved.
  2. Page 2 of 13

    Topics for Discussion 1. Time-differentiated Compensation 2. Designs to facilitate comparisons of competitive solicitations a) b) c) Percent discount bidding Bidding tranches Multipart Payment Framework (MPF) proposed by Eversource www.synapse-energy.com | ©2026 Synapse Energy Economics Inc. All rights reserved. 2
  3. Page 3 of 13

    Time Differentiated Compensation
  4. Page 4 of 13

    Time-differentiation promotes equity and provides incentives Customer Equity Charge and compensate customers at the value to the system in each hour Host Operating Incentive Provide host customers incentives to consume during the lowest cost hours, promoting system efficiency For PV-only systems: the main reason for time differentiation is to achieve customer equity, because the generation profile cannot be modified by the host customers thus operating incentives are not necessary. • This means that a weighted average proxy of the hourly system values can be used if needed. For any system with storage: time differentiation is necessary for both customer equity and operating incentives, because the storage operating profile is flexible. Time-differentiation can be achieved in two forms: 1. TOU rates – these affect behind the meter consumption patterns. (These tend to be limited to 2-3 tiers of rates.) 2. Program compensation rates – these affect generation and storage patterns www.synapse-energy.com | ©2026 Synapse Energy Economics Inc. All rights reserved. 4
  5. Page 5 of 13

    Flat proxies support time-differentiation for solar-only systems • Export profiles vary with behind-the-meter loads, but do not change the system value of the generation • Because the generation profiles are similar, a flat payment rate based on the generation-weighted average avoided cost is a reasonable proxy for timedifferentiated compensation • This means that customers with existing (non-interval) meters could be compensated based on the grid-value of their generation without a new interval meter www.synapse-energy.com | ©2026 Synapse Energy Economics Inc. All rights reserved. 9 Illustrative Values 8 250 200 7 6 150 5 4 100 3 2 50 1 0 10:00 11:00 12:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 AM AM PM PM PM PM PM PM PM PM 0 Generation (variance band) Generation (customer class avg) Hourly Avoided Cost Weighted Average Avoided Cost 5 Avoided Cost ($/MWh) • Generation profiles can vary somewhat by shading, clouds, and tracking capabilities 10 PV Generation (MWh) • Systems should be compensated based on the timedifferentiated value of their services to the grid • Solar-only systems (without storage) have relatively fixed, predictable generation profiles
  6. Page 6 of 13

    Instantaneous Netting Meter and Billing Capabilities Time differentiation depends on (a) metering & billing, and (b) whether operational incentives are needed Meter Capabilities Simple Meters (ES Residential) Time Differentiated Export Payments Time differentiated export payments are not feasible Time Differentiated Rates (TOU) TOU not feasible PV only: DER Technologies Current Meters (operational incentives are not necessary because PV generation profile is inflexible) PV + Storage: (operational incentives are necessary because storage dispatch profile is flexible) Future Meters Interval Meters (Select UI and ES) Interval Meters (All Customers) Time differentiated export payments are feasible Current TOU Rates New TOU Rates • Flat proxy for export payments is sufficient. • TOU rates are not feasible and not relevant. • Flat proxy for export payment is sufficient but time differentiated payments are better. • TOU rates are feasible but not relevant. • Flat proxy is not sufficient because storage discharging profiles are flexible. • TOU rates are not feasible but are necessary. • Time differentiated export payments are • Time differentiated necessary. export payments are • TOU rates are necessary. necessary. But current TOU rates • TOU rates are up to date. are out of date. 6
  7. Page 7 of 13

    Buy-All and SCEF Meter and Billing Capabilities Time differentiation depends on (a) metering & billing, and (b) whether operational incentives are needed Meter Capabilities Simple Meters (ES Residential) Time Differentiated Generation Payments Time differentiated generation payments are not feasible Time Differentiated Rates (TOU) TOU not feasible PV only: DER Technologies Current Meters (operational incentives are not necessary because PV generation profile is inflexible) PV + Storage: (operational incentives are necessary because storage dispatch profile is flexible) • Flat proxy for generation payment is sufficient. • TOU rates are not feasible and not relevant. Future Meters Interval Meters (Select UI and ES) Interval Meters (All Customers) Time differentiated generation payments are feasible Current TOU Rates New TOU Rates • Flat proxy for generation payment is sufficient but time differentiated payments are better. • TOU rates are feasible but not relevant. • Time differentiated generation payments are necessary. • TOU rates are not relevant. 7
  8. Page 8 of 13

    Summary takeaways PV-Only Systems PV + Storage Systems Instantaneous Netting • Flat proxies are sufficiently timedifferentiated. • TOU rates are not relevant. • Therefore, all types of metering and billing capabilities can support sufficient time differentiation. Instantaneous Netting: • Time differentiated export payments are necessary. • TOU rates are necessary. Buy-All and SCEF • Same as above. • Ideally, TOU rates would be updated. • Therefore, interval meters and TOU rates are necessary to support time differentiation. Buy-All and SCEF: • Time differentiated generation payments are necessary • TOU rates are not necessary. • Because there is no BTM consumption. • Interval meters will be installed for the combined PV + storage generation www.synapse-energy.com | ©2026 Synapse Energy Economics Inc. All rights reserved. 8
  9. Page 9 of 13

    Designs to facilitate comparison of competitive solicitations
  10. Page 10 of 13

    Percent-discount bidding off hourly avoided cost caps 210 Avoided Costs ($/MWh) 190 170 Illustrative Values 20% discount Monthly Avoided Cost Curve Bidder 1 Discount 30% discount Bidder 2 Discount 150 130 110 • 90 • 70 Bidders offer a single percentage discount, and the largest discounts win Creates a single metric for comparing bids 50 4-5pm • • 5-6pm PROS Enables administratively-set time-of-day values to coexist with competitive bids; grid-value shape stays fixed Avoided cost is a hard cap which protects ratepayers from overcompensating www.synapse-energy.com | ©2026 Synapse Energy Economics Inc. All rights reserved. 6-7pm • • 7-8pm CONS This has not been done in other states since other states do not use competitive solicitations for solar + storage EDCs must develop avoided cost profiles that vary seasonally, at minimum 10

As listed on the current system

Corres. 10/16/2026 [26-06-04] (OCC) - OCC-Synapse presentation