  1. Page 19 of 63

    Docket No. 26-06-04 Page 17 requirements of EDC reporting, reduce the Authority’s obligations to review and approve Class I resource applications, and secure the benefits of clean energy programs for all Connecticut customers. Id. In general, Eversource recognizes that production metering requirements create costs and would support eliminating the requirement in the residential successor program, provided that the program is designed to efficiently operate without consistent production data. Id., p. 11. 2. Authority Analysis Moving away from production meters in favor of an alternative approach would offer several benefits for the RRES successor program. Production meters add project costs and complexity, and related implementation and measurement issues have recurred in multiple RRES annual review dockets. Most recently, the Authority examined issues affecting DC-coupled solar-plus-storage projects that use a shared inverter. Decision, Oct. 28, 2026, Docket No. 26-08-02, Annual Residential Renewable Energy Solutions Program Review and Rate Setting – Year 6, p. 24–30. These challenges illustrate the limitations of relying on production meters and are likely to persist under the successor program. The first alternative, measurement of RECs based on exports at the revenue meter is likely to significantly undercount REC generation, with corresponding reductions to the revenue from REC sales. Under a successor program design that aims to incentivize self-consumption to shift load away from peak periods, the problem of REC undercounting is likely to be exacerbated. Accordingly, this approach is not an acceptable alternative to the use of production meters. Inverter data, however, may provide a viable option for REC measurement. Under the Energy Storage Solutions (ESS) Program, active dispatch data is typically transmitted from the battery operator directly to the EDCs’ distributed energy resource management system (DERMS) provider. See ESS Program Administrator Compliance, Jan. 27, 2026, Docket No. 25-08-05, Annual Energy Storage Solutions Program Review – Year 5, ESS Program Manual Clean, pp. 98–101. A similar approach could potentially be adapted for the RRES successor program. However, additional consideration is needed due to potential concerns around cost and data access, particularly in the case of disruption to contractor or original equipment manufacturer (OEM) operations. For example, following SunPower's bankruptcy, its battery systems became unavailable through the EDCs' DERMS platform because the application programming interface (API) connection between SunPower and the DERMS platform was lost. Decision, Dec. 17, 2025, Docket No. 25-08-05, Annual Energy Storage Solutions Program Review - Year 5, p. 36. That issue remains unresolved more than a year later. This experience illustrates the potential risk of relying on third-party data connections without a reliable means of maintaining REC measurement and reporting when those connections fail. The use of inverter data for REC measurement was previously considered in Docket No. 22-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 2, where the EDC submitted a proposal for the use of customer inverter data.
  2. Page 20 of 63

    Docket No. 26-06-04 Page 18 Compliance, Aug. 18, 2022, Docket No. 22-08-02, Att. 1. In their proposal, the EDCs concluded that it could be feasible to effectively use customer inverter data to report RECs to NEPOOL GIS, if certain criteria were met to address long-term risks to the availability and consistency of inverter data and anticipated costs of integrating data with EDC systems. Id., pp. 1–2. The EDCs’ inverter data proposal is now several years old, and may not reflect up-to-date information as inverter technology has evolved. Accordingly, to evaluate options for REC treatment under the RRES successor program with complete and current information, the Authority directs the EDCs to jointly submit, as compliance by March 1, 2027, an updated inverter data proposal. The proposal shall include, at a minimum: (1) a discussion of methods to continue REC reporting using inverter data when such data becomes unavailable, including when an API connection is lost because a company ceases operations; and (2) options for establishing automated data collection and management procedures, with associated cost and implementation timeline estimates. Following receipt of the filing, the Authority intends to address the use of inverter data in the final decision in this proceeding. For clarity, the filing shall address only the use of inverter data for REC measurement; it is not required to consider potential inverter data use for production-based incentive adders or non-bypassable charges, as these are no longer applicable under the successor program framework. Finally, as stated above, Eversource suggests that the costs and contingencies of inverter data could be avoided by using the procedure contained in General Statutes § 16-245a(g)11 to reduce the minimum Class I resource requirement for electric suppliers and EDCs based on a forecast of production from resources enrolled in clean energy programs. Eversource Comments, Aug. 26, 2026, p. 12. However, this alternative procedure in General Statutes § 16-245a(g) does not appear to be available to the RRES and SCEF successors. Public Act No. 26-127, § 2(e) states: “The [A]uthority shall follow the procedures established pursuant to subsection (g) of section 16-245a of the general statutes for certificates issued by the New England Power Pool Generation Information System for any Class I renewable energy source purchased by an electric distribution company pursuant to this section” (emphasis added). This language appears only in the section authorizing the NRES successor program (§2), and is absent in the RRES and SCEF successor program sections of Public Act No. 26-127 (§1 and § 3). Therefore, for RRES successor REC measurement, there is no current statutory option to use estimate 11 “The authority, in consultation with the Commissioner of Energy and Environmental Protection and the Office of Consumer Counsel, shall initiate a proceeding to establish procedures for the disposition of renewable energy certificates purchased pursuant to section 16-244z, sections 16a-3f to 16a-3j, inclusive, and sections 16a-3m, 16a-3n and 16a-3p which may include procedures for selling renewable energy certificates or to retire such certificates on behalf of all ratepayers and reduce the percentage of the total output or services of an electric supplier or an electric distribution company generated from Class I renewable energy sources required pursuant to subsection (a) of this section. Any such reduction shall be based on the energy production that the authority forecasts will be procured. The authority shall determine any such reduction of an annual renewable portfolio standard not later than one year prior to the effective date of such annual renewable portfolio standard. An electric distribution company shall not be responsible for any administrative or other costs or expenses associated with any difference between the number of renewable energy certificates planned to be retired pursuant to the authority's reduction and the actual number of renewable energy certificates retired.” General Statutes § 16-245a(g).
  3. Page 21 of 63

    Docket No. 26-06-04 Page 19 or forecast production to retire RECs on behalf of all ratepayers and reduce the percentage of the total output or services of an electric supplier or an electric distribution company generated from Class I renewable energy sources required pursuant to subsection (a) of General Statutes § 16-245a. Public Act No. 26-127, §1(f) for RRES, and §3(e) for SCEF, allow the EDCs to sell the RECs they purchase and credit the REC sale revenue to all ratepayers. IV. NON-RESIDENTIAL AND COMMUNITY SOLAR PROGRAM DESIGN In its Successor Study Report, the Authority offered several recommendations for successor program design based on its evaluation of the current NRES and SCEF Programs and stakeholder positions. The Authority builds on that extensive stakeholder process here, with modifications to the recommended program structure pursuant to the specifications of Public Act No. 26-127 and with the goal of advancing the proposed objectives of the successor clean energy programs. This section addresses the general tariff framework and does not yet make a final determination on all aspects of non-residential and community solar program design, which will continue to be evaluated over the course of this proceeding. Where possible, the Authority aims to preserve the current program rules to promote continuity, minimize administrative burden, and avoid participant confusion during the transition to the successor program. A. SOLICITATION RULES AND PROCESS In the Successor Study Report, the Authority recommended replacing current competitive solicitations with a "walk-up" approach where projects are awarded standardoffer tariffs upon meeting maturity requirements, which could offer greater certainty to project participants and ensure that only viable projects will be awarded a tariff agreement and reserve capacity in the program. Successor Program Report, pp. 63–64. In establishing a successor to the RRES Program, the Authority must establish “(1) tariffs for each electric distribution company, (2) a rate for such tariffs, and (3) tariff terms and conditions consistent with the requirements of this section.” Public Act No. 26-127, § 1(b) (emphasis added). In establishing a successor to the NRES Program, the Authority must establish: (1) a procurement plan for the electric distribution companies and resulting tariffs for selected projects pursuant to subsection (b) of this section, (2) a price cap on a cents-per-kilowatt-hour basis concerning any distributed energy resource selected pursuant to this section, and (3) tariff terms and conditions consistent with the requirements of this section . . . . The rate for such tariffs shall be established by the solicitation pursuant to subsection (b) of this section.
  4. Page 22 of 63

    Docket No. 26-06-04 Page 20 Public Act No. 26-127, § 2(a) (emphasis added). After the commencement of the NRES successor program: On and after January 1, 2028, not less than annually, each electric distribution company shall jointly or individually solicit and file with the Public Utilities Regulatory Authority for its approval one or more projects selected resulting from any procurement issued pursuant to this section that are consistent with the tariffs approved by the authority pursuant to subsection (a) of this section. Public Act No. 26-127, § 2(b)(1). Public Act No. 26-127, §§ 3(a) and 3(c) contain provisions for the Community Solar Program established as the SCEF successor program, which are similar to the NRES successor provisions provided above. The meaning of a statute shall, in the first instance, be ascertained from the text of the statute itself and its relationship to other statutes. If, after examining such text and considering such relationship, the meaning of such text is plain and unambiguous and does not yield absurd or unworkable results, extratextual evidence of the meaning of the statute shall not be considered. General Statutes § 1-2z. The Authority invited participants to file briefs providing legal analysis regarding the project selection methods for the NRES and SCEF successor programs allowable under Public Act No. 26-127, recognizing that the legislation may contain some ambiguity as to whether successor programs are required to competitively solicit projects or may use a standard-offer compensation framework. Notice of Briefs, July 20, 2026, p. 2. Specifically, General Statutes § 16-244z referenced the “competitiveness” of the procurements authorized for the NRES and SCEF Programs, while Public Act No. 26-127 does not. In establishing the NRES Program selection methodology, the Authority determined that “the references [to “competitiveness”] in subsections (b) and (c) clearly direct a competitive component in the § 16-244z(a) solicitations." NRES Decision, pp. 16–17. OCC, DEEP, and the EDCs argue that the plain language of Public Act No. 26-127 is clear and unambiguous, and indicates the legislature’s desire for a continued competitive process by specifying that the rate for tariffs for NRES and SCEF successors be established by the solicitation. OCC Brief, pp. 5–6; EDC Joint Brief, pp. 1–2; DEEP Brief, pp. 4–6. Further, DEEP argues that “[g]iven Sections 2 and 3 of the Act require the Authority to establish a price cap, the Act clearly assumes the NRES and SCEF successor programs will be competitive procurements that necessitate a price cap.” DEEP Brief, pp. 4–5. Additionally, OCC, DEEP, and the EDCs each identify that an earlier draft of Raised Bill 5340 directed the Authority to set the rate for the NRES successor program, but the language was amended in the version ultimately adopted. OCC Brief, p. 3; DEEP Brief,
  5. Page 23 of 63

    Docket No. 26-06-04 Page 21 pp. 6–7; EDC Joint Brief, p. 3. OCC acknowledged that the legislation may leave some ambiguity, as the absence of the requirement to “monitor the competitiveness of procurements and adjust procurement parameters to maintain competitiveness” is a consequential textual difference; however, OCC noted that the Act establishes a new and separate framework rather than amending General Statutes § 16-244z, so “the lack of explicit reference to a ‘competitive’ bidding process can be instructive, but not dispositive.” OCC Brief, p. 6. Conversely, SEIA and ACT, CLF and Vote Solar, Verogy, and Allco argue that Public Act No. 26-127 does allow the Authority to utilize a standard-offer framework. SEIA and ACT state that the omission of the term “competitive” must indicate a different legislative intent for solicitations than the currently existing process, and assert that the word “solicitation” does not necessarily imply a competitive process. SEIA Brief, pp. 2– 3. Allco similarly notes the absence of references to “competitiveness,” stating that the legislature knows how to require price competition when it wishes to do so. Allco Brief, pp. 3–5. CLF and Vote Solar assert that the legislation does not dictate competitive bidding at the solicitation stage, and the Authority can instead ensure procured energy is competitive through post-award cost-containment measures and regulatory tools. CLF Brief, pp. 2–3. Based on stakeholder briefs and its own legal analysis of Public Act No. 26-127, the Authority determined that the legislation does not authorize a standard-offer compensation framework for the NRES and SCEF successor programs. See Notice, Sept. 9, 2026, p. 1. The absence of references to “competitiveness” alone cannot be taken as evidence that the legislature intended to allow a standard-offer framework. General Statutes § 16-244z(b) refers to a competitive solicitation but also crossreferences subsection (a), which omits the “competitive” phrase; this could indicate that a “solicitation” as used by the legislature could be understood as competitive even without explicit references to “competitiveness.” In contrast, Public Act No. 26-127, § 1(b), which directs the Authority to establish “a rate for such tariffs” for the RRES successor program, clearly authorizes administratively set tariff rates and is notably different than the NRES and SCEF successor program sections. Finally, the legislative history of amendments to H.B. 5340 shows that the original draft legislation allowed for a standard-offer model, but the replacement of that language in the final legislation indicates that the legislature intended for the NRES and SCEF successor programs to be competitive. Accordingly, the NRES and SCEF successor programs shall continue to utilize competitive solicitations for project selection. Notwithstanding the above determination, legislative intent supports the conclusion that small non-residential projects may continue to be selected and compensated on a standard-offer basis. In the NRES Decision, the Authority found that: allowing the compensation rate to be administratively determined for small projects eligible to participate in the Program is consistent with the
  6. Page 24 of 63

    Docket No. 26-06-04 Page 22 legislative intent to create a successor to the current LREC/ZREC program as the compensation rate for the existing small ZREC program is administratively set. Further, the Authority concurs with stakeholders’ comments that smaller projects may be unduly affected by the administrative burden of the competitive solicitation process. Coupled with the current undersubscription in the small ZREC program, the Authority finds any additional burden on potential bidders could further diminish market activity. Therefore, interpreting the statute to require a competitive solicitation (and thus foreclose an administratively determined rate) for the projects intended to be a successor to the small ZREC program would yield an absurd or unworkable result. Accordingly, the Authority authorizes the Small Zero Emission category . . . to be administratively set, providing all eligible projects the administratively set rate on a first-come, first-serve basis. NRES Decision, pp. 17–18. Public Act No. 26-127 reflects legislative intent to create a successor to the current NRES Program, retaining the project selection and compensation methodology of NRES. The NRES program awards tariff agreements to small projects less than 200 kW on firstcome, first-served and lottery basis with administratively set tariff pricing, despite the language regarding competitive solicitations in General Statues § 16-244z. The NRES Program, in turn, continued the standard-offer selection approach used for small projects under the legacy Low and Zero Emissions Renewable Energy Credit (LREC/ZREC) Program. See NRES Decision, pp. 17–18. Accordingly, the NRES and LREC/ZREC Programs provide a well-established precedent that small projects are not subject to the requirement for competitive solicitations. Therefore, in the NRES successor program, small non-residential projects less than 200 kW may be awarded tariff agreements on first-come, first-served and lottery basis with administratively set tariff pricing. The Authority notes that there may be merits to a standard-offer approach, which offers greater revenue certainty for participants and could address the speculative bidding and high project attrition observed under competitive procurements. Ultimately, project development risk is priced into project bids, with ratepayers bearing the cost of higherpriced selected projects. A more complete analysis of the relative ratepayer benefits of a standard-offer and competitive procurement program could better inform solar program design choices. However, the Authority will not conduct further evaluation at this time as current successor program legislation does not authorize a standard-offer program. B. TARIFF STRUCTURES Public Act No. 26-127, § 2(b)(1) requires that eligible non-residential customers be offered two tariff options, specifically stating: For any such selected project that is a distributed energy resource that emits no pollutants that (A) is located on a customer's premises, (B) is not more than five megawatts in size, and (C) serves the distribution system of an electric distribution company, each electric distribution company shall
  7. Page 25 of 63

    Docket No. 26-06-04 Page 23 offer a tariff (i) for the purchase of all energy and renewable energy certificates generated at a rate consistent with the procurement plan approved by the authority, and (ii) for the purchase of any energy produced and not consumed in a period of time established by the authority, and any renewable energy certificates generated by such renewable energy resource, on a cents-per-kilowatt-hour basis, subject to any tariff terms, conditions or other stipulations of the authority, including, but not limited to, the capacity rights of such source. Public Act No. 26-127, § 2(a) requires that “[a]ny such tariff shall be for a term not to exceed twenty years.” Section 2(h) requires that the EDCs offer the non-residential tariffs for eight years, or until December 31, 2035. The Authority uses the term “buy-all tariff” to mean a tariff “for the purchase of all energy and renewable energy certificates generated at a rate consistent with the procurement plan approved by the authority,” and the term “netting tariff” to mean a tariff “for the purchase of any energy produced and not consumed in a period of time established by the authority, and any renewable energy certificates generated by such renewable energy resource, on a cents-per-kilowatt-hour basis.” Public Act No. 26-127, § 2(b)(1). Based on the analysis of tariff structures presented below, the Authority directs the EDCs to establish a netting tariff with instantaneous netting and a flat buy-all tariff, both with terms of 20 years, for the NRES successor program. As discussed further below, in establishing a flat buy-all tariff, the EDCs shall allow for the potential incorporation of a multipart payment framework (MPF), subject to further consideration in the remainder of this proceeding. 1. Buy-All Tariff Under the NRES Program, projects that choose the buy-all tariff option are compensated at a fixed per kWh volumetric rate for all energy, RECs, and any environmental attributes produced by the project. NRES Decision, p. 11. The same perkWh compensation structure is used for all projects selected in the SCEF Program. Decision, Dec. 18, 2019, Docket No. 19-07-01, Review of Statewide Shared Clean Energy Facility Program Requirements (SCEF Decision), Ex. B, pp. 5, 9. Buy-all NRES projects and all SCEF projects are front-of-the-meter (FTM) and interconnect directly to the distribution grid, selling all output directly to the applicable EDC at the fixed volumetric rate and paying the EDC for their full metered usage, if applicable, at the applicable retail rate. Compliance, Jan. 28, 2026, Docket No. 25-08-03, Annual Non-Residential Renewable Energy Solutions Program Review - Year 5, Att. 2a (NRES Year 5 Program Manual), p. 19; Compliance, Jan. 15, 2026, Docket No. 25-08-04, Annual Shared Clean Energy Facility Program Review – Year 7, Att. 1 (SCEF Year 7 Program Manual), p. 9. In accordance with the Authority’s recommendation in the Successor Study Report that programs be designed to reflect the time-varying value of solar generation and to incentivize projects to include collocated energy storage, the Authority requested comments on whether and how to incorporate time-differentiated compensation into the non-residential buy-all tariff and Community Solar Program. Successor Study Report, pp. 63, 66; Notice, July 28, 2026, pp. 1–2.
  8. Page 26 of 63

    Docket No. 26-06-04 Page 24 a. Multipart Payment Framework (MPF) Proposal Eversource proposes a MPF that would compensate projects for both overall delivery of energy to the electric power system and the sustained delivery of clean energy during periods of high load requirements. Eversource Comments, August 26, 2026, p. 6. Eversource cautions that competitively soliciting projects could become more complicated with time-differentiated compensation rates and could bias selection toward projects that generate more output during off-peak periods. Id., p. 2. Instead, Eversource suggests the MPF model as a method to incorporate performance-based compensation rates to encourage the collocation and management of battery energy storage systems (BESS) and to enhance the value that clean energy resources provide to the electrical power system. Id., pp. 2–3. Under Eversource’s proposal, projects would continue to be selected and compensated based on their fixed bid price per kWh, as in the current NRES Program, but would also be eligible to receive an additional incentive for the minimum amount of power delivered during a designated period that coincides with both high load and reduced PV output. Id., p. 6. Eversource proposes that these additional payments be provided on a dollar-per-kW basis with performance calculated daily and equal to the minimum one-hour average output during the designated period. Eversource Comments, August 26, 2026, p. 7. Under the MPF model, solar PV-only projects that do not maintain output throughout the final hour of the period would not receive any additional compensation for that day. Id. In contrast, projects that pair solar PV with energy storage could manage storage discharge to sustain output from the combined system through the end of the period and be compensated based on the minimum hourly average output (kW) over the designated period. Id. Eversource recommends that incentives be based on the minimum hourly dispatch to maximize the benefit of extending delivery of solar energy through the full evening peak period.12 Eversource Comments, Oct. 2, 2026, p. 3. Eversource recommends that, for administrative efficiency, the Authority approve a uniform dollar-per-kW payment rate in advance of solicitations that would be available to all projects selected within a program year. Eversource Comments, Aug. 26, 2026, p. 8. The per-kW payments would “provide a predictable price signal to which successor program participants can respond by building and managing collocated storage resources that better align the delivery of additional clean energy with system requirements.” Id., p. 7. Eversource suggests the hours of 4:00 to 8:00 p.m. as a reasonable default for the designated period of high load and reduced PV output. Id., p. 6. However, Eversource recommends that the EDCs have discretion to adjust the targeted period for individual projects, provided that program rules give participants sufficient opportunity to adjust their operations and maintain expected revenues. Id., pp. 6–7; Eversource Comments, Oct. 12 For comparison, ESS performance incentives are based on the average kW dispatched across all active dispatch event hours in each season. See ESS Program Administrator Compliance, Jan. 27, 2026, Docket No. 25-08-05, ESS Program Manual Clean, p. 8.
  9. Page 27 of 63

    Docket No. 26-06-04 Page 25 2, 2026, p. 3. Under this model, the targeted period would be included within projectspecific tariff agreements and be subject to revision by the EDC “within certain limitations and with sufficient notice to the customer.”13 Eversource Comments, Oct. 2, 2026, p. 3. Eversource states that this flexibility would allow the EDCs to optimize the operation of resources to align with locational requirements, including those that may vary by season. Eversource Comments, Aug. 26, 2026, p. 6; Eversource Comments, Oct. 2, 2026, p. 3. Eversource notes that the per-kW payment rate for sustained output will be “[o]ne of the most critical parameters” for the program. Eversource Comments, Aug. 26, 2026, p. 8. As an illustrative example, Eversource provided an attachment to its comments modeling the potential operation and revenue of a MPF payment structure with a $0.50 per kW-day incentive, but notes that actual revenue would be influenced by numerous program design features. Id.; Eversource Comments, Aug. 26, 2026, Att. 1. Public Act No. 26-127, § 2(d) requires that incentives for energy storage systems incorporated into clean energy tariff rates provide aggregate system benefits to all ratepayers. Eversource suggests that the methods used to evaluate the cost-effectiveness of the ESS Program could be an appropriate initial basis for setting per-kW payment levels.14 Eversource Comments, Oct. 2, 2026, p. 2. Eversource, UI, and CGB, as co-administrators of the ESS Program, are “of the cautious opinion” that a per-kW payment for FTM storage paired with a buy-all solar tariff could support recovery of the cost of storage resource’s development costs while maintaining a RIM score of 1.4, as FTM storage development costs are generally lower than those of BTM storage; however, whether the framework could achieve a participant cost test (PCT) of at least 1.0 would depend on the specific project costs, incentive levels, and benefits considered. Interrog. Resp. CAE-42. Eversource anticipates that the performance of paired solar and storage resources would be measured with a single utility-owned meter with interval capability, and states that existing NRES and SCEF metering configurations would largely be sufficient to manage additional per-kW compensation. Eversource Comments, Aug. 26, 2026, p. 7. Additionally, Eversource suggests that eligibility for the MPF be limited to projects where the battery storage exclusively charges from the paired solar PV system, as energy output must be from a Connecticut Class I renewable energy source to be eligible for incentive payments under programs authorized pursuant to Public Act No. 26-127. Id. Adherence to such requirements could be verified through periodic reporting or audits of storage Eversource recognizes that policies and procedures for target period revisions require additional discussion, and “would welcome the opportunity to collaborate with prospective program participants to develop processes by which operational requirements could be identified, updated, and effectively communicated to both optimize operations and reasonably sustain revenue on which project financing will rely.” Eversource Comments, Oct. 2, 2026, p. 3. 14 Performance-based incentives for large commercial and industrial ESS customers are currently $275 per kW for years 1–5 of enrollment and $175 per kW for years 6–10, and are paid out based on the average kW discharge from all events called during each dispatch season (i.e., summer or winter). Eversource Comments, Oct. 2, 2026, p. 2; ESS Program Administrator Compliance, Jan. 27, 2026, Docket No. 2508-05, ESS Program Manual Clean, p. 45. The corresponding ESS C&I Program BCA reports a Connecticut Ratepayer Impact Measure (RIM) of 1.23, indicating that the modeled incentive levels provide net benefits to Connecticut ratepayers. ESS Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Docket No. 26-08-05, Annual Energy Storage Solutions Program Review – Year 6, Att. 2, p. 74. 13
  10. Page 28 of 63

    Docket No. 26-06-04 Page 26 operations, although reporting requirements could potentially be mitigated through appropriate sizing requirements for paired storage resources relative to generation. Eversource Comments, Oct. 2, 2026, pp. 4–5. Under this proposed compensation structure, Eversource suggests that the Authority adopt appropriate sizing and operational requirements, such as limiting performance payments to a maximum percentage of the nameplate capacity of a paired PV system, to encourage sizing that can meet program requirements and to distribute the available budget among more projects. Eversource Comments, Aug. 26, 2026, p. 8; Interrog. Resp. CAE-26. Additionally, Eversource recommends that the MPF structure be available only to FTM resources with paired storage, as solar-only projects would be unlikely to sustain significant output over the full evening period and calculating small or zero-value payments for solar-only resources would likely add administrative complexity without corresponding benefits. Eversource Comments, Oct. 2, 2026, p. 5. Eversource asserts that the proposed MPF framework would support the deployment of FTM paired solar and storage resources, enhance the value of clean energy programs, and minimize the cost of sustaining clean energy deployment. Id., pp. 5–6. The majority of NRES projects have enrolled under the buy-all tariff, and SCEF projects are exclusively FTM; Eversource states that FTM resources have historically been more likely to require distribution system upgrades to interconnect, and minimizing the cost of continued clean energy deployment “will require FTM projects to increasingly manage their output to minimize grid impacts.” Eversource Comments, Aug. 26, 2026, p. 5. Eversource recommends that the Authority focus on developing new compensation models for FTM resources that can complement other measures, such as flexible interconnection, to maximize the value of clean energy resources. Id., pp. 5–6. Finally, Eversource does not expect that the proposed MPF would require changes to the EDCs’ billing systems or other system modifications. Eversource Interrog. Resp. CAE-3. Per-kW performance payments could be calculated based on performance data and administered outside of the billing system, following a similar approach to participant compensation in the NRES and SCEF Programs. Id.; Interrog. Resp. CAE-29. The process could initially be administered manually, with opportunities for automation considered as participation increases. Id. b. Stakeholder Comments The Authority solicited stakeholder comments on Eversource’s MPF proposal, inviting stakeholders to provide specific recommendations on the methodology for setting per-kW payment levels, how to determine the targeted period, and other elements of the proposed framework. Notice, Sept. 9, 2026, p. 2. UI does not oppose further evaluation of the MPF concept, recognizing that it reflects a broader policy objective of encouraging FTM solar and storage resources capable of delivering energy during periods of system needs. UI Comments, Oct. 2, 2026, p. 2. However, UI notes that the successor program proceeding “is fundamentally focused on renewable energy tariff design rather than the development of a comprehensive FTM storage framework,” and suggests that the Authority preserve