  1. Page 26 of 63

    Docket No. 26-06-04 Page 24 a. Multipart Payment Framework (MPF) Proposal Eversource proposes a MPF that would compensate projects for both overall delivery of energy to the electric power system and the sustained delivery of clean energy during periods of high load requirements. Eversource Comments, August 26, 2026, p. 6. Eversource cautions that competitively soliciting projects could become more complicated with time-differentiated compensation rates and could bias selection toward projects that generate more output during off-peak periods. Id., p. 2. Instead, Eversource suggests the MPF model as a method to incorporate performance-based compensation rates to encourage the collocation and management of battery energy storage systems (BESS) and to enhance the value that clean energy resources provide to the electrical power system. Id., pp. 2–3. Under Eversource’s proposal, projects would continue to be selected and compensated based on their fixed bid price per kWh, as in the current NRES Program, but would also be eligible to receive an additional incentive for the minimum amount of power delivered during a designated period that coincides with both high load and reduced PV output. Id., p. 6. Eversource proposes that these additional payments be provided on a dollar-per-kW basis with performance calculated daily and equal to the minimum one-hour average output during the designated period. Eversource Comments, August 26, 2026, p. 7. Under the MPF model, solar PV-only projects that do not maintain output throughout the final hour of the period would not receive any additional compensation for that day. Id. In contrast, projects that pair solar PV with energy storage could manage storage discharge to sustain output from the combined system through the end of the period and be compensated based on the minimum hourly average output (kW) over the designated period. Id. Eversource recommends that incentives be based on the minimum hourly dispatch to maximize the benefit of extending delivery of solar energy through the full evening peak period.12 Eversource Comments, Oct. 2, 2026, p. 3. Eversource recommends that, for administrative efficiency, the Authority approve a uniform dollar-per-kW payment rate in advance of solicitations that would be available to all projects selected within a program year. Eversource Comments, Aug. 26, 2026, p. 8. The per-kW payments would “provide a predictable price signal to which successor program participants can respond by building and managing collocated storage resources that better align the delivery of additional clean energy with system requirements.” Id., p. 7. Eversource suggests the hours of 4:00 to 8:00 p.m. as a reasonable default for the designated period of high load and reduced PV output. Id., p. 6. However, Eversource recommends that the EDCs have discretion to adjust the targeted period for individual projects, provided that program rules give participants sufficient opportunity to adjust their operations and maintain expected revenues. Id., pp. 6–7; Eversource Comments, Oct. 12 For comparison, ESS performance incentives are based on the average kW dispatched across all active dispatch event hours in each season. See ESS Program Administrator Compliance, Jan. 27, 2026, Docket No. 25-08-05, ESS Program Manual Clean, p. 8.
  2. Page 27 of 63

    Docket No. 26-06-04 Page 25 2, 2026, p. 3. Under this model, the targeted period would be included within projectspecific tariff agreements and be subject to revision by the EDC “within certain limitations and with sufficient notice to the customer.”13 Eversource Comments, Oct. 2, 2026, p. 3. Eversource states that this flexibility would allow the EDCs to optimize the operation of resources to align with locational requirements, including those that may vary by season. Eversource Comments, Aug. 26, 2026, p. 6; Eversource Comments, Oct. 2, 2026, p. 3. Eversource notes that the per-kW payment rate for sustained output will be “[o]ne of the most critical parameters” for the program. Eversource Comments, Aug. 26, 2026, p. 8. As an illustrative example, Eversource provided an attachment to its comments modeling the potential operation and revenue of a MPF payment structure with a $0.50 per kW-day incentive, but notes that actual revenue would be influenced by numerous program design features. Id.; Eversource Comments, Aug. 26, 2026, Att. 1. Public Act No. 26-127, § 2(d) requires that incentives for energy storage systems incorporated into clean energy tariff rates provide aggregate system benefits to all ratepayers. Eversource suggests that the methods used to evaluate the cost-effectiveness of the ESS Program could be an appropriate initial basis for setting per-kW payment levels.14 Eversource Comments, Oct. 2, 2026, p. 2. Eversource, UI, and CGB, as co-administrators of the ESS Program, are “of the cautious opinion” that a per-kW payment for FTM storage paired with a buy-all solar tariff could support recovery of the cost of storage resource’s development costs while maintaining a RIM score of 1.4, as FTM storage development costs are generally lower than those of BTM storage; however, whether the framework could achieve a participant cost test (PCT) of at least 1.0 would depend on the specific project costs, incentive levels, and benefits considered. Interrog. Resp. CAE-42. Eversource anticipates that the performance of paired solar and storage resources would be measured with a single utility-owned meter with interval capability, and states that existing NRES and SCEF metering configurations would largely be sufficient to manage additional per-kW compensation. Eversource Comments, Aug. 26, 2026, p. 7. Additionally, Eversource suggests that eligibility for the MPF be limited to projects where the battery storage exclusively charges from the paired solar PV system, as energy output must be from a Connecticut Class I renewable energy source to be eligible for incentive payments under programs authorized pursuant to Public Act No. 26-127. Id. Adherence to such requirements could be verified through periodic reporting or audits of storage Eversource recognizes that policies and procedures for target period revisions require additional discussion, and “would welcome the opportunity to collaborate with prospective program participants to develop processes by which operational requirements could be identified, updated, and effectively communicated to both optimize operations and reasonably sustain revenue on which project financing will rely.” Eversource Comments, Oct. 2, 2026, p. 3. 14 Performance-based incentives for large commercial and industrial ESS customers are currently $275 per kW for years 1–5 of enrollment and $175 per kW for years 6–10, and are paid out based on the average kW discharge from all events called during each dispatch season (i.e., summer or winter). Eversource Comments, Oct. 2, 2026, p. 2; ESS Program Administrator Compliance, Jan. 27, 2026, Docket No. 2508-05, ESS Program Manual Clean, p. 45. The corresponding ESS C&I Program BCA reports a Connecticut Ratepayer Impact Measure (RIM) of 1.23, indicating that the modeled incentive levels provide net benefits to Connecticut ratepayers. ESS Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Docket No. 26-08-05, Annual Energy Storage Solutions Program Review – Year 6, Att. 2, p. 74. 13
  3. Page 28 of 63

    Docket No. 26-06-04 Page 26 operations, although reporting requirements could potentially be mitigated through appropriate sizing requirements for paired storage resources relative to generation. Eversource Comments, Oct. 2, 2026, pp. 4–5. Under this proposed compensation structure, Eversource suggests that the Authority adopt appropriate sizing and operational requirements, such as limiting performance payments to a maximum percentage of the nameplate capacity of a paired PV system, to encourage sizing that can meet program requirements and to distribute the available budget among more projects. Eversource Comments, Aug. 26, 2026, p. 8; Interrog. Resp. CAE-26. Additionally, Eversource recommends that the MPF structure be available only to FTM resources with paired storage, as solar-only projects would be unlikely to sustain significant output over the full evening period and calculating small or zero-value payments for solar-only resources would likely add administrative complexity without corresponding benefits. Eversource Comments, Oct. 2, 2026, p. 5. Eversource asserts that the proposed MPF framework would support the deployment of FTM paired solar and storage resources, enhance the value of clean energy programs, and minimize the cost of sustaining clean energy deployment. Id., pp. 5–6. The majority of NRES projects have enrolled under the buy-all tariff, and SCEF projects are exclusively FTM; Eversource states that FTM resources have historically been more likely to require distribution system upgrades to interconnect, and minimizing the cost of continued clean energy deployment “will require FTM projects to increasingly manage their output to minimize grid impacts.” Eversource Comments, Aug. 26, 2026, p. 5. Eversource recommends that the Authority focus on developing new compensation models for FTM resources that can complement other measures, such as flexible interconnection, to maximize the value of clean energy resources. Id., pp. 5–6. Finally, Eversource does not expect that the proposed MPF would require changes to the EDCs’ billing systems or other system modifications. Eversource Interrog. Resp. CAE-3. Per-kW performance payments could be calculated based on performance data and administered outside of the billing system, following a similar approach to participant compensation in the NRES and SCEF Programs. Id.; Interrog. Resp. CAE-29. The process could initially be administered manually, with opportunities for automation considered as participation increases. Id. b. Stakeholder Comments The Authority solicited stakeholder comments on Eversource’s MPF proposal, inviting stakeholders to provide specific recommendations on the methodology for setting per-kW payment levels, how to determine the targeted period, and other elements of the proposed framework. Notice, Sept. 9, 2026, p. 2. UI does not oppose further evaluation of the MPF concept, recognizing that it reflects a broader policy objective of encouraging FTM solar and storage resources capable of delivering energy during periods of system needs. UI Comments, Oct. 2, 2026, p. 2. However, UI notes that the successor program proceeding “is fundamentally focused on renewable energy tariff design rather than the development of a comprehensive FTM storage framework,” and suggests that the Authority preserve
  4. Page 29 of 63Match

    Docket No. 26-06-04 Page 27 flexibility to reevaluate broader FTM storage policy through a separate proceeding if additional review is warranted in the future. Id., pp. 2–3. UI acknowledges that programs in other jurisdictions, including Hawaii and Nevada, have shown that compensation mechanisms can encourage delivery of renewable energy during targeted periods of system need; nevertheless, UI urges caution when evaluating MPF implementation due to potential implementation requirements and costs, interactions with REC administration, and overlaps with wholesale market participation. Id., p. 7. UI recommends that any per-kW payment level be tied to clearly defined and measurable system benefits (e.g., peak load reduction, reliability support, operational flexibility); established on a program-wide basis rather than adjusted for individual projects; and examined to ensure that MPF payments are necessary to encourage the desired behavior and avoid duplicating ratepayer-funded incentives. Id., p. 3. Additionally, UI asserts that the targeted period should be supported by objective system data regarding periods when customer demand remains elevated after solar production declines, and should include seasonal differentiation on a program-wide basis. UI Comments, Oct. 2, 2026, p. 4. Unlike Eversource, UI does not support allowing the EDCs to establish project-specific targeted periods, arguing that such adjustments would increase program administration, settlement complexity, metering requirements, and implementation costs. Id., p. 7. Regarding performance measurement, UI states that the proposed minimum one-hour average output methodology “provides a straightforward and administratively practical approach that encourages sustained performance throughout the entire designated period rather than short-duration output spikes.” Id., pp. 4–5. The Clean Energy Parties state that the proposed MPF “is a reasonable starting point and deserves serious evaluation.” Clean Energy Party Comments, Oct. 2, 2026, pp. 4–5. The Clean Energy Parties previously “cautioned that time-differentiated compensation fits poorly within a competitive solicitation, because bidders would have to price on-peak and off-peak rates themselves, and the resulting rates would reflect project economics rather than value to the grid,” and note that the MPF structure avoids this problem by preserving a flat $/MWh bid price with an additional time-based component set in advance of each solicitation. Id., p. 4. Accordingly, the Clean Energy Parties state that they may be able to support a MPF program design but require greater clarity on several aspects that were not fully described in Eversource’s initial proposal. Id., p. 5. These include the level and basis of the per-kW payment, including whether it will be sufficient to support the cost of storage; the contract term and durability of the rate; and the charging source and winter performance. Id., pp. 7–9. The Clean Energy Parties emphasize that the per-kW payment rate is the means for a paired project to recover the cost of storage, so a rate set too low would fail to incentivize paired solar and storage systems. Clean Energy Party Comments, Oct. 2, 2026, pp. 7–8. The Clean Energy Parties argue that the rate should be set using a transparent avoided cost framework and reflect the identified value that sustained output in the designated period provides to ratepayers. Id., p. 8. Additionally, the per-kW rate and core program terms should be fixed for the contract term for selected projects, and any updates to the per-kW rate should apply solely to future solicitations. Id. Relatedly,
  5. Page 30 of 63

    Docket No. 26-06-04 Page 28 the Clean Energy Parties submit that any EDC revisions to the targeted period after project selection should specify that the period should never be longer than it was at the time of bid, and there should be no more than one designated period per day. Id., pp. 8– 9. The tariff should also specify at the time of bid the hours within which the targeted period may move and the notice that would be provided prior to any changes, as the timing of the designated period affects project operations. Id. Finally, the Clean Energy Parties support a program designed to encourage systems paired with storage, but caution that incentives to support the cost of storage would likely allow paired projects to bid below comparable solar-only projects, making it difficult for solar-only projects to be selected. Id., p. 10. OCC suggests that per-kW compensation be aligned with the hourly marginal system value at the time of delivery, rather than a single payment level applied to the entire designated period. OCC Comments, Oct. 2, 2026, pp. 1–2. Accordingly, OCC proposes hourly performance payments calculated based on the hourly per-kW rate and actual performance in each hour, and recommends kWh-based payments. Id., p. 3. OCC also recommends that the Authority maintain flexibility in defining the targeted period to reflect evolving system peaks, supported by data on seasonal variance in system peak characteristics. Id. OCC does not support limiting collocated batteries to charging exclusively from solar, in the absence of a strong system value justification for such a limit. Id., p. 4. Finally, OCC does not oppose giving the EDCs some discretion to adjust the targeted period for individual projects to reflect location-specific constraints, noting that utilities in Massachusetts have sought to increase load between 11:00 a.m. and 3:00 p.m. to absorb excess solar generation near certain substations; however, any adjustments must be subject to published and standardized criteria. OCC Comments, Oct. 2, 2026, p. 6. OCC also proposes an alternative method to incorporate time-differentiated compensation into competitive procurements for the non-residential successor program, under which the EDCs would prepare common time-differentiated per-MWh price caps based on hourly avoided cost values and competitive bids would be structured as an overall single-value percentage discount from the EDC-established price caps. OCC Comments, Oct. 2, 2026, pp. 12–13; OCC Corresp., Oct. 16, 2026. OCC recommends that avoided costs be determined based on grid value and utilize a level of granularity that balances precision with simplicity. Id. OCC suggests that the cost curves could be based on the Avoided Energy Supply Costs in New England (AESC) study, but otherwise does not propose a specific method for calculating avoided costs. Tr., 134:12–18. OCC argues that bids submitted as a single-value percentage discount would “enable a straightforward bid evaluation process where the bids with the largest discount values are awarded.” OCC Comments, Oct. 2, 2026, p. 13. OCC acknowledges that this approach has not been used in other states. OCC Corresp., Oct. 16, 2026, p. 10. DEEP does not support the creation of a MPF for the NRES buy-all and SCEF successor programs, asserting that the compensation levels should be consistent with the value the projects provide to ratepayers. DEEP Comments, Oct. 2, 2026, pp. 1–2. DEEP recommends that the EDCs be required to develop a Connecticut-specific tool to evaluate the value of energy in a time-differentiated manner. Id.
  6. Page 31 of 63

    Docket No. 26-06-04 Page 29 CLF, in principle, supports performance-based payments that provide compensation for paired generation and storage for shifting solar output into the hours when it is worth more, citing the declining marginal system value of additional PV in ISONE as BTM PV has flattened midday load. CLF Comments, Oct. 2, 2026, pp. 1–2. However, CLF expresses concern that the record regarding the MPF proposal is inadequate to take a position on specific elements of the potential program design. Id., p. 2. In particular, CLF asserts that additional analysis is needed to set MPF parameters, including a BCA of FTM paired resources, valuation of distribution benefits, and valuesegmentation analysis. Id. CLF also emphasizes that the compensation structure must reflect the locational value of DERs on the distribution system, rather than leaving location-specific value unpriced or subject to case-by-case EDC discretion. Id., pp. 2, 9– 13. ConnSSA argues that the per-kW calculation method must be transparent and modellable, stating that an overly complex approach will introduce market friction and reduce project financeability. ConnSSA Comments, Oct. 2, 2026, p. 1. ConnSSA developers also express concern regarding the proposed payment based on the minimum hourly dispatch, arguing that it “severely drives down incentive levels for systems with any natural or operational inconsistency,” requires tight battery programming strategies, and creates risk that a single point of failure can eliminate an entire day’s payment. Id., pp. 3–4. ConnSSA instead suggests that compensation could be based on average kW discharge over the duration of the period, as in the ESS Program, and requests greater detail from the EDCs regarding an alternative interval-based performance metric. Id., pp. 3–5. If a per-kW performance payment is adopted, ConnSSA emphasizes that projects should not be penalized for any hours in which output is limited by EDC-directed curtailment or flexible interconnection export limits, and that any program parameters must be published and replicable by participants. Id., p. 5. ConnSSA recommends that participants receive the granular data used for performance incentive settlement within a defined period, and a dispute resolution process be established. ConnSSA Comments, Oct. 2, 2026, p. 10. Finally, ConnSSA cautions that high per-kW payments will rapidly drain the $85 million aggregate program budget cap and could restrict deployment of solar-only projects, which remain the most viable to reach deployment. Id., pp. 2, 6. To address this, ConnSSA suggests that the Authority establish a percentage carve-out for solar-only installations. Id., p. 7. Verogy supports the proposed MPF, although it would prefer an energy storage adder similar to that used in Massachusetts’ SMART Program to encourage paired solar and storage deployment. Verogy Comments, Oct. 2, 2026, p. 1. Verogy is “generally agnostic to MPF performance requirements,” as long as they are achievable with currently-available technology and sufficient to finance FTM storge, and does not oppose allowing the EDCs to shift targeted performance periods based on seasonal or projectspecific grid needs. Id. However, Verogy objects to the proposed requirement that storage charge exclusively from the paired PV, stating that during winter, storage could take several days to recharge from solar generation and would not be able to reduce peak load at its full capacity. Id., p. 2. Verogy also asserts that the MPF should be available both to generation-only assets that perform during targeted MPF performance periods and to standalone grid-tied storage assets. Id.
  7. Page 32 of 63

    Docket No. 26-06-04 Page 30 Eversource suggests that a working group process be used to develop consensus proposals could expedite development of successful program designs. Eversource Corresp., Oct. 16, 2026, p. 8. Eversource notes that stakeholder collaboration would help define performance criteria, metering configurations and charging restrictions, interaction with flexible interconnection and real-time automation controller (RTAC) capabilities, rate setting and project economics, and boundaries of project-specific peak periods. Id. UI and industry stakeholders express support for participating in a working group process. Tr., 24:12–19; 129:12–20; 198:3–11. c. Authority Analysis The Authority finds that a MPF model to facilitate FTM paired solar and storage deployment within a buy-all tariff is a promising conceptual proposal that warrants further consideration. However, a more complete proposal and analysis is required before authorizing a final program design. Accordingly, the Authority directs the EDCs to further develop the MPF proposal, in collaboration with stakeholders, for consideration in the remainder of this docket. A MPF that compensates clean energy resources for both overall energy production and sustained output over a designated period can improve the ratepayer value of successor clean energy programs, incentivizing the delivery of clean energy output over the hours when it provides the greatest system value. Due to the extensive deployment of solar PV in New England to date, bulk system and distribution peaks now typically occur outside solar generation hours. Incorporating compensation for the sustained delivery of renewable energy during periods where peaks are likely to occur, if valued appropriately, can thus improve the value of renewable energy to the system and benefit all ratepayers. A MPF design can be readily incorporated into the existing solicitation process, building on the current program design and aligning with the statutory requirement for continued competitive solicitations. As in the current NRES and SCEF Programs, projects would continue to submit per-MWh bids, with the lowest-cost evaluated bids selected for enrollment. Maintaining the competitive solicitation process will facilitate the selection of least-cost resources, whether standalone solar projects or paired with storage. The Authority previously indicated its intent to incorporate time-differentiated compensation into a potential standard-offer program. Successor Study Report, p. 66; Notice, July 28, 2026, pp. 1–2. However, the Authority recognizes stakeholders’ concerns that timedifferentiated compensation would be needlessly complex to implement within a competitive solicitation model. Additionally, time-differentiated bids would likely reflect underlying project economics rather than optimizing operation to provide system value. In contrast, a MPF offers an alternative model that maintains existing solicitation processes for energy procured by the EDCs, while incorporating an additional capacitybased incentive for projects to sustain renewable output during hours when PV output declines and system load remains high. This program framework furthers the objective of program accessibility through simplified tariff structures, while creating a clear incentive for FTM projects to deploy paired storage and operate it in a way that provides benefits to all ratepayers.
  8. Page 33 of 63

    Docket No. 26-06-04 Page 31 Additionally, a MPF program design is consistent with the statutory direction for PURA to examine and incorporate incentives for energy storage systems that provide electric distribution benefits, provided that the incentives in the aggregate provide benefits to all ratepayers. Public Act No. 26-127, § 2(d). A capacity-based performance incentive would compensate paired solar and storage resources for the additional benefits that storage provides to the electric distribution grid. Additionally, allowing the designated period for kW-based incentives to vary on a project-by-project basis can address the statutory directive to examine “incentives concerning the location of a distributed energy source on the electric distribution system in a manner that improves the reliability of such system.” Public Act No. 26-127, §§ 2(d), 3(d). Any incentives incorporated into the tariffs authorized under Public Act No. 26-127 must be for clean energy resources eligible for the programs; specifically, an eligible project must be a distributed energy resource that “emits no pollutants.” Public Act No. 26-127, §§ 1(a)(7), 2(b)(1). Accordingly, any storage output compensated under the program must be verifiably charged from the collocated solar PV system to ensure that discharged energy qualifies as renewable and may be compensated under the successor program tariffs. Nevertheless, a more comprehensive MPF proposal is required before determining whether and how to incorporate capacity-based payments for sustained peak period output into the final program design. As discussed above, stakeholders raised questions regarding important aspects of the MPF that are not yet fully detailed in Eversource’s conceptual proposal. For example, the proposed per-kW payment is a key parameter that will impact program outcomes. The record requires further analysis regarding a per-kW payment level that would provide net benefits to all ratepayers, as required by law. Adoption of the MPF also requires evaluation of whether such a payment level can also offer a sufficient incentive for project owners to finance the cost of storage deployment, including a more detailed analysis of revenue potential that considers daily energy production and weather patterns. Additionally, while adjustments to the designated period for individual projects have the potential to provide location-specific value, procedures must be developed to ensure that such benefits are valued appropriately without unduly increasing risk to developers, which would hinder deployment and potentially increase ratepayer costs. The record would benefit from a more complete description of how project-specific periods would be determined and the conditions under which these periods may be adjusted after a project is selected. A working group is an appropriate avenue for stakeholders to develop a common understanding of a potential MPF program design, refine program design elements and contractual terms, and identify areas of consensus. Working group processes have been successfully utilized across several programs and proceedings to develop proposals with input from involved parties. Accordingly, no later than January 1, 2027, the EDCs shall initiate and lead a working group (MPF Working Group) to further develop a MPF Report, which shall be filed for further stakeholder feedback and Authority consideration in the remainder of this docket. A designated working group to develop the MPF Report, rather than utilizing the existing Interconnection Working Group, is preferable to maintain a clear delineation of tasks and to account for the Interconnection Working Group’s already full agenda. The
  9. Page 34 of 63

    Docket No. 26-06-04 Page 32 EDCs shall invite, at a minimum, the Clean Energy Parties, ConnSSA, OCC, DEEP, and CGB. No later than April 1, 2027, the EDCs shall jointly file, for review and approval, a comprehensive MPF Report based on the results of the working group process. The MPF Report shall include the following, at a minimum: (1) proposed performance criteria and settlement procedures, including the methodology for calculating per-kW payments; (2) a proposed per-kW payment rate based on a Connecticut-specific BCA, including the assumptions, methodology, and system benefits used to derive the rate, and a proposed methodology for updating the payment level over time; (3) a methodology for establishing the designated performance period, including consideration of seasonal and locational needs, and the extent to which projectspecific periods are appropriate; (4) proposed conditions, limitations, and notice requirements governing any changes to project-specific peak periods after project selection; (5) proposed metering and data requirements, storage charging restrictions, and verification requirements for ensuring that compensated energy is eligible for Class I renewable energy certification; (6) sizing requirements for paired PV and energy storage resources to ensure that projects meet the program’s proposed operational objectives; (7) a project revenue and operating model that includes historical weather and daily solar production data, battery charging and discharging behavior, and adjustable per-kW and per-kWh compensation inputs, to evaluate project performance and economics used under alternative program parameters; (8) an assessment of EDC implementation requirements for the recommended proposal; (9) an evaluation of interactions with potential storage participation in wholesale markets, flexible interconnection, and other relevant programs or rates, including potential duplication of ratepayer-funded benefits; and (10) a proposed program manual establishing the applicable program requirements and administrative procedures. The filing shall identify areas of consensus and non-consensus among working group participants and shall include any comments or alternative proposals submitted by participants. The EDCs shall also describe the working group’s process, the issues considered, and the rationale for any recommendations on which consensus was not achieved.
  10. Page 35 of 63

    Docket No. 26-06-04 Page 33 Finally, while the MPF proposal will continue to be evaluated in the remainder of this docket, the Authority authorizes the continued use of a flat buy-all tariff on a per-kWh basis. Project compensation rates will be determined based on the results of prior solicitations for competitively-selected project categories, and any other factors determined by the Authority, and administratively set for small projects not selected competitively. As this framework is currently used for the NRES buy-all tariff, the Authority presumes that no EDC billing or system updates will be required. Any additional incentives on a kW basis under a MPF, if ultimately authorized, could likely be administered outside of the EDC billing systems; for example, using a similar process to the current quarterly administration of REC payments or the administration of ESS performance incentives and minimizing the need for significant system updates. 2. Netting Tariff Under the netting tariff structure in the current NRES Program, customers are compensated based on a two-part rate that consists of an energy export rate as well as a REC and Environmental Attribute rate.15 NRES Decision, p. 11–13; NRES Year 5 Program Manual, p. 12. The NRES Program utilizes a monthly netting interval. Id. Public Act No. 26-127 directs the Authority to establish the interval for a netting tariff for the successor to the NRES Program.16 Public Act No. 26-127, § 2(b)(1)(ii). The Authority solicited stakeholder comments regarding the adoption of instantaneous netting for the NRES successor program. Notice, Sept. 9, 2026, p. 3. The Authority noted that instantaneous netting with exports compensated at a rate less than the full retail rate has been considered for the residential successor program and requested stakeholder comments on whether the NRES successor program should utilize the same approach. Id. Additionally, the Notice asked stakeholders to comment on how instantaneous netting with reduced export compensation could be implemented within a competitive solicitation process, as required by Public Act No. 26-127. Id. a. Stakeholder Comments Eversource supports consideration of an instantaneous non-residential netting interval with exported energy compensated at a value below the full retail rate and does not anticipate that such a structure would require fundamental changes to the existing solicitation process, provided that the applicable compensation methodology is established through the successor tariff. Eversource Comments, Oct. 2, 2026, p. 8. Eversource notes that this would provide an incentive for netting tariff customers to optimize generation by TOU period. Eversource Comments, Aug. 26, 2026, p. 5. For 15 This section applies only to the successor to the NRES program, which is required to offer a netting tariff option to participants. Projects participating under the SCEF program and its successor are sell all energy to the EDCs with a buy-all-type compensation rate, as there is no onsite customer load against which to net energy production. 16 In the Successor Study Report, the Authority recommended that the non-residential successor program offer only a buy-all tariff for program simplicity, recognizing that a majority of NRES participants have opted for the buy-all tariff. Successor Study Report, p. 63. As a result, prior consideration of the netting interval and tariff was limited. However, the Authority builds on the analysis of the residential netting tariff and compensation approach, as BTM residential and non-residential renewable energy systems offer similar value to participants and the electric distribution system.