Draft Decision

Files2

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
  1. Page 29 of 63Match

    Docket No. 26-06-04 Page 27 flexibility to reevaluate broader FTM storage policy through a separate proceeding if additional review is warranted in the future. Id., pp. 2–3. UI acknowledges that programs in other jurisdictions, including Hawaii and Nevada, have shown that compensation mechanisms can encourage delivery of renewable energy during targeted periods of system need; nevertheless, UI urges caution when evaluating MPF implementation due to potential implementation requirements and costs, interactions with REC administration, and overlaps with wholesale market participation. Id., p. 7. UI recommends that any per-kW payment level be tied to clearly defined and measurable system benefits (e.g., peak load reduction, reliability support, operational flexibility); established on a program-wide basis rather than adjusted for individual projects; and examined to ensure that MPF payments are necessary to encourage the desired behavior and avoid duplicating ratepayer-funded incentives. Id., p. 3. Additionally, UI asserts that the targeted period should be supported by objective system data regarding periods when customer demand remains elevated after solar production declines, and should include seasonal differentiation on a program-wide basis. UI Comments, Oct. 2, 2026, p. 4. Unlike Eversource, UI does not support allowing the EDCs to establish project-specific targeted periods, arguing that such adjustments would increase program administration, settlement complexity, metering requirements, and implementation costs. Id., p. 7. Regarding performance measurement, UI states that the proposed minimum one-hour average output methodology “provides a straightforward and administratively practical approach that encourages sustained performance throughout the entire designated period rather than short-duration output spikes.” Id., pp. 4–5. The Clean Energy Parties state that the proposed MPF “is a reasonable starting point and deserves serious evaluation.” Clean Energy Party Comments, Oct. 2, 2026, pp. 4–5. The Clean Energy Parties previously “cautioned that time-differentiated compensation fits poorly within a competitive solicitation, because bidders would have to price on-peak and off-peak rates themselves, and the resulting rates would reflect project economics rather than value to the grid,” and note that the MPF structure avoids this problem by preserving a flat $/MWh bid price with an additional time-based component set in advance of each solicitation. Id., p. 4. Accordingly, the Clean Energy Parties state that they may be able to support a MPF program design but require greater clarity on several aspects that were not fully described in Eversource’s initial proposal. Id., p. 5. These include the level and basis of the per-kW payment, including whether it will be sufficient to support the cost of storage; the contract term and durability of the rate; and the charging source and winter performance. Id., pp. 7–9. The Clean Energy Parties emphasize that the per-kW payment rate is the means for a paired project to recover the cost of storage, so a rate set too low would fail to incentivize paired solar and storage systems. Clean Energy Party Comments, Oct. 2, 2026, pp. 7–8. The Clean Energy Parties argue that the rate should be set using a transparent avoided cost framework and reflect the identified value that sustained output in the designated period provides to ratepayers. Id., p. 8. Additionally, the per-kW rate and core program terms should be fixed for the contract term for selected projects, and any updates to the per-kW rate should apply solely to future solicitations. Id. Relatedly,
  2. Page 30 of 63

    Docket No. 26-06-04 Page 28 the Clean Energy Parties submit that any EDC revisions to the targeted period after project selection should specify that the period should never be longer than it was at the time of bid, and there should be no more than one designated period per day. Id., pp. 8– 9. The tariff should also specify at the time of bid the hours within which the targeted period may move and the notice that would be provided prior to any changes, as the timing of the designated period affects project operations. Id. Finally, the Clean Energy Parties support a program designed to encourage systems paired with storage, but caution that incentives to support the cost of storage would likely allow paired projects to bid below comparable solar-only projects, making it difficult for solar-only projects to be selected. Id., p. 10. OCC suggests that per-kW compensation be aligned with the hourly marginal system value at the time of delivery, rather than a single payment level applied to the entire designated period. OCC Comments, Oct. 2, 2026, pp. 1–2. Accordingly, OCC proposes hourly performance payments calculated based on the hourly per-kW rate and actual performance in each hour, and recommends kWh-based payments. Id., p. 3. OCC also recommends that the Authority maintain flexibility in defining the targeted period to reflect evolving system peaks, supported by data on seasonal variance in system peak characteristics. Id. OCC does not support limiting collocated batteries to charging exclusively from solar, in the absence of a strong system value justification for such a limit. Id., p. 4. Finally, OCC does not oppose giving the EDCs some discretion to adjust the targeted period for individual projects to reflect location-specific constraints, noting that utilities in Massachusetts have sought to increase load between 11:00 a.m. and 3:00 p.m. to absorb excess solar generation near certain substations; however, any adjustments must be subject to published and standardized criteria. OCC Comments, Oct. 2, 2026, p. 6. OCC also proposes an alternative method to incorporate time-differentiated compensation into competitive procurements for the non-residential successor program, under which the EDCs would prepare common time-differentiated per-MWh price caps based on hourly avoided cost values and competitive bids would be structured as an overall single-value percentage discount from the EDC-established price caps. OCC Comments, Oct. 2, 2026, pp. 12–13; OCC Corresp., Oct. 16, 2026. OCC recommends that avoided costs be determined based on grid value and utilize a level of granularity that balances precision with simplicity. Id. OCC suggests that the cost curves could be based on the Avoided Energy Supply Costs in New England (AESC) study, but otherwise does not propose a specific method for calculating avoided costs. Tr., 134:12–18. OCC argues that bids submitted as a single-value percentage discount would “enable a straightforward bid evaluation process where the bids with the largest discount values are awarded.” OCC Comments, Oct. 2, 2026, p. 13. OCC acknowledges that this approach has not been used in other states. OCC Corresp., Oct. 16, 2026, p. 10. DEEP does not support the creation of a MPF for the NRES buy-all and SCEF successor programs, asserting that the compensation levels should be consistent with the value the projects provide to ratepayers. DEEP Comments, Oct. 2, 2026, pp. 1–2. DEEP recommends that the EDCs be required to develop a Connecticut-specific tool to evaluate the value of energy in a time-differentiated manner. Id.
  3. Page 31 of 63

    Docket No. 26-06-04 Page 29 CLF, in principle, supports performance-based payments that provide compensation for paired generation and storage for shifting solar output into the hours when it is worth more, citing the declining marginal system value of additional PV in ISONE as BTM PV has flattened midday load. CLF Comments, Oct. 2, 2026, pp. 1–2. However, CLF expresses concern that the record regarding the MPF proposal is inadequate to take a position on specific elements of the potential program design. Id., p. 2. In particular, CLF asserts that additional analysis is needed to set MPF parameters, including a BCA of FTM paired resources, valuation of distribution benefits, and valuesegmentation analysis. Id. CLF also emphasizes that the compensation structure must reflect the locational value of DERs on the distribution system, rather than leaving location-specific value unpriced or subject to case-by-case EDC discretion. Id., pp. 2, 9– 13. ConnSSA argues that the per-kW calculation method must be transparent and modellable, stating that an overly complex approach will introduce market friction and reduce project financeability. ConnSSA Comments, Oct. 2, 2026, p. 1. ConnSSA developers also express concern regarding the proposed payment based on the minimum hourly dispatch, arguing that it “severely drives down incentive levels for systems with any natural or operational inconsistency,” requires tight battery programming strategies, and creates risk that a single point of failure can eliminate an entire day’s payment. Id., pp. 3–4. ConnSSA instead suggests that compensation could be based on average kW discharge over the duration of the period, as in the ESS Program, and requests greater detail from the EDCs regarding an alternative interval-based performance metric. Id., pp. 3–5. If a per-kW performance payment is adopted, ConnSSA emphasizes that projects should not be penalized for any hours in which output is limited by EDC-directed curtailment or flexible interconnection export limits, and that any program parameters must be published and replicable by participants. Id., p. 5. ConnSSA recommends that participants receive the granular data used for performance incentive settlement within a defined period, and a dispute resolution process be established. ConnSSA Comments, Oct. 2, 2026, p. 10. Finally, ConnSSA cautions that high per-kW payments will rapidly drain the $85 million aggregate program budget cap and could restrict deployment of solar-only projects, which remain the most viable to reach deployment. Id., pp. 2, 6. To address this, ConnSSA suggests that the Authority establish a percentage carve-out for solar-only installations. Id., p. 7. Verogy supports the proposed MPF, although it would prefer an energy storage adder similar to that used in Massachusetts’ SMART Program to encourage paired solar and storage deployment. Verogy Comments, Oct. 2, 2026, p. 1. Verogy is “generally agnostic to MPF performance requirements,” as long as they are achievable with currently-available technology and sufficient to finance FTM storge, and does not oppose allowing the EDCs to shift targeted performance periods based on seasonal or projectspecific grid needs. Id. However, Verogy objects to the proposed requirement that storage charge exclusively from the paired PV, stating that during winter, storage could take several days to recharge from solar generation and would not be able to reduce peak load at its full capacity. Id., p. 2. Verogy also asserts that the MPF should be available both to generation-only assets that perform during targeted MPF performance periods and to standalone grid-tied storage assets. Id.
  4. Page 32 of 63

    Docket No. 26-06-04 Page 30 Eversource suggests that a working group process be used to develop consensus proposals could expedite development of successful program designs. Eversource Corresp., Oct. 16, 2026, p. 8. Eversource notes that stakeholder collaboration would help define performance criteria, metering configurations and charging restrictions, interaction with flexible interconnection and real-time automation controller (RTAC) capabilities, rate setting and project economics, and boundaries of project-specific peak periods. Id. UI and industry stakeholders express support for participating in a working group process. Tr., 24:12–19; 129:12–20; 198:3–11. c. Authority Analysis The Authority finds that a MPF model to facilitate FTM paired solar and storage deployment within a buy-all tariff is a promising conceptual proposal that warrants further consideration. However, a more complete proposal and analysis is required before authorizing a final program design. Accordingly, the Authority directs the EDCs to further develop the MPF proposal, in collaboration with stakeholders, for consideration in the remainder of this docket. A MPF that compensates clean energy resources for both overall energy production and sustained output over a designated period can improve the ratepayer value of successor clean energy programs, incentivizing the delivery of clean energy output over the hours when it provides the greatest system value. Due to the extensive deployment of solar PV in New England to date, bulk system and distribution peaks now typically occur outside solar generation hours. Incorporating compensation for the sustained delivery of renewable energy during periods where peaks are likely to occur, if valued appropriately, can thus improve the value of renewable energy to the system and benefit all ratepayers. A MPF design can be readily incorporated into the existing solicitation process, building on the current program design and aligning with the statutory requirement for continued competitive solicitations. As in the current NRES and SCEF Programs, projects would continue to submit per-MWh bids, with the lowest-cost evaluated bids selected for enrollment. Maintaining the competitive solicitation process will facilitate the selection of least-cost resources, whether standalone solar projects or paired with storage. The Authority previously indicated its intent to incorporate time-differentiated compensation into a potential standard-offer program. Successor Study Report, p. 66; Notice, July 28, 2026, pp. 1–2. However, the Authority recognizes stakeholders’ concerns that timedifferentiated compensation would be needlessly complex to implement within a competitive solicitation model. Additionally, time-differentiated bids would likely reflect underlying project economics rather than optimizing operation to provide system value. In contrast, a MPF offers an alternative model that maintains existing solicitation processes for energy procured by the EDCs, while incorporating an additional capacitybased incentive for projects to sustain renewable output during hours when PV output declines and system load remains high. This program framework furthers the objective of program accessibility through simplified tariff structures, while creating a clear incentive for FTM projects to deploy paired storage and operate it in a way that provides benefits to all ratepayers.
  5. Page 33 of 63

    Docket No. 26-06-04 Page 31 Additionally, a MPF program design is consistent with the statutory direction for PURA to examine and incorporate incentives for energy storage systems that provide electric distribution benefits, provided that the incentives in the aggregate provide benefits to all ratepayers. Public Act No. 26-127, § 2(d). A capacity-based performance incentive would compensate paired solar and storage resources for the additional benefits that storage provides to the electric distribution grid. Additionally, allowing the designated period for kW-based incentives to vary on a project-by-project basis can address the statutory directive to examine “incentives concerning the location of a distributed energy source on the electric distribution system in a manner that improves the reliability of such system.” Public Act No. 26-127, §§ 2(d), 3(d). Any incentives incorporated into the tariffs authorized under Public Act No. 26-127 must be for clean energy resources eligible for the programs; specifically, an eligible project must be a distributed energy resource that “emits no pollutants.” Public Act No. 26-127, §§ 1(a)(7), 2(b)(1). Accordingly, any storage output compensated under the program must be verifiably charged from the collocated solar PV system to ensure that discharged energy qualifies as renewable and may be compensated under the successor program tariffs. Nevertheless, a more comprehensive MPF proposal is required before determining whether and how to incorporate capacity-based payments for sustained peak period output into the final program design. As discussed above, stakeholders raised questions regarding important aspects of the MPF that are not yet fully detailed in Eversource’s conceptual proposal. For example, the proposed per-kW payment is a key parameter that will impact program outcomes. The record requires further analysis regarding a per-kW payment level that would provide net benefits to all ratepayers, as required by law. Adoption of the MPF also requires evaluation of whether such a payment level can also offer a sufficient incentive for project owners to finance the cost of storage deployment, including a more detailed analysis of revenue potential that considers daily energy production and weather patterns. Additionally, while adjustments to the designated period for individual projects have the potential to provide location-specific value, procedures must be developed to ensure that such benefits are valued appropriately without unduly increasing risk to developers, which would hinder deployment and potentially increase ratepayer costs. The record would benefit from a more complete description of how project-specific periods would be determined and the conditions under which these periods may be adjusted after a project is selected. A working group is an appropriate avenue for stakeholders to develop a common understanding of a potential MPF program design, refine program design elements and contractual terms, and identify areas of consensus. Working group processes have been successfully utilized across several programs and proceedings to develop proposals with input from involved parties. Accordingly, no later than January 1, 2027, the EDCs shall initiate and lead a working group (MPF Working Group) to further develop a MPF Report, which shall be filed for further stakeholder feedback and Authority consideration in the remainder of this docket. A designated working group to develop the MPF Report, rather than utilizing the existing Interconnection Working Group, is preferable to maintain a clear delineation of tasks and to account for the Interconnection Working Group’s already full agenda. The
  6. Page 34 of 63

    Docket No. 26-06-04 Page 32 EDCs shall invite, at a minimum, the Clean Energy Parties, ConnSSA, OCC, DEEP, and CGB. No later than April 1, 2027, the EDCs shall jointly file, for review and approval, a comprehensive MPF Report based on the results of the working group process. The MPF Report shall include the following, at a minimum: (1) proposed performance criteria and settlement procedures, including the methodology for calculating per-kW payments; (2) a proposed per-kW payment rate based on a Connecticut-specific BCA, including the assumptions, methodology, and system benefits used to derive the rate, and a proposed methodology for updating the payment level over time; (3) a methodology for establishing the designated performance period, including consideration of seasonal and locational needs, and the extent to which projectspecific periods are appropriate; (4) proposed conditions, limitations, and notice requirements governing any changes to project-specific peak periods after project selection; (5) proposed metering and data requirements, storage charging restrictions, and verification requirements for ensuring that compensated energy is eligible for Class I renewable energy certification; (6) sizing requirements for paired PV and energy storage resources to ensure that projects meet the program’s proposed operational objectives; (7) a project revenue and operating model that includes historical weather and daily solar production data, battery charging and discharging behavior, and adjustable per-kW and per-kWh compensation inputs, to evaluate project performance and economics used under alternative program parameters; (8) an assessment of EDC implementation requirements for the recommended proposal; (9) an evaluation of interactions with potential storage participation in wholesale markets, flexible interconnection, and other relevant programs or rates, including potential duplication of ratepayer-funded benefits; and (10) a proposed program manual establishing the applicable program requirements and administrative procedures. The filing shall identify areas of consensus and non-consensus among working group participants and shall include any comments or alternative proposals submitted by participants. The EDCs shall also describe the working group’s process, the issues considered, and the rationale for any recommendations on which consensus was not achieved.
  7. Page 35 of 63

    Docket No. 26-06-04 Page 33 Finally, while the MPF proposal will continue to be evaluated in the remainder of this docket, the Authority authorizes the continued use of a flat buy-all tariff on a per-kWh basis. Project compensation rates will be determined based on the results of prior solicitations for competitively-selected project categories, and any other factors determined by the Authority, and administratively set for small projects not selected competitively. As this framework is currently used for the NRES buy-all tariff, the Authority presumes that no EDC billing or system updates will be required. Any additional incentives on a kW basis under a MPF, if ultimately authorized, could likely be administered outside of the EDC billing systems; for example, using a similar process to the current quarterly administration of REC payments or the administration of ESS performance incentives and minimizing the need for significant system updates. 2. Netting Tariff Under the netting tariff structure in the current NRES Program, customers are compensated based on a two-part rate that consists of an energy export rate as well as a REC and Environmental Attribute rate.15 NRES Decision, p. 11–13; NRES Year 5 Program Manual, p. 12. The NRES Program utilizes a monthly netting interval. Id. Public Act No. 26-127 directs the Authority to establish the interval for a netting tariff for the successor to the NRES Program.16 Public Act No. 26-127, § 2(b)(1)(ii). The Authority solicited stakeholder comments regarding the adoption of instantaneous netting for the NRES successor program. Notice, Sept. 9, 2026, p. 3. The Authority noted that instantaneous netting with exports compensated at a rate less than the full retail rate has been considered for the residential successor program and requested stakeholder comments on whether the NRES successor program should utilize the same approach. Id. Additionally, the Notice asked stakeholders to comment on how instantaneous netting with reduced export compensation could be implemented within a competitive solicitation process, as required by Public Act No. 26-127. Id. a. Stakeholder Comments Eversource supports consideration of an instantaneous non-residential netting interval with exported energy compensated at a value below the full retail rate and does not anticipate that such a structure would require fundamental changes to the existing solicitation process, provided that the applicable compensation methodology is established through the successor tariff. Eversource Comments, Oct. 2, 2026, p. 8. Eversource notes that this would provide an incentive for netting tariff customers to optimize generation by TOU period. Eversource Comments, Aug. 26, 2026, p. 5. For 15 This section applies only to the successor to the NRES program, which is required to offer a netting tariff option to participants. Projects participating under the SCEF program and its successor are sell all energy to the EDCs with a buy-all-type compensation rate, as there is no onsite customer load against which to net energy production. 16 In the Successor Study Report, the Authority recommended that the non-residential successor program offer only a buy-all tariff for program simplicity, recognizing that a majority of NRES participants have opted for the buy-all tariff. Successor Study Report, p. 63. As a result, prior consideration of the netting interval and tariff was limited. However, the Authority builds on the analysis of the residential netting tariff and compensation approach, as BTM residential and non-residential renewable energy systems offer similar value to participants and the electric distribution system.
  8. Page 36 of 63

    Docket No. 26-06-04 Page 34 competitively selected projects, Eversource recommends that the $/MWh bid continue to be used to evaluate proposals, with the compensation applicable to instantaneous netting established through a uniform methodology. Eversource Comments, Oct. 2, 2026, p. 8. Eversource suggests that the methodology could distinguish between the components of the retail rate and the value each component provides to the electric system, and proposes that the approach used in Massachusetts’ SMART program be used as an example. Id., pp. 8–9. UI states that NRES netting with an export compensation rate below the full retail rate “is conceptually feasible and could be implemented within a successor NRES framework,” but recommends that existing NRES Program tariff structures and administrative process be preserved to the greatest extent possible. UI Comments, Oct. 2, 2026, pp. 9–10. UI notes that implementation for small projects, which are currently selected on a non-competitive basis, could be accomplished through an administratively established export compensation rate applicable to all eligible projects within that category. Id., p. 11. For competitively selected medium and large projects, the existing competitive procurement could largely be maintained; developers would continue to submit bids while the export-compensation methodology for excess generation would apply consistently to all selected projects within a given program year. Id. The Clean Energy Parties oppose a reduced export compensation rate for nonresidential netting projects, stating that the approach creates a tension between incentivizing solar and storage deployment and reducing incentives to invest in those projects. Clean Energy Party Comments, Oct. 2, 2026, p. 11. The Clean Energy Parties argue that a reduced export rate may fail to fully capture locational and distribution-system value provided by BTM resources, which can reduce customer demand from the distribution system, reduce power flows from the upstream grid, and do not incur regional transmission costs. Id. Additionally, the Clean Energy Parties assert that the transition to instantaneous netting would alter project economics and could adversely affect project revenue predictability and debt service coverage for project hosts. Id., p. 12. Therefore, the Clean Energy Parties recommend that netting export compensation be maintained at the full retail rate. Id., pp. 11–12. OCC supports netting on an instantaneous basis. OCC Comments, Oct. 2, 2026, p. 12. OCC asserts that instantaneous netting allows for payments that more accurately reflect the value of the generation provided, and recommends that export rates be based on avoided costs. Id. OCC supports “the same transition in the residential context for the same reasons: monthly kWh-based netting lets consumers offset high-cost peak consumption with low-value midday exports.” Id. However, OCC suggests using an hourly avoided cost-based compensation approach for the export compensation rate, similar to their recommendation for buy-all projects, where the EDCs would determine time-differentiated per-MWh price caps based on hourly avoided costs and participants would bid an overall single-value percentage difference from the EDC-established price caps. Id., pp. 12–13. DEEP maintains its position that programs should be designed to value energy at the time of production, not consumption, as the value to non-participants depends on
  9. Page 37 of 63

    Docket No. 26-06-04 Page 35 when it is delivered; therefore, instantaneous netting with reduced export compensation is not the optimal program design. DEEP Comments, Oct. 2, 2026, p. 3. Eversource estimates that implementation of instantaneous netting for the NRES successor program would cost about $1.5 million and take 12 months to complete. Eversource Interrog. Resp. CAE-2. These costs would be additional to the estimated cost of implementation for the RRES successor program, but assume a coordinated implementation for the residential and non-residential successor programs. Id.; Eversource Interrog. Resp. CAE-31. UI asserts that instantaneous netting is feasible and could potentially leverage billing and system enhancements developed for the residential successor program; however, UI states that it cannot provide a reliable estimate of the additional costs or implementation timeline. UI Interrog. Resp. CAE-2. Both EDCs anticipate providing additional implementation cost information in response to the Authority’s procedural order no later than December 30, 2026. Eversource Interrog. Resp. CAE-31; UI Corresp., Oct. 16, 2026, p. 9. b. Authority Analysis The NRES successor program shall adopt instantaneous netting for the netting tariff. The Authority makes this determination for the same reason as for the residential program: instantaneous netting paired with reduced export compensation can advance the objective of providing positive net benefits to all ratepayers, by serving as a proxy for time-differentiated compensation. Reduced compensation for energy exported to the grid on a real-time basis will create an intrinsic incentive for customers to charge storage from solar and self-consume energy stored behind the meter. Additionally, a consistent framework for both the residential and non-residential netting tariffs will simplify program administration and enhance clarity for participants. An instantaneous netting tariff can be implemented within competitive solicitations with minimal changes to existing NRES procurement processes. The export rate can be determined using a consistent methodology across rate classes, allowing project bidders to estimate revenue potential and the EDCs to evaluate bids on a consistent basis. Participants can continue to bid a REC rate that reflects project economics. For small projects that are not competitively selected, the same export rate methodology can be used as the administratively-set export rate. Instantaneous netting and reduced export compensation is also compatible with customer enrollment in TOU rates. Export rates govern only compensation for energy sent to the grid; customer enrollment in TOU rates would apply to the timing of energy consumption and can deepen the incentive for BTM load shifting without creating a duplicative or conflicting TOU structure for solar compensation. Additionally, BTM commercial storage is eligible to receive incentives under the ESS Program, which can enhance both participant and system value through active dispatch compensation for EDC-called events. Notably, the EDCs initially recommended an instantaneous netting interval for the NRES Program when it was established. NRES Decision, pp. 11–12. At that time, PURA authorized a monthly netting interval, finding that instantaneous netting could create price
  10. Page 38 of 63

    Docket No. 26-06-04 Page 36 uncertainty for participants and present a barrier to the sustained, orderly development of the state’s renewable energy industry. Id. However, the solar market has advanced significantly compared to when the NRES Program began, and the Authority finds the adoption of instantaneous netting to be a reasonable program modification that will advance the proposed program objectives. Accordingly, the EDCs shall implement billing updates to enable a netting tariff with instantaneous netting. Wherever possible, the EDCs shall strive to combine implementation of instantaneous netting across the residential and non-residential tariffs to minimize the administrative cost and timeline of such updates. The Authority directs the EDCs to complete implementation of billing updates such that the application and interconnection portals for the NRES successor tariffs may open beginning on January 1, 2028. As with the residential netting tariff, to preserve flexibility in the ultimate export rate determination, the EDCs shall implement billing system updates such that the export compensation rate may be either linked to existing bill components or programmed as an independent value that can be updated over time. The Authority will establish a standardized methodology for export compensation rates that fulfills statutory directives in the subsequent portion of this proceeding. V. COST RECOVERY Public Act No. 26-127, §§ 1(f), 2(f), and 3(e), provides that: The costs prudently and reasonably incurred by an electric distribution company pursuant to this section shall be recovered on a timely basis through a nonbypassable fully reconciling component of electric rates for all customers of the electric distribution company. Any net revenues from the sale of products purchased in accordance with any tariff offered pursuant to this section shall be credited to customers through the same fully reconciling rate component for all customers of such electric distribution company. This statutory language is identical to the cost-recovery language in General Statutes § 16-244z(e), which governs the RRES, NRES, and SCEF Programs. In implementing these existing programs, the Authority established a consistent framework for recovering prudently incurred program costs, crediting program revenues to ratepayers, and requiring detailed cost accounting and full prudence review. This framework remains appropriate for the successor residential, non-residential, and community solar programs, subject to the modifications described below. For the SCEF Program, the Authority authorized the EDCs to: seek recovery of all payments made to Subscribers and Subscriber Organizations under the SCEF Program through the NBFMCC charge . . . To offset the program costs, the EDCs shall credit any revenues from the sale of energy and RECs associated with the delivered output from a SCEF for the full term of Subscriber Organization’s enrollment under the Tariff. Furthermore, the Authority authorizes each EDC to seek recovery all of prudently-incurred costs related to the implementation and administration
No matches