  1. Page 9 of 63

    Docket No. 26-06-04 Page 7 instantaneous netting paired with reduced export compensation to advance the objective of providing positive net system benefits to all ratepayers. Importantly, instantaneous netting is feasible using the EDCs’ existing metering equipment, although billing updates will be required. Id., p. 35; Interrog. Resps. OCC-7, CAE-43.3 Existing meters record energy imports and exports on separate channels, enabling the EDCs to bill customers for energy purchased from the grid and separately credit customers for exports to the grid at a different compensation rate. Id., p. 35; Interrog. Resps. OCC-7, CAE-43. In contrast, alternative daily, sub-daily, or hourly netting intervals would require AMI, which is not yet widely deployed in Eversource service territory. Eversource Interrog. Resp. CAE-1, Docket No. 25-02-14. a. Stakeholder Comments i. Netting Interval Several stakeholders expressed support for instantaneous netting paired with reduced export compensation. The Connecticut Green Bank (CGB) points to language in Public Act No. 26-127 that prioritizes the pairing of solar and storage systems that provide system benefits for all ratepayers by reducing peak demand. CGB Comments, Aug. 26, 2026, pp. 1–2. Accordingly, CGB recommends that the successor framework establish lower export compensation to encourage paired solar and storage systems to “retain and shift solar production that would otherwise be exported to the grid during periods of low onsite load, and instead utilize that energy to reduce customer and system demand during peak periods,” reducing costs passed on to all ratepayers through the non-bypassable federally mandated congestion charge. Id., p. 4. The Office of Consumer Counsel (OCC) recommends that instantaneous netting with energy exports be compensated at a flat rate that is less than the retail rate with current metering capabilities, and states that the flat rates should be equal to or less than the weighted average hourly value provided by solar generation. OCC Comments, Aug. 26, 2026, p. 12. Eversource states that adjusting netting intervals and compensation for excess generation would incentivize customers to optimize the use of onsite generation through paired energy storage. Eversource Comments, Aug. 26, 2026, pp. 9–10. The Solar Energy Industries Association (SEIA), the Alliance for Climate Transition (ACT), and Advanced Energy United (United; collectively, the Clean Energy Parties) note that instantaneous netting will involve estimating the percentage of a solar system’s production that will be exported in real-time each month using customer energy consumption and solar production data; these estimates will necessarily be uncertain and widen the range of customer outcomes, particularly if customers do not have access to 3 UI suggests that its advanced metering infrastructure (AMI) meters cannot perform instantaneous netting without manually reprogramming each meter. See UI Corresp., Oct. 16, 2026, p. 8; UI Comments, Oct. 2, 2026, pp. 9–10. At the same time, UI confirms that its existing meters record energy imports and exports on separate channels, on a real-time basis. Id. These separate measurements of energy sent to the grid and received from the grid are the only additional information required to adopt an instantaneous netting compensation structure. The Authority also notes that, when the RRES Program was established, UI indicated that “instantaneous netting has the lowest administrative costs and offers the least complex billing relative to the other netting options.” RRES Decision, p. 11.
  2. Page 10 of 63

    Docket No. 26-06-04 Page 8 granular energy usage data. Clean Energy Party Comments, Aug. 26, 2026, pp. 7–8. Nevertheless, the Clean Energy Parties recognize that instantaneous netting will “provide an economic signal to the market to move toward solar and energy storage because of the relative benefit of storing solar energy for self-consumption outside of daylight hours.” Id., p. 8. ii. Time-Differentiated Export Compensation Additionally, the Authority considered whether the successor residential tariffs should adopt time-differentiated export compensation rates, noting that the Successor Study Report recommendations indicated that export compensation could shift from a fixed rate to a time-varying rate in the future. Notice, July 28, 2026, pp. 1–2. The Authority requested stakeholder feedback on the optimal timing of such a shift. Id. Most stakeholders oppose near-term time-differentiation in residential compensation rates. CGB recommends that such a transition should occur gradually for residential customers, stating that the initial tariff could use a fixed reduced export compensation rate while stakeholders collaborate on developing the technical and programmatic requirements necessary for a future transition to time-differentiated export rates. CGB Comments, Aug. 26, 2026, p. 6. The Clean Energy Parties and the Connecticut Solar and Storage Association (ConnSSA) caution against overly complex compensation structures for participants and installers. Clean Energy Party Comments, Aug. 26, 2026, pp. 7–9; ConnSSA Comments, Aug. 26, 2026, p. 3. The Clean Energy Parties state that any consideration of time-differentiated export compensation should be determined after AMI is deployed, more granular energy usage data is available, and updated time-of-use (TOU) rates are established. Clean Energy Party Comments, Aug. 26, 2026, p. 9. Similarly, the Acadia Center, the Conservation Law Foundation (CLF), People’s Action for Clean Energy (PACE), Portland Clean Energy Task Force, Sierra Club, and Vote Solar (collectively, the Clean Energy Advocates) recommend postponing timedifferentiated export compensation until updated residential TOU rates and periods are available to avoid creating two different “peak” definitions for residential customers. Clean Energy Advocates Comments, Aug. 26, 2026, p. 4. UI also recommends postponing time-differentiated export compensation until updated TOU rates and periods are available. UI Comments, Aug. 26, 2026, p. 4. Eversource recommends that more complex compensation structures be prioritized for large resources because for residential customers, the benefits of time-differentiated compensation would be less significant, while adjusting netting intervals and compensation for excess generation would be sufficient to optimize generation without more complex time-differentiated frameworks. Eversource Comments, Aug. 26, 2026, pp. 9–10. Conversely, DEEP supports time-differentiated compensation for the RRES successor program, stating that it is “the only way to have the benefits to all ratepayers be greater than the costs” and should not be postponed for any reason. DEEP Comments, Aug. 26, 2026, pp. 4–5.
  3. Page 11 of 63

    Docket No. 26-06-04 Page 9 b. Authority Analysis The Authority concludes that the RRES successor program shall adopt instantaneous netting with exported energy compensated at a rate less than the full retail rate. Public Act No. 26-127 indicates a clear goal for successor programs to prioritize delivering benefits to all ratepayers. Instantaneous netting paired with reduced export compensation can advance this objective. By incentivizing customers to consume solar onsite, through battery storage or demand flexibility, clean energy generation is effectively shifted away from hours of high solar production and low load, and toward hours when energy is more expensive to procure and deliver. See Successor Study Report, pp. 33– 34. Reduced export compensation for real-time exports thus serves as a proxy for timedifferentiated compensation in the absence of interval metering or AMI. Further, additional time-differentiation of export compensation is unnecessary at this time. As noted in the Successor Study Report, a fixed export compensation rate provides an effective proxy for time-differentiation, while recognizing current limitations of available metering equipment. Additionally, instantaneous netting presents a more complex program structure for residential customers to understand when compared to the current RRES Program. Avoiding additional complexity via time-differentiated exports while participants adapt to the new program framework will further the fourth program objective of promoting program accessibility through simplified program and tariff designs. Pursuant to General Statutes § 16-243n(a), the EDCs should propose time-varying rates for residential customers by October 1, 2027. The Authority agrees with stakeholders that solar programs should avoid implementing time-differentiated frameworks that duplicate or conflict with the anticipated TOU proposals. Once updated TOU rates are available, this may present an opportunity to further align solar compensation with established TOU periods and rate structures. Eversource estimates that it could implement billing upgrades for residential instantaneous netting at a cost of approximately $1 million and timeline of 12 months. Eversource Interrog. Resp. CAE-01. Eversource recommends that compensation for exported energy should remain tied to prevailing retail rate components, stating that using existing rate values within EDC billing systems would streamline tariff administration and be easier for customers to understand. Eversource Comments, July 31, 2026, Docket No. 25-02-14, pp. 3–4; Tech Mt’g Tr., Oct. 22, 2026, 93:1–94:5. However, Eversource stated that implementing a separate export compensation rate not tied to existing bill components would also be feasible. Tr., 94:7–17. In Docket No. 25-02-14, UI estimated that it could adapt current methods used for the RRES Buy-All tariff and Rate SG2 for a real-time netting option for less than $100,000 with an implementation timeline of between six to eight months. UI Interrog. Resp. CAE01, Docket No. 25-02-14. UI did not subsequently provide an updated estimate of the cost and timeline in this docket, noting that the previous response was “a high-level, preliminary estimate” based on limited information and citing the need to engage outside vendors after an Authority final decision. UI Interrog. Resp. CAE-01. However, UI’s previous estimates in Docket Nos. 25-02-14 and 20-07-01 suggest that an instantaneous netting option could be implemented without excessive cost, building on existing tariff
  4. Page 12 of 63

    Docket No. 26-06-04 Page 10 designs. Additionally, UI notes that Rate SG2 currently prices imports and exports separately using the two meter channels, and anticipates that implementing a similar approach used for an instantaneous netting tariff could be straightforward. Tr., 47:1–21; 39:9–12. The Authority also issued a procedural order directing the EDCs to conduct a request for proposals (RFP) to evaluate billing upgrade requirements. Notice of Procedural Order, Oct. 9, 2026, pp. 1–2. Thus, the Authority expects that UI, to the extent it has not already done so, will soon complete a more thorough evaluation of the implementation requirements. The EDCs shall implement billing updates to enable a netting tariff with an instantaneous netting interval. As initial estimates indicated that billing updates to accommodate instantaneous netting could be completed within 12 months or less, the Authority directs the EDCs to complete implementation of billing updates such that customers can apply to the program and begin receiving compensation under the RRES successor netting tariff beginning on January 1, 2028.4 For clarity, instantaneous netting should solely require changes to the billing system to utilize the import and export channels of both EDCs’ existing metering equipment, such that exports to the grid can be compensated at a different value from prevailing retail rates. As discussed above, the Authority is not authorizing time-varying export compensation at this time, and no manual adjustments to meters should be required. As the values of the import and export meter channels are already measured and reported monthly on RRES customers’ bills, implementing instantaneous netting should require only simple changes to EDC billing systems. The Authority will evaluate the prudence of all implementation costs after they have been incurred. The EDCs will be responsible for demonstrating the reasonableness and prudence of expenditures and taking all reasonable measures to contain costs. A specific compensation rate for exported energy has not yet been determined. In establishing tariff rates, the Authority must take into account: the electric system benefits received by all ratepayers from the distributed energy resource based on time of production, equitable distribution of participant benefits, the Comprehensive Energy Strategy adopted pursuant to section 16a-3d of the general statutes, the Integrated Resources Plan developed pursuant to section 16a-3a of the general statutes, the system efficiency and utilization goal established pursuant to section 16a-3v of the 4 Eversource suggests that, if its AMI plan proceeds as proposed in Docket No. 26-05-10, Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules, it may “recommend instantaneous netting be implemented in parallel with deployment of a new [customer information system (CIS)] instead of making changes to existing IT infrastructure that would be promptly replaced.” Eversource Interrog. Resp. CAE-1. However, Eversource is unable to estimate when instantaneous netting could be implemented in conjunction with the new CIS. Interrog. Resp. CAE-30. Deferring implementation of instantaneous netting based on the as-yet uncertain outcome of Eversource’s AMI plan would delay the authorized program framework by at least several years, which is not an acceptable timeline for successor programs that are statutorily required to begin in 2028.
  5. Page 13 of 63

    Docket No. 26-06-04 Page 11 general statutes and the value or benefits of distributed energy resources to the reliability of the electric grid in the state. Public Act No. 26-127, § 1(c). In the remainder of this proceeding, the Authority will analyze and determine an export compensation methodology and rate that satisfies these statutory requirements. To preserve flexibility in the ultimate export rate determination, the EDCs shall implement billing system updates such that the export compensation rate may be either linked to existing bill components or programmed as an independent value that can be updated over time. Finally, in its report to the legislature, the Authority did not recommend the continued assessment of a production-based non-bypassable charge (also referred to on customer bill as the solar energy adjustment or solar production charge).5 Successor Study Report, pp. 16, 36. The Authority maintains this determination. Non-bypassable charges are utilized in the RRES program to avoid overcompensating netting customers when excess generation is credited at the full retail rate. Under an RRES successor program with reduced export rates, non-bypassable charges are no longer required, as the export rate may be directly adjusted to ensure appropriate customer compensation. 2. Buy-All Tariff In the Successor Study Report, the Authority recommended that, for most participants, the successor residential program offer a single netting tariff option, as over 99% of RRES customers have chosen the netting option to date. Successor Study Report, p. 40. However, the Authority determined that the RRES successor program should retain a buy-all option for low-income customers and multifamily affordable housing (MFAH) projects. Id., pp. 40–42. The buy-all tariff offers a predictable revenue stream independent from a customer’s retail rate, protecting customers enrolled in lowincome discount rates (LIDR) from eroded value under the netting tariff. Id. Additionally, the buy-all tariff is required for MFAH properties under the RRES Program and allows for simpler benefit allocation among tenants, building owners, and project owners. Id., p. 41. Stakeholders continue to affirm the importance of a buy-all tariff option for MFAH and lowincome customers. CGB Comments, Aug. 26, 2026, p. 7; Clean Energy Party Comments, Aug. 26, 2026, p. 15. Consistent with these recommendations, the Authority authorizes a buy-all tariff for the RRES successor program, with energy and renewable energy certificates (RECs) purchased at a fixed per-kWh compensation rate over the 20-year tariff term. Eligibility for the buy-all tariff shall be limited to income-eligible customers (as defined by Public Act 5 In the RRES Program, “non-bypassable charge” means a charge that cannot be netted against behind- the-meter renewable energy production for the purposes of a customer’s electric utility bill. RRES Decision, p. 39. The Authority authorizes a non-bypassable charge for RRES systems installed in a given calendar year if it calculates that full retail net metering will provide system owners with a rate of return higher than the target (e.g., 11%). Id. The non-bypassable charge is assessed per kWh of solar energy produced for RRES netting customers. Motion No. 7 Ruling, Feb. 24, 2022, Docket No. 20-07-01RE01, p. 2. The non-bypassable charge in the RRES Program is distinct from the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC), which is the electric rate component where program costs are recovered from all ratepayers.
  6. Page 14 of 63

    Docket No. 26-06-04 Page 12 No. 26-127, § 1(a)(9), customers whose income does not exceed sixty percent of the state median income (SMI); or who resides in an affordable housing development) and properties classified as MFAH. To maintain continuity with the current program rules, the Authority intends to preserve the same MFAH eligibility classifications as currently used in the RRES Program.6 The RRES Program currently utilizes a buy-all tariff with the same structure as the successor tariff authorized herein. Under a buy-all tariff, the EDC separately records a participant’s electricity consumption from the grid and the participant’s renewable energy production, compensating the participant for all eligible production at the applicable tariff rate while billing the participant for all electricity consumed at the applicable retail rate. Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 01B (RRES Year 5 Program Manual), p. 11. Because the existing RRES buy-all tariff already employs this structure, the EDCs should be able to administer the successor buy-all tariff using their existing billing systems, without requiring additional billing system upgrades. Accordingly, the Authority expects that the EDCs can implement the successor buy-all tariff by updating the applicable tariff compensation rate and any other necessary program parameters, rather than undertaking the more extensive billing system modifications that may be required to implement a new netting methodology. A specific buy-all compensation rate that appropriately reflects electric system benefits to ratepayers, an equitable distribution of participant benefits, and Connecticut’s policy goals, as required by Public Act No. 26-127, § 1(c), will be determined in the remainder of this proceeding. Additionally, the Authority will investigate whether separate buy-all compensation rates for income-eligible customers and MFAH properties would more appropriately reflect the distinct characteristics of the two customer segments and advance state policy goals. Stakeholders in the most recent RRES Program annual review proceeding, Docket No. 26-08-02, Annual Residential Renewable Energy Solutions Program Review and Rate Setting – Year 6, suggested that larger 5+ unit MFAH projects have lower upfront costs than the 1–4 unit residential segment, due to economies of scale; conversely, other stakeholder noted that MFAH projects have similar costs due to more complicated 6 For the purposes of the RRES Program, a three-tier methodology is used for determining when multi- family housing is “affordable housing,” and, therefore, is considered a residential customer pursuant to General Statutes § 16-244z(b)(2): Tier I: Multi-family properties with 5 or more units that participate in the Low-Income Housing Tax Credit Program (LIHTC) or that contain a majority of households earning 80% or less of Area Median Income (AMI) as set by the U.S. Department of Housing and Urban Development (HUD). Tier II: Multi-family properties with 5 or more units where more than 66% of the residents have a household income at or below 60% of SMI. Naturally Occurring Affordable Housing (NOAH) properties, defined as multi-family properties with 5 or more units with rent levels affordable to persons or families earning less than 80% AMI, based on CT Department of Housing rental calculations. Tier III: Multi-family properties with 5 or more units that apply for review by the Agencies, are determined to meet the eligibility requirements of an affordable multi-family dwelling by the Agencies, and are approved as an affordable housing facility by PURA. RRES Year 5 Program Manual, p. 51 (footnotes omitted).
  7. Page 15 of 63

    Docket No. 26-06-04 Page 13 building and ownership arrangements and tenant benefit sharing requirements. See Eversource Comments, May 28, 2026, Docket No. 26-08-02, pp. 7–8; OCC Comments, Aug. 19, 2026, Docket No. 26-08-02, p. 4; CGB Comments, Aug. 19, 2026, Docket No. 26-08-02, pp. 1–3. More analysis is needed to determine whether buy-all compensation rates should be differentiated between low-income and MFAH projects. To the extent that EDC systems cannot currently accommodate different buy-all rates by customer class,7 the Authority directs the EDCs to implement changes to allow separate low-income and MFAH buy-all compensation rates no later than January 1, 2028. B. ADDERS Public Act No. 26-127, § 1(c) specifies that: [i]n addition to a tariff rate applicable to any residential customer, the authority shall authorize a separate tariff rate for (1) low-income customers and residential customers in a multifamily development as described in subparagraph (A) or (B) of subdivision (8) of subsection (a) of this section, and (2) residential customers that reside in a distressed municipality, as defined in section 32-9p of the general statutes. The RRES Program includes incentive adders for low-income customers and customers who reside in distressed municipalities.8 See, e.g., RRES Year 5 Program Manual, p. 16. For both the netting and buy-all tariffs, incentive adders are assessed based on total PV production as measured by a utility-owned production meter. 1. Stakeholder Comments Solar contractors participating in the RRES Program recommended that the successor residential program be designed to minimize reliance on utility-owned production meters. Specifically, solar contractors argue the production meter requirement adds equipment and installation costs, requires additional physical space, can lead to delays associated with scheduling utility work, and caused disagreements and challenges throughout the RRES Program. Clean Energy Party Comments, Aug. 26, 2026, pp. 11– 13; Clean Energy Advocates Comments, Aug. 26, 2026, pp. 6–7. Instead of adders based on total system production, stakeholders suggested basing them on energy exports as measured by the revenue meter. Id.; Clean Energy Party Comments, Aug. 26, 2026, p. 15. Alternatively, Eversource suggested basing adders on a fixed value, such as system 7 Eversource suggested that its billing system can accommodate different buy-all rates, and the change could be implemented at no cost and a minimal timeline. Eversource Interrog. Resp. CAE-26, Docket No. 26-08-02. UI was unable to provide information regarding implementation cost or timeline. UI Interrog. Resp. CAE-26, Docket No. 26-08-02. The Authority anticipates that this should be a straightforward change with zero or minimal implementation cost, but nevertheless directs the EDCs to pursue implementation to allow various options for the successor program design. 8 Customers are eligible for the RRES income-eligible adder if they have verified incomes at or below 60% of SMI. Customers are eligible for the RRES distressed municipality adder if they reside in Economically Distressed Communities, as defined by the Connecticut Department of Economic and Community Development (DECD).
  8. Page 16 of 63Match

    Docket No. 26-06-04 Page 14 capacity, if the production meter requirement is removed. Eversource Comments, Aug. 26, 2026, pp. 11–12. The Clean Energy Parties9 state that either method (fixed capacity-based incentives or volumetric incentives based on exports) offers the benefit of not relying on a production meter and provide an incentive to drive deployment among certain customers; however, a capacity-based approach would be preferable as it provides a clear and reliable incentive amount. Clean Energy Party Comments, Oct. 2, 2026, p. 12. Save the Sound similarly argues that a fixed capacity-based incentive would likely incur lower administrative costs and simplify project financing. Save the Sound Comments, Oct. 2, 2026, p. 1. Conversely, OCC prefers adders administered based on volumetric energy exports, but expresses concern that export-based adders would discourage onsite consumption of produced energy. OCC Comments, Oct. 2, 2026, p. 14. OCC and Eversource also recommend against upfront incentives, as they could expose ratepayers to risk by funding incentives for facilities that may not remain in service for their full useful lives. Id.; Eversource Comments, Oct. 2, 2026, p. 10. Eversource states that it would be feasible to administer fixed per-kW residential incentives within existing processes and systems, and expects that the current quarterly frequency of incentive payments of the RRES program will remain adequate for any successor program. Eversource Interrog. Resp. CAE-6; Eversource Comments, Oct. 2, 2026, p. 9. UI states that, if the Authority adopted a fixed per-kW incentive structure and retained a quarterly or annual payment cadence, UI could likely administer the incentive through a modified semi-automated process similar to the current approach, where incentive calculations are done within the billing system based on production data but payments are issued outside of the billing system. UI Interrog. Resp. CAE-6, p. 1. 2. Authority Analysis The Authority adopts a fixed capacity-based adder structure, which eliminates one use of production meters for netting customers under the RRES successor program. Incentive adders can readily achieve their intended objective—advancing inclusive and equitable access to clean energy resources and their benefits, and authorizing a separate tariff rate for low-income customers, MFAH residents, and residents of distressed municipalities pursuant to Public Act No. 26-127, § 1(c)—without being tied to total system production. An incentive adder assessed based on installed kW capacity reduces reliance on production meters, which can increase project development costs, with minimal changes to EDC processes while continuing to enable equitable access by reducing the higher upfront costs of such projects. The Authority finds capacity-based adders preferable to adders based on exports measured at the revenue meter. A capacity-based adder offers predictable value for participants and facilitates more accurate estimates of total program costs. By contrast, adders based on energy exports are inherently more uncertain under a netting tariff design that incentivizes self- 9 Along with SEIA, ACT, and United, Vote Solar is also included in the Clean Energy Parties’ October 2, 2026 Comments.
  9. Page 17 of 63

    Docket No. 26-06-04 Page 15 consumption over exports and could create competing financial incentives for participants. Accordingly, the Authority authorizes incentive adders as a fixed value per kW AC of installed system capacity for the RRES successor program. Incentive adders shall continue to be provided on a quarterly basis, maintaining the cadence used in the RRES Program to minimize administrative changes and implementation costs. As incentive adders are currently issued outside of the EDCs’ billing systems, minimal updates to EDC systems and processes should be required to facilitate a capacity-based method of incentive administration. Specific incentive values will be determined in the remainder of this docket. C. METERING REQUIREMENTS AND REC TREATMENT Utility-owned production meters are revenue-grade meters that enable the EDCs to measure a project’s total renewable electricity production. EDC Compliance, Jan. 22, 2026, Docket No. 25-08-02, Annual Residential Renewable Energy Solutions Program Review and Rate Setting – Year 5, Att. 1b, p. 9. Under the current RRES Program, these meters are required to calculate production-based customer adders and assess nonbypassable charges. As discussed in Section III.B above, however, the RRES successor program’s framework no longer requires a utility-owned production meter for incentive adders. Additionally, production meters will no longer be required for the assessment of non-bypassable charges under the netting tariff. See Section III.A.1, Netting Tariff. For customers participating under the buy-all tariff, production meters will still be necessary to measure total production and determine customer compensation. Utility-owned production meters also serve a separate function under the RRES Program: measuring renewable energy production for purposes of accounting for RECs, which the EDCs sell into the New England Power Pool Generation information system (NEPOOL GIS) REC market on behalf of all ratepayers. See, e.g., RRES Decision, p. 19. As in the RRES Program, successor residential tariffs are for the purchase of energy and RECs. Public Act No. 26-127, § 1(d)(1). Thus, REC production from renewable resources installed under the RRES successor program must continue to be measured and accounted for, whether through existing utility-owned production meters or an alternative mechanism. 1. Stakeholder Comments The Authority solicited comments on potential approaches to measure REC generation without the need for a production meter, including the accuracy, cost, administrative feasibility, and legal permissibility of alternatives. Notice of Request for Written Comments, July 28, 2026, pp. 2–3. Several stakeholders suggest that RECs could be recorded based on exports measured at the revenue meter, rather than total system production. Clean Energy Party Comments, Aug. 26, 2026, p. 13; Clean Energy Advocates Comments, Aug. 26, 2026, p. 7; ConnSSA Comments, Aug. 26, 2026, p. 4. The Clean Energy Parties state that utility revenue meters meet the NEPOOL GIS meter accuracy requirements. Clean Energy
  10. Page 18 of 63

    Docket No. 26-06-04 Page 16 Party Comments, Aug. 26, 2026, p. 13. The EDCs oppose the proposal to measure RECs at the revenue meter, stating that this would significantly undercount the volume of RECs produced and reduce revenue from REC sales that are passed through to ratepayers. Eversource Interrog. Resp. CAE-8; UI Interrog. Resp. CAE-8. Based on the average customer profile, Eversource estimates a potential 40% reduction in REC revenues if only RECs associated with exports are recorded, because this approach would not capture solar energy generated and consumed onsite. Eversource Interrog. Resp. CAE-8. Alternatively, solar industry stakeholders suggest that RECs can be measured with inverter data. The Clean Energy Parties emphasize that revenue-grade inverter data is “available through virtually all commercially available solar inverters.” Clean Energy Party Comments, Aug. 26, 2026, p. 13. The Clean Energy Parties also state that either the EDCs or another state-designated entity would be required to serve as the independent verifier for generation reporting to NEPOOL, and system owners would report production data to the designated independent verifier on a regular basis. Id., pp. 13–14. ConnSSA and the Clean Energy Advocates similarly support the use of inverter data for REC measurement. Clean Energy Advocates Comments, Aug. 26, 2026, p. 7; ConnSSA Comments, Aug. 26, 2026, p. 4. In contrast, the EDCs oppose the use of inverter data. Eversource asserts that, when the use of inverter data was previously examined for REC reporting under the RRES Program, the EDCs found that it “would require approval of alternative reporting methodologies to be utilized when customer data was unavailable, and that significant software and license costs would be incurred to support the automated collection and management of customer inverter data.” Eversource Comments, Aug. 26, 2026, p. 12. UI states that using inverter data instead of production meters is not feasible, raising concerns related to the cost of establishing and maintaining interfaces for transmitting inverter data, potential disruptions to data availability if vendors go out of business, and EDC inability to verify or test the accuracy inverter production data. UI Comments, Aug. 26, 2026, pp. 7–8. Additionally, the Clean Energy Advocates suggest that an estimation-based production methodology could be used to report RECs to NEPOOL GIS; however, compared to the use of inverter data, the estimation method is less preferred as it involves greater verification complexity and less reliable data than direct inverter or productionmeter measurement and would require NEPOOL approval. Clean Energy Advocates Comments, Aug. 26, 2026, p. 7. Finally, Eversource suggests that the costs and contingencies of inverter data could be avoided by implementing an alternative approach that would invoke General Statutes § 16-245a(g)10, which authorizes the Authority to reduce the minimum Class I resource requirement for electric suppliers and EDCs based on a forecast of production from resources enrolled in clean energy programs. Eversource Comments, Aug. 26, 2026, p. 12. Eversource states that this approach would likely reduce the administrative 10 Eversource cites General Statutes 16-245a(h); however, the Authority notes that after recent amendments to the statutes, the relevant section is 16-245a(g).