Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Page 11 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 11 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 60 kW shall provide all necessary information to, and cooperate with, the Company to enable the Company to provide necessary information to the NEPOOL-GIS for the creation of RECs to be credited to the Company’s appropriate NEPOOL-GIS account. The Company collects the RPS Class I Renewable Generation Attributes as they are created. 6.3.2 STGUs that are 60 kW or smaller, and BTM STGUs that are greater than 60 kW, shall provide all necessary information to, and cooperate with, the Company to enable the Company to obtain the appropriate asset identification for reporting generation to the NEPOOL-GIS for the creation of RECs to be credited to the Company’s appropriate NEPOOL-GIS account. The Owner or Authorized Agent shall provide approvals or assignments, including, but not limited to, completing the Company’s Renewable Energy Certificate Assignment and Aggregation Form, to facilitate the STGU’s participation in asset aggregation or other model of asset registration and reporting for the term of enrollment in this tariff. This form will be collected by the SPA and provided to the Company. 6.3.3 Energy: Energy produced by AOBC Generation Units must be delivered to the Company in the Company’s ISO–NE load zone at the delivery node associated with the STGU. As requested by the Company or ISO-NE, the Owner or Authorized Agent shall provide all necessary information as well as follow all requirements for all applicable market rules. As needed, the Company will report exported power from standalone AOBC Generation Units greater than 60 kW to ISO-NE as the host participant or assigned meter reader, as those terms are used in ISO-NE’s Transmission, Markets, and Services Tariff and will include energy settlement revenue in the Company’s annual SMART reconciliation. If the Company elects to register any AOBC Generation Unit less than or equal to 60 kW, then the associated energy settlement revenue shall also be included in the Company’s annual SMART reconciliation. The Company does not hold title to the energy associated with an ESS that is co-located with an STGU. 6.3.3.1 Issued by: Douglas W. Foley President Load Reducer Option: The Company shall treat any BTM STGU as a load reducer and shall not register it in the energy market operated by the ISO-NE. However, should the BTM STGU’s exported energy equal or exceed 35 percent of its annual energy production, the Filed: Effective: June 10, 2026 July 1, 2026Page 12 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 12 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) Company may treat the BTM STGU as an asset and register it in the ISO-NE energy market. The Company is not required to register as a market participant any STGU that demonstrates that it is designed as a non-exporter of energy. 6.3.4 Capacity: (1) The Company does not hold title to the capacity associated with an ESS that is co-located with an STGU. (2) Unless the Buyout Option is properly elected under Section 6.3.5, title to the capacity rights associated with an STGU will automatically transfer to the Company upon enrollment in the SMART Program and the Company shall participate in the FCM under one of the following options: (a) qualifying and bidding the capacity into the ISO-NE FCM to obtain a CSO as defined by ISO-NE (Option 1); or (b) registering for performance incentive payments under the ISO-NE FCM Pay-for-Performance Project (Option 2). (3) The Company will be exempt from the requirement to participate in the FCM with respect to the capacity for a specific STGU if the facility cannot be qualified for the ISO-NE FCM due to circumstances outside of the Company’s control, and the Company can demonstrate that it made reasonable efforts to mitigate the issues preventing qualification. (4) Consistent with Section 6.3.4 and Section 6.3.5, if requested by the Company, the Owner or Authorized Agent of an STGU shall take all commercially reasonable means necessary to cooperate with the Company to qualify an STGU for participation in the ISO-NE FCM. If the Company has already participated in the ISO-NE FCM by qualifying and bidding the associated capacity for an existing STGU that becomes a Buyout Eligible Facility as a result of being retrofitted with an ESS and Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 13 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 13 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) subsequently exercises the Buyout Option, the Company shall transfer any associated CSO, as defined by ISO-NE, to the facility owner upon receipt of full payment of the buyout. The owner of a Buyout Eligible Facility electing the Buyout Option must make payment to the Company not later than 15 business days after the owner submits written notice of intent to exercise the Buyout Option to the Company. Within 15 business days after the Company receives the full buyout payment, it must provide the owner of the Eligible Facility with all necessary documents to transfer the title to the capacity rights to the owner. 6.3.5 7.0 Buyout Option: Buyout Eligible Facilities shall have a one-time Buyout Option to purchase the capacity rights of the solar generation from the Company. Such Buyout Option may be exercised by these facility owners under the following conditions: (1) for a new STGU that is co-located with an ESS, any time after the filing of an interconnection application and before the Company issues an authorization to interconnect; (2) for a new BTM STGU , any time after the filing of an interconnection application and before the Company issues an authorization to interconnect; and (3) for an existing Standalone STGU enrolled under the provisions of this tariff that retrofits with an ESS after the filing of a revised interconnection application and before the Company issues a new authorization to interconnect for the ESS. Calculation of Incentive Payments 7.1 Standalone STGUs Incentive Payments to Standalone STGUs will be in accordance with the formula specified in 225 CMR 20.08 and will be calculated for each monthly billing period as follows: Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 14 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 14 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) IP = (BCR + CRA – GS) * kWhgen - VOE Where IP = Incentive Payment. BCR = Base Compensation Rate applicable to the STGU as specified in the STGU’s FSOQ. The Base Compensation Rates are provided in Appendix A. CRA = Compensation Rate Adder(s) applicable to the STGU as specified in the STGU’s FSOQ. GS = Greenfield Subtractor applicable to the STGU as specified in the STGU’s FSOQ. kWhgen = kWh generated by the STGU during the billing period measured after the reduction for parasitic or station load. VOE = Value of Energy, determined as set forth below: Issued by: (1) For Standalone STGUs that are taking service under the Company’s Net Metering tariff, the VOE rate will equal the applicable net metering credit. (2) For Standalone STGUs that are QFs or OSGFs and are not net metered pursuant to the Company’s Net Metering tariff, the VOE credit will be calculated based on the Company’s Power Purchase tariff. (3) For AOBC Generation Units, the VOE credit will be calculated based on the Basic Service rate applicable to the AOBC Generation Unit’s rate class in effect during the billing period, as established by the Company’s Basic Service tariff. (4) Base Compensation Rates and, if applicable, Compensation Rate Adders, and/or Greenfield Subtractors are determined as authorized in the FSOQ, and those rates will not change during the period of time in which the STGU is receiving Incentive Payments unless as directed by the DOER, SPA or the Department. Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 15 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 15 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 7.2 Behind-the Meter STGUs Incentive Payments to BTM STGUs will be in accordance with the formula specified in 225 CMR 20.08 and will be calculated for each monthly billing period as follows: IP = (BCR + CRA – GS – VOEr) * kWhgen Where IP = Incentive Payment. BCR = Base Compensation Rate applicable to the STGU as specified in the STGU’s FSOQ. The Base Compensation Rates by capacity block are provided in Appendix A. CRA = Compensation Rate Adder(s) Applicable to the STGU as specified in the STGU’s FSOQ (e.g., Pollinator Adder, etc.). GS = Greenfield Subtractor applicable to the STGU as specified in the STGU’s FSOQ. kWhgen = kWh generated by the STGU during the billing period, measured after the reduction for parasitic or station load, at the Generation or Production Meter. VOEr = VOE rate, determined as set forth below: (1) Issued by: For BTM STGUs taking service under the Company’s Net Metering tariff, the VOEr will equal the sum of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Customer’s applicable Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ, and will not change during the period of time in which the STGU is receiving Incentive Payments, unless directed to change by the DOER. Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 16 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 16 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 7.3 Issued by: (2) For BTM STGUs that are QFs, OSGFs, or AOBC Generation Units that are not taking service under the Company’s Net Metering tariff and that were issued an FSOQ prior to April 15, 2020, the VOEr will be equal to the sum of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Customer’s applicable Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ, and will not change during the period of time in which the STGU is receiving Incentive Payments unless directed to change by the DOER. (3) For BTM STGUs that are QFs, OSGFs, or AOBC Generation Units that are not net metered pursuant to the Company’s Net Metering tariff and were issued an FSOQ on or after April 15, 2020, the VOEr will be a weighted average equal to (a) 65% of the sum total of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER, plus (b) 35% of the average of the Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ and will not change during the period of time in which the STGU is receiving Incentive Payments, unless directed to change by the DOER. (4) Base Compensation Rates and, if applicable, Compensation Rate Adders, and/or Greenfield Subtractors are determined as authorized in the FSOQ, and those rates will not change during the period of time in which the STGU is receiving Incentive Payment unless directed by the DOER, SPA or the Department. The applicable distribution, transmission and transition charges, and the three-year average of Basic Service rates will change once annually as shown in Appendix A to this tariff. True-Up Payments for DC-Coupled STGUs co-located with ESS Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 17 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 17 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) For DC-Coupled STGUs co-located with ESS, the Owner or Authorized Agent of the STGU may seek an annual “true-up” payment from the Company for any losses that may have reduced the STGU’s Incentive Payments during the year. To qualify for such trueup payments, the Owner or Authorized Agent of the STGU must meet all requirements identified in the DOER’s Guideline on Energy Storage. The DOER will be responsible to calculate true-up payment amount for the Company, and the Company shall pay the specified true-up payment amount to the Owner or Authorized Agent. 8.0 Distribution of Incentive Payments The Company will disburse regular, periodic Incentive Payments, in the form of an electronic payment or as otherwise agreed to by the Company, to the STGU’s Owner or Authorized Agent as specified on the Incentive Payment/Credit Form or AOBC Payment/Credit Form. If the Incentive Payment is to be disbursed to an Authorized Agent, the Owner must indicate so on the applicable Payment/Credit Form. The STGU’s Owner or Authorized Agent must ensure that the Company has accurate information necessary for distribution of Incentive Payments and for taxpayer identification and reporting. Changes will be implemented by the Company no later than the next full billing cycle. Incentive Payments not paid due to inaccurate or incomplete records will be available for 90 calendar days, after which they may be forfeited. 9.0 Calculation of Buyout Payment The Buyout Payment for the option pursuant to in Section 6.3.5 shall be calculated as follows: ACF = [FNC * CCR * (60% * CP) * (80%) * SE] – ADM. Buyout Payment = Net Present Value of ACF. Where ACF = Annual Cash Flow, determined based on a discount rate of 10 percent and a term of 20 years less the time the Eligible Facility has participated in the SMART Program. FNC = Facility Nameplate Capacity of the inverter using an AC rating. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 18 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 18 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) CCR = Capacity Contribution Rate of 31.8%, initially, and as updated in each year ISO-NE issues a new Report of Capacity, Energy, Loads, and Transmission. CP = Capacity Price based on the levelized 15-year forecast of capacity prices under the AESC Study, updated in any year a new final AESC Study is issued. SE = Four months of annual solar eligibility in the ISO-NE FCM. ADM = Estimated long-term costs incurred by the Company in the administration of participation in the ISO-NE FCM, calculated at $1,300/MW and escalated at two percent per year. If actual Administrative Costs differ significantly from those included in the Buyout Payment, the Company shall petition the Department for a revision to the Buyout Payment formula to more accurately reflect actual administrative costs. 10.0 Alternative On-Bill Credits 10.1 Basis of AOBCs For AOBC Generation Units, the AOBC will be equal to the Basic Service rate applicable to the AOBC Generation Unit’s rate class in effect during the billing period as established by the Company’s Basic Service tariff, or a rate approved by the Department for AOBC facilities enrolled in any Company offered CSAP, as allowed by Section 10.4, multiplied by the kWh measured on the Company’s service or revenue meter. The AOBCs will be applied to the single host account associated with the AOBC Generation Unit. 10.2 AOBC Payment/Credit Form The Owner of the AOBC Generation Unit must complete an Incentive Payment/Credit Form and AOBC Payment/Credit Form indicating how the AOBCs are to be transferred to Customer accounts other than the AOBC Generation Unit’s account in the Company’s service area. It is the responsibility of the Owner or the Authorized Agent to ensure that billing account information of the designated recipients of AOBCs and information necessary for distribution of Incentive Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 19 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 19 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) Payments is accurately reflected on the AOBC Payment/Credit Form and provided on any forms required for taxpayer identification and reporting. The Company shall not transfer AOBCs without a completed Incentive Payment/Credit Form and AOBC Payment/Credit Form. Such allocations are allowed up to two decimal places and the AOBC Payment/Credit Form and any subsequent updates to the Form will not be considered complete unless allocations correctly total at least 90 percent to active and valid Customer accounts and there are no billing account number or customer name errors. At its option, the Company may increase the number of decimal places on the AOBC Payment/Credit Form once there is automation of AOBCs, if it does not place an undue burden on the Company. Changes will be implemented by the Company no later than the next full billing cycle. 10.3 Unused AOBCs At its option or as requested by the Owner, the Company may pay a designated recipient, in a lump sum amount, any Unused AOBCs remaining on the billing account of an AOBC Generation Unit at the end of a 12-month period ending March 31. The Company may also offer to allocate Unused AOBCs to eligible accounts using the same criteria as regular AOBC allocations. Owners that achieve commercial operation on or after January 1, 2021, may receive a lump sum payment in the amount of the Unused AOBCs. Owners with AOBCs that achieved commercial operation prior to January 1, 2021, may receive a lump sum payment of the Unused AOBCs, adjusted by the ratio of the average ISO-NE Locational Marginal Pricing rate that was realized by the settlement of the output of STGUs with ISO-NE over the course of the year divided by the average Basic Service rate for the 12-month period. Any Owner receiving payment by the Company for Unused AOBCs and whose AOBC Payment/Credit Form has allocations totaling less than 100 percent, must provide a revised AOBC Payment/Credit Form that allocates 100 percent of credits to eligible recipients. AOBCs transferred to recipient Customer accounts that are not used by a recipient Customer shall carry forward on the recipient Customer’s billing account, from billing period to billing period. If a Host or recipient Customer closes an account with a balance of AOBCs remaining on it, then the AOBCs may be re-allocated to another account with the same Distribution Company for up to one year after account closure using the same criteria as regular AOBC allocations. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026Page 20 of 35
NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 20 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 10.4 Community Solar Access Programs At its option, the Company may propose and receive Department approval for one or more CSAP, that may offer billing, enrollment, default management, and credit netting services to AOBC facilities also operating as Community Shared STGUs, including Low-Income Community Shared STGUs. If accepted for enrollment in such a program, enrolled systems must comply with the CSAP Program Rules, attached as Appendix B, and all other rules, requirements and fees specified therein shall apply for the term of enrollment of that facility. In addition, only STGUs enrolled in a CSAP Program that serves low-income customers may be counted by the Company for purposes of meeting set-asides for Low-Income CSS projects, as per 225 C.M.R. 20.05(3)(d). 11.0 Term of Tariff All STGUs with capacities larger than 25 kW AC will be eligible to receive compensation under this tariff for 20 years from the STGU’s Incentive Payment Effective Date. All STGUs with capacities less than or equal to 25 kW AC will be eligible to receive compensation under this tariff for 10 years from the STGU’s Incentive Payment Effective Date. This tariff will remain in effect until the costs incurred to administer the SMART Program have been fully recovered through the SMART Factors and termination of this tariff has been granted by the Department. 12.0 Applicability of SMART Factor The SMART Factor shall be determined in accordance with Section 14.0 below, subject to the Department’s review and approval. The costs to determine the SMART Factor shall include both 225 CMR 20.00 and 225 CMR 28.00 SMART program costs, shall be applied to all bills issued by the Company, shall be assessed to the kWh of all retail delivery service customers based on the readings of usage from the retail, service, or revenue meter and the readings of generation from the production or generation meter, and will be identified as “Distributed Solar Charge” on customer bills. 13.0 SMART Factor Effective Date The SMART Factor shall be effective January 1 of each year, unless otherwise ordered by the Department. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Text of CAE-027 Attachment 1.pdf
Extracted from the file · 245 pages · 470,259 characters
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026