Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf
2 pages match
  1. Page 14 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 14 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) IP = (BCR + CRA – GS) * kWhgen - VOE Where IP = Incentive Payment. BCR = Base Compensation Rate applicable to the STGU as specified in the STGU’s FSOQ. The Base Compensation Rates are provided in Appendix A. CRA = Compensation Rate Adder(s) applicable to the STGU as specified in the STGU’s FSOQ. GS = Greenfield Subtractor applicable to the STGU as specified in the STGU’s FSOQ. kWhgen = kWh generated by the STGU during the billing period measured after the reduction for parasitic or station load. VOE = Value of Energy, determined as set forth below: Issued by: (1) For Standalone STGUs that are taking service under the Company’s Net Metering tariff, the VOE rate will equal the applicable net metering credit. (2) For Standalone STGUs that are QFs or OSGFs and are not net metered pursuant to the Company’s Net Metering tariff, the VOE credit will be calculated based on the Company’s Power Purchase tariff. (3) For AOBC Generation Units, the VOE credit will be calculated based on the Basic Service rate applicable to the AOBC Generation Unit’s rate class in effect during the billing period, as established by the Company’s Basic Service tariff. (4) Base Compensation Rates and, if applicable, Compensation Rate Adders, and/or Greenfield Subtractors are determined as authorized in the FSOQ, and those rates will not change during the period of time in which the STGU is receiving Incentive Payments unless as directed by the DOER, SPA or the Department. Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  2. Page 15 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 15 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 7.2 Behind-the Meter STGUs Incentive Payments to BTM STGUs will be in accordance with the formula specified in 225 CMR 20.08 and will be calculated for each monthly billing period as follows: IP = (BCR + CRA – GS – VOEr) * kWhgen Where IP = Incentive Payment. BCR = Base Compensation Rate applicable to the STGU as specified in the STGU’s FSOQ. The Base Compensation Rates by capacity block are provided in Appendix A. CRA = Compensation Rate Adder(s) Applicable to the STGU as specified in the STGU’s FSOQ (e.g., Pollinator Adder, etc.). GS = Greenfield Subtractor applicable to the STGU as specified in the STGU’s FSOQ. kWhgen = kWh generated by the STGU during the billing period, measured after the reduction for parasitic or station load, at the Generation or Production Meter. VOEr = VOE rate, determined as set forth below: (1) Issued by: For BTM STGUs taking service under the Company’s Net Metering tariff, the VOEr will equal the sum of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Customer’s applicable Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ, and will not change during the period of time in which the STGU is receiving Incentive Payments, unless directed to change by the DOER. Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  3. Page 16 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 16 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 7.3 Issued by: (2) For BTM STGUs that are QFs, OSGFs, or AOBC Generation Units that are not taking service under the Company’s Net Metering tariff and that were issued an FSOQ prior to April 15, 2020, the VOEr will be equal to the sum of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Customer’s applicable Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ, and will not change during the period of time in which the STGU is receiving Incentive Payments unless directed to change by the DOER. (3) For BTM STGUs that are QFs, OSGFs, or AOBC Generation Units that are not net metered pursuant to the Company’s Net Metering tariff and were issued an FSOQ on or after April 15, 2020, the VOEr will be a weighted average equal to (a) 65% of the sum total of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER, plus (b) 35% of the average of the Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ and will not change during the period of time in which the STGU is receiving Incentive Payments, unless directed to change by the DOER. (4) Base Compensation Rates and, if applicable, Compensation Rate Adders, and/or Greenfield Subtractors are determined as authorized in the FSOQ, and those rates will not change during the period of time in which the STGU is receiving Incentive Payment unless directed by the DOER, SPA or the Department. The applicable distribution, transmission and transition charges, and the three-year average of Basic Service rates will change once annually as shown in Appendix A to this tariff. True-Up Payments for DC-Coupled STGUs co-located with ESS Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  4. Page 17 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 17 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) For DC-Coupled STGUs co-located with ESS, the Owner or Authorized Agent of the STGU may seek an annual “true-up” payment from the Company for any losses that may have reduced the STGU’s Incentive Payments during the year. To qualify for such trueup payments, the Owner or Authorized Agent of the STGU must meet all requirements identified in the DOER’s Guideline on Energy Storage. The DOER will be responsible to calculate true-up payment amount for the Company, and the Company shall pay the specified true-up payment amount to the Owner or Authorized Agent. 8.0 Distribution of Incentive Payments The Company will disburse regular, periodic Incentive Payments, in the form of an electronic payment or as otherwise agreed to by the Company, to the STGU’s Owner or Authorized Agent as specified on the Incentive Payment/Credit Form or AOBC Payment/Credit Form. If the Incentive Payment is to be disbursed to an Authorized Agent, the Owner must indicate so on the applicable Payment/Credit Form. The STGU’s Owner or Authorized Agent must ensure that the Company has accurate information necessary for distribution of Incentive Payments and for taxpayer identification and reporting. Changes will be implemented by the Company no later than the next full billing cycle. Incentive Payments not paid due to inaccurate or incomplete records will be available for 90 calendar days, after which they may be forfeited. 9.0 Calculation of Buyout Payment The Buyout Payment for the option pursuant to in Section 6.3.5 shall be calculated as follows: ACF = [FNC * CCR * (60% * CP) * (80%) * SE] – ADM. Buyout Payment = Net Present Value of ACF. Where ACF = Annual Cash Flow, determined based on a discount rate of 10 percent and a term of 20 years less the time the Eligible Facility has participated in the SMART Program. FNC = Facility Nameplate Capacity of the inverter using an AC rating. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  5. Page 18 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 18 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) CCR = Capacity Contribution Rate of 31.8%, initially, and as updated in each year ISO-NE issues a new Report of Capacity, Energy, Loads, and Transmission. CP = Capacity Price based on the levelized 15-year forecast of capacity prices under the AESC Study, updated in any year a new final AESC Study is issued. SE = Four months of annual solar eligibility in the ISO-NE FCM. ADM = Estimated long-term costs incurred by the Company in the administration of participation in the ISO-NE FCM, calculated at $1,300/MW and escalated at two percent per year. If actual Administrative Costs differ significantly from those included in the Buyout Payment, the Company shall petition the Department for a revision to the Buyout Payment formula to more accurately reflect actual administrative costs. 10.0 Alternative On-Bill Credits 10.1 Basis of AOBCs For AOBC Generation Units, the AOBC will be equal to the Basic Service rate applicable to the AOBC Generation Unit’s rate class in effect during the billing period as established by the Company’s Basic Service tariff, or a rate approved by the Department for AOBC facilities enrolled in any Company offered CSAP, as allowed by Section 10.4, multiplied by the kWh measured on the Company’s service or revenue meter. The AOBCs will be applied to the single host account associated with the AOBC Generation Unit. 10.2 AOBC Payment/Credit Form The Owner of the AOBC Generation Unit must complete an Incentive Payment/Credit Form and AOBC Payment/Credit Form indicating how the AOBCs are to be transferred to Customer accounts other than the AOBC Generation Unit’s account in the Company’s service area. It is the responsibility of the Owner or the Authorized Agent to ensure that billing account information of the designated recipients of AOBCs and information necessary for distribution of Incentive Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  6. Page 19 of 35Match

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 19 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) Payments is accurately reflected on the AOBC Payment/Credit Form and provided on any forms required for taxpayer identification and reporting. The Company shall not transfer AOBCs without a completed Incentive Payment/Credit Form and AOBC Payment/Credit Form. Such allocations are allowed up to two decimal places and the AOBC Payment/Credit Form and any subsequent updates to the Form will not be considered complete unless allocations correctly total at least 90 percent to active and valid Customer accounts and there are no billing account number or customer name errors. At its option, the Company may increase the number of decimal places on the AOBC Payment/Credit Form once there is automation of AOBCs, if it does not place an undue burden on the Company. Changes will be implemented by the Company no later than the next full billing cycle. 10.3 Unused AOBCs At its option or as requested by the Owner, the Company may pay a designated recipient, in a lump sum amount, any Unused AOBCs remaining on the billing account of an AOBC Generation Unit at the end of a 12-month period ending March 31. The Company may also offer to allocate Unused AOBCs to eligible accounts using the same criteria as regular AOBC allocations. Owners that achieve commercial operation on or after January 1, 2021, may receive a lump sum payment in the amount of the Unused AOBCs. Owners with AOBCs that achieved commercial operation prior to January 1, 2021, may receive a lump sum payment of the Unused AOBCs, adjusted by the ratio of the average ISO-NE Locational Marginal Pricing rate that was realized by the settlement of the output of STGUs with ISO-NE over the course of the year divided by the average Basic Service rate for the 12-month period. Any Owner receiving payment by the Company for Unused AOBCs and whose AOBC Payment/Credit Form has allocations totaling less than 100 percent, must provide a revised AOBC Payment/Credit Form that allocates 100 percent of credits to eligible recipients. AOBCs transferred to recipient Customer accounts that are not used by a recipient Customer shall carry forward on the recipient Customer’s billing account, from billing period to billing period. If a Host or recipient Customer closes an account with a balance of AOBCs remaining on it, then the AOBCs may be re-allocated to another account with the same Distribution Company for up to one year after account closure using the same criteria as regular AOBC allocations. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  7. Page 20 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 20 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 10.4 Community Solar Access Programs At its option, the Company may propose and receive Department approval for one or more CSAP, that may offer billing, enrollment, default management, and credit netting services to AOBC facilities also operating as Community Shared STGUs, including Low-Income Community Shared STGUs. If accepted for enrollment in such a program, enrolled systems must comply with the CSAP Program Rules, attached as Appendix B, and all other rules, requirements and fees specified therein shall apply for the term of enrollment of that facility. In addition, only STGUs enrolled in a CSAP Program that serves low-income customers may be counted by the Company for purposes of meeting set-asides for Low-Income CSS projects, as per 225 C.M.R. 20.05(3)(d). 11.0 Term of Tariff All STGUs with capacities larger than 25 kW AC will be eligible to receive compensation under this tariff for 20 years from the STGU’s Incentive Payment Effective Date. All STGUs with capacities less than or equal to 25 kW AC will be eligible to receive compensation under this tariff for 10 years from the STGU’s Incentive Payment Effective Date. This tariff will remain in effect until the costs incurred to administer the SMART Program have been fully recovered through the SMART Factors and termination of this tariff has been granted by the Department. 12.0 Applicability of SMART Factor The SMART Factor shall be determined in accordance with Section 14.0 below, subject to the Department’s review and approval. The costs to determine the SMART Factor shall include both 225 CMR 20.00 and 225 CMR 28.00 SMART program costs, shall be applied to all bills issued by the Company, shall be assessed to the kWh of all retail delivery service customers based on the readings of usage from the retail, service, or revenue meter and the readings of generation from the production or generation meter, and will be identified as “Distributed Solar Charge” on customer bills. 13.0 SMART Factor Effective Date The SMART Factor shall be effective January 1 of each year, unless otherwise ordered by the Department. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  8. Page 21 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 21 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 14.0 Calculation of SMART Factor The SMART Factor shall be determined in accordance with this Section in the form of a volumetric charge that varies by rate class, subject to the Department’s review and approval. Costs that are ineligible for recovery through the SMART Factor include, but are not limited to: (1) SPA costs, and (2) overhead and burdens O&M expenses, unless the Department approves such expenses. Capitalized overhead and burdens are eligible for recovery provided the associated expenses meet the requirements of the test referenced in Section 16.0. The SMART Factor recovers the annual incremental costs that the Company incurs during the applicable 12-month period associated with the SMART Program. The SMART Factor shall include estimated Incentive Payments, AOBCs, and Market Revenue. The Company will reflect actual Incentive Payments, AOBCs, and Market Revenue, along with actual incremental administrative costs, in determining the amount it has under or over-recovered through the applicable year’s SMART Factor. The SMART Factor shall be calculated as follows: = ( IPx + ABCx – MRx + ADMx-1 + RAx-1 ) * BDRA ÷ FkWhxs SFxs Where x = The Current Year. s = A separate value for each rate class group. SFxs = The SMART Factor for the Current Year for each rate class group. IPx = Estimated Incentive Payments issued in the Current Year, net of any forfeited Incentive Payments. ABCx = Estimated AOBCs issued in the Current Year, net of any forfeited AOBCs. MRx = Estimated Market Revenue in the Current Year as determined by: (1) the market value or the net proceeds from the sale or use of the RPS Class I Renewable Generation Attributes and/or Environmental Attributes procured pursuant to the SMART provision; Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  9. Page 22 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 22 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) (2) net proceeds from the sale of energy generated by AOBC Generation Units greater than 60 kW; (3) net proceeds received from ISO-NE for participation in the ISO-NE FCM by AOBC Generation Units; and (4) payments received under the Buyout Option described in Section 6.3.5. The market value of RPS Class I Renewable Generation Attributes and/or Environmental Attributes procured pursuant to the SMART provision and used by the Company shall be determined from actual sales or purchases, and/or recent quotes from market participants. For net proceeds received as a result of the Company’s participation in the FCM, amounts shall be included in the annual SMART Factor as follows: (1) 80 percent of the net proceeds under Option 1 pursuant to Section 6.3.4(2)(a); and (2) 100 percent of the net proceeds under Option 2 pursuant to Section 6.3.4(2)(b). ADMx-1 = The incremental capital and O&M administrative cost the Company incurred in the Prior Year necessary to meet SMART Program objectives, including, but not limited to, billing system improvements, additional personnel required for ongoing operations, and those costs solely attributable to participation in the ISONE FCM as described in Section 6.3.4(2) and Section 6.3.5. Incremental administrative costs include the revenue requirement associated with cumulative capital improvements placed in service up through the Prior Year. RA = The Reconciliation Amount is the sum of (a) the difference between (1) the actual IP, ABC, and MR incurred in the Prior Year plus incremental administrative costs approved for recovery in prior years; and (2) the amount of SF revenue billed by the Company during the Prior Year, plus any credits from Unused AOBCs. Interest shall be applied to the reconciling balance at the Prime Rate as reported by the Wall Street Journal. BDRA = The Base Distribution Revenue Allocator percentage for each rate class group. FkWhxs = Forecasted kWh for each rate class group for the Current Year. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  10. Page 23 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 23 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) The Base Distribution Revenue Allocator shall be derived from the Company’s most recent general rate case as approved by the Department. Effective January 1, 2023, the Base Distribution Revenue Allocator shall be as shown below. Rate Class Group Residential Small General Service/Streetlights Medium General Service Large General Service Total Base Distribution Revenue Allocator 50.795% 21.268% 17.654% 10.283% 100.000% Interim SMART Factor Adjustments If at any time during the year, the annual SMART Program costs are ten percent above or below the costs the Company is recovering through its SMART Factor, the Company may petition the Department for an interim adjustment prior to its next scheduled SMART Factor filing. 15.0 Determination of Incremental Administrative Cost To be eligible for inclusion as an incremental administrative cost recoverable through the SMART factor, the Company shall demonstrate that all O&M expenses incurred in the performance of SMART Program activities and proposed for recovery through the SMART factor are: (1) incremental to the representative level of O&M expenses recovered through all other rates billed by the Company to its customers; and (2) directly related to SMART Program activities. The Company shall apply these thresholds to all O&M expenses for which it seeks recovery for Department review in annual SMART Factor filings. 16.0 Overhead and Burden Adjustments The Company will perform an overhead and burdens test to demonstrate that actual overhead and burdens costs charged to SMART Program capital projects are incremental to amounts recovered in base distribution rates and other reconciling mechanisms. This test shall compare the actual O&M overhead and burdens and the amount included in base distribution rates in each year. If the actual O&M overhead Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

Text of CAE-027 Attachment 1.pdf

Extracted from the file · 245 pages · 470,259 characters

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)