Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf
2 pages match
  1. Page 9 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 9 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 2.65 3.0 Unused AOBCs shall mean a balance of AOBCs on an AOBC Generation Unit’s billing account. Unused AOBCs result when AOBCs are not applied, allocated, or transferred to recipient accounts. Availability Incentive Payments and, as applicable, AOBCs provided under this SMART provision are available to the Owner or Authorized Agent of an STGU that has received a FSOQ from the DOER, has met all eligibility requirements from 225 CMR 20.00, has a total installed capacity of less than or equal to five megawatts (measured in MW AC), and is interconnected to the Company’s electric distribution system. The Base Compensation Rates and any Compensation Rate Adders, which form the basis for Incentive Payments, are established by capacity blocks as shown in Appendix A. Other than STGUs selected under the one-time competitive procurement described in 225 CMR 20.07(3), no STGU shall be eligible to qualify in the Company’s first capacity block unless it has a capacity equal to or less than one megawatt or is eligible to receive a Compensation Rate Adder. Projects will be enrolled in the SMART program by the Distribution Company in the order that they are received. Incentive Payments and, as applicable, AOBCs provided under this SMART provision are available to the Owner or Authorized Agent of Eligible STGUs installed on distribution infrastructure served, but not owned, by the Company, provided that (1) there is a Customer associated with the distribution infrastructure served by the Company; and (2) the STGU shall also comply with the requirements in Section 6.0, below. 4.0 Other Tariff Applicability All Customers must comply with the Company’s Interconnection Tariff and the Terms and Conditions for Distribution Service, as may be amended from time to time. STGUs that are served on the Company’s Net Metering tariff pursuant to 220 CMR 18.00 or Power Purchase tariff pursuant to 220 CMR 8.00 will receive Incentive Payments pursuant to the SMART provision. The terms and conditions regarding the calculation and distribution of net metering credits or payments for purchased power are governed by the provisions of the applicable tariff. 5.0 Metering The Company will own, install, and maintain a meter on each STGU that complies with the metering standards applicable to the size of the STGU as defined in the Company’s Interconnection Tariff or as Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  2. Page 10 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 10 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) required by ISO-NE for registration. All STGUs must be separately metered from any other existing electricity generating unit, whether such other units are taking service under the SMART provision or not. Regular, periodic readings obtained from the meter will be used to determine Incentive Payments pursuant to Section 7.0 below. The Company must be provided adequate access to read the meter(s), and to install, repair, maintain, and replace the meter(s), if applicable. During the interconnection process, the Company will assess the Owner, Authorized Agent, or their designee of an STGU a charge for the installed cost of the meter, including necessary metering equipment (e.g., instrument transformers, communication equipment). An ESS co-located with an STGU greater than 60 kW may require separate metering, and during the interconnection process, the Company will assess a charge to the Owner, Authorized Agent or their designee for the installed cost of the meter, including necessary metering equipment (e.g., instrument transformers, communication equipment), if installed. 6.0 Conditions for Participation Owners or Authorized Agents of an STGU must demonstrate compliance with the following conditions prior to receiving Incentive Payments and AOBCs, if applicable. Incentive Payments and AOBCs will be processed on a prospective basis only after all of the following conditions have been met. 6.1 The Owner must obtain the Company’s written authority to interconnect and operate in parallel with the Company’s electric distribution system. 6.2 Each STGU must have been issued a FSOQ from the DOER to begin to participate in the SMART program. FSOQs may be provided directly to the Company by the SPA. 6.3 The Company shall have the irrevocable rights and title to the RPS Class I Renewable Generation Attributes and/or Environmental Attributes of all STGUs for the term of their enrollment in this tariff. In addition, for those units that are also AOBC Generation Units, the Company will also have irrevocable rights and title to the energy and any market products associated with the sale of energy or energy services produced by the AOBC Generation Unit for the term of their enrollment in this tariff. These conditions may be met through the Company’s election per Section 6.3.1 or Section 6.3.2. 6.3.1 Issued by: RPS Class I Renewable Generation Attributes in the form of RECs must be delivered to the Company’s appropriate NEPOOL-GIS account. For Standalone STGUs greater than 60 kW, this will be accomplished through the Company registering the STGU with the NEPOOL-GIS. Standalone STGUs greater than Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  3. Page 11 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 11 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 60 kW shall provide all necessary information to, and cooperate with, the Company to enable the Company to provide necessary information to the NEPOOL-GIS for the creation of RECs to be credited to the Company’s appropriate NEPOOL-GIS account. The Company collects the RPS Class I Renewable Generation Attributes as they are created. 6.3.2 STGUs that are 60 kW or smaller, and BTM STGUs that are greater than 60 kW, shall provide all necessary information to, and cooperate with, the Company to enable the Company to obtain the appropriate asset identification for reporting generation to the NEPOOL-GIS for the creation of RECs to be credited to the Company’s appropriate NEPOOL-GIS account. The Owner or Authorized Agent shall provide approvals or assignments, including, but not limited to, completing the Company’s Renewable Energy Certificate Assignment and Aggregation Form, to facilitate the STGU’s participation in asset aggregation or other model of asset registration and reporting for the term of enrollment in this tariff. This form will be collected by the SPA and provided to the Company. 6.3.3 Energy: Energy produced by AOBC Generation Units must be delivered to the Company in the Company’s ISO–NE load zone at the delivery node associated with the STGU. As requested by the Company or ISO-NE, the Owner or Authorized Agent shall provide all necessary information as well as follow all requirements for all applicable market rules. As needed, the Company will report exported power from standalone AOBC Generation Units greater than 60 kW to ISO-NE as the host participant or assigned meter reader, as those terms are used in ISO-NE’s Transmission, Markets, and Services Tariff and will include energy settlement revenue in the Company’s annual SMART reconciliation. If the Company elects to register any AOBC Generation Unit less than or equal to 60 kW, then the associated energy settlement revenue shall also be included in the Company’s annual SMART reconciliation. The Company does not hold title to the energy associated with an ESS that is co-located with an STGU. 6.3.3.1 Issued by: Douglas W. Foley President Load Reducer Option: The Company shall treat any BTM STGU as a load reducer and shall not register it in the energy market operated by the ISO-NE. However, should the BTM STGU’s exported energy equal or exceed 35 percent of its annual energy production, the Filed: Effective: June 10, 2026 July 1, 2026
  4. Page 12 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 12 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) Company may treat the BTM STGU as an asset and register it in the ISO-NE energy market. The Company is not required to register as a market participant any STGU that demonstrates that it is designed as a non-exporter of energy. 6.3.4 Capacity: (1) The Company does not hold title to the capacity associated with an ESS that is co-located with an STGU. (2) Unless the Buyout Option is properly elected under Section 6.3.5, title to the capacity rights associated with an STGU will automatically transfer to the Company upon enrollment in the SMART Program and the Company shall participate in the FCM under one of the following options: (a) qualifying and bidding the capacity into the ISO-NE FCM to obtain a CSO as defined by ISO-NE (Option 1); or (b) registering for performance incentive payments under the ISO-NE FCM Pay-for-Performance Project (Option 2). (3) The Company will be exempt from the requirement to participate in the FCM with respect to the capacity for a specific STGU if the facility cannot be qualified for the ISO-NE FCM due to circumstances outside of the Company’s control, and the Company can demonstrate that it made reasonable efforts to mitigate the issues preventing qualification. (4) Consistent with Section 6.3.4 and Section 6.3.5, if requested by the Company, the Owner or Authorized Agent of an STGU shall take all commercially reasonable means necessary to cooperate with the Company to qualify an STGU for participation in the ISO-NE FCM. If the Company has already participated in the ISO-NE FCM by qualifying and bidding the associated capacity for an existing STGU that becomes a Buyout Eligible Facility as a result of being retrofitted with an ESS and Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  5. Page 13 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 13 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) subsequently exercises the Buyout Option, the Company shall transfer any associated CSO, as defined by ISO-NE, to the facility owner upon receipt of full payment of the buyout. The owner of a Buyout Eligible Facility electing the Buyout Option must make payment to the Company not later than 15 business days after the owner submits written notice of intent to exercise the Buyout Option to the Company. Within 15 business days after the Company receives the full buyout payment, it must provide the owner of the Eligible Facility with all necessary documents to transfer the title to the capacity rights to the owner. 6.3.5 7.0 Buyout Option: Buyout Eligible Facilities shall have a one-time Buyout Option to purchase the capacity rights of the solar generation from the Company. Such Buyout Option may be exercised by these facility owners under the following conditions: (1) for a new STGU that is co-located with an ESS, any time after the filing of an interconnection application and before the Company issues an authorization to interconnect; (2) for a new BTM STGU , any time after the filing of an interconnection application and before the Company issues an authorization to interconnect; and (3) for an existing Standalone STGU enrolled under the provisions of this tariff that retrofits with an ESS after the filing of a revised interconnection application and before the Company issues a new authorization to interconnect for the ESS. Calculation of Incentive Payments 7.1 Standalone STGUs Incentive Payments to Standalone STGUs will be in accordance with the formula specified in 225 CMR 20.08 and will be calculated for each monthly billing period as follows: Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  6. Page 14 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 14 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) IP = (BCR + CRA – GS) * kWhgen - VOE Where IP = Incentive Payment. BCR = Base Compensation Rate applicable to the STGU as specified in the STGU’s FSOQ. The Base Compensation Rates are provided in Appendix A. CRA = Compensation Rate Adder(s) applicable to the STGU as specified in the STGU’s FSOQ. GS = Greenfield Subtractor applicable to the STGU as specified in the STGU’s FSOQ. kWhgen = kWh generated by the STGU during the billing period measured after the reduction for parasitic or station load. VOE = Value of Energy, determined as set forth below: Issued by: (1) For Standalone STGUs that are taking service under the Company’s Net Metering tariff, the VOE rate will equal the applicable net metering credit. (2) For Standalone STGUs that are QFs or OSGFs and are not net metered pursuant to the Company’s Net Metering tariff, the VOE credit will be calculated based on the Company’s Power Purchase tariff. (3) For AOBC Generation Units, the VOE credit will be calculated based on the Basic Service rate applicable to the AOBC Generation Unit’s rate class in effect during the billing period, as established by the Company’s Basic Service tariff. (4) Base Compensation Rates and, if applicable, Compensation Rate Adders, and/or Greenfield Subtractors are determined as authorized in the FSOQ, and those rates will not change during the period of time in which the STGU is receiving Incentive Payments unless as directed by the DOER, SPA or the Department. Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  7. Page 15 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 15 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 7.2 Behind-the Meter STGUs Incentive Payments to BTM STGUs will be in accordance with the formula specified in 225 CMR 20.08 and will be calculated for each monthly billing period as follows: IP = (BCR + CRA – GS – VOEr) * kWhgen Where IP = Incentive Payment. BCR = Base Compensation Rate applicable to the STGU as specified in the STGU’s FSOQ. The Base Compensation Rates by capacity block are provided in Appendix A. CRA = Compensation Rate Adder(s) Applicable to the STGU as specified in the STGU’s FSOQ (e.g., Pollinator Adder, etc.). GS = Greenfield Subtractor applicable to the STGU as specified in the STGU’s FSOQ. kWhgen = kWh generated by the STGU during the billing period, measured after the reduction for parasitic or station load, at the Generation or Production Meter. VOEr = VOE rate, determined as set forth below: (1) Issued by: For BTM STGUs taking service under the Company’s Net Metering tariff, the VOEr will equal the sum of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Customer’s applicable Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ, and will not change during the period of time in which the STGU is receiving Incentive Payments, unless directed to change by the DOER. Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  8. Page 16 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 16 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) 7.3 Issued by: (2) For BTM STGUs that are QFs, OSGFs, or AOBC Generation Units that are not taking service under the Company’s Net Metering tariff and that were issued an FSOQ prior to April 15, 2020, the VOEr will be equal to the sum of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Customer’s applicable Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ, and will not change during the period of time in which the STGU is receiving Incentive Payments unless directed to change by the DOER. (3) For BTM STGUs that are QFs, OSGFs, or AOBC Generation Units that are not net metered pursuant to the Company’s Net Metering tariff and were issued an FSOQ on or after April 15, 2020, the VOEr will be a weighted average equal to (a) 65% of the sum total of the Customer’s currently applicable distribution kWh charge, transmission kWh charge, transition kWh charge plus the average of the Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER, plus (b) 35% of the average of the Basic Service kWh charge for the three calendar years immediately prior to the year in which the SMART application is filed with the DOER. The VOEr will be specified on the FSOQ and will not change during the period of time in which the STGU is receiving Incentive Payments, unless directed to change by the DOER. (4) Base Compensation Rates and, if applicable, Compensation Rate Adders, and/or Greenfield Subtractors are determined as authorized in the FSOQ, and those rates will not change during the period of time in which the STGU is receiving Incentive Payment unless directed by the DOER, SPA or the Department. The applicable distribution, transmission and transition charges, and the three-year average of Basic Service rates will change once annually as shown in Appendix A to this tariff. True-Up Payments for DC-Coupled STGUs co-located with ESS Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  9. Page 17 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 17 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) For DC-Coupled STGUs co-located with ESS, the Owner or Authorized Agent of the STGU may seek an annual “true-up” payment from the Company for any losses that may have reduced the STGU’s Incentive Payments during the year. To qualify for such trueup payments, the Owner or Authorized Agent of the STGU must meet all requirements identified in the DOER’s Guideline on Energy Storage. The DOER will be responsible to calculate true-up payment amount for the Company, and the Company shall pay the specified true-up payment amount to the Owner or Authorized Agent. 8.0 Distribution of Incentive Payments The Company will disburse regular, periodic Incentive Payments, in the form of an electronic payment or as otherwise agreed to by the Company, to the STGU’s Owner or Authorized Agent as specified on the Incentive Payment/Credit Form or AOBC Payment/Credit Form. If the Incentive Payment is to be disbursed to an Authorized Agent, the Owner must indicate so on the applicable Payment/Credit Form. The STGU’s Owner or Authorized Agent must ensure that the Company has accurate information necessary for distribution of Incentive Payments and for taxpayer identification and reporting. Changes will be implemented by the Company no later than the next full billing cycle. Incentive Payments not paid due to inaccurate or incomplete records will be available for 90 calendar days, after which they may be forfeited. 9.0 Calculation of Buyout Payment The Buyout Payment for the option pursuant to in Section 6.3.5 shall be calculated as follows: ACF = [FNC * CCR * (60% * CP) * (80%) * SE] – ADM. Buyout Payment = Net Present Value of ACF. Where ACF = Annual Cash Flow, determined based on a discount rate of 10 percent and a term of 20 years less the time the Eligible Facility has participated in the SMART Program. FNC = Facility Nameplate Capacity of the inverter using an AC rating. Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026
  10. Page 18 of 35

    NSTAR ELECTRIC COMPANY d/b/a EVERSOURCE ENERGY M.D.P.U. No. 74M Cancels M.D.P.D. No. 74L Page 18 of 35 SOLAR MASSACHUSETTS RENEWABLE TARGET (SMART) CCR = Capacity Contribution Rate of 31.8%, initially, and as updated in each year ISO-NE issues a new Report of Capacity, Energy, Loads, and Transmission. CP = Capacity Price based on the levelized 15-year forecast of capacity prices under the AESC Study, updated in any year a new final AESC Study is issued. SE = Four months of annual solar eligibility in the ISO-NE FCM. ADM = Estimated long-term costs incurred by the Company in the administration of participation in the ISO-NE FCM, calculated at $1,300/MW and escalated at two percent per year. If actual Administrative Costs differ significantly from those included in the Buyout Payment, the Company shall petition the Department for a revision to the Buyout Payment formula to more accurately reflect actual administrative costs. 10.0 Alternative On-Bill Credits 10.1 Basis of AOBCs For AOBC Generation Units, the AOBC will be equal to the Basic Service rate applicable to the AOBC Generation Unit’s rate class in effect during the billing period as established by the Company’s Basic Service tariff, or a rate approved by the Department for AOBC facilities enrolled in any Company offered CSAP, as allowed by Section 10.4, multiplied by the kWh measured on the Company’s service or revenue meter. The AOBCs will be applied to the single host account associated with the AOBC Generation Unit. 10.2 AOBC Payment/Credit Form The Owner of the AOBC Generation Unit must complete an Incentive Payment/Credit Form and AOBC Payment/Credit Form indicating how the AOBCs are to be transferred to Customer accounts other than the AOBC Generation Unit’s account in the Company’s service area. It is the responsibility of the Owner or the Authorized Agent to ensure that billing account information of the designated recipients of AOBCs and information necessary for distribution of Incentive Issued by: Douglas W. Foley President Filed: Effective: June 10, 2026 July 1, 2026

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

Text of CAE-027 Attachment 1.pdf

Extracted from the file · 245 pages · 470,259 characters

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)