Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Page 1 of 36
Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth COMMONWEALTH OF MASSACHUSETTS Charles D. Baker, Governor Karyn E. Polito, Lt. Governor Kathleen Theoharides, Secretary Judith Judson, Commissioner September 5, 2019 SMART Program 400 MW ReviewPage 2 of 36
SMART Application Statistics • Since its launch on November 26, 2018, the SMART Program has received 11,300 applications for over 1,000 MW of capacity # of Applications Capacity Installed Large: >25kW AC 794 939 MW 14 MW Small: <=25 kW AC 10,517 78 MW 20 MW 11,311 1,017 MW 34 MW TOTAL • SMART Capacity Blocks for Large (>25kW <=5MW) Systems are full or nearly full in most territories Electric Distribution Company Accepting Applications for Block: • Eversource MA West National Grid (Massachusetts Electric) National Grid (Nantucket) Unitil 3 of 8 Waiting List Waiting List 1 of 2 Waiting List SMART Capacity Blocks for SMART (<=25kW) Systems are progressing at a steady pace Electric Distribution Company Accepting Applications for Block: 2 Eversource MA East Eversource MA East Eversource MA West National Grid (Massachusetts Electric) National Grid (Nantucket) Unitil 2 of 8 4 of 8 3 of 8 1 of 2 2 of 4 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 3 of 36
Scope of 400 MW Review • 400 MW Review is required to look at compensation rates, adders, and total program costs: (5) Review of Compensation Rates. Upon issuing Statements of Qualification for 400 MW of Solar Tariff Generation Units, the Department will conduct a review of the Base Compensation Rates, Compensation Rate Adders, and overall cost impact to ratepayers to determine if any revisions to the SMART Program are necessary. • DOER proposes to examine the following issues as well: Addressing program oversubscription Land use impacts Geographic and project type diversity Accessibility of program to low income communities Other administrative fixes 3 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 4 of 36
Benefits of SMART Program Proposals • The proposals of the 400 MW review are aimed at continuing to achieve the environmental and economic benefits of increasing solar installations in the Commonwealth • DOER’s proposals are particularly designed to achieve the following: Help conservation impact of siting solar Help to alleviate grid saturation and target interconnection sites Encourage greater benefits from pairing solar with energy storage Provide certainty for solar development in the next few years 4 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 5 of 36
Program Expansion Program Oversubscription Analysis • • • • • 5 Capacity Block Reservations are progressing unevenly across different service territories National Grid, Eversource West, and Unitil have Waiting Lists Capacity Blocks for Small systems (≤ 25kW) have been progressing at a steadier pace Small and mid-size commercial applications compete for capacity with large ground mounted applications Applications have been submitted for half of all available capacity 4 months into the SMART program Data is skewed by large number of applications in initial week Outside of Week 1, application rates have steadied Large: Approximately 47 MW/ month Small: Approximately 8 MW/ month Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 6 of 36
Program Expansion Proposal 1. Expand SMART Program by 800 MW, with future Capacity Block values declining by 2% per block for Behind-the-Meter systems, and by 4% for Standalone Systems 2. All Solar Tariff Generation Units > 500 kW must be paired with Energy Storage • Allows for the following number of new Capacity Blocks: • • • • 6 4 Capacity Blocks for Eversource (both East and West) 4 Capacity Blocks for National Grid 2 Capacity Blocks for Unitil 1 Capacity block for Nantucket Eversource East and West Large Capacity Blocks will remain separate and continue to accept applications through Block 8 Under the program extension, Eversource Capacity Blocks will retain separate rates for East and West, but expanded capacity will be available to both under one Capacity Block Expansion will continue to address land use concerns, and alleviate market pressure in service territories with waiting lists Eversource Capacity Blocks will retain separate rates for East and West, but expanded capacity will be available to both under one Capacity Block after Block 8 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 7 of 36
Program Expansion Capacity Blocks by Service Territory Distribution Company Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 Block 7 Block 8 Block 9 Block 10 Block 11 Block 12 Total Unitil 3.947 3.947 3.947 3.947 3.947 3.947 N/A N/A N/A N/A N/A N/A 23.682 National Grid (Massachusetts Electric) 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 1,080.266 National Grid (Nantucket Electric) 3.021 3.021 3.021 N/A N/A N/A N/A N/A N/A N/A N/A N/A 9.063 Eversource (East) 91.514 91.514 91.514 91.514 91.514 91.514 91.514 91.514 107.249 107.249 107.249 107.249 1,286.988 197.271 197.271 197.271 197.271 2,400.000 Eversource (West) 15.735 15.735 15.735 15.735 15.735 15.735 15.735 15.735 Total Capacity 204.239 204.239 204.239 201.218 201.218 201.218 197.271 197.271 • • Anticipating market response and subsequent increase in application numbers, DOER expects expansion to allow program to last around 5 years Large applications have applied at a pace of about 47 MW per month. Assuming applications continue at this pace, DOER estimates: The current remaining capacity, combined with an 800 MW expansion, should last around 82 months, or around 7 years • Small Applications have applied at a pace of about 8 MW per month The current remaining capacity, combined with an 800 MW expansion, should last around 66 months, or around 5.5 years 7 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 8 of 36
Land Use Proposal Current Status The SMART program was designed to create a diversity of project types and to steer development away from large scale ground mounted projects in undeveloped spaces Category 3 Category 2 Ground Mounted and not C&I Zoned Ground Mounted, C&I Zoned, and NOT Previously Developed Compensation Rate ($/kWh) Base Rate minus $0.001/acre Base Rate minus $0.0005/acre Qualified Cat 1 Large Projects (MW) N/A N/A Qualified Large Projects (MW) 192 (24%) 47 (6%) Project Type Category 1 Small Ground Mounted (<=500 kW) Previously Developed Solar Zoned Base Rate 5 60 421 (51%) 356 Rooftop Brownfield Landfill Parking Lot Canopy Dual Use Ag Base Rate plus $0.02 Base Rate plus $0.03 Base Rate plus $0.04 Base Rate plus $0.06 Base Rate plus $0.06 89 10 29 36 3 166 (20%) The majority of projects in Category 1 have avoided the Greenfield Subtractor by complying with local solar zoning, even though most of those projects are large ground mounted greenfields. A significant percentage of these projects are seeking a Community Shared Solar Adder. 8 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 9 of 36
Land Use Proposal Revise Land Use Categories 1. Move solar specific local zoning from Category 1 Land Use eligibility to Category 2 for all new projects • • Move 225 CMR 20.05(5)(e)1.b.vi to CMR 20.05(5)(e)2 Moving this section from Category 1 to Category 2 ensures that projects >500 kW sited on land that has not been previously developed are assessed the Greenfield Subtractor 2. Allow any project with a Public Entity Adder to qualify as Category 1 3. Increase Greenfield Subtractor x 5 for all new projects Land Use Category Current Subtractors ($/kWh per acre impacted) Proposed Subtractors ($/kWh per acre impacted) Category 2 $0.0005 $0.0025 Category 3 $0.0010 $0.0050 Projects with all required application documentation dated as of the filing date of the regulation or earlier will be exempt from new land use requirements. 9 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 10 of 36
Land Use Proposal Location Based Adder Adjustments Eliminate Rate of Decline for Location Based Adders 10 • Evidence has been presented that most of projects with Location Based Adders have fixed incremental costs that in some cases have actually increased since the regulation was initially promulgated (e.g. tariffs on foreign steel). • Given the focus being placed on the development of solar in areas where it provides the most locational value from both a land use and electric grid standpoint, DOER is proposing that Location Based Adders remain at the levels they were initially set and not decline as more capacity is reserved. Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Text of CAE-027 Attachment 1.pdf
Extracted from the file · 245 pages · 470,259 characters
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026