Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Words on different pages
  1. Page 12 of 36

    Behind the Meter (BTM)/ C & I Proposals Exported Energy Compensation The SMART Incentive Payment for BTM systems is calculated using an estimated value for the energy compensation, to determine a fixed $/kWh payment SMART Incentive = Total SMART Compensation Rate – Value of Energy Value of Energy = (3 year avg. of Basic Service +Current Volumetric Rates) • • • • • 12 The value of energy is represents the value the customer receives for each kWh of avoided energy cost, so is equal to roughly full retail value If all of the solar energy produced is used at the same time as customer energy usage, the full SMART tariff value is received However, even if the system is sized to load, its almost impossible to avoid exporting energy to the grid If the system can only utilize the QF energy rate to be compensate for the exported energy, the value they receive is much lower than the value they are assumed to be receiving in the SMART Incentive calculation Facing value loss, the system will instead choose to interconnect as a standalone system The SMART Incentive calculation for standalone systems does not represent the same value loss as BTM Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  2. Page 13 of 36

    Behind the Meter (BTM)/ C & I Proposals Expand the AOBC to BTM Systems Expand Alternative On-bill Credit (AOBC) availability to Behind-the-meter facilities • • • • 13 Expanding AOBC makes all in compensation more equitable between standalone and behind-the-meter systems. DOER will revise the definition of Behind-the-meter Solar Tariff Generation Unit to reflect this change and the EDCs will revise their SMART tariffs accordingly. Encourage these systems to be built as Behind the Meter helps to achieve grid integration policy goals as well as reduces overall costs If these systems continue to be built as standalone, overall costs are higher, without achieve grid and customer benefits Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  3. Page 14 of 36

    Behind the Meter (BTM)/ C & I Proposals Expand the AOBC to BTM Systems 500kW Building Mounted System, National Grid Block 1 Assuming 70,000 kWh production a month, with 65% energy used on site Energy Compensation Facility Type Incentive Payment BTM Facility (QF) $2,650.20 $7,950.60 $750.00 $11,350.80 BTM Facility (AOBC) $2,650.20 $7,950.60 $2,515.00 $13,115.80 Standalone Facility (AOBC) $7,975.80 N/A $7,042.00 $15,017.80 Consumed Energy Exported Energy Savings Compensation Total Monthly Compensation • Allowing Behind the Meter Systems access to the AOBC will encourage projects to build behind the meter, achieving greater benefits for the customer and the grid Any behind the meter project that only has access to the qualifying facility tariff for net export energy compensation will receive less compensation than the same project that has access to AOBC, and will likely build the project as standalone instead of behind the meter. 14 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  4. Page 15 of 36

    Behind the Meter (BTM)/ C & I Proposals Negative Incentive Values • Expanding the AOBC helps to resolve one barrier for BTM systems, but the basic design of the SMART program presents another • The SMART Incentive for BTM systems is calculated by subtracting the Value of Energy from the Total Compensation Rate for a System • The Value of Energy is equal to full retail value, assuming all kWh produced by the system will be consumed on site behind the meter • As SMART Capacity Blocks Decline in value, the Value of Energy becomes greater than the Total Compensation Rate • Therefore, the calculation of the SMART Incentive Results in a negative value • BTM systems will receive $0 in incentive payments • Systems will interconnect as standalone facilities to ensure an incentive payment is received The incentive structure for behind the meter systems does not support project development when total compensation falls below the assumed energy savings. Systems will move to standalone in order to receive an incentive payment. 15 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  5. Page 16 of 36

    Behind the Meter (BTM)/ C & I Proposals Negative Incentive Values 500 kW Building Mounted System, National Grid, Block 8 Assuming 70,000 kWh production a month, with 65% energy used on site Energy Compensation Facility Type BTM Facility (AOBC) Standalone Facility (AOBC) • • • • • • Total Monthly Value for System Incentive Payment Consumed Energy Savings Exported Energy Compensation $0.00 $7,950.60 $2,515.00 $10,465.60 $4,590.60 N/A $7,042.00 $11,632.60 The SMART Incentive for BTM systems is calculated by subtracting the Value of Energy from the Total Compensation Rate for a System The Value of Energy is equal to full retail value, assuming all kWh produced by the system will be consumed on site behind the meter As SMART Capacity Blocks Decline in value, the Value of Energy becomes greater than the Total Compensation Rate Therefore, the calculation of the SMART Incentive Results in a negative value BTM systems will receive $0 in incentive payments Systems will interconnect as standalone facilities to ensure an incentive payment is received The incentive structure for behind the meter systems does not support project development when total compensation falls below the assumed energy savings. Systems will move to standalone in order to receive an incentive payment. 16 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  6. Page 17 of 36

    Behind the Meter (BTM)/ C & I Proposals Adjust the BTM Value of Energy Adjust the Value of Energy calculation for Behind the Meter Systems to more accurately reflect real project usage Value of Energy = + • • • • 17 .65 * (3 year average basic service+ current volumetric charges) .35 * (3 year average basic service) Expanding AOBC to BTM system means we know the value of those systems will be compensated for next energy exported, at the basic service rate The adjusted Value of Energy will increase the calculated Incentive Payment for behind the meter systems because the estimated value received from offsetting energy use and from receiving the AOBC will be lower than assuming all kWh are valued at full retail Behind the meter systems will be incentivized correctly, encouraging greater on site energy usage Encouraging more behind the meter systems will help offset the additional costs associated with building those same projects as standalone systems Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  7. Page 18 of 36

    Behind the Meter (BTM)/ C & I Proposals Adjust the BTM Value of Energy 500 kW Building Mounted System, National Grid, Block 8 Assuming 70,000 kWh production a month, with 65% energy used on site Facility Type BTM Facility (AOBC) BTM Facility w/adjusted VOE (AOBC) Standalone Facility (AOBC) Incentive Payment Energy Compensation Total Monthly Value for System Total Cost to Ratepayers Consumed Energy Savings Exported Energy Compensation $0.00 $7,950.60 $2,515.00 $10,465.60 $2,515.00 $1,129.29 $7,950.60 $2,464.70 $11,544.59 $3,593.99 $4,590.93 N/A $7,042.00 $11,632.60 $11,632.60 Adjusting the value of energy in the incentive calculation for behind the meter systems encourages customers to build behind the meter systems, providing greater grid benefits, while reducing overall cost impact to ratepayers. 18 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  8. Page 19 of 36

    Increase Low Income Benefits Low Income Participation Analysis Current submitted and qualified applications for Low Income eligible rates (Low Income Base Rate, Low Income Community Shared Solar and Low Income Property) represent 2.5 % of all submitted and qualified SMART capacity. • DOER aims to increase the number of Low Income CSS and Low Income systems • DOER recognizes the complex challenge of expanding solar access to low income community • Issues around increasing participation for eligible low income ratepayers include, but are not limited to: 19 Challenges in determining who is on an R-2 rate Marketing to possible eligible customers Ability of eligible customers to finance installations Higher probability of older housing and therefor older roofs Ability of eligible customers to enter into off-taker contracts Higher percent of low income customers are renters Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  9. Page 20 of 36

    Increase Low Income Benefits Proposals 1. Broaden the definition of Low Income Customer to include residents that meet the Low Income Environmental Justice Criteria • • The new definition increases the eligibility pool for the small (≤ 25kW) Low Income Base Compensation Rate and the Low Income Community Shared Solar Adder Utilizing EJ criteria helps to facilitate easier siting and marketing of these projects 2. Allow other Low Income Community Shared Solar models to qualify for the adder • • 20 Alternative models may include participation through an EDC established program Alternative models may also include participation through a community aggregation Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  10. Page 21 of 36

    Solar + Storage Metering and Operational Changes • • • Metering Proposal Current metering requirements have not interfaced well with solar + storage business models and have resulted in situations in which solar + storage arrays may receive lower compensation than a facility that did not have storage Majority of solar industry stakeholders have advocated eliminating the utility ownership of production meters and requiring utilities to accept inverter meter readings DOER wants to ensure all solar output is accurately metered 21 For AC coupled systems o EDCs must accept inverter readings as long as the inverters contain revenue grade meters o If the inverter does not contain a revenue grade meter, all output on the AC side of the inverter must be metered using a revenue grade meter which should be placed as close to the inverter as possible For DC coupled systems o Production may be measured (at the owner’s option) behind the inverter using DC meters that meet revenue grade accuracy requirements o For DC coupled systems that measure production on the DC side of the inverter, a discount rate of 3% will be applied to the output to account for inverter losses that would have otherwise been measured if the system were AC coupled o Incentive payments for DC coupled arrays will be calculated on this discounted output total Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

Text of CAE-027 Attachment 1.pdf

Extracted from the file · 245 pages · 470,259 characters

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)