Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Words on different pages
  1. Page 18 of 36

    Behind the Meter (BTM)/ C & I Proposals Adjust the BTM Value of Energy 500 kW Building Mounted System, National Grid, Block 8 Assuming 70,000 kWh production a month, with 65% energy used on site Facility Type BTM Facility (AOBC) BTM Facility w/adjusted VOE (AOBC) Standalone Facility (AOBC) Incentive Payment Energy Compensation Total Monthly Value for System Total Cost to Ratepayers Consumed Energy Savings Exported Energy Compensation $0.00 $7,950.60 $2,515.00 $10,465.60 $2,515.00 $1,129.29 $7,950.60 $2,464.70 $11,544.59 $3,593.99 $4,590.93 N/A $7,042.00 $11,632.60 $11,632.60 Adjusting the value of energy in the incentive calculation for behind the meter systems encourages customers to build behind the meter systems, providing greater grid benefits, while reducing overall cost impact to ratepayers. 18 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  2. Page 19 of 36

    Increase Low Income Benefits Low Income Participation Analysis Current submitted and qualified applications for Low Income eligible rates (Low Income Base Rate, Low Income Community Shared Solar and Low Income Property) represent 2.5 % of all submitted and qualified SMART capacity. • DOER aims to increase the number of Low Income CSS and Low Income systems • DOER recognizes the complex challenge of expanding solar access to low income community • Issues around increasing participation for eligible low income ratepayers include, but are not limited to: 19 Challenges in determining who is on an R-2 rate Marketing to possible eligible customers Ability of eligible customers to finance installations Higher probability of older housing and therefor older roofs Ability of eligible customers to enter into off-taker contracts Higher percent of low income customers are renters Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  3. Page 20 of 36

    Increase Low Income Benefits Proposals 1. Broaden the definition of Low Income Customer to include residents that meet the Low Income Environmental Justice Criteria • • The new definition increases the eligibility pool for the small (≤ 25kW) Low Income Base Compensation Rate and the Low Income Community Shared Solar Adder Utilizing EJ criteria helps to facilitate easier siting and marketing of these projects 2. Allow other Low Income Community Shared Solar models to qualify for the adder • • 20 Alternative models may include participation through an EDC established program Alternative models may also include participation through a community aggregation Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  4. Page 21 of 36

    Solar + Storage Metering and Operational Changes • • • Metering Proposal Current metering requirements have not interfaced well with solar + storage business models and have resulted in situations in which solar + storage arrays may receive lower compensation than a facility that did not have storage Majority of solar industry stakeholders have advocated eliminating the utility ownership of production meters and requiring utilities to accept inverter meter readings DOER wants to ensure all solar output is accurately metered 21 For AC coupled systems o EDCs must accept inverter readings as long as the inverters contain revenue grade meters o If the inverter does not contain a revenue grade meter, all output on the AC side of the inverter must be metered using a revenue grade meter which should be placed as close to the inverter as possible For DC coupled systems o Production may be measured (at the owner’s option) behind the inverter using DC meters that meet revenue grade accuracy requirements o For DC coupled systems that measure production on the DC side of the inverter, a discount rate of 3% will be applied to the output to account for inverter losses that would have otherwise been measured if the system were AC coupled o Incentive payments for DC coupled arrays will be calculated on this discounted output total Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  5. Page 22 of 36

    Solar + Storage Metering and Operational Changes Exempt Demand Response Participants Eligible Energy Storage Systems participating in a retail level demand response program will be exempt from the 52 cycle requirement and 225 CMR 20.06(1)(e)4 will be modified as follows: 5. Operational Requirements. The Energy Storage System must discharge at least 52 complete cycle equivalents per year, or must participate in a demand response program, and must remain functional and operational in order for the Solar Tariff Generation Unit to continue to be eligible for the energy storage adder. If the Energy Storage System is decommissioned or non-functional for more than 15% of any 12month period, the Department may disqualify the Solar Tariff Generation Unit from continuing to receive the energy storage adder. • • 22 DOER wants to encourage solar plus storage projects to participate in demand respond programs This change allows demand response participants to respond to these signals rather than have SMART program requirements override the DR program signals, based on recommendations from the EDCs Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  6. Page 23 of 36

    Public Off-taker Adder Changes 1. Increase the Public Off-taker adder from $0.02/kWh to $0.04/kWh Of projects larger than 25 kW, only 2% of capacity to date is planning to utilize the Public Off-taker adder. DOER has received considerable feedback from municipalities, state agencies, and project developers that work with these entities that the Public Off-taker adder is insufficient to both overcome the incremental costs associated with building projects on public land and to provide enough value to the public entity to make the investment attractive. Given these comments as well as the added benefits of deploying solar on public lands and property, DOER proposes to increase the Public Off-taker adder to $0.04/kWh to encourage more solar deployment in these areas. 2. Allow Public Off-taker STGUs to qualify for SMART at least six months earlier Public off-taker applicants can obtain a Statement of Qualification by providing evidence that they have been awarded a contract with a public entity, allowing for an 18-month Reservation Period 3. Qualify Public Off-taker STGUs under Category 1 Land Use 23 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  7. Page 24 of 36

    New Preferred Interconnection Adder/ Subtractor • Working with EDCs to obtain data on where locational benefits exist and recommendations on size of adders/subtractors • Adder will apply to projects located on ideal grid locations that could support and/or benefit from additional solar • Subtractor will apply to projects interconnected to locations identified as too congested 24 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  8. Page 25 of 36

    Strengthen Consumer Protection Standards Review customer contracts more closely to ensure customers clearly understand the terms of contracts, with penalties applied to delinquent applicants • • • • DOER will perform periodic audits of customer disclosure forms submitted with SMART applications not applying for low income incentives The customer disclosure form will be reviewed against its accompanying contract, as well as the current utility rate for the customer’s rate class Applications with signed customer disclosure forms containing details that do not match details of the customer contract will be required to correct the form and the applicant will receive a warning from DOER Applications for projects serving Low Income Customers that are shown to not provide direct savings will be rejected and the applicant will receive a warning from DOER Eligible projects serving Low Income Customers must demonstrate the customer is receiving direct savings • 25 Savings may be demonstrated through a no cost allocation of benefits or clear savings to low income resident off-takers Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  9. Page 26 of 36

    Strengthen Consumer Protection Standards Three Strikes, You’re Out • • • 26 After receiving two warnings, if the same applicant provides a third customer disclosure form with incorrect details, that applicant will be barred from submitting any new SMART application for 1 year After receiving two warnings, if the same applicant submits a third application serving a Low Income Customer that does not provide savings, that applicant will be barred from submitting any new SMART application for 1 year The applicant, individuals submitting on behalf of the applicant, or any other affiliated parties, will be notified that their accounts will be immediately suspended Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
  10. Page 27 of 36

    Dual Use Agricultural Systems Updates Agricultural Solar Tariff Generation Unit • Update regulation by updating the Land In Agricultural Use definition, striking the definition of Prime Farmland and replacing it with a definition of Important Agricultural Farmland, as follows: Land in Agricultural Use. All land as defined under M.G. L. c. 61A, §§ 1 & 2, enrolled in a program established pursuant to M.G.L. c. 61A, and land that had been enrolled in a program established pursuant to M.G.L. c. 61A within the past five years. Important Agricultural Farmlands. Means those soils found to be Important Farmlands pursuant to 7 C.F.R. § 657.5, that includes Prime Farmlands, Unique Farmlands and Additional Land of State Importance. • Add DC size limitation to regulation stating that Agricultural STGUs may be no larger than 2.5 MW DC. • Update the Agricultural STGU Guideline to add language to clarify agricultural yield requirements and increase minimum sunlight requirements, consistent with MDAR recommendations. 27 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

Text of CAE-027 Attachment 1.pdf

Extracted from the file · 245 pages · 470,259 characters

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)