Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Page 24 of 36
New Preferred Interconnection Adder/ Subtractor • Working with EDCs to obtain data on where locational benefits exist and recommendations on size of adders/subtractors • Adder will apply to projects located on ideal grid locations that could support and/or benefit from additional solar • Subtractor will apply to projects interconnected to locations identified as too congested 24 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 25 of 36
Strengthen Consumer Protection Standards Review customer contracts more closely to ensure customers clearly understand the terms of contracts, with penalties applied to delinquent applicants • • • • DOER will perform periodic audits of customer disclosure forms submitted with SMART applications not applying for low income incentives The customer disclosure form will be reviewed against its accompanying contract, as well as the current utility rate for the customer’s rate class Applications with signed customer disclosure forms containing details that do not match details of the customer contract will be required to correct the form and the applicant will receive a warning from DOER Applications for projects serving Low Income Customers that are shown to not provide direct savings will be rejected and the applicant will receive a warning from DOER Eligible projects serving Low Income Customers must demonstrate the customer is receiving direct savings • 25 Savings may be demonstrated through a no cost allocation of benefits or clear savings to low income resident off-takers Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 26 of 36
Strengthen Consumer Protection Standards Three Strikes, You’re Out • • • 26 After receiving two warnings, if the same applicant provides a third customer disclosure form with incorrect details, that applicant will be barred from submitting any new SMART application for 1 year After receiving two warnings, if the same applicant submits a third application serving a Low Income Customer that does not provide savings, that applicant will be barred from submitting any new SMART application for 1 year The applicant, individuals submitting on behalf of the applicant, or any other affiliated parties, will be notified that their accounts will be immediately suspended Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 27 of 36
Dual Use Agricultural Systems Updates Agricultural Solar Tariff Generation Unit • Update regulation by updating the Land In Agricultural Use definition, striking the definition of Prime Farmland and replacing it with a definition of Important Agricultural Farmland, as follows: Land in Agricultural Use. All land as defined under M.G. L. c. 61A, §§ 1 & 2, enrolled in a program established pursuant to M.G.L. c. 61A, and land that had been enrolled in a program established pursuant to M.G.L. c. 61A within the past five years. Important Agricultural Farmlands. Means those soils found to be Important Farmlands pursuant to 7 C.F.R. § 657.5, that includes Prime Farmlands, Unique Farmlands and Additional Land of State Importance. • Add DC size limitation to regulation stating that Agricultural STGUs may be no larger than 2.5 MW DC. • Update the Agricultural STGU Guideline to add language to clarify agricultural yield requirements and increase minimum sunlight requirements, consistent with MDAR recommendations. 27 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 28 of 36
New Pollinator Adder • Proposed to be $0.0025/kWh (approximately $3,500/MW per year) • Would apply to projects that are awarded pollinator certification by UMass Amherst Clean Energy Extension • Existing and new projects may apply for this adder 28 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 29 of 36
Eligibility Updates Replacement Systems Rules for Replacement Systems • Current rules prohibit replacement of an existing pre-SMART system unless the existing system was non-operational for 12+ months prior. • Propose modifying rules to allow for prorated replacement and expansion of existing systems. • 29 Example: • A 3 kW PV facility installed in 2010 with funding from the SREC I and Commonwealth Solar II Rebate Programs is replaced with a 5 kW solar array that seeks qualification under the SMART Program • The facility may qualify under SMART, but only for the portion of its output associated with the incremental capacity (2 kW) • It would therefore receive a capacity reservation that is 40% of its total capacity and would receive incentive payments for 40% of its output at the full incentive payment rate to which it is entitled Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 30 of 36
Eligibility Updates Community Shared Solar Community Shared Solar/ Low Income CSS • Applicants will not be required to provide Customer Disclosure Forms for the 1 or 2 customers that take up to 50% of a project’s output (aka “anchor tenants”) • Adjust the definition of CSS and LICSS to allow for projects to participate through an EDC model or community aggregation If such a model does not require customer contracts, no customer disclosure forms would be required • Applicants that reserve the CSS Adder must demonstrate compliance with the adder when operational Applicants that do not may lose their queue position DOER will offer a period after implementation of rule when projects may remove CSS Adder with no consequence 30 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 31 of 36
Proposed Schedule • May / June/ July 2019 – Hold stakeholder meetings • September 2019- Present findings of 400 MW review and collect comments on straw proposal • September- Mid November 2019– Review draft regulation at DOER/EEA/ANF • Mid-late November 2019-File emergency regulation • Mid February 2020- Regulation Promulgated, DOER changes permanently in effect • Early to mid April 2020– File revised tariffs with DPU for approval • Late 2020- Tariff changes in effect 31 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 32 of 36
APPENDIX: Proposed Technical Corrections, Statistics and Further Analysis 32 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 33 of 36
SMART Application Statistics Small Projects (<= 25kW AC) Electric Accepting Distribution Applications Company (EDC) for Block: Eversource MA East Eversource MA West Block Size (MW) Total Qualified Total Capacity Total Total Total Capacity Total Available NonQualified or Remaining Interconnected Under Review Capacity (MW) Operational Applied For SMART Capacity (MW) (MW) Capacity (MW) (MW) Capacity (MW) 2 of 8 18.3 146.4 12.9 10.8 2.7 26.4 120 4 of 8 3.1 25.2 4.8 4.8 1.2 10.8 14.4 National Grid (Massachusetts Electric) 3 of 8 18 144 16.5 19 6.3 41.8 102.2 National Grid (Nantucket) 1 of 2 0.6 1.2 0.06 0.02 0 0.08 1.12 Unitil 2 of 4 0.8 3.2 0.5 0.6 0.35 1.45 1.75 Totals 320 34.76 35.22 10.55 80.53 239.47 Large Projects (>25 kW AC) Electric Accepting Distribution Applications Company (EDC) for Block: Block Size (MW) Total Qualified Total Capacity Total Total Total Capacity Total Capacity Total Qualified Total Available NonQualified or Remaining Interconnected Under Review Under Waitlist Waiting List Capacity (MW) Operational Applied For SMART Capacity (MW) (MW) Review (MW) (MW) Capacity (MW) (MW) Capacity (MW) Eversource MA East 3 of 8 73.2 585.7 7.1 115.2 27.1 149.4 436.3 N/A 0 Eversource MA West Waiting List 12.6 100.7 11.5 87.7 N/A 99.2 1.5 0 36.5 Waiting List 72 576.2 14.9 523.8 37.5 576.2 0 11.7 0 1 of 2 2.4 4.8 0 1 0 1 3.8 N/A 0 National Grid (Massachusetts Electric) National Grid (Nantucket) Unitil Waiting List 3.2 12.6 0 12.4 N/A 12.4 0.2 0 6.5 Totals 1280 33.5 740.1 64.6 838.2 441.8 11.7 43 Energy Storage Adder 33 Current Tranche Total MW (Solar) Paired Total MW of Storage Total MWh of Storage 4 317.6 222.4 994.2 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Text of CAE-027 Attachment 1.pdf
Extracted from the file · 245 pages · 470,259 characters
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026