Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Page 7 of 36
Program Expansion Capacity Blocks by Service Territory Distribution Company Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 Block 7 Block 8 Block 9 Block 10 Block 11 Block 12 Total Unitil 3.947 3.947 3.947 3.947 3.947 3.947 N/A N/A N/A N/A N/A N/A 23.682 National Grid (Massachusetts Electric) 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 90.022 1,080.266 National Grid (Nantucket Electric) 3.021 3.021 3.021 N/A N/A N/A N/A N/A N/A N/A N/A N/A 9.063 Eversource (East) 91.514 91.514 91.514 91.514 91.514 91.514 91.514 91.514 107.249 107.249 107.249 107.249 1,286.988 197.271 197.271 197.271 197.271 2,400.000 Eversource (West) 15.735 15.735 15.735 15.735 15.735 15.735 15.735 15.735 Total Capacity 204.239 204.239 204.239 201.218 201.218 201.218 197.271 197.271 • • Anticipating market response and subsequent increase in application numbers, DOER expects expansion to allow program to last around 5 years Large applications have applied at a pace of about 47 MW per month. Assuming applications continue at this pace, DOER estimates: The current remaining capacity, combined with an 800 MW expansion, should last around 82 months, or around 7 years • Small Applications have applied at a pace of about 8 MW per month The current remaining capacity, combined with an 800 MW expansion, should last around 66 months, or around 5.5 years 7 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 8 of 36
Land Use Proposal Current Status The SMART program was designed to create a diversity of project types and to steer development away from large scale ground mounted projects in undeveloped spaces Category 3 Category 2 Ground Mounted and not C&I Zoned Ground Mounted, C&I Zoned, and NOT Previously Developed Compensation Rate ($/kWh) Base Rate minus $0.001/acre Base Rate minus $0.0005/acre Qualified Cat 1 Large Projects (MW) N/A N/A Qualified Large Projects (MW) 192 (24%) 47 (6%) Project Type Category 1 Small Ground Mounted (<=500 kW) Previously Developed Solar Zoned Base Rate 5 60 421 (51%) 356 Rooftop Brownfield Landfill Parking Lot Canopy Dual Use Ag Base Rate plus $0.02 Base Rate plus $0.03 Base Rate plus $0.04 Base Rate plus $0.06 Base Rate plus $0.06 89 10 29 36 3 166 (20%) The majority of projects in Category 1 have avoided the Greenfield Subtractor by complying with local solar zoning, even though most of those projects are large ground mounted greenfields. A significant percentage of these projects are seeking a Community Shared Solar Adder. 8 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 9 of 36
Land Use Proposal Revise Land Use Categories 1. Move solar specific local zoning from Category 1 Land Use eligibility to Category 2 for all new projects • • Move 225 CMR 20.05(5)(e)1.b.vi to CMR 20.05(5)(e)2 Moving this section from Category 1 to Category 2 ensures that projects >500 kW sited on land that has not been previously developed are assessed the Greenfield Subtractor 2. Allow any project with a Public Entity Adder to qualify as Category 1 3. Increase Greenfield Subtractor x 5 for all new projects Land Use Category Current Subtractors ($/kWh per acre impacted) Proposed Subtractors ($/kWh per acre impacted) Category 2 $0.0005 $0.0025 Category 3 $0.0010 $0.0050 Projects with all required application documentation dated as of the filing date of the regulation or earlier will be exempt from new land use requirements. 9 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 10 of 36
Land Use Proposal Location Based Adder Adjustments Eliminate Rate of Decline for Location Based Adders 10 • Evidence has been presented that most of projects with Location Based Adders have fixed incremental costs that in some cases have actually increased since the regulation was initially promulgated (e.g. tariffs on foreign steel). • Given the focus being placed on the development of solar in areas where it provides the most locational value from both a land use and electric grid standpoint, DOER is proposing that Location Based Adders remain at the levels they were initially set and not decline as more capacity is reserved. Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 11 of 36
Behind the Meter (BTM)/ C & I Proposals Addressing Inequities Most large Building Mounted and Canopy systems (60%) are being installed as standalone systems instead of being installed behind-the-meter • • • 11 Behind the meter systems provide a variety of additional benefits: Interconnecting behind-the-meter also provides greater opportunities to pair with storage and reduce on-site demand Encouraging more behind-the-meter interconnection with storage may help to alleviate interconnection issues Creating new standalone service in addition to an existing service also requires additional utility work and may trigger higher interconnection cost DOER wants to encourage more behind-the-meter installations to provide greater grid benefits DOER has identified two main issues to pose a significant barrier to building BTM systems The exported energy compensation and the overall impact it has on the financial viability of the system The method of calculating the value of energy for the SMART incentive payment results in a negative incentive value for later capacity blocks Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 12 of 36
Behind the Meter (BTM)/ C & I Proposals Exported Energy Compensation The SMART Incentive Payment for BTM systems is calculated using an estimated value for the energy compensation, to determine a fixed $/kWh payment SMART Incentive = Total SMART Compensation Rate – Value of Energy Value of Energy = (3 year avg. of Basic Service +Current Volumetric Rates) • • • • • 12 The value of energy is represents the value the customer receives for each kWh of avoided energy cost, so is equal to roughly full retail value If all of the solar energy produced is used at the same time as customer energy usage, the full SMART tariff value is received However, even if the system is sized to load, its almost impossible to avoid exporting energy to the grid If the system can only utilize the QF energy rate to be compensate for the exported energy, the value they receive is much lower than the value they are assumed to be receiving in the SMART Incentive calculation Facing value loss, the system will instead choose to interconnect as a standalone system The SMART Incentive calculation for standalone systems does not represent the same value loss as BTM Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 13 of 36
Behind the Meter (BTM)/ C & I Proposals Expand the AOBC to BTM Systems Expand Alternative On-bill Credit (AOBC) availability to Behind-the-meter facilities • • • • 13 Expanding AOBC makes all in compensation more equitable between standalone and behind-the-meter systems. DOER will revise the definition of Behind-the-meter Solar Tariff Generation Unit to reflect this change and the EDCs will revise their SMART tariffs accordingly. Encourage these systems to be built as Behind the Meter helps to achieve grid integration policy goals as well as reduces overall costs If these systems continue to be built as standalone, overall costs are higher, without achieve grid and customer benefits Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 14 of 36
Behind the Meter (BTM)/ C & I Proposals Expand the AOBC to BTM Systems 500kW Building Mounted System, National Grid Block 1 Assuming 70,000 kWh production a month, with 65% energy used on site Energy Compensation Facility Type Incentive Payment BTM Facility (QF) $2,650.20 $7,950.60 $750.00 $11,350.80 BTM Facility (AOBC) $2,650.20 $7,950.60 $2,515.00 $13,115.80 Standalone Facility (AOBC) $7,975.80 N/A $7,042.00 $15,017.80 Consumed Energy Exported Energy Savings Compensation Total Monthly Compensation • Allowing Behind the Meter Systems access to the AOBC will encourage projects to build behind the meter, achieving greater benefits for the customer and the grid Any behind the meter project that only has access to the qualifying facility tariff for net export energy compensation will receive less compensation than the same project that has access to AOBC, and will likely build the project as standalone instead of behind the meter. 14 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 15 of 36
Behind the Meter (BTM)/ C & I Proposals Negative Incentive Values • Expanding the AOBC helps to resolve one barrier for BTM systems, but the basic design of the SMART program presents another • The SMART Incentive for BTM systems is calculated by subtracting the Value of Energy from the Total Compensation Rate for a System • The Value of Energy is equal to full retail value, assuming all kWh produced by the system will be consumed on site behind the meter • As SMART Capacity Blocks Decline in value, the Value of Energy becomes greater than the Total Compensation Rate • Therefore, the calculation of the SMART Incentive Results in a negative value • BTM systems will receive $0 in incentive payments • Systems will interconnect as standalone facilities to ensure an incentive payment is received The incentive structure for behind the meter systems does not support project development when total compensation falls below the assumed energy savings. Systems will move to standalone in order to receive an incentive payment. 15 Creating A Clean, Affordable, and Resilient Energy Future For the CommonwealthPage 16 of 36
Behind the Meter (BTM)/ C & I Proposals Negative Incentive Values 500 kW Building Mounted System, National Grid, Block 8 Assuming 70,000 kWh production a month, with 65% energy used on site Energy Compensation Facility Type BTM Facility (AOBC) Standalone Facility (AOBC) • • • • • • Total Monthly Value for System Incentive Payment Consumed Energy Savings Exported Energy Compensation $0.00 $7,950.60 $2,515.00 $10,465.60 $4,590.60 N/A $7,042.00 $11,632.60 The SMART Incentive for BTM systems is calculated by subtracting the Value of Energy from the Total Compensation Rate for a System The Value of Energy is equal to full retail value, assuming all kWh produced by the system will be consumed on site behind the meter As SMART Capacity Blocks Decline in value, the Value of Energy becomes greater than the Total Compensation Rate Therefore, the calculation of the SMART Incentive Results in a negative value BTM systems will receive $0 in incentive payments Systems will interconnect as standalone facilities to ensure an incentive payment is received The incentive structure for behind the meter systems does not support project development when total compensation falls below the assumed energy savings. Systems will move to standalone in order to receive an incentive payment. 16 Creating A Clean, Affordable, and Resilient Energy Future For the Commonwealth
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Text of CAE-027 Attachment 1.pdf
Extracted from the file · 245 pages · 470,259 characters
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026