Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 10 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 10 of 245 • Fort Churchill Generating Station – Sierra: Fort Churchill Generating Station (“Fort Churchill”) comprises two natural gas-fired steam boilers supplying steam turbine generators and is located 10 miles north of Yerington, Nevada. Fort Churchill’s total peak summer capacity is 196 MW. • Goodsprings Heat Recovery – Nevada Power: Goodsprings Heat Recovery (“Goodsprings”) provides 5 MW peak summer capacity located adjacent to the Kern River Goodsprings natural gas compressor station, 6 miles from Goodsprings, Nevada. Goodsprings captures waste heat from Kern River Gas’s natural gas-fueled compressors and uses a separate generator to produce electricity. • Harry Allen Generating Station – Nevada Power: Harry Allen Generating Station (“Harry Allen”) provides 672 MW of total peak summer capacity. Harry Allen is comprised of 510 MW of natural gas-fired combined-cycle units and 162 MW of natural gas-fired combustion turbine peak summer capacity generated by two gas-fired turbine units (81 MW each). Harry Allen is located 24 miles northeast of Las Vegas, Nevada. • Las Vegas Generating Station – Nevada Power: Las Vegas Generating Station provides 272 MW peak summer capacity. Formerly Las Vegas Cogen, the Las Vegas Generating Station comprises one (1x1) natural gas-fired aero derivative combined-cycle unit rated at 48 MW, and two (2x1) natural gas-fired aero-derivative combined-cycle units rated at 112 MW each. Las Vegas Generating Station is located in North Las Vegas, Nevada. • Nellis Solar PV II – Nevada Power: The Nellis Solar PV II plant is a single axis tracker, consisting of ten 1.5 MW blocks, for a total of 15 MW AC capacity. Nellis Solar PV II is located on the Nellis Air Force Base in North Las Vegas, Nevada. • North Valmy Generating Station – Sierra: North Valmy Generating Station (“Valmy”) consists of two natural gas-fired steam boilers supplying steam turbine generators with a peak summer capacity of 522 MW. Sierra owns 50 percent of Valmy, making its share of capacity from the two units at Valmy 261 MW. Valmy is located 19 miles west of Battle Mountain, Nevada. As of the date of the filing, Sierra is converting Valmy Unit 2 to natural gas fuel. • Reid Gardner Battery Energy Storage System: The Reid Gardner Battery Energy Storage System (“Reid Gardner BESS”) is a 506 MWh energy storage system with a maximum discharge capability of 220 MW over a 2-hour duration. Reid Gardner BESS is located approximately 50 miles northeast of Las Vegas, Nevada. 6 Page 10 of 245Page 11 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 11 of 245 • Silverhawk Generating Station – Nevada Power: Silverhawk Generating Station (“Silverhawk”) provides 1,030 MW of total peak summer capacity, including duct burners. Silverhawk consists of one 2x1 natural gas-fired combined-cycle unit (590 MW), two natural gas-fired simple-cycle units (440MW) and is located approximately 26 miles northeast of Las Vegas, Nevada. • Sun Peak Generating Station – Nevada Power: Sun Peak Generating Station (“Sun Peak”) provides 216 MW of summer peak capacity. Sun Peak consists of three dual fuel (natural gas and No. 2 fuel oil) simple-cycle combustion turbine units (each capable of producing 70 MW). Sun Peak is located in Las Vegas, Nevada. • Tracy Generating Station – Sierra: Tracy Generating Station (“Tracy”) provides 785 MW of total peak summer capacity. Tracy comprises one natural gas-fired steam boiler unit (92 MW), one natural gas-fired simple-cycle combustion turbine/duct burner (104 MW) and one natural gas-fired combined-cycle block (589 MW). Tracy is located approximately 15 miles east of Reno, Nevada. • Walter Higgins Generating Station –- Nevada Power: The Walter Higgins Generating Station (“Higgins”) provides 619 MW of total peak summer capacity including duct burners. Higgins consists of one 2x1 natural gas-fired combined-cycle unit and is located approximately 35 miles southwest of Las Vegas, Nevada. Figure GEN-1 summarizes Nevada Power’s and Sierra’s generating units and their respective operating characteristics including name plate ratings, winter and summer capacities, commercial operation dates, planning-based retirement dates, and fuel types. Additional unit-specific details, such as heat rates, can be found in the Confidential Technical Appendix GEN-1. 7 Page 11 of 245Page 12 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 12 of 245 8 Page 12 of 245Page 13 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 13 of 245 2. Other Generation Assets Nevada Power holds ownership or participant interests in two other retired and decommissioned generation sites: • Mohave Generating Station – Nevada Power: The Mohave site is located in Laughlin, Nevada and is the previous site of a 1,500 MW coal-fired generating plant. The site is coowned by Southern California Edison (“SCE”) (56%), the Salt River Project (20%), Nevada Power (14%), and Los Angeles Department of Water and Power (10%). SCE is the controlling partner of the facility. Mohave ceased operations January 1, 2006, and has been decommissioned. 5 In 2015, the co-owners agreed to proceed with selling most of the property through a public sale process. The property was listed by a nationwide commercial real estate firm in October 2016. No sales transactions have been executed at this time. • Navajo Generating Station – Nevada Power: The Navajo Generating Station is located near Page, Arizona and is the previous site of a 2,250 MW total net capacity coal-fired facility. Nevada Power has ownership rights to 11.3 percent of the Navajo Generating Station. The coal-fired facility ceased operation in November 2019 and has completed decommissioning and demolition of the generating units. The Navajo Project includes the generating station, transmission lines and interconnections, water, and rail facilities, and is co-owned by five parties as tenants-in-common, who together with the United States are “Participants” in the Navajo Project. The Participants’ relative interests in the nontransmission facilities are as follows: • • • • • 5 Salt River Project (“SRP”) (42.9%); U.S. Bureau of Reclamation (24.3%), whose share is owned by the SRP; Arizona Public Service (14%); Nevada Power (11.3%); and Tucson Electric Power (7.5%). As defined in NRS § 704.7332. 9 Page 13 of 245Page 14 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 14 of 245 3. Status of Previously Approved Generation Projects a. Valmy Natural Gas Conversion Project Project Overview Sierra requested and received approval to complete the conversion of the Valmy coal-fired Units 1 and 2 to operate on natural gas and complete the retirement of coal-fired operations at Valmy in the Fifth Amendment to the 2021 IRP, Docket No. 23-08015. The project costs and continued operation include Idaho Power Company’s continued participation in Valmy with its 50 percent ownership, sharing 50 percent of the output and cost. Valmy Unit 1’s conversion was completed in the fall of 2025, and the unit began operation on natural gas in December of 2025. The unit became commercially operational on January 7, 2026. Valmy Unit 2 began its conversion outage in January 2026 and is expected to be completed in May 2026. The project also assumes requirements to install additional pollution control equipment for the reduction of nitrogen oxides (“NOx”) emissions on both units under the Regional Haze Rule. Idaho Power Company Participation Idaho Power Company has received acknowledgement of their participation in the gas conversion projects by the Idaho Public Utility Commission. Idaho Power Company submitted and received a Certificate of Public Convenience from the Idaho Public Utility Commission and will continue its full 50 percent participation in the converted units. Project Costs The current estimates place total expenditures for the natural gas conversion at $96.2 million total cost ($48.1 million Sierra’s share), excluding NOx controls installation. The Commission also approved Sierra’s share of the project for $50.43 million ($100.846 million total project), which included the estimated cost for NOx controls. The cash flow projections submitted in the Action Plan budget were based on assumptions outlined in the Fifth Amendment to the 2021 Joint IRP, Docket No. 23-08015, which incorporated these capital improvement projects. The Commission did not approve inclusion of $64.15 million in capital expenditures for improvement projects deemed necessary to ensure the continued operation of the Valmy generating units. Therefore, the Action Plan’s budgeted cash flows include both the gas conversion and capital improvement projects which exceed the Commission-approved estimate of $50.43 million for Sierra’s share. Installation of NOx controls will occur following U.S. Environmental Protection Agency (“EPA”) approval of the 2025 Nevada Regional Haze State Implementation Plan (“SIP”) revision for Valmy 10 Page 14 of 245Page 15 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 15 of 245 Units 1 and 2, which was finalized by the Nevada Division of Environmental Protection (“NDEP”) and submitted to the EPA in May 2025. For Valmy Units 1 and 2, additional cost effective NOx reductions while firing natural gas were determined to be to a control level equivalent to Selective Non-Catalytic Reduction (“SNCR”) performance. Sierra and the NDEP also preserved flexibility to meet these limits using either Flue Gas Recirculation (“FGR”) or Selective Catalytic Reduction (“SCR”). This flexibility also supports compliance with other federal requirements that may take effect, including the federal Good Neighbor Plan. Installation of NOx controls would be implemented within 36 months following EPA approval of the 2025 Nevada Regional Haze SIP revision for Valmy Units 1 and 2. Section 5 - Environmental Regulation Updates - provides more information on the federal Regional Haze Rule status. Sierra’s share of the NOx controls cost after EPA’s approval for Valmy Units 1 and 2 is expected to be between $14.1 and $42.7 million, depending on NOx control selected based on final regulatory determinations. The original cost estimate to install NOx controls that was submitted in the 2021 Joint IRP was based on budgetary quotes from an earlier estimate. The installation of NOx controls is not included in the aforementioned current estimate of total expenditure. b. Lenzie Thermal Storage Project Project Overview The Commission approved the Lenzie Thermal Storage Project in Docket No. 22-03024. This thermal energy storage project will allow the chillers to be turned off up to six (6) hours a day during peak periods and utilize chilled water made during the off-peak hours when chillers are not needed. Removing the chillers from service during peak hours will reduce the plant auxiliary load by 18 MW. Since the Lenzie Generating Station is the only combined-cycle plant that currently has chillers, it is the only plant currently being considered for this type of efficiency enhancement. The project consists of installing new thermal storage tanks, piping and pumping systems that use the existing plant chillers to produce and store chilled water during off-peak hours. Then during the peak hours, the chillers would be taken out of service, and the chilled water would be taken from the storage tanks and used in place of the chillers. This would reduce the auxiliary electrical load during up to six peak hours by 18 MW while maintaining the plant capacity. Reducing auxiliary electrical load results in a corresponding increase in peak capacity. Project Costs The Commission approved the project with an estimated cost of $13 million. Initially, Nevada Power planned to complete the project by June 2024. Unit outage schedules and the need to relocate natural gas lines feeding the units delayed the project, which now is expected to be in 11 Page 15 of 245Page 16 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 16 of 245 service before June 2027. As a result of scope changes and price escalation, the current project cost is expected to be approximately $20 million. c. Valmy Simple-Cycle Plant Project Overview The Commission approved the Valmy Simple-Cycle Plant project in Docket No. 24-05041. The project consists of two simple-cycle natural gas combustion turbines, each approximately 200 MW, for a total of 400 MW. The units will be sited at Valmy, utilizing existing infrastructure and providing fast-start capability to support system reliability. The units will be designated as Valmy Units 3 and Unit 4 and are scheduled to begin commercial operation in June 2028. The Commission approved the Utility Environmental Protection Act (“UEPA”) application., NDEP issued the Title V air permit modification for public comment in February 2026. NPEP addressed public comments in April 2026. The EPA is finalizing their review, which is expected to be completed in May 2026. Civil design is underway, and procurement of major equipment, including turbines, generators, generator step-up transformers, balance of plant equipment, and power distribution centers, is well advanced. Project Costs The project was originally planned under an Engineering, Procurement, and Construction (“EPC”) model consistent with the 2024 Joint IRP. The sole EPC bid received exceeded the IRP estimate, driven by regional labor constraints, continued escalation in large electrical equipment costs, and site-specific workforce challenges associated with Valmy’s remote location. In response, Sierra transitioned to evaluating a General Contractor (“GC”) delivery approach to increase control over engineering, procurement, and critical scopes and to mitigate further cost risk. Under the GC approach, current estimated project costs, excluding AFUDC and tariff impacts, are approximately $752.5 million. The project remains consistent with least-cost planning principles. As shown in Table Report-1, the Combination Case VBDL1, including the Valmy Simple-Cycle Plant project and assuming even the higher $821.9 million EPC cost estimate, continues to produce the lowest 20- and 26year PWRR among all evaluated cases. 12 Page 16 of 245Page 17 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 17 of 245 TABLE REPORT-1 d. Tracy 4/5 Emission Controls Upgrade Project Project Overview The Commission approved extending the operating life of Tracy Units 4 and 5 (“Tracy 4/5”, also referred to as Piñon Pine Unit 4) to 2049 in Docket No. 23-08015. This extension of operating life required re-evaluation of NOx emission controls to comply with the federal Regional Haze Rule. For Tracy 4/5, SCR was determined to be an appropriate level of emission controls under the federal Regional Haze Rule for continued operation until 2049. Installation of NOx controls needs to be completed within 36 months following EPA approval of the 2025 Nevada Regional Haze SIP revision for Tracy 4/5. Section 5 - Environmental Regulation Updates - provides more information on the federal Regional Haze Rule status. Project Costs In Docket No. 23-08015, the Commission approved $12 million to install SCR as NOx emission controls, without AFUDC. The Commission did not approve Sierra’s request for approval of other “capital projects for continued operation” and directed Sierra to include these projects in future IRP filings or general rate case filings. As of March 2026, the current estimate for project cost was updated to approximately $18.2 million to install SCR for NOx emissions control, without AFUDC. These costs were updated based on a recent indicative estimate by the vendor, received in 2025. e. Sierra Solar Phase I Project Overview The Commission approved Sierra Solar Phase I (“Sierra Solar”) in Docket No. 23-08015. Located in Churchill County, the project combines 400 MW of PV generation with an integrated 1,600 MWh BESS. The facility is interconnected at the newly constructed Lantern Switchyard on the 13 Page 17 of 245Page 18 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 18 of 245 existing 345-kV Valmy-Tracy Transmission Line, ensuring reliable delivery of clean energy to customers across the region. The project was approved with a budget of $1.536 billion, excluding AFUDC. Significant construction progress continues to be achieved at Sierra Solar. The generation tie, Lantern switchyard, and site substation have been energized and placed in service, and the Sierra Solar BESS was commissioned and began commercial operation on March 20, 2026. On the solar field, all mass grading is complete, and panel deliveries and installations are well underway. Installation activities including racking, module placement, alternating current and direct current terminations, and string wiring are progressing in line with the current construction plan. As a result, Sierra Solar remains on schedule with the BESS commercial operation by July 2026. The Companies continue to target April 2027 as the PV field commercial operation date. Project Costs Current forecasts indicate that Sierra Solar remains within the Commission-approved budget. As of March 2026, approximately $1.28 billion has been expended. 4. New Generation Projects The Companies completed a generation study to investigate its existing plant sites that could support aeroderivative and frame simple-cycle plants and combined-cycle plants. This study examined the following brownfield sites: Fort Churchill, Harry Allen, Valmy, Higgins, Tracy, and Sierra Solar. This generation study is included in Technical Appendix GEN-3 (Confidential). The Companies evaluated multiple thermal resource options and sites based on the information provided in the generation study, which guided the development of the alternate plans for this filing. The Preferred Plan includes the addition of aeroderivative and frame units at Fort Churchill, as shown below: 6 Project Estimate Assumptions The cost estimates for the proposed new‑build generation projects are based on firm fixed‑price EPC bid data for the Valmy Simple-Cycle Plant, submitted in March 2025. Project cash flows were developed using milestone payment structures provided with the EPC proposal, ensuring consistency between the estimate basis and expected expenditure timing. Additionally, historical experience from NV Energy’s recent and comparable simple-cycle generation projects was used While the projects are presented with updated estimated costs in the Joint Application, the Economic Analysis used an earlier vintage of the estimated costs. The differences between the updated costs in the Joint Application and the costs modeled in the Economic Analysis are presented in the Economic Analysis Section of the narrative, under the heading Differences Between Projects As Studied and Projects As Requested for Approval. 6 14 Page 18 of 245Page 19 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 19 of 245 to inform balance‑of‑plant equipment costs, indirect cost levels, installation approaches, and expected construction logistics. These benchmarks reflect executed and in‑progress peaking projects with similar technology, scope, and execution characteristics across NV Energy’s generation portfolio. Cash‑flow profiles for combustion turbine generators (“CTGs”) and other balance‑of‑plant components outside the EPC scope were developed using representative historical payment curves from prior NV Energy generation projects, ensuring alignment with established procurement and construction practices. The Companies applied a 22.5 percent contingency to capture risks, including permitting durations, construction sequencing, commodity escalation, and site‑specific development challenges. Estimate Risk Considerations Thermal projects costs have increased in recent years due to a combination of sustained inflation, supply-chain disruptions, and labor shortages, which have driven up the prices of critical materials such as steel, cement, electrical equipment, and fuel, while also extending procurement lead times and construction schedules. At the same time, heightened competition for skilled labor has increased wage rates. These pressures are compounded by geopolitical events and energy market volatility, which have amplified price uncertainty, ultimately raising the total capital cost of power generation assets. 7 For combustion turbines from the major Original Equipment Manufacturers (“OEM”), costs have risen sharply because demand has surged far beyond manufacturing capacity while the supply base remains highly constrained. These three OEMs effectively supply the global gas turbine market, and orders have accelerated due to data-center growth, electrification, and reliability needs, pushing turbine lead times to roughly 5 to 7 years and driving significant price escalation. At the same time, production is limited by shortages of specialized labor and critical hot-section components (such as single-crystal blades and forged rotors) that are manufactured by only a handful of suppliers worldwide. This imbalance has made turbines the single largest cost driver in new gas-fired plants and has shifted project economics from fuel-driven decisions to Callum Johnson, Energy and Infrastructure Project Risks Around Escalation, Feb. 19, 2024, available at https://www.whitecase.com/insight-alert/energy-and-infrastructure-project-risks-around-escalation; Mark Shenk, Rush for US Gas Plants Drives Up Costs, Lead Times, July 21, 2025, available at https://www.reuters.com/business/energy/rush-us-gas-plants-drives-up-costs-lead-times-2025-07-21/; Al Greenwood, INSIGHT: Large Construction Cost Overruns Hit US Chemical Plants, Sept. 21, 2023, available at https://www.icis.com/explore/resources/news/2023/09/21/10927175/insight-large-construction-cost-overruns-hit-uschemical-plants/; IEA, Rising Component Prices and Supply Chain Pressures Are Hindering the Development of Transmission Grid Infrastructure, Feb. 25, 2025, available at https://www.iea.org/news/rising-component-prices-andsupply-chain-pressures-are-hindering-the-development-of-transmission-grid-infrastructure. 7 15 Page 19 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026