Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 102 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 102 of 245 According to estimates provided by the developer, during the construction phase, the project is expected to support approximately 250 jobs, with an estimated 150 positions filled by Nevada residents, generating nearly $9 million in local payroll over one year. Once operational, the project will create seven permanent operations and maintenance positions with average annual salaries of approximately $80,000, resulting in more than $20 million in cumulative payroll over the project’s operating life. In addition to workforce impacts, the project will contribute ongoing property tax revenues to Lander County and generate sales tax revenue through the purchase of local goods and services. These economic impacts support local communities while contributing to Nevada’s renewable energy infrastructure and long-term economic development. Figure REN-11 shows a map of the project site. FIGURE REN-11 Jersey Valley Solar and Storage project Site A copy of the PPA can be found in Technical Appendix REN-12-JVS(a). The Companies’ due diligence summary for the Jersey Valley Solar and Storage project is included as Confidential Technical Appendix REN-12-JVS(b). Technical Appendix REN-12-JVS(c) contains detailed information about the Jersey Valley Solar and Storage project, including the information required 98 Page 102 of 245
  2. Page 103 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 103 of 245 by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Jersey Valley Solar and Storage PPA are summarized in Technical Appendix REN-12-JVS(d). Libra Solar & Storage Project Third Amendment The Companies present the Libra Solar & Storage Project Third Amendment (“Libra Third Amendment”) that will provide for an additional 200-MW BESS capacity in contract years 21 through 25, beginning on January 1, 2048. Under the Libra Solar & Storage Project (“Libra”) PPA currently in effect, this incremental BESS capacity was not under contract for those contract years. 45 The technology and characteristics of the proposed incremental BESS will be consistent with Libra’s overall project design and operation, as presented and previously approved in the 2024 Joint IRP, Docket No. 24-05041. The requested additional 200-MW, 4-hour BESS will add 800 MWh of energy storage capacity to Libra’s 700-MW solar PV facility, adding flexibility to absorb additional solar energy in the latter years and mitigate curtailments. Since the Libra PPA was approved, the Libra project has faced increased cost challenges driven by external factors, including multi-month permitting delays due to the impact of the DOI Review Policy Memorandum, increased BLM lease costs due to the OBBBA, and evolving OBBBArelated Foreign Entity of Concern (“FEOC”) tax and other regulations requiring supply chain shifts and trade policy impacts on key equipment. 46 However, as proposed in the Libra Third Amendment, the project has now received NTP from the BLM, 47 vetted its supply chain, locked in major equipment and construction pricing, and incorporated all regulatory and policy changes into final costs—eliminating further exposure to these drivers. The additional BESS capacity will add value to the Companies’ system 48 while assuring delivery of the resource by providing targeted, time-limited additional BESS payments that will partially offset discrete project cost increases and allow the Libra project to continue development and reach its planned COD. 45 The Libra Solar and Storage Project PPA requires an Expected Storage Facility Nameplate Capacity Rating of 700 MW in contract years 1-20, and an Expected Storage Facility Nameplate Capacity Rating of 500 MW in contract years 21-25; i.e. while the actual BESS capacity available after allowable degradation in contract years 21-25 is unknown, the Companies and its customers are only guaranteed 500 MW in those latter years. 46 One Big Beautiful Bill Act, Pub. L. No. 119-21 (2025). OBBBA added new restrictions to clean electricity credits under Internal Revenue Code Sections 45Y and 48E, and the advanced manufacturing production credit under Section 45X to determine eligibility for credits. See Internal Revenue Service, IR-2026-23 (Feb. 12, 2026), Treasury, IRS Provide Guidance for certain energy tax credits regarding material assistance provided by prohibited foreign entities under the One, Big, Beautiful Bill. Also, see infra the Renewable and Storage Candidate Resource Pricing Outlook part of this Renewables Section, for a description of FEOC and its impacts. 47 BLM National NEPA Register, Libra solar Project Modifications, December 15, 2025, available at https://eplanning.blm.gov/Project-Home/?id=f58d6bf4-a7f2-f011-8407-001dd80bcf93 48 The PPA is with Nevada Power, but located in Sierra’s territory, and, therefore ,can provide value to both systems in the form of ancillary services, energy, capacity, and renewable energy benefits. 99 Page 103 of 245
  3. Page 104 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 104 of 245 In the Libra Third Amendment, no changes are proposed to the development security requirements of the Libra PPA previously approved in Docket No. 24-05041. 49 Key Project Characteristics: The current developer of the Libra project is SB Energy. 50 SB Energy is a U.S.-based renewable energy developer and owner with utility-scale solar and energy storage projects in operation and under construction across the United States. Founded in 2019, SB Energy is backed by SoftBank Group Corp. and other institutional investors. The company has a portfolio of over five gigawatts of energy projects operating and under construction and has raised over ten billions of dollars in project-level financing. SB Energy’s development pipeline includes more than 15 GW of solar generation and multiple gigawatts of energy storage, in addition to related digital infrastructure projects. The payments for the additional BESS will not begin until 2048, contract year 21, and will be fixed at a rate of $24,620 per MW-month, for a duration of 5 years. Because the payments will be made at a future time, the Companies calculated the present value of the future payments using Nevada Power’s Weighted Average Cost of Capital (“WACC”), resulting in a net present value of $5,088 per MW-month for contract year 21 (the first year of the term). However, the nature of the project’s payments set to begin more than 20 years in the future, coupled with the contract’s short 5-year term length, are unique and are not comparable to any other projects in this filing. Therefore, to present an appropriate metric, the Companies incorporated the new BESS into the Libra project’s LCOE evaluation, and calculated the hybrid LCOE for the combined Libra and the Libra Third Amendment projects as $101.46 per MWh. 51 Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE is 35 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Technical Appendix REN-24. 49 The Companies currently hold a Letter of Credit in the amount of $98 million as development security for the Libra Solar and Storage Project PPA. 50 On March 21, 2025, SB Energy acquired the Libra Solar and Storage Project from Arevia Power LLC. 51 As presented in Docket No. 24-05041, the Companies calculated the hybrid LCOE of the Libra Solar and Storage Project as $93.69 per MWh. 100 Page 104 of 245
  4. Page 105 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 105 of 245 All costs under the amended agreement would continue to be recovered through Nevada Power’s fuel and purchased power BTER mechanisms. 52 Based on the developer’s current estimates, during construction the entire Libra Solar & Storage Project, including the 200-MW BESS addition contemplated in the Libra Third Amendment, is expected to support approximately 725 jobs, of which an estimated 50 percent of positions will be sourced locally from Nevada at an estimated average salary of $104,000 annually, equaling a total estimated payroll of $37.75 million over one construction year. Following commercial operation, the project will support a permanent long-term increase in the workforce for the operation and maintenance of the facility of an estimated 10 positions at an estimated average salary of $62,400 annually and a total payroll of $21.45 million over its operational life. Figure REN-12 shows a map of the project site. While the Commission approved the Libra Solar & Storage Project PPA without allocating its energy, capacity, and PCs to either Nevada Power or Sierra in Docket No. 24-05041, the Companies assume 100 percent allocation to Nevada Power for analyses conducted in this Part E. 52 101 Page 105 of 245
  5. Page 106 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 106 of 245 FIGURE REN-12 Libra Solar and Storage Project Site A copy of the PPA Amendment can be found in Technical Appendix REN-13-LSA(a). The Companies’ due diligence summary for the Libra Solar and Storage Project PPA Third Amendment is included as Confidential Technical Appendix REN-13-LSA(b). Technical Appendix REN-13-LSA(c) contains detailed information about the Libra Solar & Storage Project Third Amendment PPA, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. 102 Page 106 of 245
  6. Page 107 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 107 of 245 Lux Solar Center The Companies present the Lux Solar Center PPA (“Lux Solar Center”), a 125-MW solar PV facility paired with a 125-MW, four-hour BESS in Sierra’s territory with a targeted COD of July 1, 2028. The project was bid into the Companies’ 2024 RFP and selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project is one of the very few bids received in the 2024 RFP involving projects that are located entirely on private land, including site access roads and generation tie-line routes. Thus, the risk of permitting delays associated with DOI Review Policy Memorandum impacts is eliminated, and the project is well positioned to reach COD in time to secure the available solar tax credits and pass the value on to Sierra’s customers for the contract term. A portion of the land intended for development of the project site is pending the issuance of a Conditional Use Permit (“CUP”) from Lyon County authorizing construction activities, jeopardizing project viability. However, given the certainty this project brings in terms of nearterm deliverability in Sierra’s system and tax credit eligibility, the Companies worked with the developer to create a solution that mitigates the project non-deliverability risk stemming from the pending CUP issuance. The PPA includes a provision that if the county permit is not approved, the solar PV and BESS capacity will each be reduced to 121 MW in size, and the price of the solar resource will increase slightly. The reduction in buildable project area will reduce the directcurrent (“DC”) capacity of the solar facility, affecting the annual supply amount and overall project economics, thus requiring an offset in price. The PPA provision ensures that the resource can be delivered regardless of the outcome of the CUP, and that the size of the resource is maximized in either scenario. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $7.5 million in development security upon execution of the PPA, which increases to $21.25 million upon receipt of PUCN approval. This development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The proposed Lux Solar Center project is a utility‑scale solar photovoltaic and BESS facility located in Lyon County, Nevada, approximately one hour southeast of Reno. The project is being developed by Lux Solar Center, LLC, an affiliate of Ørsted Americas. At present, Ørsted Americas owns and operates over 5.6 GW of renewable energy projects across North America. Orsted 103 Page 107 of 245
  7. Page 108 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 108 of 245 Americas has delivered or is developing over 8 GW of utility-scale renewable energy projects since 2010. The solar facility will utilize commercially proven thin‑film bifacial PV modules mounted on single‑axis tracking systems. Energy produced by the solar PV facility will be delivered to the Companies’ system or stored in the co‑located BESS for later dispatch. The BESS component will utilize lithium‑ion technology in an AC‑coupled configuration and will be capable of providing dispatchable capacity, energy, and ancillary services. Project facilities will be located on approximately 1,100 acres of privately owned land under executed long‑term lease agreements. Environmental studies, including a Phase I Environmental Site Assessment, cultural desktop review, critical issues analysis, and biological screening, have been completed. No material environmental constraints have been identified that would preclude construction or operation of the facility. Additional environmental studies will be completed in support of the Utilities Environmental Protection Act application prior to construction. The Lux Solar Center project has executed an LGIA with the Companies. The project will interconnect to the Companies’ transmission system at the Walker River Substation (formerly Fort Churchill Substation) at 120 kV. Under the agreement, energy from the solar facility will be purchased for a 25‑year term at a fixed rate of $55.95 per MWh, and BESS capacity will be purchased for a 20‑year term at a fixed rate of $18,090 per MW‑month. The Companies calculated the hybrid LCOE as $135.70 per MWh. As discussed above, if the CUP is not received, then the project size is reduced and the price of the solar energy will be $57.97 per MWh, and the calculated hybrid LCOE in that scenario is $143.92 per MWh. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE for the 125 MW scenario is 13 percent lower in comparison, and 8 percent lower in the 121 MW scenario. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement are proposed to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support approximately 250 direct jobs, of which an estimated 12 positions will be sourced locally from Nevada at an estimated average salary of $84,240 annually, equaling a total estimated payroll of $1 million over one construction year. Following commercial operation, the project is expected 104 Page 108 of 245
  8. Page 109 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 109 of 245 to provide a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated three positions at an estimated average salary of $90,002 annually and a total payroll in excess of $9.8 million over 35 years. Figure REN-13 shows a map of the project site. FIGURE REN-13 Lux Solar Center Project Site A copy of the PPA can be found in Technical Appendix REN-14-LSC(a). The Companies’ due diligence summary for the Lux Solar Center project is included as Confidential Technical Appendix REN-14-LSC(b). Technical Appendix REN-14-LSC(c) contains detailed information about the Lux Solar Center project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Lux Solar Center PPA are summarized in Technical Appendix REN-14-LSC(d). Nevada Geothermal Portfolio (OKGP) The Companies present the Nevada Geothermal Portfolio (OKGP) PPA, a sleeved PPA associated with a customer agreement with Callisto Enterprises, LLC (“Callisto”). The portfolio will allow for a minimum of 50 MW and up to 150 MW of geothermal resources, with an expected COD of December 31, 2030. The project was not bid into the Companies’ 2024 RFP but was rather brought forward by Callisto as a dedicated resource to serve their load. The PPA will provide for a 15‑year term following completion of the project development period. 105 Page 109 of 245
  9. Page 110 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 110 of 245 As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $1.5 million in development security upon execution of the PPA, which increases to $4.25 million upon receipt of PUCN approval of the PPA. As this PPA is for a portfolio of projects, the development security reduces proportionally with the MW-capacity of projects that achieve COD, provided that it shall not be less than $0. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Furthermore, as this is a sleeved PPA associated with a customer agreement, the PPA also contains a provision that in the event of non-receipt of PUCN approval of the customer agreement, then the PPA may be terminated with no liability to either party. Key Project Characteristics: The proposed Nevada Geothermal Portfolio (OKGP) project is a portfolio‑based renewable energy resource consisting of multiple utility‑scale geothermal facilities located within the State of Nevada. The portfolio is being developed by OKGP, LLC, an affiliate of Ormat Technologies, and will deliver energy to Sierra’s system. The Nevada Geothermal Portfolio (OKGP) includes up to six geothermal generation facilities, as follows: Baltazor, Whirlwind, Dixie Valley West, McGee, Excelsior, and Mason. Each facility is designed to deliver approximately 7 MW of net geothermal generating capacity 53, resulting in a combined portfolio capacity of approximately 42 MW net of station usage. The facilities will utilize commercially proven binary geothermal technology employing OEC units, providing firm, dispatchable, baseload renewable energy. All geothermal fluids will be fully reinjected, resulting in minimal environmental impact and high operational reliability. Project facilities are located on land for which Ormat has secured geothermal leases and associated site control. Environmental analysis, permitting, and interconnection activities are underway or planned in accordance with applicable federal, state, and local requirements. Approximately half of the portfolio projects have executed LGIAs with the Companies, and interconnection applications have been submitted or are expected to be executed for the remaining projects in advance of their respective CODs. The portfolio approach allows individual facilities to achieve commercial operation independently while contributing to a single aggregated resource. No material environmental constraints have been identified that would preclude development of the facilities, and permitting activities are expected to proceed in parallel with project 53 Net geothermal generating capacity is the total capacity of the facility net of all energy consumed by the facility for station usage. 106 Page 110 of 245
  10. Page 111 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 111 of 245 development. Environmental reviews will be conducted in accordance with NEPA, the Utilities Environmental Protection Act (“UEPA”), and other applicable requirements. Under the sleeved PPA and associated customer agreement, energy from each geothermal facility will be purchased at a fixed price of $107.00 per MWh. The Companies calculated the LCOE as $107.00 per MWh excluding any network upgrade costs of the facilities, as those costs are not currently known. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA associated with the customer agreement. 54 According to estimates provided by the developer during construction, each facility is expected to support significant local employment and economic benefits, including construction jobs and long‑term skilled operations positions, including a temporary increase in workforce of an estimated 20 positions, of which an estimated 15 positions will be sourced locally from Nevada at an estimated average salary of $87,942 annually, equaling a total estimated payroll of $1,758,848 million over one construction year per facility. Following commercial operation, the project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of each facility of an estimated 13 positions at an estimated average salary of $72,252 annually and a total payroll of $19,825,728 over 20 years per facility. Figure REN-14 through REN-19 show maps of the project sites. 54 Id. 107 Page 111 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)