Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 109 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 109 of 245 to provide a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated three positions at an estimated average salary of $90,002 annually and a total payroll in excess of $9.8 million over 35 years. Figure REN-13 shows a map of the project site. FIGURE REN-13 Lux Solar Center Project Site A copy of the PPA can be found in Technical Appendix REN-14-LSC(a). The Companies’ due diligence summary for the Lux Solar Center project is included as Confidential Technical Appendix REN-14-LSC(b). Technical Appendix REN-14-LSC(c) contains detailed information about the Lux Solar Center project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Lux Solar Center PPA are summarized in Technical Appendix REN-14-LSC(d). Nevada Geothermal Portfolio (OKGP) The Companies present the Nevada Geothermal Portfolio (OKGP) PPA, a sleeved PPA associated with a customer agreement with Callisto Enterprises, LLC (“Callisto”). The portfolio will allow for a minimum of 50 MW and up to 150 MW of geothermal resources, with an expected COD of December 31, 2030. The project was not bid into the Companies’ 2024 RFP but was rather brought forward by Callisto as a dedicated resource to serve their load. The PPA will provide for a 15‑year term following completion of the project development period. 105 Page 109 of 245Page 110 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 110 of 245 As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $1.5 million in development security upon execution of the PPA, which increases to $4.25 million upon receipt of PUCN approval of the PPA. As this PPA is for a portfolio of projects, the development security reduces proportionally with the MW-capacity of projects that achieve COD, provided that it shall not be less than $0. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Furthermore, as this is a sleeved PPA associated with a customer agreement, the PPA also contains a provision that in the event of non-receipt of PUCN approval of the customer agreement, then the PPA may be terminated with no liability to either party. Key Project Characteristics: The proposed Nevada Geothermal Portfolio (OKGP) project is a portfolio‑based renewable energy resource consisting of multiple utility‑scale geothermal facilities located within the State of Nevada. The portfolio is being developed by OKGP, LLC, an affiliate of Ormat Technologies, and will deliver energy to Sierra’s system. The Nevada Geothermal Portfolio (OKGP) includes up to six geothermal generation facilities, as follows: Baltazor, Whirlwind, Dixie Valley West, McGee, Excelsior, and Mason. Each facility is designed to deliver approximately 7 MW of net geothermal generating capacity 53, resulting in a combined portfolio capacity of approximately 42 MW net of station usage. The facilities will utilize commercially proven binary geothermal technology employing OEC units, providing firm, dispatchable, baseload renewable energy. All geothermal fluids will be fully reinjected, resulting in minimal environmental impact and high operational reliability. Project facilities are located on land for which Ormat has secured geothermal leases and associated site control. Environmental analysis, permitting, and interconnection activities are underway or planned in accordance with applicable federal, state, and local requirements. Approximately half of the portfolio projects have executed LGIAs with the Companies, and interconnection applications have been submitted or are expected to be executed for the remaining projects in advance of their respective CODs. The portfolio approach allows individual facilities to achieve commercial operation independently while contributing to a single aggregated resource. No material environmental constraints have been identified that would preclude development of the facilities, and permitting activities are expected to proceed in parallel with project 53 Net geothermal generating capacity is the total capacity of the facility net of all energy consumed by the facility for station usage. 106 Page 110 of 245Page 111 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 111 of 245 development. Environmental reviews will be conducted in accordance with NEPA, the Utilities Environmental Protection Act (“UEPA”), and other applicable requirements. Under the sleeved PPA and associated customer agreement, energy from each geothermal facility will be purchased at a fixed price of $107.00 per MWh. The Companies calculated the LCOE as $107.00 per MWh excluding any network upgrade costs of the facilities, as those costs are not currently known. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA associated with the customer agreement. 54 According to estimates provided by the developer during construction, each facility is expected to support significant local employment and economic benefits, including construction jobs and long‑term skilled operations positions, including a temporary increase in workforce of an estimated 20 positions, of which an estimated 15 positions will be sourced locally from Nevada at an estimated average salary of $87,942 annually, equaling a total estimated payroll of $1,758,848 million over one construction year per facility. Following commercial operation, the project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of each facility of an estimated 13 positions at an estimated average salary of $72,252 annually and a total payroll of $19,825,728 over 20 years per facility. Figure REN-14 through REN-19 show maps of the project sites. 54 Id. 107 Page 111 of 245Page 112 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 112 of 245 FIGURE REN-14 Baltazor Project Site 108 Page 112 of 245Page 113 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 113 of 245 FIGURE REN-15 Whirlwind Project Site 109 Page 113 of 245Page 114 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 114 of 245 FIGURE REN-16 Dixie Valley West Project Site 110 Page 114 of 245Page 115 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 115 of 245 FIGURE REN-17 McGee Project Site 111 Page 115 of 245Page 116 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 116 of 245 FIGURE REN-18 Excelsior Project Site 112 Page 116 of 245Page 117 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 117 of 245 FIGURE REN-19 Mason Project Site 113 Page 117 of 245Page 118 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 118 of 245 A copy of the PPA can be found in Technical Appendix REN-15-NGP(a). The Companies’ due diligence summary for the Nevada Geothermal Portfolio (OKGP) project is included as Confidential Technical Appendix REN-15-NGP(b). Technical Appendix REN-15-NGP(c) contains detailed information about the Nevada Geothermal Portfolio (OKGP) project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Nevada Geothermal Portfolio (OKGP) PPA are summarized in Technical Appendix REN-15-NGP(d). NGP Blue Mountain Third Amendment The Companies present the NGP Blue Mountain PPA Third Amendment project (“NGP Third Amendment”) that will provide for additional generation output of the facility, beginning on March 31, 2027, and an extension of the term through 2046. 55 The NGP Third Amendment project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The NGP Third Amendment project would enable the existing NGP Blue Mountain facility to undergo capital improvements, including improvements to the geothermal wells, to allow increased net generation to be delivered to the Companies’ system. Once completed, the improvement project would increase the expected output of the facility, reaching up to 30 MW and degrading annually for the remainder of the term. As the resource is located in Sierra’s territory and can achieve additional increased generating capacity in the near term, it will support helping address systemwide open capacity needs. The NGP Third Amendment project also assigns the PPA from Nevada Power to Sierra to align the resource with the load base it will serve, as well as allocating the portfolio credits generated from the facility to Sierra. The assignment would become effective upon the date of the Commission’s Order approving request of the NGP Third Amendment. As the NGP Blue Mountain is an existing facility, development security is not applicable, and the NGP Blue Mountain Third Amendment does not propose any changes to the operating security requirements of the current NGP Blue Mountain PPA approved in Docket No. 06-10021. 56 Key Project Characteristics: The NGP Blue Mountain (“NGP Blue Mountain”) facility is an existing geothermal electric generating facility located near Winnemucca in Humboldt County, Nevada. The facility is owned and operated by NGP Blue Mountain I, LLC, which is affiliated with Ormat Technologies. The NGP Blue Mountain PPA was approved in Docket No. 06-10021. The Companies currently hold a Letter of Credit in the amount of $3.8 million as operating security for the NGP Blue Mountain PPA. 55 56 114 Page 118 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026