Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 111 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 111 of 245 development. Environmental reviews will be conducted in accordance with NEPA, the Utilities Environmental Protection Act (“UEPA”), and other applicable requirements. Under the sleeved PPA and associated customer agreement, energy from each geothermal facility will be purchased at a fixed price of $107.00 per MWh. The Companies calculated the LCOE as $107.00 per MWh excluding any network upgrade costs of the facilities, as those costs are not currently known. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA associated with the customer agreement. 54 According to estimates provided by the developer during construction, each facility is expected to support significant local employment and economic benefits, including construction jobs and long‑term skilled operations positions, including a temporary increase in workforce of an estimated 20 positions, of which an estimated 15 positions will be sourced locally from Nevada at an estimated average salary of $87,942 annually, equaling a total estimated payroll of $1,758,848 million over one construction year per facility. Following commercial operation, the project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of each facility of an estimated 13 positions at an estimated average salary of $72,252 annually and a total payroll of $19,825,728 over 20 years per facility. Figure REN-14 through REN-19 show maps of the project sites. 54 Id. 107 Page 111 of 245Page 112 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 112 of 245 FIGURE REN-14 Baltazor Project Site 108 Page 112 of 245Page 113 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 113 of 245 FIGURE REN-15 Whirlwind Project Site 109 Page 113 of 245Page 114 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 114 of 245 FIGURE REN-16 Dixie Valley West Project Site 110 Page 114 of 245Page 115 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 115 of 245 FIGURE REN-17 McGee Project Site 111 Page 115 of 245Page 116 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 116 of 245 FIGURE REN-18 Excelsior Project Site 112 Page 116 of 245Page 117 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 117 of 245 FIGURE REN-19 Mason Project Site 113 Page 117 of 245Page 118 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 118 of 245 A copy of the PPA can be found in Technical Appendix REN-15-NGP(a). The Companies’ due diligence summary for the Nevada Geothermal Portfolio (OKGP) project is included as Confidential Technical Appendix REN-15-NGP(b). Technical Appendix REN-15-NGP(c) contains detailed information about the Nevada Geothermal Portfolio (OKGP) project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Nevada Geothermal Portfolio (OKGP) PPA are summarized in Technical Appendix REN-15-NGP(d). NGP Blue Mountain Third Amendment The Companies present the NGP Blue Mountain PPA Third Amendment project (“NGP Third Amendment”) that will provide for additional generation output of the facility, beginning on March 31, 2027, and an extension of the term through 2046. 55 The NGP Third Amendment project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The NGP Third Amendment project would enable the existing NGP Blue Mountain facility to undergo capital improvements, including improvements to the geothermal wells, to allow increased net generation to be delivered to the Companies’ system. Once completed, the improvement project would increase the expected output of the facility, reaching up to 30 MW and degrading annually for the remainder of the term. As the resource is located in Sierra’s territory and can achieve additional increased generating capacity in the near term, it will support helping address systemwide open capacity needs. The NGP Third Amendment project also assigns the PPA from Nevada Power to Sierra to align the resource with the load base it will serve, as well as allocating the portfolio credits generated from the facility to Sierra. The assignment would become effective upon the date of the Commission’s Order approving request of the NGP Third Amendment. As the NGP Blue Mountain is an existing facility, development security is not applicable, and the NGP Blue Mountain Third Amendment does not propose any changes to the operating security requirements of the current NGP Blue Mountain PPA approved in Docket No. 06-10021. 56 Key Project Characteristics: The NGP Blue Mountain (“NGP Blue Mountain”) facility is an existing geothermal electric generating facility located near Winnemucca in Humboldt County, Nevada. The facility is owned and operated by NGP Blue Mountain I, LLC, which is affiliated with Ormat Technologies. The NGP Blue Mountain PPA was approved in Docket No. 06-10021. The Companies currently hold a Letter of Credit in the amount of $3.8 million as operating security for the NGP Blue Mountain PPA. 55 56 114 Page 118 of 245Page 119 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 119 of 245 facility has been in continuous operation for more than a decade and currently delivers geothermal energy to the Companies pursuant to an existing PPA. 57 NGP Blue Mountain has a nameplate capacity of approximately 49.5 MW and a net contract capacity of approximately 40.1 MW, neither of which will be affected by the NGP Third Amendment project. The NGP Blue Mountain facility consists of three binary geothermal units utilizing the Ormat Energy Converter (“OEC”) technology 58, supported by an established geothermal wellfield. Power is delivered as a baseload, around‑the‑clock renewable resource and provides firm, dispatchable energy to the Companies’ system. The NGP Blue Mountain geothermal resource has experienced natural thermal decline associated with the original wellfield configuration. To address this decline and support long‑term operational stability, the NGP Blue Mountain facility owner proposes, through the NGP Third Amendment project, a redevelopment of the geothermal wellfield and targeted retrofits to existing generation equipment. The redevelopment includes well workovers, injection optimization, and plant efficiency upgrades designed to stabilize resource temperatures and sustain reliable generation over the extended contract term. No new generating units are proposed, and all work will occur on existing well pads and within the established NGP Blue Mountain facility footprint. The NGP Blue Mountain facility operates under all required federal, state, and local permits, including geothermal well permits, air quality permits, underground injection control approvals, water rights, and a conditional use permit. Existing interconnection facilities are in service, and the facility maintains an active LGIA with Sierra. The NGP Third Amendment project will require no new transmission facilities. The proposed amended PPA would extend the contract term through December 31, 2046, and include renewed annual generation supply tables. Beginning on the amended PPA’s effective date, all geothermal energy from the facility would be purchased at a rate of $105.00 per MWh. As the NGP Third Amendment project is an improvement of the existing NGP Blue Mountain facility and requires no network upgrades or other costs, the Companies calculated the LCOE of this improved resource as $105.00 per MWh. This is nearly 2.5 percent less than the geothermal energy resource most recently presented for the Commission’s review, the Corsac Generating Station 2 PPA approved in Docket No. 24-05041. All costs under the amended agreement would continue to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, the project is expected to continue supporting approximately ten full‑time onsite jobs, along with additional technical and engineering support roles based in Nevada. Capital investment associated with the wellfield redevelopment and plant Approved in Docket No. 06-10021. Ormat Technologies Inc., Recovered Energy Generation, April 17, 2026, available at https://www.ormat.com/en/renewables/reg/view/?ContentID=231. 57 58 115 Page 119 of 245Page 120 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 120 of 245 retrofits is expected to exceed $20 million, with a significant portion spent in Nevada on labor, construction services, and equipment. Figure REN-20 shows a map of the NGP Third Amendment project site. FIGURE REN-20 NGP Blue Mountain Third Amendment Project Site A copy of the PPA Amendment can be found in Technical Appendix REN-16-NBM(a). The Companies’ due diligence summary for the NGP Blue Mountain Third Amendment project is included as Confidential Technical Appendix REN-16-NBM(b). Technical Appendix REN-16NBM(c) contains detailed information about the NGP Blue Mountain Third Amendment project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. 116 Page 120 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026