Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 114 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 114 of 245 FIGURE REN-16 Dixie Valley West Project Site 110 Page 114 of 245
  2. Page 115 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 115 of 245 FIGURE REN-17 McGee Project Site 111 Page 115 of 245
  3. Page 116 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 116 of 245 FIGURE REN-18 Excelsior Project Site 112 Page 116 of 245
  4. Page 117 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 117 of 245 FIGURE REN-19 Mason Project Site 113 Page 117 of 245
  5. Page 118 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 118 of 245 A copy of the PPA can be found in Technical Appendix REN-15-NGP(a). The Companies’ due diligence summary for the Nevada Geothermal Portfolio (OKGP) project is included as Confidential Technical Appendix REN-15-NGP(b). Technical Appendix REN-15-NGP(c) contains detailed information about the Nevada Geothermal Portfolio (OKGP) project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Nevada Geothermal Portfolio (OKGP) PPA are summarized in Technical Appendix REN-15-NGP(d). NGP Blue Mountain Third Amendment The Companies present the NGP Blue Mountain PPA Third Amendment project (“NGP Third Amendment”) that will provide for additional generation output of the facility, beginning on March 31, 2027, and an extension of the term through 2046. 55 The NGP Third Amendment project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The NGP Third Amendment project would enable the existing NGP Blue Mountain facility to undergo capital improvements, including improvements to the geothermal wells, to allow increased net generation to be delivered to the Companies’ system. Once completed, the improvement project would increase the expected output of the facility, reaching up to 30 MW and degrading annually for the remainder of the term. As the resource is located in Sierra’s territory and can achieve additional increased generating capacity in the near term, it will support helping address systemwide open capacity needs. The NGP Third Amendment project also assigns the PPA from Nevada Power to Sierra to align the resource with the load base it will serve, as well as allocating the portfolio credits generated from the facility to Sierra. The assignment would become effective upon the date of the Commission’s Order approving request of the NGP Third Amendment. As the NGP Blue Mountain is an existing facility, development security is not applicable, and the NGP Blue Mountain Third Amendment does not propose any changes to the operating security requirements of the current NGP Blue Mountain PPA approved in Docket No. 06-10021. 56 Key Project Characteristics: The NGP Blue Mountain (“NGP Blue Mountain”) facility is an existing geothermal electric generating facility located near Winnemucca in Humboldt County, Nevada. The facility is owned and operated by NGP Blue Mountain I, LLC, which is affiliated with Ormat Technologies. The NGP Blue Mountain PPA was approved in Docket No. 06-10021. The Companies currently hold a Letter of Credit in the amount of $3.8 million as operating security for the NGP Blue Mountain PPA. 55 56 114 Page 118 of 245
  6. Page 119 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 119 of 245 facility has been in continuous operation for more than a decade and currently delivers geothermal energy to the Companies pursuant to an existing PPA. 57 NGP Blue Mountain has a nameplate capacity of approximately 49.5 MW and a net contract capacity of approximately 40.1 MW, neither of which will be affected by the NGP Third Amendment project. The NGP Blue Mountain facility consists of three binary geothermal units utilizing the Ormat Energy Converter (“OEC”) technology 58, supported by an established geothermal wellfield. Power is delivered as a baseload, around‑the‑clock renewable resource and provides firm, dispatchable energy to the Companies’ system. The NGP Blue Mountain geothermal resource has experienced natural thermal decline associated with the original wellfield configuration. To address this decline and support long‑term operational stability, the NGP Blue Mountain facility owner proposes, through the NGP Third Amendment project, a redevelopment of the geothermal wellfield and targeted retrofits to existing generation equipment. The redevelopment includes well workovers, injection optimization, and plant efficiency upgrades designed to stabilize resource temperatures and sustain reliable generation over the extended contract term. No new generating units are proposed, and all work will occur on existing well pads and within the established NGP Blue Mountain facility footprint. The NGP Blue Mountain facility operates under all required federal, state, and local permits, including geothermal well permits, air quality permits, underground injection control approvals, water rights, and a conditional use permit. Existing interconnection facilities are in service, and the facility maintains an active LGIA with Sierra. The NGP Third Amendment project will require no new transmission facilities. The proposed amended PPA would extend the contract term through December 31, 2046, and include renewed annual generation supply tables. Beginning on the amended PPA’s effective date, all geothermal energy from the facility would be purchased at a rate of $105.00 per MWh. As the NGP Third Amendment project is an improvement of the existing NGP Blue Mountain facility and requires no network upgrades or other costs, the Companies calculated the LCOE of this improved resource as $105.00 per MWh. This is nearly 2.5 percent less than the geothermal energy resource most recently presented for the Commission’s review, the Corsac Generating Station 2 PPA approved in Docket No. 24-05041. All costs under the amended agreement would continue to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, the project is expected to continue supporting approximately ten full‑time onsite jobs, along with additional technical and engineering support roles based in Nevada. Capital investment associated with the wellfield redevelopment and plant Approved in Docket No. 06-10021. Ormat Technologies Inc., Recovered Energy Generation, April 17, 2026, available at https://www.ormat.com/en/renewables/reg/view/?ContentID=231. 57 58 115 Page 119 of 245
  7. Page 120 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 120 of 245 retrofits is expected to exceed $20 million, with a significant portion spent in Nevada on labor, construction services, and equipment. Figure REN-20 shows a map of the NGP Third Amendment project site. FIGURE REN-20 NGP Blue Mountain Third Amendment Project Site A copy of the PPA Amendment can be found in Technical Appendix REN-16-NBM(a). The Companies’ due diligence summary for the NGP Blue Mountain Third Amendment project is included as Confidential Technical Appendix REN-16-NBM(b). Technical Appendix REN-16NBM(c) contains detailed information about the NGP Blue Mountain Third Amendment project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. 116 Page 120 of 245
  8. Page 121 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 121 of 245 Key provisions of the NGP Blue Mountain Third Amendment PPA are summarized in Technical Appendix REN-16-NBM(d). North Nevada Geothermal Portfolio The Companies present the North Nevada Geothermal Portfolio PPA as part of a sleeved PPA associated with a customer energy agreement. The portfolio will allow for an expected 100 MW of geothermal resources, with an expected COD of December 31, 2030, with limited relief to reach the entire 100 MW up until December 31, 2033. The project was not bid into the Companies’ 2024 RFP but was rather brought forward by the sleeved PPA counterparty, Amazon , as a dedicated resource to serve their load. The PPA will provide for a term extending through December 31, 2050, approximately 20 years. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $1.5 million in development security upon execution of the PPA, which increases to $3 million upon the Companies’ submittal of the PPA to the PUCN for approval, which further increases to $5.4 million upon receipt of PUCN approval of the PPA, and which further increases to $8.5 million 120 days after receipt of PUCN approval of the PPA. As this PPA is for a portfolio of projects, the development security reduces proportionally with the MW-capacity of projects that achieve COD, provided that it shall not be less than $0. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Furthermore, as this is a sleeved PPA associated with a customer agreement, the PPA also contains a provision that in the event of non-receipt of PUCN approval of the customer agreement, then the PPA may be terminated with no liability to either party. Key Project Characteristics: The proposed North Nevada Geothermal Portfolio PPA is associated with a portfolio consisting of five utility‑scale geothermal generating facilities located in northern Nevada (the “Zanskar Portfolio”), as follows: Pumpernickel, Rose of Snowville, Stony Point, Trexler, and Big Blind. The facilities are being developed by Overcall Energy LLC, a wholly owned affiliate of Zanskar Geothermal & Minerals, Inc (“Zanskar”), and will deliver energy to Sierra’s system. Zanskar is a U.S.-based company, headquartered in Salt Lake City, UT. Zanskar owns and operates the 15 MW Lightning Dock Geothermal facility in New Mexico, which it acquired in 2024 and subsequently repowered to improve operations. Zanskar’s team has been involved with the wellfield drilling and development of 700 MW of geothermal capacity across five countries, covering the full spectrum from early discovery holes to full production wells. . 117 Page 121 of 245
  9. Page 122 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 122 of 245 Each facility will utilize commercially proven binary Organic Rankine Cycle (“ORC”) geothermal technology and will be designed with a net contract capacity of approximately 20 MW, resulting in an aggregate portfolio capacity of approximately 100 MW. The facilities will be air‑cooled, utilize closed‑loop geothermal fluid systems with full reinjection, and are expected to operate as firm, dispatchable, baseload renewable resources. Project sites are located on a combination of private and federal land for which Zanskar has secured all geothermal rights. Environmental and land use permitting activities are underway, including early coordination with the BLM, Nevada Department of Wildlife, and county jurisdictions. Environmental review will be conducted in accordance with NEPA, UEPA, and other applicable requirements. No material environmental constraints have been identified that would preclude development of the facilities. The portfolio approach allows individual facilities to achieve commercial operation independently while contributing to a single aggregated resource. Each facility will interconnect to Sierra’s transmission system pursuant to individual interconnection agreements. Interconnection requests have been submitted for all but one project within the North Nevada Geothermal Portfolio , 59 and the developer plans to submit the remaining interconnection request during the next Large Generator Interconnection Cluster window that opens beginning June 15, 2026, with points of interconnection located at existing 120-kV substations or transmission lines. Transmission facilities required for the projects are anticipated to be consistent with standard geothermal interconnection configurations, including generation step‑up transformers, gen‑tie lines, and related substation equipment. Under the customer agreement, energy from each facility will be purchased at a fixed price of $105.00 per MWh. The Companies calculated the LCOE as $105.00 per MWh excluding any network upgrade costs of the facilities, as those costs are not currently known. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA. 60 According to estimates provided by the developer construction of the facilities is expected to support over 700 jobs across drilling, civil construction, electrical work, and plant installation, of which an estimated 550 positions will be sourced locally from Nevada at an estimated average salary of $150,000 annually, equaling a total estimated payroll of $115 million over one construction year. Following commercial operation, the project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated 34 positions at an estimated average salary of $83,000 annually and a total annual payroll of $2.8 million over 20 years. The North Nevada Geothermal Portfolio PPA is securitized by a letter of credit as discussed in the project’s introductory paragraphs above, in part as a means to mitigate development risk, including risk associated with the early stage development project sites that have pending interconnection agreements. 60 Id. 59 118 Page 122 of 245
  10. Page 123 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 123 of 245 Figures REN-21 through REN-25 show maps of the project sites. FIGURE REN-21 Pumpernickel Project Site 119 Page 123 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)