Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 121 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 121 of 245 Key provisions of the NGP Blue Mountain Third Amendment PPA are summarized in Technical Appendix REN-16-NBM(d). North Nevada Geothermal Portfolio The Companies present the North Nevada Geothermal Portfolio PPA as part of a sleeved PPA associated with a customer energy agreement. The portfolio will allow for an expected 100 MW of geothermal resources, with an expected COD of December 31, 2030, with limited relief to reach the entire 100 MW up until December 31, 2033. The project was not bid into the Companies’ 2024 RFP but was rather brought forward by the sleeved PPA counterparty, Amazon , as a dedicated resource to serve their load. The PPA will provide for a term extending through December 31, 2050, approximately 20 years. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $1.5 million in development security upon execution of the PPA, which increases to $3 million upon the Companies’ submittal of the PPA to the PUCN for approval, which further increases to $5.4 million upon receipt of PUCN approval of the PPA, and which further increases to $8.5 million 120 days after receipt of PUCN approval of the PPA. As this PPA is for a portfolio of projects, the development security reduces proportionally with the MW-capacity of projects that achieve COD, provided that it shall not be less than $0. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Furthermore, as this is a sleeved PPA associated with a customer agreement, the PPA also contains a provision that in the event of non-receipt of PUCN approval of the customer agreement, then the PPA may be terminated with no liability to either party. Key Project Characteristics: The proposed North Nevada Geothermal Portfolio PPA is associated with a portfolio consisting of five utility‑scale geothermal generating facilities located in northern Nevada (the “Zanskar Portfolio”), as follows: Pumpernickel, Rose of Snowville, Stony Point, Trexler, and Big Blind. The facilities are being developed by Overcall Energy LLC, a wholly owned affiliate of Zanskar Geothermal & Minerals, Inc (“Zanskar”), and will deliver energy to Sierra’s system. Zanskar is a U.S.-based company, headquartered in Salt Lake City, UT. Zanskar owns and operates the 15 MW Lightning Dock Geothermal facility in New Mexico, which it acquired in 2024 and subsequently repowered to improve operations. Zanskar’s team has been involved with the wellfield drilling and development of 700 MW of geothermal capacity across five countries, covering the full spectrum from early discovery holes to full production wells. . 117 Page 121 of 245
  2. Page 122 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 122 of 245 Each facility will utilize commercially proven binary Organic Rankine Cycle (“ORC”) geothermal technology and will be designed with a net contract capacity of approximately 20 MW, resulting in an aggregate portfolio capacity of approximately 100 MW. The facilities will be air‑cooled, utilize closed‑loop geothermal fluid systems with full reinjection, and are expected to operate as firm, dispatchable, baseload renewable resources. Project sites are located on a combination of private and federal land for which Zanskar has secured all geothermal rights. Environmental and land use permitting activities are underway, including early coordination with the BLM, Nevada Department of Wildlife, and county jurisdictions. Environmental review will be conducted in accordance with NEPA, UEPA, and other applicable requirements. No material environmental constraints have been identified that would preclude development of the facilities. The portfolio approach allows individual facilities to achieve commercial operation independently while contributing to a single aggregated resource. Each facility will interconnect to Sierra’s transmission system pursuant to individual interconnection agreements. Interconnection requests have been submitted for all but one project within the North Nevada Geothermal Portfolio , 59 and the developer plans to submit the remaining interconnection request during the next Large Generator Interconnection Cluster window that opens beginning June 15, 2026, with points of interconnection located at existing 120-kV substations or transmission lines. Transmission facilities required for the projects are anticipated to be consistent with standard geothermal interconnection configurations, including generation step‑up transformers, gen‑tie lines, and related substation equipment. Under the customer agreement, energy from each facility will be purchased at a fixed price of $105.00 per MWh. The Companies calculated the LCOE as $105.00 per MWh excluding any network upgrade costs of the facilities, as those costs are not currently known. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA. 60 According to estimates provided by the developer construction of the facilities is expected to support over 700 jobs across drilling, civil construction, electrical work, and plant installation, of which an estimated 550 positions will be sourced locally from Nevada at an estimated average salary of $150,000 annually, equaling a total estimated payroll of $115 million over one construction year. Following commercial operation, the project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated 34 positions at an estimated average salary of $83,000 annually and a total annual payroll of $2.8 million over 20 years. The North Nevada Geothermal Portfolio PPA is securitized by a letter of credit as discussed in the project’s introductory paragraphs above, in part as a means to mitigate development risk, including risk associated with the early stage development project sites that have pending interconnection agreements. 60 Id. 59 118 Page 122 of 245
  3. Page 123 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 123 of 245 Figures REN-21 through REN-25 show maps of the project sites. FIGURE REN-21 Pumpernickel Project Site 119 Page 123 of 245
  4. Page 124 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 124 of 245 FIGURE REN-22 Rose of Snowville Project Site 120 Page 124 of 245
  5. Page 125 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 125 of 245 FIGURE REN-23 Stony Point Project Site 121 Page 125 of 245
  6. Page 126 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 126 of 245 FIGURE REN-24 Trexler Project Site 122 Page 126 of 245
  7. Page 127 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 127 of 245 FIGURE REN-25 Big Blind Project Site A copy of the PPA can be found in Technical Appendix REN-17-NNGP(a). The Companies’ due diligence summary for the North Nevada Geothermal Portfolio project is included as Confidential Technical Appendix REN-17-NNGP(b). Technical Appendix REN-17-NNGP(c) contains detailed information about the North Nevada Geothermal Portfolio project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the North Nevada Geothermal Portfolio PPA are summarized in Technical Appendix REN-17-NNGP(d). 123 Page 127 of 245
  8. Page 128 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 128 of 245 Sleepy Orange The Companies present the Sleepy Orange PPA (“Sleepy Orange”) that will provide a 500-MW solar PV generation facility paired with a 500-MW, four-hour battery resource in Sierra’s system with a COD of May 31, 2030. The project was bid into the Companies’ 2024 RFP and selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project is located entirely on BLM land and is thus subject to the DOI Review Policy Memorandum process. However, as described above, the Companies received responses from RFP bidders regarding their project-specific safe harbor strategies, and Primergy, the parent company to the Sleepy Orange project, conveyed a unique situation applicable to the project. Because Sleepy Orange established “beginning of construction” requirements prior to the passage of the OBBBA, and is located on public lands, it qualifies for safe harbor status under the previous tax rules, and therefore is allowed up to a 10-year window from beginning of construction to reach its COD and maintain eligibility to claim the tax credits. Thus, potential development or permitting delays do not present the same risk of a tax credit cliff in 2030 faced by most other projects. The project is being offered at a fixed price, and with a runway up to the year 2034 to place the project in service and still be eligible to claim the tax credits. Hence, Sleepy Orange is well-positioned to navigate permitting and project schedule challenges and ultimately deliver competitively priced energy for Sierra’s customers. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $30 million in development security upon execution of the PPA, which increases to $85 million upon receipt of PUCN approval of the PPA. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies’ were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPA that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain Full Notice to Proceed (“FNTP”) authorization from the BLM prior to December 31, 2032. The retained security amount was tailored specific to this PPA and set equal to $30 million. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. 124 Page 128 of 245
  9. Page 129 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 129 of 245 Key Project Characteristics: The Sleepy Orange project is a proposed utility‑scale solar PV and BESS facility to be located in Lyon County, Nevada, within Sierra’s service territory. The project is being developed by Sleepy Orange Solar, LLC, an affiliate of Primergy Solar. Primergy is a U.S.‑based company with approximately 1,584 MW of operating generation capacity across four states, including more than 1,200 MW of solar PV capacity and 1,520 MWh of BESS usable storage capacity. Primergy has developed, constructed, and currently operates 49 solar facilities and one battery energy storage facility. Primergy’s notable project in Nevada includes the Gemini Solar project, consisting of 690 MW of operational solar PV capacity and 1,520 MWh of operational battery energy storage, that is currently under contract with Nevada Power and providing energy and associated benefits to Sierra’s customers. The solar facility will utilize commercially proven bifacial photovoltaic modules mounted on single‑axis tracking systems. Energy produced by the solar facility will be delivered to Sierra's system or stored in the co‑located battery energy storage system for later dispatch. The battery storage system will use lithium‑ion technology in an AC‑coupled configuration and will be capable of providing energy, capacity, and ancillary services. The Sleepy Orange project will be constructed on approximately 3,000 acres of BLM land. The developer has established site control sufficient to support continued permitting and development activities, and federal land use authorization is being advanced through the applicable BLM processes. Environmental baseline studies are underway, including biological, cultural, and other surveys required to support National Environmental Policy Act review. No material environmental constraints have been identified at this stage that would preclude development of the project. The project has an executed LGIA with Sierra, and will interconnect to Sierra’s transmission system at a collector substation near the Walker River Substation (formerly Fort Churchill Substation) at 345 kV. Until the collector substation is built, it will be interconnecting at the Walker River Substation 345 kV bus. The interconnection facilities include a new project substation and an approximately 11‑mile generation tie‑line. Under the agreement, energy from the solar generating facility will be purchased for a 25‑year term at a fixed rate of $30.90 per MWh, and capacity from the battery energy storage facility will be purchased for a 20‑year term at a fixed rate of $12,750 per MW‑month. The Companies calculated the hybrid LCOE as $89.80 per MWh. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using 125 Page 129 of 245
  10. Page 130 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 130 of 245 the submitted cap pricing of the solar energy and found that this project’s LCOE is 43 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement are proposed to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support an estimated 700 temporary construction jobs at peak, with 525 being sourced locally from Nevada, and with an average salary of $135,000 annually, equating to a total estimated payroll of $70.98 million over one construction year. A permanent long‑term increase in workforce for the operations and maintenance of the facility is an estimated seven permanent positions at an estimated average salary of $114,400 annually and a total payroll of $20.02 million over 25 years. Figure REN-26 shows a map of the project site. 126 Page 130 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)