Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 124 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 124 of 245 FIGURE REN-22 Rose of Snowville Project Site 120 Page 124 of 245
  2. Page 125 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 125 of 245 FIGURE REN-23 Stony Point Project Site 121 Page 125 of 245
  3. Page 126 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 126 of 245 FIGURE REN-24 Trexler Project Site 122 Page 126 of 245
  4. Page 127 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 127 of 245 FIGURE REN-25 Big Blind Project Site A copy of the PPA can be found in Technical Appendix REN-17-NNGP(a). The Companies’ due diligence summary for the North Nevada Geothermal Portfolio project is included as Confidential Technical Appendix REN-17-NNGP(b). Technical Appendix REN-17-NNGP(c) contains detailed information about the North Nevada Geothermal Portfolio project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the North Nevada Geothermal Portfolio PPA are summarized in Technical Appendix REN-17-NNGP(d). 123 Page 127 of 245
  5. Page 128 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 128 of 245 Sleepy Orange The Companies present the Sleepy Orange PPA (“Sleepy Orange”) that will provide a 500-MW solar PV generation facility paired with a 500-MW, four-hour battery resource in Sierra’s system with a COD of May 31, 2030. The project was bid into the Companies’ 2024 RFP and selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project is located entirely on BLM land and is thus subject to the DOI Review Policy Memorandum process. However, as described above, the Companies received responses from RFP bidders regarding their project-specific safe harbor strategies, and Primergy, the parent company to the Sleepy Orange project, conveyed a unique situation applicable to the project. Because Sleepy Orange established “beginning of construction” requirements prior to the passage of the OBBBA, and is located on public lands, it qualifies for safe harbor status under the previous tax rules, and therefore is allowed up to a 10-year window from beginning of construction to reach its COD and maintain eligibility to claim the tax credits. Thus, potential development or permitting delays do not present the same risk of a tax credit cliff in 2030 faced by most other projects. The project is being offered at a fixed price, and with a runway up to the year 2034 to place the project in service and still be eligible to claim the tax credits. Hence, Sleepy Orange is well-positioned to navigate permitting and project schedule challenges and ultimately deliver competitively priced energy for Sierra’s customers. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $30 million in development security upon execution of the PPA, which increases to $85 million upon receipt of PUCN approval of the PPA. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies’ were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPA that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain Full Notice to Proceed (“FNTP”) authorization from the BLM prior to December 31, 2032. The retained security amount was tailored specific to this PPA and set equal to $30 million. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. 124 Page 128 of 245
  6. Page 129 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 129 of 245 Key Project Characteristics: The Sleepy Orange project is a proposed utility‑scale solar PV and BESS facility to be located in Lyon County, Nevada, within Sierra’s service territory. The project is being developed by Sleepy Orange Solar, LLC, an affiliate of Primergy Solar. Primergy is a U.S.‑based company with approximately 1,584 MW of operating generation capacity across four states, including more than 1,200 MW of solar PV capacity and 1,520 MWh of BESS usable storage capacity. Primergy has developed, constructed, and currently operates 49 solar facilities and one battery energy storage facility. Primergy’s notable project in Nevada includes the Gemini Solar project, consisting of 690 MW of operational solar PV capacity and 1,520 MWh of operational battery energy storage, that is currently under contract with Nevada Power and providing energy and associated benefits to Sierra’s customers. The solar facility will utilize commercially proven bifacial photovoltaic modules mounted on single‑axis tracking systems. Energy produced by the solar facility will be delivered to Sierra's system or stored in the co‑located battery energy storage system for later dispatch. The battery storage system will use lithium‑ion technology in an AC‑coupled configuration and will be capable of providing energy, capacity, and ancillary services. The Sleepy Orange project will be constructed on approximately 3,000 acres of BLM land. The developer has established site control sufficient to support continued permitting and development activities, and federal land use authorization is being advanced through the applicable BLM processes. Environmental baseline studies are underway, including biological, cultural, and other surveys required to support National Environmental Policy Act review. No material environmental constraints have been identified at this stage that would preclude development of the project. The project has an executed LGIA with Sierra, and will interconnect to Sierra’s transmission system at a collector substation near the Walker River Substation (formerly Fort Churchill Substation) at 345 kV. Until the collector substation is built, it will be interconnecting at the Walker River Substation 345 kV bus. The interconnection facilities include a new project substation and an approximately 11‑mile generation tie‑line. Under the agreement, energy from the solar generating facility will be purchased for a 25‑year term at a fixed rate of $30.90 per MWh, and capacity from the battery energy storage facility will be purchased for a 20‑year term at a fixed rate of $12,750 per MW‑month. The Companies calculated the hybrid LCOE as $89.80 per MWh. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using 125 Page 129 of 245
  7. Page 130 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 130 of 245 the submitted cap pricing of the solar energy and found that this project’s LCOE is 43 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement are proposed to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support an estimated 700 temporary construction jobs at peak, with 525 being sourced locally from Nevada, and with an average salary of $135,000 annually, equating to a total estimated payroll of $70.98 million over one construction year. A permanent long‑term increase in workforce for the operations and maintenance of the facility is an estimated seven permanent positions at an estimated average salary of $114,400 annually and a total payroll of $20.02 million over 25 years. Figure REN-26 shows a map of the project site. 126 Page 130 of 245
  8. Page 131 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 131 of 245 FIGURE REN-26 Sleepy Orange Project Site A copy of the PPA can be found in Technical Appendix REN-18-SOS(a). The Companies’ due diligence summary for the Sleepy Orange Solar project is included as Confidential Technical Appendix REN-18-SOS(b). Technical Appendix REN-18-SOS(c) contains detailed information about the Sleepy Orange Solar project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Sleepy Orange Solar PPA are summarized in Technical Appendix REN-18-SOS(d). 127 Page 131 of 245
  9. Page 132 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 132 of 245 Southern Bighorn 1 and Southern Bighorn 2 The Companies present the Southern Bighorn 1 and Southern Bighorn 2 PPAs (collectively referred to as “Southern Bighorn”) that will provide for additional 400-MW solar PV and 400MW BESS resources in Nevada Power’s system with a COD of July 15, 2028. This project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. This PPA represents the second iteration of the Southern Bighorn project for the Commission’s review. The previous Southern Bighorn Solar PPA, as approved in Docket No. 19-06039, terminated on November 13, 2023, due to several issues encountered by the developer, including global supply chain issues and significant cost increases for materials due to the Covid-19 pandemic. These issues, primarily affecting cost and schedule, have been mitigated by the developer. The necessary BLM Right-ofWay grant was received as of January 23, 2026, authorizing the project to begin physical construction. Thus, the risk of permitting delays associated with DOI Review Policy Memorandum impacts is eliminated, and the project is well positioned to reach COD in time to secure the available solar tax credits and pass the value on to Nevada Power’s customers for the contract term. The Southern Bighorn project was split into two PPAs, consisting of Southern Bighorn 1, a 100MW solar and 100-MW BESS PPA, and Southern Bighorn 2, a 300-MW solar and 300-MW BESS PPA, for a combined project totaling 400 MW of solar and 400 MW of BESS. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPAs require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $24 million ($18 million for Southern Bighorn 1 PPA and $6 million for Southern Bighorn 2 PPA) in development security upon execution of the PPA, which increases to $68 million ($51 million for Southern Bighorn 1 PPA and $17 million for Southern Bighorn 2 PPA) upon receipt of PUCN approval of the PPA. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies’ were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPAs that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain all necessary governmental approvals necessary to start construction (“Federal Permit”) prior to September 30, 2027. The retained security amount was tailored specific to this PPA and set equal to $10 million ($7.5 million for Southern Bighorn 1 PPA and $2.5 million for Southern Bighorn 2 PPA). This balanced approach to development security 128 Page 132 of 245
  10. Page 133 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 133 of 245 structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The Southern Bighorn project is a proposed utility‑scale solar PV generation facility with co‑located BESS to be located on the Moapa Band of Paiutes Tribal lands in Clark County, Nevada, within Nevada Power’s service territory. The projects are owned by 300MS 8me LLC and 425LM 8me LLC, respectively owning Southern Bighorn 1 and Southern Bighorn 2. The project is being developed by Avantus Clean Energy, LLC, a U.S.-based renewable energy company, headquartered in San Diego, California that has developed over two dozen large-scale projects currently operating or under construction, spanning over 5,000 MW of system capacity (3,900 MW solar and 4,500 MWh of energy storage systems) across the western United States and Texas. The solar facility will utilize commercially proven PV modules mounted on single‑axis tracking systems, while the BESS facility will use lithium‑ion battery technology in an AC‑coupled configuration. The combined configuration is designed to provide renewable energy, capacity, and ancillary services. The project site is located entirely on tribal trust lands for which the developer has secured site control through execution of long-term land lease agreements with the Moapa Band of Paiutes. The project includes access to adequate water supplies for construction and operation through existing tribal water rights. The majority of discretionary environmental and land use permitting has been completed. The federal Bureau of Indian Affairs and the BLM, both part of DOI, completed a full National Environmental Policy Act review, including issuance of a Final Environmental Impact Statement and Record of Decision in 2021. Required biological consultations and cultural resource reviews have been completed, and mitigation measures have been incorporated into project design and construction planning. Because the project is located on tribal lands and utilizes an existing shared generation tie‑line, a Utility Environmental Protection Act permit from the Public Utilities Commission of Nevada is not required. Southern Bighorn 1 and Southern Bighorn 2 will both interconnect to Nevada Power’s transmission system at the Reid Gardner Substation at the 230 kV level. The project has two executed LGIAs and will utilize a shared generation tie‑line with an existing operational solar facility on Moapa tribal lands. Under the agreement, energy from the solar generating facility will be purchased for a 25‑year term at a fixed rate of $47.23 per MWh, and capacity from the BESS facility will be purchased for a 20‑year term at a fixed rate of $15,500 per MW‑month. The Companies calculated the hybrid 129 Page 133 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)