Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 130 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 130 of 245 the submitted cap pricing of the solar energy and found that this project’s LCOE is 43 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement are proposed to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support an estimated 700 temporary construction jobs at peak, with 525 being sourced locally from Nevada, and with an average salary of $135,000 annually, equating to a total estimated payroll of $70.98 million over one construction year. A permanent long‑term increase in workforce for the operations and maintenance of the facility is an estimated seven permanent positions at an estimated average salary of $114,400 annually and a total payroll of $20.02 million over 25 years. Figure REN-26 shows a map of the project site. 126 Page 130 of 245
  2. Page 131 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 131 of 245 FIGURE REN-26 Sleepy Orange Project Site A copy of the PPA can be found in Technical Appendix REN-18-SOS(a). The Companies’ due diligence summary for the Sleepy Orange Solar project is included as Confidential Technical Appendix REN-18-SOS(b). Technical Appendix REN-18-SOS(c) contains detailed information about the Sleepy Orange Solar project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Sleepy Orange Solar PPA are summarized in Technical Appendix REN-18-SOS(d). 127 Page 131 of 245
  3. Page 132 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 132 of 245 Southern Bighorn 1 and Southern Bighorn 2 The Companies present the Southern Bighorn 1 and Southern Bighorn 2 PPAs (collectively referred to as “Southern Bighorn”) that will provide for additional 400-MW solar PV and 400MW BESS resources in Nevada Power’s system with a COD of July 15, 2028. This project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. This PPA represents the second iteration of the Southern Bighorn project for the Commission’s review. The previous Southern Bighorn Solar PPA, as approved in Docket No. 19-06039, terminated on November 13, 2023, due to several issues encountered by the developer, including global supply chain issues and significant cost increases for materials due to the Covid-19 pandemic. These issues, primarily affecting cost and schedule, have been mitigated by the developer. The necessary BLM Right-ofWay grant was received as of January 23, 2026, authorizing the project to begin physical construction. Thus, the risk of permitting delays associated with DOI Review Policy Memorandum impacts is eliminated, and the project is well positioned to reach COD in time to secure the available solar tax credits and pass the value on to Nevada Power’s customers for the contract term. The Southern Bighorn project was split into two PPAs, consisting of Southern Bighorn 1, a 100MW solar and 100-MW BESS PPA, and Southern Bighorn 2, a 300-MW solar and 300-MW BESS PPA, for a combined project totaling 400 MW of solar and 400 MW of BESS. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPAs require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $24 million ($18 million for Southern Bighorn 1 PPA and $6 million for Southern Bighorn 2 PPA) in development security upon execution of the PPA, which increases to $68 million ($51 million for Southern Bighorn 1 PPA and $17 million for Southern Bighorn 2 PPA) upon receipt of PUCN approval of the PPA. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies’ were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPAs that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain all necessary governmental approvals necessary to start construction (“Federal Permit”) prior to September 30, 2027. The retained security amount was tailored specific to this PPA and set equal to $10 million ($7.5 million for Southern Bighorn 1 PPA and $2.5 million for Southern Bighorn 2 PPA). This balanced approach to development security 128 Page 132 of 245
  4. Page 133 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 133 of 245 structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The Southern Bighorn project is a proposed utility‑scale solar PV generation facility with co‑located BESS to be located on the Moapa Band of Paiutes Tribal lands in Clark County, Nevada, within Nevada Power’s service territory. The projects are owned by 300MS 8me LLC and 425LM 8me LLC, respectively owning Southern Bighorn 1 and Southern Bighorn 2. The project is being developed by Avantus Clean Energy, LLC, a U.S.-based renewable energy company, headquartered in San Diego, California that has developed over two dozen large-scale projects currently operating or under construction, spanning over 5,000 MW of system capacity (3,900 MW solar and 4,500 MWh of energy storage systems) across the western United States and Texas. The solar facility will utilize commercially proven PV modules mounted on single‑axis tracking systems, while the BESS facility will use lithium‑ion battery technology in an AC‑coupled configuration. The combined configuration is designed to provide renewable energy, capacity, and ancillary services. The project site is located entirely on tribal trust lands for which the developer has secured site control through execution of long-term land lease agreements with the Moapa Band of Paiutes. The project includes access to adequate water supplies for construction and operation through existing tribal water rights. The majority of discretionary environmental and land use permitting has been completed. The federal Bureau of Indian Affairs and the BLM, both part of DOI, completed a full National Environmental Policy Act review, including issuance of a Final Environmental Impact Statement and Record of Decision in 2021. Required biological consultations and cultural resource reviews have been completed, and mitigation measures have been incorporated into project design and construction planning. Because the project is located on tribal lands and utilizes an existing shared generation tie‑line, a Utility Environmental Protection Act permit from the Public Utilities Commission of Nevada is not required. Southern Bighorn 1 and Southern Bighorn 2 will both interconnect to Nevada Power’s transmission system at the Reid Gardner Substation at the 230 kV level. The project has two executed LGIAs and will utilize a shared generation tie‑line with an existing operational solar facility on Moapa tribal lands. Under the agreement, energy from the solar generating facility will be purchased for a 25‑year term at a fixed rate of $47.23 per MWh, and capacity from the BESS facility will be purchased for a 20‑year term at a fixed rate of $15,500 per MW‑month. The Companies calculated the hybrid 129 Page 133 of 245
  5. Page 134 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 134 of 245 LCOE as $117.93 per MWh. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE is 25 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement are proposed to be recovered through Nevada Power’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support a peak of nearly 400 jobs with 155 being sourced locally from Nevada. Long‑term operations will require eight permanent positions. Estimated salaries for the temporary construction jobs are anticipated to be $85,200 annually, equating to a total estimated payroll of $13.2 million over one construction year. The permanent long‑term workforce for the operations and maintenance of the facility is estimated to provide an average salary of $125,000 annually and a total payroll in excess of $25.0 million over 25 years. Figure REN-27 shows a map of the project site. 130 Page 134 of 245
  6. Page 135 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 135 of 245 FIGURE REN-27 Southern Bighorn 1 and 2 Project Site A copy of the two PPAs can be found in Technical Appendices REN-19-SBS(a)(1) and REN-19SBS(a)(2). The Companies’ due diligence summary for the Southern Bighorn 1 & 2 project is included as Confidential Technical Appendix REN-19-SBS(b). Technical Appendix REN-19SBS(c) contains detailed information about the Southern Bighorn project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Southern Bighorn 1 & 2 PPAs are summarized in two Technical Appendices REN-19SBS(d)(1) (for Southern Bighorn 1) and REN-19-SBS(d)(2) (for Southern Bighorn 2). Trego Grid The Companies present the Trego Grid PPA (“Trego Grid”) that will provide a 200-MW, fourhour standalone battery resource in Sierra’s system with a COD of June 30, 2028. This project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project provides capacity to Sierra’s system in 2028, helping address systemwide open capacity needs. Trego Grid does not require any BLM or other federal approvals subject to the DOI Review Policy 131 Page 135 of 245
  7. Page 136 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 136 of 245 Memorandum review process, thereby mitigating schedule risk due to permitting. The project will qualify for the ITC tax credits, which is reflected in the pricing, passing the value on to Sierra’s customers for the contract term. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $6 million in development security upon execution of the PPA, which increases to $17 million upon receipt of PUCN approval of the PPA. This development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The Trego Grid project is a proposed utility‑scale, standalone battery energy storage facility to be located in Washoe County, Nevada, within Sierra’s service territory. The project is owned by Trego Grid, LLC and is being developed by Coval Infrastructure DevCo Holdings LP, which has a portfolio of 4.2 GW of assets currently in operation, under construction, or in active development. The facility will utilize commercially proven battery energy storage technology configured to charge from and discharge to the Companies’ system. The project is designed to provide dispatchable capacity, energy, and ancillary services. The Trego Grid project site is located on approximately seven acres adjacent to the existing Mira Loma Substation. Trego Grid, LLC owns the project parcel and has full site control. The project site is within the City of Reno and is expected to be permitted through the local land use process. The facility does not generate electricity and will interconnect below the voltage threshold applicable to the Utility Environmental Protection Act; therefore, a Permit to Construct from the Public Utilities Commission of Nevada is not required. No material environmental constraints have been identified that would preclude development of the project. The facility will be directly interconnected to the Companies’ transmission system at the Mira Loma Substation at 120 kV. The project has an executed and amended LGIA with the Companies. Required transmission facilities include a short generation tie‑line and associated substation equipment. Under the agreement, the Companies would purchase storage capacity from the facility at a fixed rate of $15,070 per MW‑month for a 20‑year term. The Companies calculated the LCOS of this resource as $151.52 per MWh. When comparing the LCOS of this resource to the Dodge Flat BESS Addition, which was the most recent standalone BESS resource approved by the Commission in the 2024 Joint IRPA, Docket No. 25‑10028, the proposed project’s LCOS is lower 132 Page 136 of 245
  8. Page 137 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 137 of 245 by approximately 9 percent. A comparison of the LCOS for all standalone battery storage projects presented for approval in this filing, relative to the Dodge Flat BESS Addition, is provided in REN‑23: Standalone BESS LCOS Comparison Summary. All costs associated with the agreement are proposed to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, construction of the project is expected to support temporary construction employment of an estimated 135 positions, of which an estimated 108 positions will be sourced locally from Nevada at an estimated average salary of $54,080 annually, equaling a total estimated payroll of $5.8 million over one construction year. Ongoing operations, supported through contracted operations and maintenance services, with an estimated three positions at an estimated average salary of $52,000 annually, and a total payroll of $9.8 million over 25 years. The facility will be operated in accordance with applicable safety, environmental, and reliability standards. Figure REN-28 shows a map of the project site. FIGURE REN-28 Trego Grid Project Site A copy of the PPA can be found in Technical Appendix REN-20-TG(a). The Companies’ due diligence summary for the Trego Grid project is included as Confidential Technical Appendix REN-20-TG(b). Technical Appendix REN-20-TG(c) contains detailed information about the Trego Grid project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Trego Grid PPA are summarized in Technical Appendix REN-20-TG(d). 133 Page 137 of 245
  9. Page 138 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 138 of 245 White Pine Solar The Companies present the White Pine Solar PPA (“White Pine Solar”) that will provide 350 MW of solar photovoltaic generating capacity paired with a 350-MW, four-hour battery resource in Sierra’s system with a COD of December 31, 2028. This project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project can deliver energy in Sierra’s system in 2028, helping address systemwide open capacity needs. The project will qualify for tax credits, which is reflected in the pricing, passing the value on to Sierra’s customers for the contract term. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $21 million in development security upon execution of the PPA, which increases to $59.5 million upon receipt of PUCN approval of the PPA. Due to uncertainty in available transmission capacity for the project associated with a pending DNR study, the Companies were challenged to contract with the counterparty as they were not willing to bear the risk of losing the development security due to lack of available transmission capacity on the transmission system preventing the project from reaching its intended COD with firm capability to transmit power to load. To facilitate a viable transaction, the Companies negotiated terms of the PPA that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain a final DNR study that confirms 350 MW of firm transmission capacity is available for use by the project by December 15, 2028 (“Favorable DNR Study”), prior to February 28, 2027. The retained security amount was tailored specific to this PPA and set equal to $60,000 to cover the cost of DNR studies performed by the Companies. Moreover, as discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPA that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain governmental approvals necessary for construction and operation of the project (“DOI/BLM Approval”) prior to July 1, 2027. The retained security amount was tailored specific to this PPA and set equal to $5 million. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. 134 Page 138 of 245
  10. Page 139 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 139 of 245 Key Project Characteristics: The White Pine Solar project is a proposed utility‑scale solar PV generation facility with co‑located BESS to be located on private land in White Pine County, Nevada, within the Sierra’s service territory. The project is owned by White Pine Solar, LLC and is being developed by AMPYR Energy USA DevCo, LLC (“AMPYR”). White Pine Solar, LLC is a wholly owned indirect subsidiary of AMPYR Energy USA (“AEUSA”), which operates as part of a global renewable energy platform focused on utility-scale solar PV, BESS, and wind generation. Through its upstream affiliate, AMPYR Global, the AMPYR platform maintains a presence across Europe, North America, Australia, and Asia, with a development portfolio exceeding 12,000 MW of renewable energy capacity, including more than 1,700 MW of BESS, spanning over 365 projects and supported by more than 100 professionals. Founded in 2021, AEUSA is led by senior executives with over 200 years of combined experience developing, constructing, and operating more than 40,000 MW of renewable energy facilities across the United States, including Nevada. AEUSA currently has approximately 2,800 MW of solar PV and standalone BESS projects under development across the WECC, CAISO, ERCOT, PJM, and SERC markets. The solar facility will utilize commercially proven PV technology mounted on single‑axis tracking systems, and the BESS facility will utilize lithium‑ion battery technology in an AC‑coupled configuration. The combined facility is designed to deliver renewable energy, dispatchable capacity, and ancillary services. The White Pine Solar Project site comprises approximately 1,990 acres of privately owned and previously disturbed agricultural land located north of Ely, Nevada. The developer has secured site control through executed long‑term lease agreements that include sufficient water supply rights for construction and operation. Because the project is located primarily on private land and requires only a short generation tie‑line across BLM‑managed land, the associated environmental permitting risk is significantly lower than for generation resources sited predominantly on BLM land. Environmental studies completed to date have identified no fatal flaws, and all required local, state, and federal permits are either in progress or planned. The project will interconnect to Sierra’s transmission system at the Gonder Substation at 345 kV via an approximately one‑mile generation tie‑line. The project has executed an LGIA. While the executed interconnection agreement reflects a conservative COD in early 2031, updated transmission assessments indicate that the project is capable of achieving full commercial operation by December 31, 2028, subject to completion of the required transmission facilities that will be further identified in subsequent transmission studies. The project is designed to leverage the Companies’ Greenlink North transmission infrastructure to support long‑term deliverability. Under the proposed agreement, energy from the solar generating facility would be purchased for a 25‑year term at a rate of $28.20 per MWh with a two‑percent annual escalator, and capacity from 135 Page 139 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)