Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 143 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 143 of 245 changes to the PPAs necessary to enable grid-charging of the BESS, with expected completion in the second half of 2026. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development or performance failure, the terms of the PPAs require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $24 million ($12 million per PPA) in development security upon execution of the PPAs, which increases to $68 million ($34 million per PPA) upon receipt of PUCN approval. This development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract nonperformance or termination. Key Project Characteristics: The Winston Solar project is a proposed utility‑scale solar PV generation facility with co‑located BESS, to be located on private land in Lyon County, Nevada, within Sierra’s service territory. The project is owned by Winston FC Solar, LLC, and is being developed by EDF Renewables North America. The Companies have other contracted projects with EDF Renewables North America, as follows: Arrow Canyon Solar, a 200-MW PV and 75-MW BESS project approved in Docket No. 19-06393; Switch Station 1/Playa 2, a 100-MW PV facility approved in Docket No. 15-08005; and Switch Station 2/Playa 1, a 79-MW PV project approved in Docket No. 15-11025/1511027/15-11029. The BESS is expected to provide up to four hours of duration and will be AC‑coupled with the solar facility. The project is designed to deliver renewable energy, dispatchable capacity, and ancillary services. The project site encompasses approximately 2,300 acres of privately owned land in central Lyon County, Nevada, adjacent to the Walker River Substation (formerly Fort Churchill Substation). A Conditional Use Permit for solar development from Lyon County is pending, as discussed above. Water necessary for construction will be supplied through secured water rights associated with the underlying private land. Environmental and site studies completed to date have not identified any biological or environmental fatal flaws. The project will be permitted through applicable local, state, and federal processes, including issuance of a Utility Environmental Protection Act permit to construct. The project will interconnect to the Companies’ transmission system at the Walker River Substation (formerly Fort Churchill Substation) at 230 kV. Two LGIAs have been executed. The current interconnection in‑service date under the executed agreements is December 31, 2029; 139 Page 143 of 245Page 144 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 144 of 245 however, coordination with the Companies’ transmission team is ongoing to potentially advance the in‑service date. Under the agreements, energy from the solar generating facility would be purchased for a 25‑year term at a fixed price of $39.60 per MWh, and capacity from the BESS facility would be purchased for a 20‑year term at a fixed rate of $14,220 per MW‑month. The Companies calculated the hybrid LCOE of this resource as $111.50 per MWh, for the anticipated full 400 MW project size. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE is 29 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the PPA will be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support approximately 400 jobs, of which an estimated 50 percent of positions will be sourced locally from Nevada at an estimated average salary of $124,060 annually, equaling a total estimated payroll of $14.33 million over one construction year. Following commercial operation, the project will support a permanent long-term increase in the workforce for the operation and maintenance of the facility of an estimated five positions at an estimated average salary of $110,032 annually and a total payroll of $21.45 million over its operational life. 140 Page 144 of 245Page 145 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 145 of 245 FIGURE REN-30 Winston Solar Project Site A copy of the two PPAs can be found in Technical Appendices REN-22-WS(a)(1) and REN-22WS(a)(2). The Companies’ due diligence summary for the Winston Solar project is included as Confidential Technical Appendix REN-22-WS(b). Technical Appendix REN-#22-WS(c) contains detailed information about the Winston Solar project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the two Winston Solar PPAs are summarized in Technical Appendices REN-22-WS(d)(1) and REN-22-WS(d)(2). Solicitation of Proposals for Sierra Solar Phase II Development Asset Sale with PPA/BTA Options In the 2024 RFP, the Companies solicited proposals to develop the Sierra Solar Phase II project. Similar to the Amargosa project solicitation, the Companies sought third-party development of the 600-MW solar and 600-MW BESS facility through an APA in conjunction with a BTA or a PPA for the offtake of the energy. The solicitation outlined a proposal with a COD of January 31, 2030, contingent upon the completion of the new Lantern-Comstock Meadows 345-kV Line. 63 However, 63 The Lantern-Comstock Meadows 345-kV Line project, also known as 20780-BTX-Lantern Switching Station Phase 2, Lantern - Comstock Meadows 345 kV line-SPPCO, was approved as a contingent facility for several transmission load service requests from Rule 9 customers, which will be required even if the Sierra Solar Phase II project does not proceed. Construction approval was granted by the Commission in Docket No. 24-05041. 141 Page 145 of 245Page 146 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 146 of 245 at the end of March 2025, during the 2024 RFP’s evaluation process, the Companies learned— through the Companies’ posting of the Quarterly Contingent Facility Update on OASIS—that the Lantern-Comstock Meadows 345-kV Line would not be completed until 2031 at the earliest. 64 Absent the new transmission line, the project would not be able to reach COD prior to the end of 2030 and secure eligibility for the PTC, thereby negating the urgency of development to lock in tax credit savings for the Companies’ customers. While the Companies did not pursue any solicited proposals for Sierra Solar Phase II in the 2024 RFP, the Companies continue to evaluate its options and future plans for Sierra Solar Phase II. E. Renewable and Storage Candidate Resource Pricing Outlook As discussed in the 2024 Joint IRPA, Docket No. 25‑10028, the outlook for renewable and storage candidate pricing is expected to increase due to the following three primary factors: 1) Change in tax law resulting from the OBBBA. 2) Change in federal policy as a result of the U.S. Administration Executive Order (“EO”) 14315. 3) Change in several import tariffs on raw materials and equipment. First, the OBBBA, 65 which was signed into law on July 4, 2025, ended PTC and ITC for solar and wind resources that are placed in service after December 31, 2027. There are exceptions to this deadline due to safe harbor provisions, discussed further below, for wind or solar projects that start construction prior to July 4, 2026. For other technologies, such as BESS, the ITC phases out over time for projects that are placed in service during the years listed as follows: • • • • 100 percent in 2033; 75 percent in 2034; 50 percent in 2035; and 0 percent in 2036 and beyond. Furthermore, the OBBBA restricts federal tax-credit eligibility based on the percentage of total direct costs attributable to manufactured products incorporated into the energy storage technology that are from an FEOC country, such as China, North Korea, Iran, and Russia. These restrictions impact energy storage significantly because China’s share of the global battery manufacturing 64 In the 2024 Joint IRP Action Plan Progress Report, Docket No. 26-02031, the Companies reported that the planned in-service date for the project was September 2031. 65 Congress, Public Law 119-21- July 4, 2025, available at https://www.congress.gov/119/plaws/publ21/PLAW119publ21.pdf. 142 Page 146 of 245Page 147 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 147 of 245 supply chain is approximately 70 to 90 percent. 66 Following is a list describing the material assistance cost ratio threshold percentage—the percentage of direct costs attributable to manufactured products incorporated into the energy storage technologies that are not from a prohibited foreign entity—for BESS that are placed in service in applicable years: • • • • • 55 percent in 2026; 60 percent in 2027; 65 percent in 2028; 70 percent in 2029; and 75 percent after December 31, 2029. The exception to this provision is that it does not apply to projects that start construction prior to December 31, 2025. These thresholds place additional constraints that pose equipment supply challenges and create upward pressure on prices. On February 12, 2026, the Department of the Treasury and the IRS issued a notice 67 with interim guidance on determining FEOC compliance for tax-credit planning purposes. However, many of the details remain unclear, and the notice also provides that the Treasury and IRS intend to propose regulations and further guidance in the future. While the OBBBA includes numerous other changes not detailed above, the elimination of tax credits and restrictions on supply chains has the net effect of adding risk to tax-credit eligibility which increases the pricing outlook. Second, the U.S. Administration’s July 7, 2025, EO 14315 “Ending Market Distorting Subsidies for Unreliable, Foreign Controlled Energy Sources” 68 directed both the Secretary of the Treasury and the Secretary of the Interior to issue new guidance or otherwise implement the steps necessary to enforce the termination of the tax credits and eliminate preferential treatment for wind and solar facilities. On August 15, 2025, the U.S. Treasury Department issued Notice 2025-42, 69 in response to EO 14315. In the new guidance, the Treasury clarified that the tax-credit termination applies to wind and solar projects that start construction after July 4, 2026. Projects that start construction prior to this date, and maintain a continuous program of construction, and that are placed in service no more than four calendar years after the calendar year during which construction began, maintain eligibility to claim the tax credits. The methodology utilized to qualify for tax credits under this 66 Congress, Advanced Lithium-Ion Energy Storage Battery Manufacturing in the United States, July 30,2025, available at https://www.congress.gov/crs_external_products/R/PDF/R48538/R48538.6.pdf. 67 IRS, Notice 2026-15, available at https://www.irs.gov/pub/irs-drop/n-26-15.pdf. 68 The White House, Ending Market Distorting Subsidies for Unreliable, Foreign Controlled Energy Sources, July 7, 2025, available at https://www.whitehouse.gov/presidential-actions/2025/07/ending-market-distorting-subsidies-forunreliable-foreign-controlled-energy-sources/. 69 IRS, Notice 2025-42, available at https://www.irs.gov/pub/irs-drop/n-25-42.pdf. 143 Page 147 of 245Page 148 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 148 of 245 guidance is referred to as “safe harbor”, meaning that the tax credits that the project was eligible to receive at the time that the project met the definition of start of construction, and all other qualifying criteria of the guidance, will still be applicable when the project is placed in service even after the tax-credit termination date of December 31, 2027, specified in the OBBBA. The guidance further clarifies what activities constitute start of construction and continuity of construction, as it relates to wind and solar projects. On July 15, 2025, the DOI issued the DOI Review Policy Memorandum with the subject Departmental Review Procedures for Decisions, Actions, Consultations, and Other Undertakings Related to Wind and Solar Energy Facilities, 70 in response to EO 14315. In the DOI Review Policy Memorandum, circulated internally to all DOI Bureau and Office Heads, the Deputy Chief of Staff directed all decisions, actions, consultations, and other undertakings related to wind and solar energy facilities to be submitted to the Office of the Executive Secretariat and Regulatory Affairs, subsequent review by the Office of the Deputy Secretary, and final review by the Office of the Secretary. Referred to as the three-layer review process, the memo effectively stalled all permitting actions, such as environmental reviews, right of way grants, and lease assignments for solar and wind projects that have a federal nexus. Projects located in Nevada are disproportionately impacted by this memo, as over 80 percent of total land in the state is under federal control. The vast majority of solar and wind projects located in the state have at least some part of land, generation tie-line, access road, or other aspect that requires review and authorization by an agency under the DOI. The memo removes the authority from State, District, and Field offices of agencies such as the BLM and others to issue final actions for solar or wind projects and adds additional reviews and final authorization from the highest levels of the DOI. With the added uncertainty on permitting timelines, solar projects’ ability to achieve planned CODs is jeopardized, increasing risks to schedule, tax-credit eligibility and project economics, translating to increased non-deliverability risk and resulting in additional forecasted costs due to delays and contingencies. Taken together, the U.S. Administration EO 14315, the resulting guidance from the U.S. Treasury and the DOI Review Policy Memorandum introduce a significant amount of uncertainty in tax credit eligibility for solar and wind as well as the ability to develop a renewable project with a federal nexus. To illustrate, if a solar project undertakes efforts to safe harbor the tax credits by starting construction prior to July 4, 2026, per the Notice 2025-42 guidance, but is later delayed in its continuous construction efforts due to non-receipt of a requisite permit authorization from the DOI such that it can no longer be placed in service before the end of the fourth calendar year, then the tax credits may not be realized. Hence, the uncertainty adds risk, which in turn adds cost to the pricing outlook for solar and wind. See supra note 10, citing United States Department of the Interior, Memorandum, July 15, 2025, available at https://www.doi.gov/media/document/departmental-review-procedures-decisions-actions-consultations-and-other. 70 144 Page 148 of 245Page 149 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 149 of 245 The third primary factor contributing to the renewable and storage candidate resource pricing outlook expected to increase, is tariffs. Tariffs are taxes on imported products or raw materials. Beginning on February 1, 2025, the U.S. Administration has issued several EOs and taken actions to enact tariffs, and retaliatory tariffs, with both sweeping applicability to all countries as well as targeted to specific countries to varying degrees for specific products. Relevant tariffs include those placed on China, 71 the world’s largest supplier of both solar and battery components such as polysilicon, solar cells, and panels, as well as anodes and cathodes for lithium-ion batteries used in utility-scale BESS. Additionally, tariffs on raw materials such as aluminum and steel 72 have been placed on all countries with few exceptions, as well as tariffs on certain copper imports. While there have been recent developments related to tariffs such as the February 20, 2026 U.S. Supreme Court ruling that the International Emergency Economic Powers Act (“IEEPA”) does not give the President authority to impose tariffs, 73 other measures continue to apply 74 and the uncertain impact due to tariffs remains. The combined effect of these tariffs has resulted in increased pricing outlook for solar and storage resources, as developers look to remove exposure to Chinese tariffs and shift suppliers, sacrificing lower prices for increased certainty. The end result of the three primary factors currently impacting renewable and storage candidate resources discussed above is an increased price outlook for all future resources. Therefore, the pricing for each placeholder candidate resource utilized the “conservative” forecast 75 as published by the National Renewable Energy Laboratory (“NREL”). 76 In regard to tax-credit assumptions, the current expectation for solar and wind resources in general is that tax-credit eligibility is viable through the end of 2030, after which it will not be possible. 77 However, as these causative changes are very recent, the tax-equity market’s risk tolerance has yet to be tested to finance projects with a COD near a 2029 or 2030 safe-harbor eligibility cutoff. Therefore, while candidate pricing The Federal Register, Modifying Reciprocal Tariff Rates To Reflect Trading Partner Retaliation and Alignment, April 15, 2025, available at https://www.federalregister.gov/documents/2025/04/15/2025-06462/modifyingreciprocal-tariff-rates-to-reflect-trading-partner-retaliation-and-alignment. 72 The Federal Register, Addressing Certain Tariffs on Imported Articles, April 29, 2025, available at https://www.federalregister.gov/documents/2025/05/02/2025-07835/addressing-certain-tariffs-on-imported-articles. 73 United States Library of Congress, Supreme Court Rules Against Tariffs Imposed Under the International Emergency Economic Powers Act (IEEPA), February 20, 2026, available at https://www.congress.gov/crsproduct/LSB11398 74 Directly following the termination of the tariffs under IEEPA, the U.S. Administration implemented a 10 percent additional global tariff under Section 122 of the Trade Act of 1974. See U.S. Federal Register, Imposing a Temporary Import Surcharge To Address Fundamental International Payments Problems, February 20, 2026, available at https://www.federalregister.gov/documents/2026/02/25/2026-03824/imposing-a-temporary-import-surcharge-toaddress-fundamental-international-payments-problems 75 NREL publishes data using three assumption levels to project technological advancement: Conservative, Moderate, and Advanced, with the Conservative assumption representing the slowest rate of investment and technological advancement leading to costs and performance lagging behind the Moderate and Advanced cases. 76 National Renewable Energy Laboratory, Annual Technology Baseline, April 12, 2026, available at https://atb.nrel.gov/electricity/2024b/definitions 77 Exceptions include the implementation of safe harbor strategies prior to the passage of the OBBBA, such as those implemented for and applicable to the Sleepy Orange project discussed in this section’s Part E above, that may allow for tax credit eligibility after 2030 under limited and project-specific circumstances. 71 145 Page 149 of 245Page 150 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 150 of 245 assumes tax credit eligibility for wind and solar through 2030, this outlook may change in future filings as the market continues to digest the risks. The outlook for ITC tax-credit eligibility for other candidate resource types such as BESS and pumped storage hydropower extends through 2033 and phases out completely in 2036 and beyond per the OBBBA. F. Named Placeholders Historically, the Companies have sought approval of generation and storage projects in IRPs only for those projects that can start construction during the three-year action plan. As further discussed in other parts of this Renewables Section, 78 the Companies are taking a longer-term and more detailed integrated planning approach, through more efficient planning and project execution, to meet the RPS, load growth, and customer needs for renewable energy at the best value to customers. The various plans considered in the 2026 Joint IRP primarily rely on PPAs for additional supply of low-cost renewable energy, which are projected to continue to be a component of supplying low-cost renewable energy in the future. However, to add planning clarity and comply with the Commission’s guidance for the use of placeholders, 79 the Companies are identifying “named placeholder” projects under the alternative plans. 80 All alternative plans include “named placeholders” that address Directive 6 of the Commission’s April 9, 2024, Modified Final Order in the Fifth Amendment to the Companies’ Triennial 2021 Joint Integrated Resource Plan (“2021 Joint IRP 5A”), Docket No. 23-08015. 81 Named placeholders are provided to represent reasonably See, e.g., Parts A, D, H and I. See 2026 Joint IRP’s Supply Plan, Economic Analysis, Part C. Key Modeling Assumptions, “Placeholder Resources,” starting at 14, for a detailed explanation of the way the Companies have defined and used “placeholders” in this and other IRPs. Aside from the draft regulations currently pending before the Commission in Docket No. 2307026, the term “placeholder” is not currently defined in either the Nevada Revised Statutes or the Nevada Administrative Code. The Commission has addressed how the Companies should use placeholders in IRP proceedings through findings and directives in various IRP decisions, including the Companies’ Triennial 2018 Joint Integrated Resource Plan, Docket No. 18-06003, Final Order (February 15, 2019), where the Commission stated the following in Paragraph 55: “…. Although NV Energy is not seeking approval for any of these resources in this Docket and generally keeps placeholders identical among various Plans to provide a fair and more accurate comparison, the Commission encourages NV Energy to select placeholders in future resource filings that more accurately reflect the general policy of this State toward more renewable generation and energy efficiency as well as NV Energy's own aspirational goals of supplying an ever-greater percentage of energy from renewable sources.” 80 See 2026 Joint IRP Supply Plan, Economic Analysis, Part E. Plan Development, “Alternative Plans,” starting at 56, for a detailed explanation of the alternative plans in this IRP. 81 See 2021 Joint IRP 5A Modified Final Order, Par. 331 (“…[Commission] orders NV Energy to include reasonably known projects as placeholders and to reflect more accurate pricing/cost structures for its renewable placeholders….”), Par. 333 (“The Commission finds that, at a minimum, a project for which an agreement, such as an APA, is in place, a land acquisition and/or permitting has been completed, and any project that NV Energy plans on seeking approval in the three-year action plan period should be considered a reasonably known project and included as a placeholder in the economic analysis.”), and Par. 334 (“….The Commission finds that is not appropriate for NV Energy to use renewable PPA pricing for all renewable placeholders given that NV Energy has been requesting more 78 79 146 Page 150 of 245Page 151 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 151 of 245 known projects in progress or requested, and to reflect anticipated company-owned projects. These are presented with estimated cost/pricing data, including anticipated associated transmission infrastructure costs, and are described further in this Renewables Section. The Companies are not requesting approval of any of the named placeholders, and placeholders are subject to change as needs and circumstances change. The Companies are naming placeholder resources for three distinct new utility-scale projects: one that is not located on company-owned or controlled land, and two that are located on companyowned or controlled land. The Companies present these resources with the intent of growing its portfolio of renewable energy resources to meet several business and policy objectives including the following: 1) Support closing the Companies’ open capacity positions, 2) Comply with the Nevada RPS, 3) Meet customers’ sustainability business goals to be carbon-free, 4) reduced exposure to market price volatility, and 5) Progressing towards the State of Nevada’s 2050 clean energy goal, 82 as described in the ECON narrative. The timing of these projects was driven by the Companies’ open position and RPS needs. Table REN-3 Named Placeholder Summary Storage Capacity (MW) Term Expected Commercial (years) Operation NREL Cost77 Technology Project Description Type Generation Capacity (MW) Solar BESS Sierra Solar II BESS PPA NA 591 1/1/2031 20 NA $179.95 Solar PV Sierra Solar II PV PPA 600 NA 1/1/2033 30 $57.17 NA Idaho Wind PPA 747 NA 1/1/2034 25 $73.17 NA Idaho Wind PPA 184 NA 1/1/2035 25 $72.80 NA Idaho Wind PPA 21 NA 1/1/2036 25 $72.33 NA Wind Generation79 Storage80 As discussed in the Economic Analysis, the Companies modeled both future candidate resources and the named placeholder costs based on NREL published cost data that was adjusted based on recent RFP proposal pricing as applicable. Idaho Wind, the project not located on companyowned or controlled land, is included due to the Companies’ allocation of 952 MW of transmission rights on the Southwest Intertie Transmission Project (“SWIP North”), which is currently under development and expected to become operational in NV Energy-owned projects in recent IRPs and IRP amendments. The price for PPA resources is known and fixed at the time of Commission approval, whereas, NV Energy-owned projects may be subject to cost overruns and are recovered through the BTGR for which NV Energy earns a return on its investment….”). 82 See NRS § 704.7820(2), codifying 2019 Nev.Stat., ch. 3, § 8(2) (S.B.358) (setting Nevada’s 2050 clean energy goal), which declares Nevada’s policy goal of achieving by 2050 an amount of energy production from zero carbon dioxide emission resources equal to the total amount of electricity sold by providers of electric service in the State. 147 Page 151 of 245Page 152 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 152 of 245 2028. Idaho wind projects are anticipated to have high capacity factors that are complementary to the Companies’ existing resource mix. The Companies anticipate bringing projects forward in the next IRP to satisfy the SWIP North allocation. Sierra Solar Phase II’s BESS resource and Sierra Solar Phase II’s solar PV resource are included due to land rights owned by the Companies for these phases. The Companies could submit these named placeholders for regulatory approval in future IRP filings. Additionally, the request for approval of named placeholders in future IRP filings will accommodate the evolving needs of the Companies, such as updated load forecasts and other changes that impact the Companies’ resource needs. The historical practice of identifying projects only within the three-year action period limits the Companies’ ability to achieve key project development milestones that de-risk schedule and cost. The identification of named place holders past the three-year action period provides regulators, stakeholders, and customers transparency into the Companies’ renewables project plans. G. Renewable Energy Planning: RPS Compliance The alternative plans presented in this filing include the Obsidian, Ward, Wildhorse, Low Carbon and No Open Position Plans as described in the Economic Analysis. 83 The Companies vigilantly plan for their ongoing RPS PC requirements, recognizing there are still uncertainties and risks inherent in renewable energy production and renewable project development. The planning strategy incorporates all rules, regulations, and requirements codified in NRS §§ 704.7801 through 704.7828. In determining future PC needs, the Companies carefully consider the following overarching objectives: • Full compliance with an escalating and compressed RPS schedule: 34 percent through 2026, 42 percent in years 2027-2029, and 50 percent in 2030 and beyond; • Ensuring enough renewable capacity to satisfy a strong and growing demand from the Nevada business community to meet their energy needs from carbon-free, sustainable energy; and • Developing a long-term strategy to build a generating portfolio that is capable of progressing towards the Nevada policy goal “of achieving by 2050 an amount of energy production from zero carbon dioxide emission resources equal to the total amount of electricity sold by providers of electric service in this State.” 84 See Economic Analysis, Part E. Plan Development, for a detailed explanation of the alternative plans presented in this filing. 84 NRS § 704.7820(2). 83 148 Page 152 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026