Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 151 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 151 of 245 known projects in progress or requested, and to reflect anticipated company-owned projects. These are presented with estimated cost/pricing data, including anticipated associated transmission infrastructure costs, and are described further in this Renewables Section. The Companies are not requesting approval of any of the named placeholders, and placeholders are subject to change as needs and circumstances change. The Companies are naming placeholder resources for three distinct new utility-scale projects: one that is not located on company-owned or controlled land, and two that are located on companyowned or controlled land. The Companies present these resources with the intent of growing its portfolio of renewable energy resources to meet several business and policy objectives including the following: 1) Support closing the Companies’ open capacity positions, 2) Comply with the Nevada RPS, 3) Meet customers’ sustainability business goals to be carbon-free, 4) reduced exposure to market price volatility, and 5) Progressing towards the State of Nevada’s 2050 clean energy goal, 82 as described in the ECON narrative. The timing of these projects was driven by the Companies’ open position and RPS needs. Table REN-3 Named Placeholder Summary Storage Capacity (MW) Term Expected Commercial (years) Operation NREL Cost77 Technology Project Description Type Generation Capacity (MW) Solar BESS Sierra Solar II BESS PPA NA 591 1/1/2031 20 NA $179.95 Solar PV Sierra Solar II PV PPA 600 NA 1/1/2033 30 $57.17 NA Idaho Wind PPA 747 NA 1/1/2034 25 $73.17 NA Idaho Wind PPA 184 NA 1/1/2035 25 $72.80 NA Idaho Wind PPA 21 NA 1/1/2036 25 $72.33 NA Wind Generation79 Storage80 As discussed in the Economic Analysis, the Companies modeled both future candidate resources and the named placeholder costs based on NREL published cost data that was adjusted based on recent RFP proposal pricing as applicable. Idaho Wind, the project not located on companyowned or controlled land, is included due to the Companies’ allocation of 952 MW of transmission rights on the Southwest Intertie Transmission Project (“SWIP North”), which is currently under development and expected to become operational in NV Energy-owned projects in recent IRPs and IRP amendments. The price for PPA resources is known and fixed at the time of Commission approval, whereas, NV Energy-owned projects may be subject to cost overruns and are recovered through the BTGR for which NV Energy earns a return on its investment….”). 82 See NRS § 704.7820(2), codifying 2019 Nev.Stat., ch. 3, § 8(2) (S.B.358) (setting Nevada’s 2050 clean energy goal), which declares Nevada’s policy goal of achieving by 2050 an amount of energy production from zero carbon dioxide emission resources equal to the total amount of electricity sold by providers of electric service in the State. 147 Page 151 of 245
  2. Page 152 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 152 of 245 2028. Idaho wind projects are anticipated to have high capacity factors that are complementary to the Companies’ existing resource mix. The Companies anticipate bringing projects forward in the next IRP to satisfy the SWIP North allocation. Sierra Solar Phase II’s BESS resource and Sierra Solar Phase II’s solar PV resource are included due to land rights owned by the Companies for these phases. The Companies could submit these named placeholders for regulatory approval in future IRP filings. Additionally, the request for approval of named placeholders in future IRP filings will accommodate the evolving needs of the Companies, such as updated load forecasts and other changes that impact the Companies’ resource needs. The historical practice of identifying projects only within the three-year action period limits the Companies’ ability to achieve key project development milestones that de-risk schedule and cost. The identification of named place holders past the three-year action period provides regulators, stakeholders, and customers transparency into the Companies’ renewables project plans. G. Renewable Energy Planning: RPS Compliance The alternative plans presented in this filing include the Obsidian, Ward, Wildhorse, Low Carbon and No Open Position Plans as described in the Economic Analysis. 83 The Companies vigilantly plan for their ongoing RPS PC requirements, recognizing there are still uncertainties and risks inherent in renewable energy production and renewable project development. The planning strategy incorporates all rules, regulations, and requirements codified in NRS §§ 704.7801 through 704.7828. In determining future PC needs, the Companies carefully consider the following overarching objectives: • Full compliance with an escalating and compressed RPS schedule: 34 percent through 2026, 42 percent in years 2027-2029, and 50 percent in 2030 and beyond; • Ensuring enough renewable capacity to satisfy a strong and growing demand from the Nevada business community to meet their energy needs from carbon-free, sustainable energy; and • Developing a long-term strategy to build a generating portfolio that is capable of progressing towards the Nevada policy goal “of achieving by 2050 an amount of energy production from zero carbon dioxide emission resources equal to the total amount of electricity sold by providers of electric service in this State.” 84 See Economic Analysis, Part E. Plan Development, for a detailed explanation of the alternative plans presented in this filing. 84 NRS § 704.7820(2). 83 148 Page 152 of 245
  3. Page 153 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 153 of 245 The annual RPS PC requirements were calculated in compliance with NRS § 704.7821, which sets forth the annual PC requirement for the Companies based on a percentage of total electricity sold to their respective retail customers during a calendar year. The expected PC supply was determined starting with the current portfolio of approved projects, both operating and under development or contemplated by the Companies. The following assumptions are built into the PC supply forecast: • Existing PPAs expire in accordance with the contract terms and are not automatically renewed. The Companies reached out to all geothermal supplier counterparties whose contracts will be expiring in the next five years to commence discussions related to future renewals or extensions; 85 the Beowawe, Burdett, Desert Peak 2, and Galena 3 contracts have been renegotiated in the Ormat Geothermal Portfolio, Docket No. 2211032. A contract extension for the Stillwater Geothermal project is under evaluation. • The Companies adjusted the expected amount of energy and PCs from renewable facilities for the period of 2027-2028 in cases where the historic generation, based on two or more years of data, consistently varied from that of the contractual or expected supply table. This is consistent with the methodology that the Companies used for the past several years in developing their IRPs and Energy Supply Plans (“ESPs”). This adjustment recognizes that options to address underperformance within a shorter planning window are limited. It also aligns the short-term and long-term plans. Adjustments for 2029 were not identified, as actual resource performance from 2025 that would inform a 2029 adjustment was unavailable at the time of the analysis. • The projected number of PCs derived from the Renewable Generations incentive programs plateaued in 2020, with the last of the incentivized solar systems installed. Thus, the expected number of PCs from incentivized rooftop solar is forecasted to continue to decrease by 0.5 percent per year as these systems age and their output slowly begins to decline. 86 • Solar systems placed into service before December 31, 2015, qualify for the solar multiplier; systems placed into service after do not qualify. • Surplus/Deficit PCs are not being carried forward. This does not imply that the Companies would rule out renewing or extending existing agreements. Rather, it recognizes the uncertainty as to whether the resource could continue to support ongoing generation and whether the Companies and the counterparties can come to terms on renewing the agreement to address changes in expected output or other necessary contract revisions, or simply extending the term of the agreement under a materially similar contract. 86 Annual degradation is based on the median degradation rate published by National Renewable Energy Laboratory, available at https://www.nrel.gov/solar/market-research-analysis/blog/posts/stat-faqs-part2-lifetime-of-pv-panels. 85 149 Page 153 of 245
  4. Page 154 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 154 of 245 • The RPS outlook assumes that generation from both company-owned solar PV systems and PPA projects would degrade starting the year following the first full year of operation. Annual degradation is based on project specific data provided by the solar panel suppliers or project developers. • Geothermal generation would continue to qualify for station usage credits, while all other technologies would no longer qualify. • The RPS outlook accounts for all pending and existing NGR and ESAs as of December 31, 2025, where PCs associated with all or a portion of the output from a renewable facility(ies) has been assigned to a customer under the NGR, the MPE or LCMPE tariffs, or other customer energy agreements, and therefore, cannot be used by the Companies in meeting their RPS credit requirements. 87 As of April 2026, the NGR forecast, incorporated into the assessment of need discussed in the Economic Analysis, reflects existing commitments through 2027. Beginning in 2030, the forecast assumes the annual limits established in Docket No. 25-03025, with reduced limits for Sierra during the 2028-2029 period as established in Docket No. 26-04021; • The RPS outlook adjusts the retail sales total that is used to calculate the RPS requirement to exclude sales to bundled NGR or ESA customers, and other customers participating in a program of optional pricing that includes the transfer of PCs above that required for RPS compliance in an amount that is equal to the number of credits transferred to or retired on behalf of the participating customers. • The RPS outlook assumes that the net energy produced by Hoover and allocated to Nevada Power counts towards meeting the RPS. • The RPS outlook assumes no changes to the existing statutory and regulatory RPS regime. • The base plan RPS outlook has been adjusted to account for recent cancellations and delays associated with the 120-MW Ormat Western Geothermal Portfolio (OWGP), originally consisting of eight geothermal plants with staggered COD dates. 88 Ormat Technologies has provided notice to the Companies that two of its portfolio projects, North Valley 2 and Gerlach, have been cancelled, and the Lone Mountain project COD has been delayed from January 2026 to October 2028. Sierra will be the sole offtaker The PCs associated with output assigned to a customer under a customer agreement are not counted towards the Companies’ total PCs used to determine RPS compliance. 88 Ormat Western Geothermal Portfolio (OWGP) was approved in the Fourth Amendment to the 2021 Joint IRP, Docket No. 22-11032. 87 150 Page 154 of 245
  5. Page 155 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 155 of 245 of the energy and PCs from the Ormat Western Geothermal Portfolio (OWGP). The total number of PCs for the portfolio includes estimated station usage PCs. Certain geothermal station usage, the energy for the extraction and transportation of geothermal brine or used to pump or compress geothermal brine, is eligible for certification under the NRS § 704.78215(3)(b). Station usage PCs for these facilities were estimated at 15 percent of net. • The plan RPS outlook has been adjusted to account for recent cancellations and delays associated with the 127.9-MW solar and 127.9-MW BESS Boulder Solar III facility approved in Docket No. 24-05041. As discussed above, the agreement for the project that was intended to reach COD on June 1, 2027, has been terminated. Nevada Power was the sole offtaker of the energy and PCs from the terminated agreement. A new PPA with a planned COD of June 1, 2028, is being sought for approval in this filing. • The annual amount of energy produced by solar PV systems paired with BESS has been reduced to account for battery losses which are site-specific but typically further degrade by less than one percent annually. The adjustment recognized that not all of the energy produced by solar PV arrays paired with energy storage will be delivered real-time to the grid. Some of the energy will be stored and dispatched at a later time when needed. The process of charging and discharging the batteries will result in energy losses. • An adjustment has been added to the model to capture the generation and PCs lost due to curtailment. The curtailed amount is estimated by the PLEXOS ST model as an annual amount and varies year to year. This adjustment recognizes that as renewable energy becomes the dominant source of generation, there may be times when the transmission system cannot accommodate all of the energy being produced making generation curtailment necessary to maintain grid integrity. 151 Page 155 of 245
  6. Page 156 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 156 of 245 • The plan assumes an extension of the Liberty Utilities (“Liberty”) contract through December 31, 2027, reflecting potential delays with Greenlink West that would enable Liberty’s transition to Network Integration Transmission Service. • In the absence of a Commission-approved allocation, 89 the Libra Solar & Storage Project is allocated 100 percent to Sierra for purposes of projecting RPS compliance in this Part H, in contrast to the proposed allocation of 100 percent to Nevada Power as assumed in analyses conducted in Part E above 90 and as proposed in the 2024 Joint IRP (Docket No. 24-05041);). 91 • The plan excludes the Libra Solar & Storage Project Third Amendment as the project was not evaluated in the economic analysis due to its 2048 in-service date; • The plan includes a modified load forecast that is detailed in Section 3, the Load Forecast Section of the Supply Plan Narrative. • The plan assumes a reduction in previously forecasted PCs due to the Community Solar Program proposed by the Companies in the 2024 Joint IRP (Docket No. 24-05041) not receiving approval in the Commission’s Order. Technical Appendices REN-1 and REN-2 provide the annual supply tables of proposed renewable energy projects requested in this filing, and the RPS buildout scenarios, respectively. The following sets of chart-related figures illustrate the RPS compliance projections for Nevada Power, Sierra, and the combined Companies. The first set of figures assumes that no action is taken to add new renewable or storage resources – neither the ones requested for approval in this filing nor placeholders. All figures are based on the Companies’ current renewable portfolio, viable pipeline projects, and above planning protocol under a base load. See Docket No. 24-05041, Dec. 20, 2024, Order at 252, Par. 680 (“The Commission approves the Libra PPA without allocating its energy, capacity, and PCs to either NPC or SPPC at this time…”). 90 See supra note 57. 91 See Docket No. 24-05041, 2024 Joint IRP, Supply Plan, Renewables, Volume 8 at 82-84 of 393. 89 152 Page 156 of 245
  7. Page 157 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 157 of 245 FIGURE REN-31 Assuming no actions to add new renewable or storage resources are taken, the Companies are projected to be non-compliant starting in 2027. FIGURE REN-32 Assuming that no actions to add new renewable or storage resources are taken and no PC sharing occurs, Sierra is projected to be non-compliant starting in 2027. 153 Page 157 of 245
  8. Page 158 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 158 of 245 FIGURE REN-33 Assuming that no actions to add new renewable or storage resources are taken, Nevada Power is projected to be non-compliant starting in 2027. The next set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Obsidian Plan. This plan includes future placeholder resources, including the named placeholders described in Part G above. 154 Page 158 of 245
  9. Page 159 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 159 of 245 FIGURE REN-34 FIGURE REN-35 155 Page 159 of 245
  10. Page 160 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 160 of 245 FIGURE REN-36 Under the 2026 Joint IRP Obsidian Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2030, become non-compliant in 2031 through 2032, and return to compliance in 2033 through the end of the 24-year study period (2027-2050). 92 Nevada Power is projected to be non-compliant in 2027 through the end of the study period. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-4 shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. The Companies will pursue all viable plans including inter-company PC transfer and/or procurement of additional generating resources as needed to avoid a noncompliance outcome. Resource plan regulations, including NAC § 704.9152 and 704.923, specify a 20-year resource plan period. For this 2026 Joint IRP, the Companies have extended the economic analyses to cover the study period from 2027 to 2050. A 20-year and a 24-year PWRR for relevant cases and plans has been calculated. See Economic Analysis for a definition of “study period” (C. Key Modeling Assumptions) and how the economic analysis was conducted. 92 156 Page 160 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)