Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 154 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 154 of 245 • The RPS outlook assumes that generation from both company-owned solar PV systems and PPA projects would degrade starting the year following the first full year of operation. Annual degradation is based on project specific data provided by the solar panel suppliers or project developers. • Geothermal generation would continue to qualify for station usage credits, while all other technologies would no longer qualify. • The RPS outlook accounts for all pending and existing NGR and ESAs as of December 31, 2025, where PCs associated with all or a portion of the output from a renewable facility(ies) has been assigned to a customer under the NGR, the MPE or LCMPE tariffs, or other customer energy agreements, and therefore, cannot be used by the Companies in meeting their RPS credit requirements. 87 As of April 2026, the NGR forecast, incorporated into the assessment of need discussed in the Economic Analysis, reflects existing commitments through 2027. Beginning in 2030, the forecast assumes the annual limits established in Docket No. 25-03025, with reduced limits for Sierra during the 2028-2029 period as established in Docket No. 26-04021; • The RPS outlook adjusts the retail sales total that is used to calculate the RPS requirement to exclude sales to bundled NGR or ESA customers, and other customers participating in a program of optional pricing that includes the transfer of PCs above that required for RPS compliance in an amount that is equal to the number of credits transferred to or retired on behalf of the participating customers. • The RPS outlook assumes that the net energy produced by Hoover and allocated to Nevada Power counts towards meeting the RPS. • The RPS outlook assumes no changes to the existing statutory and regulatory RPS regime. • The base plan RPS outlook has been adjusted to account for recent cancellations and delays associated with the 120-MW Ormat Western Geothermal Portfolio (OWGP), originally consisting of eight geothermal plants with staggered COD dates. 88 Ormat Technologies has provided notice to the Companies that two of its portfolio projects, North Valley 2 and Gerlach, have been cancelled, and the Lone Mountain project COD has been delayed from January 2026 to October 2028. Sierra will be the sole offtaker The PCs associated with output assigned to a customer under a customer agreement are not counted towards the Companies’ total PCs used to determine RPS compliance. 88 Ormat Western Geothermal Portfolio (OWGP) was approved in the Fourth Amendment to the 2021 Joint IRP, Docket No. 22-11032. 87 150 Page 154 of 245Page 155 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 155 of 245 of the energy and PCs from the Ormat Western Geothermal Portfolio (OWGP). The total number of PCs for the portfolio includes estimated station usage PCs. Certain geothermal station usage, the energy for the extraction and transportation of geothermal brine or used to pump or compress geothermal brine, is eligible for certification under the NRS § 704.78215(3)(b). Station usage PCs for these facilities were estimated at 15 percent of net. • The plan RPS outlook has been adjusted to account for recent cancellations and delays associated with the 127.9-MW solar and 127.9-MW BESS Boulder Solar III facility approved in Docket No. 24-05041. As discussed above, the agreement for the project that was intended to reach COD on June 1, 2027, has been terminated. Nevada Power was the sole offtaker of the energy and PCs from the terminated agreement. A new PPA with a planned COD of June 1, 2028, is being sought for approval in this filing. • The annual amount of energy produced by solar PV systems paired with BESS has been reduced to account for battery losses which are site-specific but typically further degrade by less than one percent annually. The adjustment recognized that not all of the energy produced by solar PV arrays paired with energy storage will be delivered real-time to the grid. Some of the energy will be stored and dispatched at a later time when needed. The process of charging and discharging the batteries will result in energy losses. • An adjustment has been added to the model to capture the generation and PCs lost due to curtailment. The curtailed amount is estimated by the PLEXOS ST model as an annual amount and varies year to year. This adjustment recognizes that as renewable energy becomes the dominant source of generation, there may be times when the transmission system cannot accommodate all of the energy being produced making generation curtailment necessary to maintain grid integrity. 151 Page 155 of 245Page 156 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 156 of 245 • The plan assumes an extension of the Liberty Utilities (“Liberty”) contract through December 31, 2027, reflecting potential delays with Greenlink West that would enable Liberty’s transition to Network Integration Transmission Service. • In the absence of a Commission-approved allocation, 89 the Libra Solar & Storage Project is allocated 100 percent to Sierra for purposes of projecting RPS compliance in this Part H, in contrast to the proposed allocation of 100 percent to Nevada Power as assumed in analyses conducted in Part E above 90 and as proposed in the 2024 Joint IRP (Docket No. 24-05041);). 91 • The plan excludes the Libra Solar & Storage Project Third Amendment as the project was not evaluated in the economic analysis due to its 2048 in-service date; • The plan includes a modified load forecast that is detailed in Section 3, the Load Forecast Section of the Supply Plan Narrative. • The plan assumes a reduction in previously forecasted PCs due to the Community Solar Program proposed by the Companies in the 2024 Joint IRP (Docket No. 24-05041) not receiving approval in the Commission’s Order. Technical Appendices REN-1 and REN-2 provide the annual supply tables of proposed renewable energy projects requested in this filing, and the RPS buildout scenarios, respectively. The following sets of chart-related figures illustrate the RPS compliance projections for Nevada Power, Sierra, and the combined Companies. The first set of figures assumes that no action is taken to add new renewable or storage resources – neither the ones requested for approval in this filing nor placeholders. All figures are based on the Companies’ current renewable portfolio, viable pipeline projects, and above planning protocol under a base load. See Docket No. 24-05041, Dec. 20, 2024, Order at 252, Par. 680 (“The Commission approves the Libra PPA without allocating its energy, capacity, and PCs to either NPC or SPPC at this time…”). 90 See supra note 57. 91 See Docket No. 24-05041, 2024 Joint IRP, Supply Plan, Renewables, Volume 8 at 82-84 of 393. 89 152 Page 156 of 245Page 157 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 157 of 245 FIGURE REN-31 Assuming no actions to add new renewable or storage resources are taken, the Companies are projected to be non-compliant starting in 2027. FIGURE REN-32 Assuming that no actions to add new renewable or storage resources are taken and no PC sharing occurs, Sierra is projected to be non-compliant starting in 2027. 153 Page 157 of 245Page 158 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 158 of 245 FIGURE REN-33 Assuming that no actions to add new renewable or storage resources are taken, Nevada Power is projected to be non-compliant starting in 2027. The next set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Obsidian Plan. This plan includes future placeholder resources, including the named placeholders described in Part G above. 154 Page 158 of 245Page 159 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 159 of 245 FIGURE REN-34 FIGURE REN-35 155 Page 159 of 245Page 160 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 160 of 245 FIGURE REN-36 Under the 2026 Joint IRP Obsidian Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2030, become non-compliant in 2031 through 2032, and return to compliance in 2033 through the end of the 24-year study period (2027-2050). 92 Nevada Power is projected to be non-compliant in 2027 through the end of the study period. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-4 shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. The Companies will pursue all viable plans including inter-company PC transfer and/or procurement of additional generating resources as needed to avoid a noncompliance outcome. Resource plan regulations, including NAC § 704.9152 and 704.923, specify a 20-year resource plan period. For this 2026 Joint IRP, the Companies have extended the economic analyses to cover the study period from 2027 to 2050. A 20-year and a 24-year PWRR for relevant cases and plans has been calculated. See Economic Analysis for a definition of “study period” (C. Key Modeling Assumptions) and how the economic analysis was conducted. 92 156 Page 160 of 245Page 161 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 161 of 245 TABLE REN-4 2026 IRP - Obsidian Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 RPS STATUS NPC SPPC NVE Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit) NPC SPPC NVE (2,574,221) (799,023) (3,373,244) (2,958,725) 207,772 (2,750,952) (2,673,785) 119,297 (2,554,488) (6,133,384) 816 (6,132,569) (2,017,168) (1,267,556) (3,284,724) (2,543,474) (1,520,216) (4,063,690) (4,535,585) 4,652,937 117,352 (4,926,142) 6,479,797 1,553,654 (5,379,434) 6,710,359 1,330,925 (5,912,461) 8,276,513 2,364,052 (6,347,982) 7,550,146 1,202,163 (6,026,673) 6,746,752 720,079 (4,208,256) 6,082,117 1,873,861 (4,853,074) 5,797,961 944,887 267,739 5,088,497 5,356,236 2,910,700 7,210,609 10,121,310 7,029,710 8,542,442 15,572,152 9,339,573 10,533,757 19,873,331 10,965,213 15,062,924 26,028,137 11,465,205 19,359,766 30,824,971 10,683,124 25,349,398 36,032,522 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over The next set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Ward Plan. The Ward Plan includes all the Approved and Proposed projects that are included in the Obsidian Plan with the expansion of Thermal Generation units in the placeholder resources. A more detailed analysis is provided in the Economic Analysis. 157 Page 161 of 245Page 162 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 162 of 245 FIGURE REN-37 FIGURE REN-38 158 Page 162 of 245Page 163 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 163 of 245 FIGURE REN-39 Under the 2026 Joint IRP Ward Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2030, become non-compliant in 2031 through 2032, and return to compliance in 2033 through the end of the study period. Nevada Power is projected to be noncompliant through 2040. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-5 below shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. 159 Page 163 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026