Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 16 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 16 of 245 service before June 2027. As a result of scope changes and price escalation, the current project cost is expected to be approximately $20 million. c. Valmy Simple-Cycle Plant Project Overview The Commission approved the Valmy Simple-Cycle Plant project in Docket No. 24-05041. The project consists of two simple-cycle natural gas combustion turbines, each approximately 200 MW, for a total of 400 MW. The units will be sited at Valmy, utilizing existing infrastructure and providing fast-start capability to support system reliability. The units will be designated as Valmy Units 3 and Unit 4 and are scheduled to begin commercial operation in June 2028. The Commission approved the Utility Environmental Protection Act (“UEPA”) application., NDEP issued the Title V air permit modification for public comment in February 2026. NPEP addressed public comments in April 2026. The EPA is finalizing their review, which is expected to be completed in May 2026. Civil design is underway, and procurement of major equipment, including turbines, generators, generator step-up transformers, balance of plant equipment, and power distribution centers, is well advanced. Project Costs The project was originally planned under an Engineering, Procurement, and Construction (“EPC”) model consistent with the 2024 Joint IRP. The sole EPC bid received exceeded the IRP estimate, driven by regional labor constraints, continued escalation in large electrical equipment costs, and site-specific workforce challenges associated with Valmy’s remote location. In response, Sierra transitioned to evaluating a General Contractor (“GC”) delivery approach to increase control over engineering, procurement, and critical scopes and to mitigate further cost risk. Under the GC approach, current estimated project costs, excluding AFUDC and tariff impacts, are approximately $752.5 million. The project remains consistent with least-cost planning principles. As shown in Table Report-1, the Combination Case VBDL1, including the Valmy Simple-Cycle Plant project and assuming even the higher $821.9 million EPC cost estimate, continues to produce the lowest 20- and 26year PWRR among all evaluated cases. 12 Page 16 of 245
  2. Page 17 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 17 of 245 TABLE REPORT-1 d. Tracy 4/5 Emission Controls Upgrade Project Project Overview The Commission approved extending the operating life of Tracy Units 4 and 5 (“Tracy 4/5”, also referred to as Piñon Pine Unit 4) to 2049 in Docket No. 23-08015. This extension of operating life required re-evaluation of NOx emission controls to comply with the federal Regional Haze Rule. For Tracy 4/5, SCR was determined to be an appropriate level of emission controls under the federal Regional Haze Rule for continued operation until 2049. Installation of NOx controls needs to be completed within 36 months following EPA approval of the 2025 Nevada Regional Haze SIP revision for Tracy 4/5. Section 5 - Environmental Regulation Updates - provides more information on the federal Regional Haze Rule status. Project Costs In Docket No. 23-08015, the Commission approved $12 million to install SCR as NOx emission controls, without AFUDC. The Commission did not approve Sierra’s request for approval of other “capital projects for continued operation” and directed Sierra to include these projects in future IRP filings or general rate case filings. As of March 2026, the current estimate for project cost was updated to approximately $18.2 million to install SCR for NOx emissions control, without AFUDC. These costs were updated based on a recent indicative estimate by the vendor, received in 2025. e. Sierra Solar Phase I Project Overview The Commission approved Sierra Solar Phase I (“Sierra Solar”) in Docket No. 23-08015. Located in Churchill County, the project combines 400 MW of PV generation with an integrated 1,600 MWh BESS. The facility is interconnected at the newly constructed Lantern Switchyard on the 13 Page 17 of 245
  3. Page 18 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 18 of 245 existing 345-kV Valmy-Tracy Transmission Line, ensuring reliable delivery of clean energy to customers across the region. The project was approved with a budget of $1.536 billion, excluding AFUDC. Significant construction progress continues to be achieved at Sierra Solar. The generation tie, Lantern switchyard, and site substation have been energized and placed in service, and the Sierra Solar BESS was commissioned and began commercial operation on March 20, 2026. On the solar field, all mass grading is complete, and panel deliveries and installations are well underway. Installation activities including racking, module placement, alternating current and direct current terminations, and string wiring are progressing in line with the current construction plan. As a result, Sierra Solar remains on schedule with the BESS commercial operation by July 2026. The Companies continue to target April 2027 as the PV field commercial operation date. Project Costs Current forecasts indicate that Sierra Solar remains within the Commission-approved budget. As of March 2026, approximately $1.28 billion has been expended. 4. New Generation Projects The Companies completed a generation study to investigate its existing plant sites that could support aeroderivative and frame simple-cycle plants and combined-cycle plants. This study examined the following brownfield sites: Fort Churchill, Harry Allen, Valmy, Higgins, Tracy, and Sierra Solar. This generation study is included in Technical Appendix GEN-3 (Confidential). The Companies evaluated multiple thermal resource options and sites based on the information provided in the generation study, which guided the development of the alternate plans for this filing. The Preferred Plan includes the addition of aeroderivative and frame units at Fort Churchill, as shown below: 6 Project Estimate Assumptions The cost estimates for the proposed new‑build generation projects are based on firm fixed‑price EPC bid data for the Valmy Simple-Cycle Plant, submitted in March 2025. Project cash flows were developed using milestone payment structures provided with the EPC proposal, ensuring consistency between the estimate basis and expected expenditure timing. Additionally, historical experience from NV Energy’s recent and comparable simple-cycle generation projects was used While the projects are presented with updated estimated costs in the Joint Application, the Economic Analysis used an earlier vintage of the estimated costs. The differences between the updated costs in the Joint Application and the costs modeled in the Economic Analysis are presented in the Economic Analysis Section of the narrative, under the heading Differences Between Projects As Studied and Projects As Requested for Approval. 6 14 Page 18 of 245
  4. Page 19 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 19 of 245 to inform balance‑of‑plant equipment costs, indirect cost levels, installation approaches, and expected construction logistics. These benchmarks reflect executed and in‑progress peaking projects with similar technology, scope, and execution characteristics across NV Energy’s generation portfolio. Cash‑flow profiles for combustion turbine generators (“CTGs”) and other balance‑of‑plant components outside the EPC scope were developed using representative historical payment curves from prior NV Energy generation projects, ensuring alignment with established procurement and construction practices. The Companies applied a 22.5 percent contingency to capture risks, including permitting durations, construction sequencing, commodity escalation, and site‑specific development challenges. Estimate Risk Considerations Thermal projects costs have increased in recent years due to a combination of sustained inflation, supply-chain disruptions, and labor shortages, which have driven up the prices of critical materials such as steel, cement, electrical equipment, and fuel, while also extending procurement lead times and construction schedules. At the same time, heightened competition for skilled labor has increased wage rates. These pressures are compounded by geopolitical events and energy market volatility, which have amplified price uncertainty, ultimately raising the total capital cost of power generation assets. 7 For combustion turbines from the major Original Equipment Manufacturers (“OEM”), costs have risen sharply because demand has surged far beyond manufacturing capacity while the supply base remains highly constrained. These three OEMs effectively supply the global gas turbine market, and orders have accelerated due to data-center growth, electrification, and reliability needs, pushing turbine lead times to roughly 5 to 7 years and driving significant price escalation. At the same time, production is limited by shortages of specialized labor and critical hot-section components (such as single-crystal blades and forged rotors) that are manufactured by only a handful of suppliers worldwide. This imbalance has made turbines the single largest cost driver in new gas-fired plants and has shifted project economics from fuel-driven decisions to Callum Johnson, Energy and Infrastructure Project Risks Around Escalation, Feb. 19, 2024, available at https://www.whitecase.com/insight-alert/energy-and-infrastructure-project-risks-around-escalation; Mark Shenk, Rush for US Gas Plants Drives Up Costs, Lead Times, July 21, 2025, available at https://www.reuters.com/business/energy/rush-us-gas-plants-drives-up-costs-lead-times-2025-07-21/; Al Greenwood, INSIGHT: Large Construction Cost Overruns Hit US Chemical Plants, Sept. 21, 2023, available at https://www.icis.com/explore/resources/news/2023/09/21/10927175/insight-large-construction-cost-overruns-hit-uschemical-plants/; IEA, Rising Component Prices and Supply Chain Pressures Are Hindering the Development of Transmission Grid Infrastructure, Feb. 25, 2025, available at https://www.iea.org/news/rising-component-prices-andsupply-chain-pressures-are-hindering-the-development-of-transmission-grid-infrastructure. 7 15 Page 19 of 245
  5. Page 20 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 20 of 245 procurement-driven viability, with OEM pricing reflecting backlog risk, inflation, and supply-chain exposure. 8 Key estimate risks are primarily associated with craft labor availability and labor attraction and retention costs, particularly given sustained construction activity across the western United States. Tight labor market conditions may place upward pressure on installed costs and execution efficiency for generation construction. In addition, as discussed above the current market demand for CTGs remains exceptionally high, resulting in significant pricing volatility. Recent market pricing indicates that CTG costs have increased materially relative to earlier budgetary inputs. This observed increase highlights the rapidly changing market conditions for CTGs. Tariff and sales/use tax considerations were applied appropriately to major equipment packages, including CTGs, balance‑of‑plant equipment, structural steel, and electrical materials in alignment with Nevada’s tax treatment of construction materials and equipment, and these tax elements were incorporated directly into the capital cost basis as documented in the Technical Appendix GEN-3 study’s sales tax calculations. Owner’s indirect costs were developed using NV Energy precedents and include project management, engineering, permitting, environmental studies, construction oversight, geotechnical work, security systems, interconnection requirements, and project closeout activities, all of which materially influence total project cost and schedule expectations. These indirect costs reflect typical requirements for complex generation additions and ensure that non‑EPC owner responsibilities are fully captured in the total capital requirement. NV Energy escalated project costs estimates to the year of installation using a 2.5 percent yearly inflation rate based on the assumptions in the Financial Plan. Jared Anderson, US Gas-Fired Turbine Wait Times as Much as Seven Years; Costs Up Sharply, May 20, 2025, available at https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/052025-us-gas-firedturbine-wait-times-as-much-as-seven-years-costs-up-sharply; SustainablePowerNews, Gas Turbine Backlog Crisis: 2026 Orders Double as Buyers Face 5-Year Wait Times, March 26, 2026, available at https://sustainablepowernews.com/gas-turbine-backlog-crisis-orders-double-as-buyers-face-5-year-wait-times/; ManufacturingToday, Gas turbine costs surge 195% as demand outpaces supply, Apr. 3, 2026, available at https://www.manufacturingtodayindia.com/gas-turbine-costs-surge-195, Kevin Clark, Gas turbine prices climb 195% as supply crunch reshapes power development, Apr. 1, 2026, available at https://www.powereng.com/gas/turbines/gas-turbine-prices-climb-195-as-supply-crunch-reshapes-power-development/. 8 16 Page 20 of 245
  6. Page 21 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 21 of 245 Evaluated Technologies: Aeroderivative Combustion Turbines Aeroderivative CTGs were evaluated as smaller, modular thermal resources capable of providing flexible capacity support. These units were modeled as available beginning in 2030 and were typically represented in 200 MW aggregate blocks. Aeroderivative CTGs offer relatively short lead times, rapid start capability, and reduced execution risk compared to larger frame-based units, making them suitable for meeting near-term capacity needs and addressing uncertainty in load growth and resource timing. Additionally, simple-cycle aeroderivatives generally have low water requirements because, unlike combined-cycle units, simple-cycle operations do not require largescale condenser cooling. Water use is generally limited to optional performance enhancement. Frame Combustion Turbines Frame CTGs were evaluated as larger standalone simple-cycle thermal resources capable of providing significant incremental capacity through fewer, higher output units. These units offer higher nameplate capacity per installation relative to aeroderivative technologies and can be effective for meeting bulk capacity needs once constructed. Simple-cycle frame CTGs generally have low water requirements because, unlike combined-cycle units, they do not require large scale condenser cooling and rely primarily on ambient air, with water use generally limited to optional performance enhancement. Frame CTGs have longer procurement, manufacturing, and construction lead times than aeroderivative CTGs. During development of the IRP, information emerged indicating that, due to the increased demand for frame combustion turbines, these units are likely no longer available in time to achieve a 2031 commercial operation date. This development was a factor in the selection of the Preferred Plan, which includes aeroderivative CTGs in-service in 2031 rather than Frame CTGs, as described in the Economic Analysis Section of the narrative. Small Frame 2x1 Combined Cycle The small frame 2x1 combined-cycle configuration was evaluated as a thermal resource. This configuration consists of two frame F class CTGs paired with a single steam turbine nominally rated at roughly 760 MW. By recovering waste heat from CTGs through a steam cycle, combinedcycle resources offer significantly higher thermal efficiency than simple-cycle units. If configured with air-cooled condensers rather than wet cooling systems like a cooling tower, small frame 2x1 combined-cycle facilities can reduce water use by about 95% relative to wet-cooled designs. 9 U.S. Energy Information Administration, Some U.S. electricity generating plants use dry cooling, Aug. 29, 2018, available at https://www.eia.gov/todayinenergy/detail.php?id=36773. 9 17 Page 21 of 245
  7. Page 22 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 22 of 245 Large Frame 2x1 Combined Cycle Large frame 2x1 combined-cycle resources were evaluated as a thermal resource. These facilities consist of two large frame H or J class CTGs paired with a single steam turbine and represent the highest capacity thermal resources evaluated in the IRP. These facilities provide the highest efficiency and output among the thermal technologies evaluated and are well suited for sustained operation over extended periods and are nominally rated at roughly 1,250 MW. If configured with air-cooled condensers rather than wet cooling systems like a cooling tower, large frame 2x1 combined-cycle facilities can reduce water use by about 95% relative to wet-cooled designs.9 a. Fort Churchill Additions 1 Project Project Overview The Fort Churchill Additions 1 Project which is planned to be commercially operational in 2030 is made up of eight ~53.9 MW aeroderivative simple-cycle generating units, designed for peaking service in Sierra’s service territory. The aeroderivative generating units for the Fort Churchill Aeroderivative Additions Project are highly efficient, state-of the-art, combustion turbines. To reduce emissions, a combination of dry low-NOx combustion systems, selective catalytic reduction and carbon monoxide catalyst will be incorporated into the design. It is not certain that these units will meet the Greenhouse Gas Emissions Standards (“GHG Emissions Standards”) carbon dioxide (“CO2”) emissions limit for intermediate-load operation (capacity factor between 20 and 40 percent) under all operating scenarios and are, therefore, were conservatively considered as low-utilization resources (capacity factor of up to 20 percent) for planning purposes. Section 5 - Environmental Regulation Updates - provides more information on the GHG Emissions Standards status. Each aeroderivative gas turbine can reliably produce approximately 50 MW within 5 minutes. The unit can also balance renewable resources by load-following at 50 MW/min ramp rates while maintaining emissions compliance. Natural Gas Supply The Fort Churchill Additions 1 Project is expected to rely on natural gas transportation service. As explained in [Title], Section C – Fuel Supply, Part 1 – Current Physical Gas Supply and Proposed Pipeline Expansion, the Companies requested proposals from three gas pipeline companies. After evaluating the proposals, the Companies selected the proposal provided by Great Basin Gas Transmission Company. The expansion provides sufficient capacity to supply the Forth Churchill Additions 1, 2 and 3 Projects. In addition, the expansion proposal provides sufficient pressure to support LM 6000 units. 18 Page 22 of 245
  8. Page 23 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 23 of 245 Project Costs The estimated cost of the Fort Churchill Additions 1 Project is approximately $2.007 billion (2030$) (without AFUDC). Table GEN-2 shows the construction costs by year, and Table GEN3 shows the line-item detail of the project cost. There is always a risk that material, equipment, and labor costs can increase or decrease between the time of the cost estimates and the time of contract award and procurement. Increases in construction costs in the past few years have been dramatic; however, Sierra has developed estimated costs for major contracts, based on costs seen for the Silverhawk Peaker Project and the Valmy Simple-Cycle Plant, and believes that the costs to construct the Fort Churchill aeroderivative simple-cycle additions project are reasonable. Sierra has placed the order on the CTGs and will be required to make down payments prior to Commission approval. TABLE GEN-2 FORT CHURCHILL ADDITIONS 1 PROJECT ESTIMATED ESCALATED ANNUAL CONSTRUCTION COSTS (EXCLUDING AFUDC) In thousands Year Amount 2026 $197,322 2027 $347,082 2028 $247,807 2029 $786,705 2030 $427,665 Total (2030$) $2,006,583 19 Page 23 of 245
  9. Page 24 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 24 of 245 REDACTED PUBLIC VERSION TABLE GEN-3 FORT CHURCHILL ADDITIONS 1 PROJECT ESTIMATED ESCALATED CONSTRUCTION COSTS BY MAJOR CATEGORY (EXCLUDING AFUDC) (REDACTED) To preserve the 2030 in-service date, Sierra committed million on the Fort Churchill Additions 1 Project to secure long-lead equipment such as the CTGs, generator step-up transformers, and high voltage circuit breakers. The company intends to limit other expenditures until the Commission approves a resource plan which includes the project. Project Schedule Table GEN-4 shows the preliminary project schedule for the Fort Churchill Additions 1 Project. 20 Page 24 of 245
  10. Page 25 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 25 of 245 21 Page 25 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)