Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 160 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 160 of 245 FIGURE REN-36 Under the 2026 Joint IRP Obsidian Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2030, become non-compliant in 2031 through 2032, and return to compliance in 2033 through the end of the 24-year study period (2027-2050). 92 Nevada Power is projected to be non-compliant in 2027 through the end of the study period. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-4 shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. The Companies will pursue all viable plans including inter-company PC transfer and/or procurement of additional generating resources as needed to avoid a noncompliance outcome. Resource plan regulations, including NAC § 704.9152 and 704.923, specify a 20-year resource plan period. For this 2026 Joint IRP, the Companies have extended the economic analyses to cover the study period from 2027 to 2050. A 20-year and a 24-year PWRR for relevant cases and plans has been calculated. See Economic Analysis for a definition of “study period” (C. Key Modeling Assumptions) and how the economic analysis was conducted. 92 156 Page 160 of 245Page 161 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 161 of 245 TABLE REN-4 2026 IRP - Obsidian Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 RPS STATUS NPC SPPC NVE Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit) NPC SPPC NVE (2,574,221) (799,023) (3,373,244) (2,958,725) 207,772 (2,750,952) (2,673,785) 119,297 (2,554,488) (6,133,384) 816 (6,132,569) (2,017,168) (1,267,556) (3,284,724) (2,543,474) (1,520,216) (4,063,690) (4,535,585) 4,652,937 117,352 (4,926,142) 6,479,797 1,553,654 (5,379,434) 6,710,359 1,330,925 (5,912,461) 8,276,513 2,364,052 (6,347,982) 7,550,146 1,202,163 (6,026,673) 6,746,752 720,079 (4,208,256) 6,082,117 1,873,861 (4,853,074) 5,797,961 944,887 267,739 5,088,497 5,356,236 2,910,700 7,210,609 10,121,310 7,029,710 8,542,442 15,572,152 9,339,573 10,533,757 19,873,331 10,965,213 15,062,924 26,028,137 11,465,205 19,359,766 30,824,971 10,683,124 25,349,398 36,032,522 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over The next set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Ward Plan. The Ward Plan includes all the Approved and Proposed projects that are included in the Obsidian Plan with the expansion of Thermal Generation units in the placeholder resources. A more detailed analysis is provided in the Economic Analysis. 157 Page 161 of 245Page 162 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 162 of 245 FIGURE REN-37 FIGURE REN-38 158 Page 162 of 245Page 163 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 163 of 245 FIGURE REN-39 Under the 2026 Joint IRP Ward Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2030, become non-compliant in 2031 through 2032, and return to compliance in 2033 through the end of the study period. Nevada Power is projected to be noncompliant through 2040. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-5 below shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. 159 Page 163 of 245Page 164 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 164 of 245 TABLE REN-5 2026 IRP-Ward Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 RPS STATUS NPC SPPC NVE Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit) NPC SPPC NVE (2,574,277) (799,121) (3,373,398) (2,959,386) 206,870 (2,752,516) (2,674,299) 121,250 (2,553,049) (6,132,943) 10,319 (6,122,624) (2,016,803) (1,281,601) (3,298,404) (2,548,542) (1,541,588) (4,090,130) (4,545,491) 4,723,500 178,010 (4,938,918) 5,850,247 911,329 (5,394,721) 5,811,044 416,323 (5,924,507) 7,214,793 1,290,286 (5,657,745) 6,483,632 825,887 (5,022,697) 5,681,413 658,716 (3,554,934) 5,014,732 1,459,798 (3,359,455) 4,336,489 977,035 1,891,707 3,562,107 5,453,814 5,757,200 4,564,736 10,321,937 9,687,730 5,816,863 15,504,593 12,333,211 7,639,655 19,972,866 13,209,870 11,982,647 25,192,517 13,720,267 16,452,510 30,172,777 14,071,021 21,684,735 35,755,757 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over The next set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Wildhorse Plan. The Wildhorse Plan includes all the Approved and Proposed projects that are included in the Obsidian Plan with the expansion of thermal generation units and the placeholder resources. The Wildhorse Plan has fewer thermal generation units than the Ward Plan and is the least-cost option of the three expansion models. A more detailed analysis is provided in the Economic Analysis. 160 Page 164 of 245Page 165 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 165 of 245 FIGURE REN-40 FIGURE REN-41 161 Page 165 of 245Page 166 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 166 of 245 FIGURE REN-42 Under the Wildhorse Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2029, become non-compliant in 2030 through 2032, and return to compliance in 2033 through the end of the study period. Nevada Power is projected to remain non-compliant in 2027 through 2041 and return to compliance in 2042 through the end of the study period. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-6 below shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. 162 Page 166 of 245Page 167 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 167 of 245 TABLE REN-6 2026 IRP- Wildhorse Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 NPC Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant RPS STATUS SPPC Non-Compliant Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant NVE Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit) NPC SPPC NVE (2,574,302) (799,186) (3,373,488) (2,959,279) 208,319 (2,750,960) (2,673,574) 117,352 (2,556,222) (6,133,680) (14,612) (6,148,292) (2,032,592) (1,299,765) (3,332,357) (2,558,461) (1,557,381) (4,115,842) (4,549,027) 4,799,013 249,986 (4,951,626) 5,984,318 1,032,692 (5,405,855) 5,876,529 470,673 (5,931,883) 6,215,971 284,088 (6,372,026) 7,277,251 905,225 (6,743,205) 7,494,658 751,453 (6,020,003) 6,832,119 812,116 (6,666,025) 7,716,632 1,050,607 (1,381,728) 7,105,957 5,724,229 1,640,494 8,615,652 10,256,146 5,682,710 9,869,791 15,552,501 8,308,741 11,699,471 20,008,212 8,951,019 16,798,056 25,749,075 8,896,499 21,756,055 30,652,554 8,934,177 27,433,001 36,367,178 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over The final set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Low Carbon and No Open Position Plans. 163 Page 167 of 245Page 168 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 168 of 245 FIGURE REN-43 FIGURE REN-44 164 Page 168 of 245Page 169 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 169 of 245 FIGURE REN-45 FIGURE REN-46 165 Page 169 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026