Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 164 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 164 of 245 TABLE REN-5 2026 IRP-Ward Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 RPS STATUS NPC SPPC NVE Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit) NPC SPPC NVE (2,574,277) (799,121) (3,373,398) (2,959,386) 206,870 (2,752,516) (2,674,299) 121,250 (2,553,049) (6,132,943) 10,319 (6,122,624) (2,016,803) (1,281,601) (3,298,404) (2,548,542) (1,541,588) (4,090,130) (4,545,491) 4,723,500 178,010 (4,938,918) 5,850,247 911,329 (5,394,721) 5,811,044 416,323 (5,924,507) 7,214,793 1,290,286 (5,657,745) 6,483,632 825,887 (5,022,697) 5,681,413 658,716 (3,554,934) 5,014,732 1,459,798 (3,359,455) 4,336,489 977,035 1,891,707 3,562,107 5,453,814 5,757,200 4,564,736 10,321,937 9,687,730 5,816,863 15,504,593 12,333,211 7,639,655 19,972,866 13,209,870 11,982,647 25,192,517 13,720,267 16,452,510 30,172,777 14,071,021 21,684,735 35,755,757 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over The next set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Wildhorse Plan. The Wildhorse Plan includes all the Approved and Proposed projects that are included in the Obsidian Plan with the expansion of thermal generation units and the placeholder resources. The Wildhorse Plan has fewer thermal generation units than the Ward Plan and is the least-cost option of the three expansion models. A more detailed analysis is provided in the Economic Analysis. 160 Page 164 of 245
  2. Page 165 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 165 of 245 FIGURE REN-40 FIGURE REN-41 161 Page 165 of 245
  3. Page 166 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 166 of 245 FIGURE REN-42 Under the Wildhorse Plan, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2029, become non-compliant in 2030 through 2032, and return to compliance in 2033 through the end of the study period. Nevada Power is projected to remain non-compliant in 2027 through 2041 and return to compliance in 2042 through the end of the study period. The Companies combined are projected to be non-compliant in 2027 through 2032. Table REN-6 below shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. The table also shows the projected surplus/(deficit) for both utilities and for the Companies combined. 162 Page 166 of 245
  4. Page 167 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 167 of 245 TABLE REN-6 2026 IRP- Wildhorse Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 NPC Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant RPS STATUS SPPC Non-Compliant Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant NVE Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit) NPC SPPC NVE (2,574,302) (799,186) (3,373,488) (2,959,279) 208,319 (2,750,960) (2,673,574) 117,352 (2,556,222) (6,133,680) (14,612) (6,148,292) (2,032,592) (1,299,765) (3,332,357) (2,558,461) (1,557,381) (4,115,842) (4,549,027) 4,799,013 249,986 (4,951,626) 5,984,318 1,032,692 (5,405,855) 5,876,529 470,673 (5,931,883) 6,215,971 284,088 (6,372,026) 7,277,251 905,225 (6,743,205) 7,494,658 751,453 (6,020,003) 6,832,119 812,116 (6,666,025) 7,716,632 1,050,607 (1,381,728) 7,105,957 5,724,229 1,640,494 8,615,652 10,256,146 5,682,710 9,869,791 15,552,501 8,308,741 11,699,471 20,008,212 8,951,019 16,798,056 25,749,075 8,896,499 21,756,055 30,652,554 8,934,177 27,433,001 36,367,178 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over The final set of figures shows Nevada Power, Sierra, and the combined Companies’ projected compliance under the Low Carbon and No Open Position Plans. 163 Page 167 of 245
  5. Page 168 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 168 of 245 FIGURE REN-43 FIGURE REN-44 164 Page 168 of 245
  6. Page 169 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 169 of 245 FIGURE REN-45 FIGURE REN-46 165 Page 169 of 245
  7. Page 170 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 170 of 245 FIGURE REN-47 FIGURE REN-48 Under the Low Carbon Plan, Sierra is expected to be compliant in 2027 through the end of the study period. Nevada Power is expected to be non-compliant in 2027 through 2029 and compliant in 2030 through the end of the study period. The Companies combined are expected to be 166 Page 170 of 245
  8. Page 171 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 171 of 245 compliant in 2027 through the end of the study period. Under the No Open Position Plan, Sierra is expected to be non-compliant in 2027, compliant in 2028 and 2029, non-compliant in 2030 through 2032, and return to compliance in 2033 through the end of the study period. Nevada Power is projected to be non-compliant in 2027 through 2042 and return to compliance in 2043 through the end of the study period. The Companies combined are expected to be non-compliant in 2027 through 2032 and return to compliance for the remainder of the study period. Table REN-7 and Table REN-8 below shows the projected compliance status for each utility and the Companies combined for the period 2027 through 2047. TABLE REN-7 2026 IRP- Low Carbon Plan 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 RPS STATUS NPC SPPC Non-Compliant Compliant Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant NVE Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit)* NPC SPPC NVE (2,593,264) 3,186,511 593,247 (3,115,075) 10,450,301 7,335,226 (2,878,713) 18,214,518 15,335,805 9,311,041 21,805,471 31,116,511 12,960,111 20,872,742 33,832,853 12,760,533 21,158,075 33,918,608 13,924,812 23,531,136 37,455,948 13,809,851 23,328,582 37,138,433 13,618,202 23,089,038 36,707,240 13,302,569 24,519,695 37,822,264 12,229,763 28,713,008 40,942,770 12,000,940 30,285,312 42,286,252 12,089,893 31,364,937 43,454,830 12,156,222 33,101,005 45,257,227 12,230,018 33,797,745 46,027,763 13,342,590 34,155,393 47,497,983 14,142,534 34,073,044 48,215,578 13,790,999 35,459,925 49,250,924 14,518,156 37,016,463 51,534,618 15,467,638 37,031,462 52,499,101 17,365,381 36,158,873 53,524,254 *The Projected Credit Surplus/(Deficity) does not include the previous year carry-over 167 Page 171 of 245
  9. Page 172 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 172 of 245 TABLE REN-8 2026 IRP- No Open Position 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 NPC Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant RPS STATUS SPPC Non-Compliant Compliant Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant NVE Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Non-Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Compliant Projected Credit Surplus/(Deficit)* NPC SPPC NVE (2,574,222) (798,994) (3,373,216) (2,959,088) 206,735 (2,752,354) (2,673,343) 121,004 (2,552,339) (6,135,154) (7,903) (6,143,057) (2,028,971) (1,301,384) (3,330,355) (2,554,950) (1,552,539) (4,107,489) (4,547,147) 4,699,606 152,459 (4,944,379) 5,831,065 886,686 (5,401,075) 5,745,235 344,160 (5,925,163) 6,113,599 188,436 (2,969,879) 6,100,186 3,130,307 (3,333,752) 5,311,839 1,978,087 (3,560,577) 4,655,212 1,094,635 (4,205,199) 5,187,957 982,757 (3,460,656) 9,003,546 5,542,890 (2,902,602) 13,451,994 10,549,392 708,531 14,810,086 15,518,617 3,548,418 16,505,953 20,054,371 11,344,742 14,351,675 25,696,417 11,960,291 17,963,888 29,924,179 11,341,192 23,973,033 35,314,226 *The Projected Credit Surplus/(Deficit) does not include the previous year carry-over Compliance Outlook NEVADA POWER With the approval of the proposed projects in this filing, Nevada Power’s RPS compliance outlook is forecasted to be non-compliant in 2027 through the end of the study period. For several reasons, this Nevada Power RPS compliance outlook is different from those stated in the 2024 Joint IRP and the Portfolio Standard Annual Report for Compliance Year 2025 filed on April 15, 2026, in Docket No. 26-04023. First, the projected high retail load growth 93 coupled with the large RPS compliance tier increase in 2027 to 42 percent, 94 magnify the goal and compound the challenge to For the 2026 Joint IRP’s three-year Action Plan period (2027 through 2029), the CAGR of the annual retail energy for the Companies is 11.3 percent (7.4 percent at Nevada Power and 17.6 percent at Sierra). High retail load growth is also projected for the 20-year period. See the Load Forecast Section within the Load Forecast, Market Fundamentals, Fuel and Purchase Power Price Forecasts Narrative in this 2026 Joint IRP filing, for load forecasting explanations. 94 The statutory RPS compliance tier increases from 34 percent for the period 2024-2026 to 42 percent for the period 2027-2029 and then to 50 percent for 2030 and each year thereafter. See NRS § 704.7821. 93 168 Page 172 of 245
  10. Page 173 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 173 of 245 meet RPS compliance. 95 Referring to Table REN-10 below, Nevada Power’s current retail load outlook in this IRP filing is higher than that of the previously approved plan from the 2024 Joint IRP and in the year when the RPS increases to 42 percent. Because the RPS credit requirement is tied directly to retail sales, the combined change increases Nevada Power’s forecasted RPS credit requirement. Second, the limited available land for development, multiyear project permitting timelines, and lack of available transmission capacity are key constraints in the renewable project pipeline. Third, the completion of costly requisite network upgrades, procurement of long-lead critical equipment, such as breakers and transformers, as well as project permit issuance and transmission interconnectivity capability, are interdependent project milestones that are subject to various independent external forces, exogenous to the project, that may not be knowable or cannot be easily mitigated, even with diligent planning. For example, the Boulder Solar III project approved in Docket No. 24-05041 has experienced challenges in its development due to increased costs, driven primarily by external factors and permitting delays. The developer missed a critical project milestone and subsequently, on March 20, 2026, terminated the PPA. Table REN-9 below shows the PCs Nevada Power has recently lost due to canceled PPAs. TABLE REN-9 NEVADA POWER LOST PROJECTS, LOST GENERATIONS Lost Projects, Lost Generation Projects a. Docket No. Original COD Date Terminated MW AC Iron Point (56% NPC) 21-06001 12/31/2023 6/22/2023 250 Hot Pot (56% NPC) 21-06001 12/31/2024 6/22/2023 350 Southern Bighorn (60% NPC) 19-06039 9/1/2023 11/13/2023 300 Chuckwalla 20-07023 12/1/2023 11/17/2023 200 Boulder Solar III 20-07023 12/31/2023 4/29/2024 128 Boulder Solar III 24-05041 6/1/2027 3/20/2026 128 2,411 Table Notes: a. The energy/credits of the project as allocated between Nevada Power and Sierra per the order. SIERRA With the approval of the proposed projects in this filing, Sierra is projected to be non-compliant in 2027, return to compliance in 2028 through 2030, become non-compliant in 2031 through 2032, and return to compliance in 2033 through the end of the 24-year study period (2027-2050). Compliance in 2028 and 2029 is partly attributable to accounting for the output from Libra in 95 Because Nevada’s RPS is calculated as a percentage of total retail sales, projected retail load growth increases the absolute quantity of qualifying portfolio energy needed for compliance. 169 Page 173 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)