Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 176 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 176 of 245 TABLE REN-11 SIERRA LOST PROJECTS, LOST GENERATION Lost Projects, Lost Generation Docket No. Original COD Date Terminated MW AC 21-06001 12/31/2023 6/22/2023 250 Hot Pot (44% SPPC) 21-06001 12/1/2024 6/22/2023 350 Southern Bighorn (40% SPPC) 19-06039 9/1/2023 11/13/2023 300 Projects a. Iron Point (44% SPPC) North Valmy Eavor Loop 22-11032 12/31/2026 6/22/2024 20 North Valley II (OWGP) 22-11032 1/1/2026 4/25/2025 15 Gerlach (OWGP) 22-11032 1/1/2028 4/25/2025 15 Lone Mountain (OWGP)b. 22-11032 1/1/2026 04/29/25 b. 15 965 Table Notes: a. The energy/credits of the projects as allocated between Nevada Power and Sierra per the order b. The Lone Mountain project has been delayed until 10/01/2028, not cancelled. The date shown reflects when NV Energy was notified of the delay. The Companies are still in discussions with the counterparty to explore all remedial options. Third, Sierra’s compliance outlook is challenged by transmission constraints for Sierra. Currently there is limited ability to move energy from generation to load in Sierra’s service territory in the near term, requiring completion of contingent facilities and significant additional transmission infrastructure to remedy. The completion of Greenlink West and Greenlink North will allow for a significant addition of renewable energy capacity in Sierra’s territory when it goes into service. To mitigate risks resulting in RPS non-compliance, Nevada Power and Sierra will continue to explore near-term options, including evaluating available proposals received from renewable energy RFPs, self-developing projects, discussions with counterparties to amend existing PPAs to facilitate acquisition of additional PCs, conducting bilateral asset purchase and other commercial transactions and exploring short-term purchase agreements that benefit customers, so that it can procure the renewable generation and BESS resources needed to continue meeting their RPS requirements. Nevada Power and Sierra will continue to closely monitor their RPS compliance outlooks, recognizing that there are many factors, some outside of the Companies’ control or exogenous to the projects, which will ultimately determine whether the Companies will have a sufficient number of PCs to satisfy their respective RPS credit obligations. 172 Page 176 of 245
  2. Page 177 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 177 of 245 H. Renewable Energy Plan Overview Nevada is fortunate to have significant renewable resources throughout the state, including some of the greatest solar and geothermal generation potential in the country. The Companies’ efforts to incorporate renewable energy into their generating fleet have grown substantially over the past decade, and the Companies have built a diverse and robust portfolio of renewable projects. In their most recent annual RPS compliance filing, Docket No. 26-04023, Nevada Power and Sierra both exceeded their respective 2025 RPS credit requirements of 34 percent. Nevada Power ended 2025 at 44.6 percent and Sierra at 54.7 percent. The Companies have been continuously compliant with RPS requirements every year since 2010. As of April 30, 2026, Nevada Power had approximately 2,723 MW of contracted and 165 MW of owned renewable generating resources operating and delivering renewable energy to meet the energy needs of its customers. In addition, Nevada Power ended March 2026 with the following three solar PV and BESS projects under development: Sierra Solar, Dry Lake East, and Libra – pending final allocation of the Libra project between Nevada Power and Sierra. Sierra had approximately 945 MW of renewable contracted generating resources and approximately 20 MW of Company-owned generating resources operating and delivering renewable energy to meet the energy needs of its customers. In addition to the aforementioned Sierra Solar PV and BESS project, Sierra ended March 2026 with seven geothermal projects in various stages of development. The following is a summary of Nevada Power’s and Sierra’s portfolios of renewable facilities that contributed to Nevada Power and Sierra meeting the RPS requirements as of March 31, 2026, which includes many resources also depicted in the Long-Term Power Purchase Agreements Section of the Supply Plan. 101 The list below does not include the community-based solar projects, short-term agreements, Nevada Power’s allocation of Hoover, or projects that are dedicated to supporting commitments to meet customer-specific requirements for renewable energy under a Commission-approved NGR Option 2 tariff. 102 The Companies made a separate compliance filing required by Schedule No. NGR in Docket No. 25-03025. Nevada Power 1. Desert Peak 2 Geothermal Power See Figure CON-1 and Figure CON-2 in the Long-Term Power Purchase Agreements Section of the Supply Plan. Nevada Power entered into a short-term purchase agreement with Tonopah Solar Energy for the output of the Crescent Dunes Solar Thermal Plant for the period December 21, 2021, through September 30, 2024, which is not expected to impact the Companies’ RPS compliance outlook. The contribution of the community based solar resources (i.e., Mojave Solar, Freedom Park Solar and Moana Solar) to the RPS compliance outlook is negligible. Facilities entirely dedicated to NGR customers are Boulder Solar II, Fort Churchill Solar, Switch Station 1, Switch Station 2, Techren Solar 2 and Turquoise Nevada. 101 102 173 Page 177 of 245
  3. Page 178 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 178 of 245 The Desert Peak 2 facility is a 25 MW geothermal project located in Churchill County, Nevada. The project was approved by the Commission in 2003. The plant began producing energy in 2007 and the PPA terminates on December 31, 2027. 2. Faulkner 1 Faulkner 1, a/k/a NGP Blue Mountain, is a 49.5 MW geothermal project located in Humboldt County near Blue Mountain, Nevada. The project was approved by the Commission in 2007. The plant began producing energy in 2009 and the PPA terminates on December 31, 2029. 3. Jersey Valley Geothermal Project The Jersey Valley facility is a 22.5 MW geothermal project located in a remote area between Lander and Pershing counties in Nevada. The project was approved by the Commission in 2007. The plant began producing energy in 2011 and the PPA terminates on December 31, 2031. 4. McGinness Hills Geothermal Project The McGinness Hills facility is a 96 MW geothermal project located in Lander County, Nevada. The project was approved by the Commission in 2010. The plant began producing energy in 2012. As part of the existing 20-year PPA between Nevada Power and ORNI 39, LLC (owned by Ormat Technologies), the McGinness Hills geothermal facility was expanded to include a second 48 MW geothermal unit (included in 96 MW total). The second unit declared contractual commercial operation on February 4, 2015. The Commission approved the expansion on December 23, 2013 (Docket No. 13-11007). The PPA terminates on December 31, 2032. 5. Salt Wells Geothermal Plant The Salt Wells facility is a 23.6 MW geothermal project located in Churchill County east of Fallon, Nevada. The project was approved by the Commission in 2007. The plant began producing energy in 2009. The PPA terminates on December 31, 2029. 6. Stillwater 2 Geothermal Plant The Stillwater 2 facility, a/k/a Stillwater Geothermal, is a 47.2 MW geothermal project located in Churchill County, Nevada. The project was approved by the Commission in 2007. The plant began producing energy in 2009. The PPA terminates on December 31, 2029. 7. Tuscarora Geothermal Plant The Tuscarora facility is a 32 MW geothermal project located in Elko County, Nevada. The capacity of the facility was expanded from 25 MW to 32 MW in Docket No. 12-06053, 174 Page 178 of 245
  4. Page 179 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 179 of 245 and the PPA was amended to allow for further capacity increases to up to 50 MW. The plant began producing energy in 2012. The PPA terminates on December 31, 2032. 8. ACE Searchlight Solar ACE Searchlight, now Searchlight Solar, is a 17.5 MW solar PV project near Searchlight, Nevada. The project was approved by the Commission in 2009. The solar farm began producing energy in 2014. The PPA terminates on December 31, 2034. 9. RV Apex RV Apex Solar facility is a 20 MW solar PV project located in Clark County north of Las Vegas, Nevada. The project was approved by the Commission in 2009. The solar facility began producing energy in 2012. The PPA terminates on December 31, 2037. 10. Boulder Solar I Boulder Solar I is a 100 MW solar PV project located in Boulder City, Nevada. The project was approved by the Commission in 2015. The solar project declared commercial operation in December 2016. The 20-year PPA terminates on December 31, 2036. 11. Las Vegas Valley Water District (“LVVWD”) The LVVWD project, a/k/a SunPower, is comprised of six Las Vegas-area small PV arrays collectively totaling 3 MW. The project was approved by the Commission in 2006. These installations began producing electricity in 2006 and 2007. LVVWD provides PCs only to Nevada Power. The agreement terminates on December 31, 2026. 12. Mountain View Solar The Mountain View solar facility is a 20 MW solar PV plant located north of Las Vegas in Clark County, Nevada. The project was approved by the Commission in 2012. The solar project began producing energy in 2014. The PPA terminates on December 31, 2039. 13. Nellis Air Force Base (“AFB”), Solar Star The Nellis AFB Solar Star project, a/k/a Nellis I, is a 13.2 MW solar PV project that produces energy for Nellis Air Force Base, located north of Las Vegas, Nevada. The project was approved by the Commission in 2007. The array began producing electricity in 2007, since then Nellis AFB sells only PCs to Nevada Power. The agreement terminates on December 31, 2027. 175 Page 179 of 245
  5. Page 180 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 180 of 245 14. Nellis Solar Array II Nellis Solar Array II is a 15 MW (nameplate AC) solar PV project located on Nellis AFB in Las Vegas, Nevada. The project was approved by the Commission in Docket No. 1405003. The solar array began producing energy in 2015. The project is owned by Nevada Power. 15. Nevada Solar One Nevada Solar One is a 69 MW concentrated solar thermal plant that is located in the Eldorado Valley near Boulder City, Nevada. Approximately 46.9 MW of the capacity and generation is contracted to Nevada Power. The balance of the capacity and generation is contracted to Sierra. The project was approved by the Commission in 2003. The solar thermal plant began producing energy in 2007 and the PPA terminates on December 31, 2027. 16. Silver State Solar The Silver State Solar facility is a 52 MW solar PV project located in Clark County near Primm, Nevada. The project was approved by the Commission in 2010. The solar project began producing energy in 2012. The PPA terminates on December 31, 2037. 17. FRV Spectrum Solar The FRV Spectrum facility is a 30 MW solar PV plant located north of Las Vegas in Clark County, Nevada. The project was approved by the Commission in 2012. The solar array began producing energy in 2013. The PPA terminates on December 31, 2038. 18. Stillwater 2 Solar The Stillwater 2 Solar facility, a/k/a Stillwater PV, is a 22 MW solar PV project located in Churchill County, Nevada. The project was approved by the Commission in 2011. The solar array began producing energy in 2012. The PPA terminates on December 31, 2029. 19. Eagle Shadow Mountain Solar Farm Eagle Shadow Mountain Solar Farm is a 300 MW solar PV facility located on the Moapa River Indian Reservation north of Las Vegas, Nevada. The solar array is online, capable of generating approximately 265 MW and declared commercial operations on May 10, 2023. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 20. Copper Mountain Solar 5 Copper Mountain Solar 5 is a 250 MW solar PV facility located in Boulder City, Nevada. The solar array declared commercial operations on July 23, 2021. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 176 Page 180 of 245
  6. Page 181 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 181 of 245 21. Arrow Canyon Solar Arrow Canyon Solar, formerly known as Moapa Solar, is a 200 MW solar PV facility with 75 MW of BESS capacity that is located on the Moapa River Indian Reservation north of Las Vegas, Nevada. The project, including the BESS, achieved commercial operation on December 8, 2023. The energy, capacity and PCs generated by the facility will be split 70 percent to Sierra, 30 percent to Nevada Power. The 25-year PPA was approved by the Commission in Docket No. 19-06039. 22. Gemini Solar Gemini Solar is a 690 MW solar PV facility with 380 MW of BESS capacity that is located in Clark County, approximately 25 miles northeast of Las Vegas, Nevada. The project declared commercial operation on March 25, 2024. While 100 percent of the energy and capacity generated by the facility will go to Nevada Power, only 60 percent of the associated PCs will be assigned to Nevada Power, with the balance assigned to Sierra. The 25-year PPA was approved by the Commission in Docket No. 19-06039. 23. Techren Solar I Techren Solar I is a 100 MW solar PV facility located in Boulder City, Nevada. The solar array declared commercial operations on March 11, 2019. The project was approved by the Commission in Docket No. 16-08026. The PPA is for 25 years. 24. Techren Solar III Techren Solar III is a 25 MW solar PV facility located in Boulder City, Nevada. The solar array achieved commercial operation on October 7, 2020. The project was approved by the Commission in Docket No. 17-11004. The PPA is for 25 years. 25. Techren Solar V Techren Solar V is a 50 MW solar PV facility located in Boulder City, Nevada. The solar farm achieved commercial operation on December 31, 2020. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 26. Spring Valley Wind The Spring Valley Wind facility is a 151.8 MW wind project located in Spring Valley near Ely, Nevada. The project was approved by the Commission in 2010. The wind farm began delivering energy in 2012. The PPA terminates on December 31, 2032. 27. Apex Landfill Facility The Apex Landfill facility is a 12 MW landfill gas-to-energy project located in Clark County, Nevada. The project was approved by the Commission in 2009. The plant began producing energy in 2012. The PPA terminates on December 31, 2032. 177 Page 181 of 245
  7. Page 182 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 182 of 245 28. Lockwood Renewable Energy Facility The Lockwood facility, a/k/a WM Renewable Energy-Lockwood, is a 3.2 MW landfill gasto-energy project located at the Lockwood Landfill near Reno, Nevada. The project was approved by the Commission in 2010. The plant began producing energy in 2012. The PPA terminates on December 31, 2032. 29. Goodsprings Recovered Energy Generation Station The Goodsprings Recovered Energy Generation Station is located 35 miles south of Las Vegas, Nevada. It is a 5 MW generating plant that converts waste heat from a natural gas pipeline compressor station to electric energy. The project was approved by the Commission in 2008 and it started producing energy in 2010. The project is owned by Nevada Power. 30. Dry Lake Solar The Dry Lake Solar project is 150 MW solar PV facility with 100 MW of BESS capacity located 20 miles northeast of Las Vegas adjacent to the Harry Allen combined cycle station and is owned by Nevada Power. The project declared commercial operations on May 2, 2024. The 25-year pricing was approved by the Commission in Docket No. 20-07023. Sierra 1. Beowawe Geothermal Power Plant The Beowawe facility, a/k/a OWGP Beowawe, is a 20 MW geothermal facility located in Eureka County and is owned by Terra-Gen Power. The plant was placed into service in 1985 and was originally under contract with Southern California Edison. However, in 2006, Sierra entered into a contract for renewable energy that expires on December 31, 2024. Beowawe is included in Ormat’s geothermal portfolio that was approved in Docket No. 22-11032 with an expiration date of December 31, 2053. 2. Burdette Geothermal Power Plant The Burdette facility is a 26 MW geothermal project located in Washoe County near Steamboat, Nevada. The plant went into service in 2006. Sierra has a 20-year PPA with the facility that expires on December 31, 2026. Burdette is also included in Ormat’s geothermal portfolio that was approved in Docket No. 22-11032 with an expiration date of December 31, 2053. 3. Galena 3 Geothermal Power Plant The Galena 3 facility is a 26.5 MW geothermal project located in Washoe County south of Reno near Steamboat, Nevada. The plant went into service in 2008. Sierra has a 20-year PPA with the facility that expires on December 31, 2028. Galena 3 is also included in 178 Page 182 of 245
  8. Page 183 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 183 of 245 Ormat’s geothermal portfolio that was approved in Docket No. 22-11032 with an expiration date of December 31, 2053. 4. North Valley Geothermal North Valley Geothermal is a 25 MW geothermal plant located in the San Emidio Desert in Washoe County, Nevada. Sierra has a 25-year PPA with Ormat to purchase the energy and associated portfolio energy credits generated by the plant. The PPA was approved by the Commission in Docket 22-03024. The plant achieved commercial operation on April 26, 2023. 5. USG San Emidio Geothermal Power Plant The USG San Emidio facility is an 11.75 MW geothermal project located just inside the eastern border of Washoe County, Nevada. Sierra originally entered into a 30-year longterm PPA in 1986 for a 3.8 MW geothermal power plant. Sierra received Commission approval for an amended and restated PPA in Docket No. 11-08010, which increased the capacity under the contract. Sierra has a 25-year contract with the facility that expires on December 31, 2037. 6. Battle Mountain Solar Battle Mountain Solar is a 101 MW solar PV facility located near Battle Mountain, Nevada. The project incorporates 25 MW of BESS. The solar array declared commercial operation on June 23, 2021. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 7. Dodge Flat Solar Dodge Flat Solar is a 200 MW solar PV facility located in Washoe County, Nevada. The project incorporates 50 MW of BESS. The solar farm declared commercial operation on March 2, 2022. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 8. Fish Springs Ranch Solar Fish Springs Ranch is a 100 MW solar PV facility located in Washoe County, Nevada. The project incorporates 25 MW of BESS. The solar farm declared commercial operation on March 15, 2022. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 9. Nevada Solar One The Nevada Solar One facility is a 69 MW concentrated solar thermal plant located in Eldorado Valley near Boulder City, Nevada. The solar thermal plant came online in 2007. Sierra purchases 22.1 MW from the facility, with the balance purchased by Nevada Power. Nevada Power’s and Sierra’s PPA with the facility expires on December 31, 2027. 179 Page 183 of 245
  9. Page 184 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 184 of 245 10. Techren Solar IV Techren Solar IV is a 25 MW solar PV facility located in Boulder City, Nevada and declared commercial operation on October 7, 2020. The project was approved by the Commission in Docket No. 17-11004. The PPA is for 25 years. 14 Fleish Hydro Power Plant The Fleish facility, a/k/a TMWA Fleish, is a 2.4 MW hydro-electric project located on the California/Nevada border southwest of Reno, Nevada. The hydro facility is owned by Truckee Meadows Water Authority (“TMWA”) and went into commercial operation in 2008. Sierra has a 20-year PPA with the facility that expires on June 1, 2028. The Companies provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra. 15 Verdi Hydro Power Plant The Verdi facility, a/k/a TMWA Verdi, is a 2.4 MW hydro-electric project located in Washoe County, Nevada. The hydro facility is owned by the Truckee Meadows Water Authority (“TMWA”) and went into service in 2009. Sierra has a 20-year PPA with the facility that expires on June 1, 2029. Sierra provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra.. 16 Washoe Hydro Power Plant The Washoe facility, a/k/a TMWA Washoe, is a 2.5 MW hydro-electric project located in Washoe County, Nevada. The hydro facility is owned by TMWA and went into service in 2008. Sierra has a 20-year PPA with the facility that expires on June 1, 2028. Sierra provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra. 17 Truckee Meadows Waste Water Facility (“TMWWF”) The TMWWF is 0.8 MW biogas facility with which Sierra has a PC-only purchase agreement. The agreement was approved by the Commission in 2006. The contract expires on September 1, 2026. 180 Page 184 of 245
  10. Page 185 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 185 of 245 18 Kingston Hydro Kingston Hydro is a small, 0.175 MW, hydro facility located in Lander County, Nevada. It is owned by Young Brothers. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program, the rights to the PCs are assigned to Sierra. The PCs from this facility are included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. 19 Mill Creek Hydro Mill Creek Hydro is a small, 0.037 MW, hydro facility located in Elko County, Nevada. It is owned by Van Norman Ranches, LLC. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program the rights to the PCs are assigned to Sierra. The PCs from this facility are included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. 20 RO Ranch Hydro RO Ranch Hydro is a small, 0.225 MW, hydro facility located in Churchill County, Nevada. It is owned by BTAZ Nevada, LLC. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program the rights to the PCs are assigned to Sierra. The facility was shut down indefinitely, however, the PPA is still active. If the facility is re-powered, the PCs would be included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. Figure REN-49 below is a map showing all renewable facilities owned by or contracted to Nevada Power and Sierra. The map includes Hoover Dam, which can now be used towards RPS compliance, as well as renewable facilities where the Companies are the counterparty to a PPA under which the PCs from the facilities are assigned to customers under an NGR agreement and cannot be used by the Companies to meet the RPS. Nevada Power is currently forecasting that the projected RPS credits generated from these resources will be 2.54 percent lower for Nevada Power and 0.55 percent lower at Sierra for the 2026 Joint IRP’s 2027-2029 action plan (“Action Plan”) period based on historical trends reflecting the most recent operating data. 181 Page 185 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)