Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 179 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 179 of 245 and the PPA was amended to allow for further capacity increases to up to 50 MW. The plant began producing energy in 2012. The PPA terminates on December 31, 2032. 8. ACE Searchlight Solar ACE Searchlight, now Searchlight Solar, is a 17.5 MW solar PV project near Searchlight, Nevada. The project was approved by the Commission in 2009. The solar farm began producing energy in 2014. The PPA terminates on December 31, 2034. 9. RV Apex RV Apex Solar facility is a 20 MW solar PV project located in Clark County north of Las Vegas, Nevada. The project was approved by the Commission in 2009. The solar facility began producing energy in 2012. The PPA terminates on December 31, 2037. 10. Boulder Solar I Boulder Solar I is a 100 MW solar PV project located in Boulder City, Nevada. The project was approved by the Commission in 2015. The solar project declared commercial operation in December 2016. The 20-year PPA terminates on December 31, 2036. 11. Las Vegas Valley Water District (“LVVWD”) The LVVWD project, a/k/a SunPower, is comprised of six Las Vegas-area small PV arrays collectively totaling 3 MW. The project was approved by the Commission in 2006. These installations began producing electricity in 2006 and 2007. LVVWD provides PCs only to Nevada Power. The agreement terminates on December 31, 2026. 12. Mountain View Solar The Mountain View solar facility is a 20 MW solar PV plant located north of Las Vegas in Clark County, Nevada. The project was approved by the Commission in 2012. The solar project began producing energy in 2014. The PPA terminates on December 31, 2039. 13. Nellis Air Force Base (“AFB”), Solar Star The Nellis AFB Solar Star project, a/k/a Nellis I, is a 13.2 MW solar PV project that produces energy for Nellis Air Force Base, located north of Las Vegas, Nevada. The project was approved by the Commission in 2007. The array began producing electricity in 2007, since then Nellis AFB sells only PCs to Nevada Power. The agreement terminates on December 31, 2027. 175 Page 179 of 245
  2. Page 180 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 180 of 245 14. Nellis Solar Array II Nellis Solar Array II is a 15 MW (nameplate AC) solar PV project located on Nellis AFB in Las Vegas, Nevada. The project was approved by the Commission in Docket No. 1405003. The solar array began producing energy in 2015. The project is owned by Nevada Power. 15. Nevada Solar One Nevada Solar One is a 69 MW concentrated solar thermal plant that is located in the Eldorado Valley near Boulder City, Nevada. Approximately 46.9 MW of the capacity and generation is contracted to Nevada Power. The balance of the capacity and generation is contracted to Sierra. The project was approved by the Commission in 2003. The solar thermal plant began producing energy in 2007 and the PPA terminates on December 31, 2027. 16. Silver State Solar The Silver State Solar facility is a 52 MW solar PV project located in Clark County near Primm, Nevada. The project was approved by the Commission in 2010. The solar project began producing energy in 2012. The PPA terminates on December 31, 2037. 17. FRV Spectrum Solar The FRV Spectrum facility is a 30 MW solar PV plant located north of Las Vegas in Clark County, Nevada. The project was approved by the Commission in 2012. The solar array began producing energy in 2013. The PPA terminates on December 31, 2038. 18. Stillwater 2 Solar The Stillwater 2 Solar facility, a/k/a Stillwater PV, is a 22 MW solar PV project located in Churchill County, Nevada. The project was approved by the Commission in 2011. The solar array began producing energy in 2012. The PPA terminates on December 31, 2029. 19. Eagle Shadow Mountain Solar Farm Eagle Shadow Mountain Solar Farm is a 300 MW solar PV facility located on the Moapa River Indian Reservation north of Las Vegas, Nevada. The solar array is online, capable of generating approximately 265 MW and declared commercial operations on May 10, 2023. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 20. Copper Mountain Solar 5 Copper Mountain Solar 5 is a 250 MW solar PV facility located in Boulder City, Nevada. The solar array declared commercial operations on July 23, 2021. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 176 Page 180 of 245
  3. Page 181 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 181 of 245 21. Arrow Canyon Solar Arrow Canyon Solar, formerly known as Moapa Solar, is a 200 MW solar PV facility with 75 MW of BESS capacity that is located on the Moapa River Indian Reservation north of Las Vegas, Nevada. The project, including the BESS, achieved commercial operation on December 8, 2023. The energy, capacity and PCs generated by the facility will be split 70 percent to Sierra, 30 percent to Nevada Power. The 25-year PPA was approved by the Commission in Docket No. 19-06039. 22. Gemini Solar Gemini Solar is a 690 MW solar PV facility with 380 MW of BESS capacity that is located in Clark County, approximately 25 miles northeast of Las Vegas, Nevada. The project declared commercial operation on March 25, 2024. While 100 percent of the energy and capacity generated by the facility will go to Nevada Power, only 60 percent of the associated PCs will be assigned to Nevada Power, with the balance assigned to Sierra. The 25-year PPA was approved by the Commission in Docket No. 19-06039. 23. Techren Solar I Techren Solar I is a 100 MW solar PV facility located in Boulder City, Nevada. The solar array declared commercial operations on March 11, 2019. The project was approved by the Commission in Docket No. 16-08026. The PPA is for 25 years. 24. Techren Solar III Techren Solar III is a 25 MW solar PV facility located in Boulder City, Nevada. The solar array achieved commercial operation on October 7, 2020. The project was approved by the Commission in Docket No. 17-11004. The PPA is for 25 years. 25. Techren Solar V Techren Solar V is a 50 MW solar PV facility located in Boulder City, Nevada. The solar farm achieved commercial operation on December 31, 2020. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 26. Spring Valley Wind The Spring Valley Wind facility is a 151.8 MW wind project located in Spring Valley near Ely, Nevada. The project was approved by the Commission in 2010. The wind farm began delivering energy in 2012. The PPA terminates on December 31, 2032. 27. Apex Landfill Facility The Apex Landfill facility is a 12 MW landfill gas-to-energy project located in Clark County, Nevada. The project was approved by the Commission in 2009. The plant began producing energy in 2012. The PPA terminates on December 31, 2032. 177 Page 181 of 245
  4. Page 182 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 182 of 245 28. Lockwood Renewable Energy Facility The Lockwood facility, a/k/a WM Renewable Energy-Lockwood, is a 3.2 MW landfill gasto-energy project located at the Lockwood Landfill near Reno, Nevada. The project was approved by the Commission in 2010. The plant began producing energy in 2012. The PPA terminates on December 31, 2032. 29. Goodsprings Recovered Energy Generation Station The Goodsprings Recovered Energy Generation Station is located 35 miles south of Las Vegas, Nevada. It is a 5 MW generating plant that converts waste heat from a natural gas pipeline compressor station to electric energy. The project was approved by the Commission in 2008 and it started producing energy in 2010. The project is owned by Nevada Power. 30. Dry Lake Solar The Dry Lake Solar project is 150 MW solar PV facility with 100 MW of BESS capacity located 20 miles northeast of Las Vegas adjacent to the Harry Allen combined cycle station and is owned by Nevada Power. The project declared commercial operations on May 2, 2024. The 25-year pricing was approved by the Commission in Docket No. 20-07023. Sierra 1. Beowawe Geothermal Power Plant The Beowawe facility, a/k/a OWGP Beowawe, is a 20 MW geothermal facility located in Eureka County and is owned by Terra-Gen Power. The plant was placed into service in 1985 and was originally under contract with Southern California Edison. However, in 2006, Sierra entered into a contract for renewable energy that expires on December 31, 2024. Beowawe is included in Ormat’s geothermal portfolio that was approved in Docket No. 22-11032 with an expiration date of December 31, 2053. 2. Burdette Geothermal Power Plant The Burdette facility is a 26 MW geothermal project located in Washoe County near Steamboat, Nevada. The plant went into service in 2006. Sierra has a 20-year PPA with the facility that expires on December 31, 2026. Burdette is also included in Ormat’s geothermal portfolio that was approved in Docket No. 22-11032 with an expiration date of December 31, 2053. 3. Galena 3 Geothermal Power Plant The Galena 3 facility is a 26.5 MW geothermal project located in Washoe County south of Reno near Steamboat, Nevada. The plant went into service in 2008. Sierra has a 20-year PPA with the facility that expires on December 31, 2028. Galena 3 is also included in 178 Page 182 of 245
  5. Page 183 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 183 of 245 Ormat’s geothermal portfolio that was approved in Docket No. 22-11032 with an expiration date of December 31, 2053. 4. North Valley Geothermal North Valley Geothermal is a 25 MW geothermal plant located in the San Emidio Desert in Washoe County, Nevada. Sierra has a 25-year PPA with Ormat to purchase the energy and associated portfolio energy credits generated by the plant. The PPA was approved by the Commission in Docket 22-03024. The plant achieved commercial operation on April 26, 2023. 5. USG San Emidio Geothermal Power Plant The USG San Emidio facility is an 11.75 MW geothermal project located just inside the eastern border of Washoe County, Nevada. Sierra originally entered into a 30-year longterm PPA in 1986 for a 3.8 MW geothermal power plant. Sierra received Commission approval for an amended and restated PPA in Docket No. 11-08010, which increased the capacity under the contract. Sierra has a 25-year contract with the facility that expires on December 31, 2037. 6. Battle Mountain Solar Battle Mountain Solar is a 101 MW solar PV facility located near Battle Mountain, Nevada. The project incorporates 25 MW of BESS. The solar array declared commercial operation on June 23, 2021. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 7. Dodge Flat Solar Dodge Flat Solar is a 200 MW solar PV facility located in Washoe County, Nevada. The project incorporates 50 MW of BESS. The solar farm declared commercial operation on March 2, 2022. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 8. Fish Springs Ranch Solar Fish Springs Ranch is a 100 MW solar PV facility located in Washoe County, Nevada. The project incorporates 25 MW of BESS. The solar farm declared commercial operation on March 15, 2022. The project was approved by the Commission in Docket No. 18-06003. The PPA is for 25 years. 9. Nevada Solar One The Nevada Solar One facility is a 69 MW concentrated solar thermal plant located in Eldorado Valley near Boulder City, Nevada. The solar thermal plant came online in 2007. Sierra purchases 22.1 MW from the facility, with the balance purchased by Nevada Power. Nevada Power’s and Sierra’s PPA with the facility expires on December 31, 2027. 179 Page 183 of 245
  6. Page 184 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 184 of 245 10. Techren Solar IV Techren Solar IV is a 25 MW solar PV facility located in Boulder City, Nevada and declared commercial operation on October 7, 2020. The project was approved by the Commission in Docket No. 17-11004. The PPA is for 25 years. 14 Fleish Hydro Power Plant The Fleish facility, a/k/a TMWA Fleish, is a 2.4 MW hydro-electric project located on the California/Nevada border southwest of Reno, Nevada. The hydro facility is owned by Truckee Meadows Water Authority (“TMWA”) and went into commercial operation in 2008. Sierra has a 20-year PPA with the facility that expires on June 1, 2028. The Companies provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra. 15 Verdi Hydro Power Plant The Verdi facility, a/k/a TMWA Verdi, is a 2.4 MW hydro-electric project located in Washoe County, Nevada. The hydro facility is owned by the Truckee Meadows Water Authority (“TMWA”) and went into service in 2009. Sierra has a 20-year PPA with the facility that expires on June 1, 2029. Sierra provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra.. 16 Washoe Hydro Power Plant The Washoe facility, a/k/a TMWA Washoe, is a 2.5 MW hydro-electric project located in Washoe County, Nevada. The hydro facility is owned by TMWA and went into service in 2008. Sierra has a 20-year PPA with the facility that expires on June 1, 2028. Sierra provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra. 17 Truckee Meadows Waste Water Facility (“TMWWF”) The TMWWF is 0.8 MW biogas facility with which Sierra has a PC-only purchase agreement. The agreement was approved by the Commission in 2006. The contract expires on September 1, 2026. 180 Page 184 of 245
  7. Page 185 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 185 of 245 18 Kingston Hydro Kingston Hydro is a small, 0.175 MW, hydro facility located in Lander County, Nevada. It is owned by Young Brothers. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program, the rights to the PCs are assigned to Sierra. The PCs from this facility are included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. 19 Mill Creek Hydro Mill Creek Hydro is a small, 0.037 MW, hydro facility located in Elko County, Nevada. It is owned by Van Norman Ranches, LLC. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program the rights to the PCs are assigned to Sierra. The PCs from this facility are included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. 20 RO Ranch Hydro RO Ranch Hydro is a small, 0.225 MW, hydro facility located in Churchill County, Nevada. It is owned by BTAZ Nevada, LLC. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program the rights to the PCs are assigned to Sierra. The facility was shut down indefinitely, however, the PPA is still active. If the facility is re-powered, the PCs would be included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. Figure REN-49 below is a map showing all renewable facilities owned by or contracted to Nevada Power and Sierra. The map includes Hoover Dam, which can now be used towards RPS compliance, as well as renewable facilities where the Companies are the counterparty to a PPA under which the PCs from the facilities are assigned to customers under an NGR agreement and cannot be used by the Companies to meet the RPS. Nevada Power is currently forecasting that the projected RPS credits generated from these resources will be 2.54 percent lower for Nevada Power and 0.55 percent lower at Sierra for the 2026 Joint IRP’s 2027-2029 action plan (“Action Plan”) period based on historical trends reflecting the most recent operating data. 181 Page 185 of 245
  8. Page 186 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 186 of 245 FIGURE REN-49 RENEWABLE ENERGY MAP 182 Page 186 of 245
  9. Page 187 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 187 of 245 I. Informational Updates Valmy Geothermal Resources Update As of the date of this filing, the Companies have received the following two bilateral proposals: the Nevada Geothermal Portfolio, and the North Nevada Geothermal Portfolio, each consisting of a portfolio of geothermal resources that include one or more proposed geothermal project sites that are located near the Valmy region. Both bilateral proposals were brought to the Companies in conjunction with a sleeved PPAs for offtake dedicated to specific customers, and are discussed in detail in this Renewables Section’s Part E above. The Companies will continue to pursue any bilateral opportunities as well as continue to solicit RFPs for renewable energy, including geothermal resources, in areas including, but not limited to, the Valmy region. 183 Page 187 of 245
  10. Page 188 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 188 of 245 E. TRANSMISSION PLAN A. INTRODUCTION The regulations governing integrated resource planning require that the Companies include in their triennial IRPs (Integrated Resource Plan) a 20-year plan to meet the transmission needs of native load customers 1 and service requests from third parties. 2 This transmission plan is built upon the load forecasts, system characteristics, existing and future transmission facilities and obligations as described in this section. Based in part on these key system characteristics, the transmission plan examines the capabilities of the existing transmission system to determine the need for and timing of any additional transmission facilities. In order to meet increasing large customer needs, the transmission plan includes several new projects. Transmission projects driven by customers have controls in place at each phase, meant to reduce the financial risk to both the Companies and native load customers. These project controls include the customer providing an advance subject to potential refund (ASTPR), security, construction deposits, reduction in service charges, and customer construction milestones. These controls are defined in each customer’s Rule 9 agreement. The transmission plan includes projects that will positively impact reliability and future load growth capabilities. These have been identified during the annually recurring North American Electric Reliability Corporation (NERC) TPL-001-5.1 transmission planning reliability requirements standard annual study assessment’s corrective action plan (CAP). Some violations and the associated mitigation may not meet the definition of Bulk Electric System (BES) because they are under 100 kV but are consistent with the intent and requirements of NERC transmission reliability standards. These include projects that are of particular concern to the affected rural communities because they reduce outage durations, increase overall reliability and improve power quality issues such as voltage stability. In section C, the Companies request approval of the various transmission projects, explain the need for each project and the project estimates. The projects are required to serve customer load growth, new generation resources 3, transmission service requests, transmission interconnection requests and reliability improvements. The term “Native Load Customer” comes from regulations established by the Federal Energy Regulatory Commission (“FERC”) creating and maintain their open access transmission policies. Nevada Power and Sierra operate a single Balancing Area Authority or (“BAA”), which is responsible for serving both native load and transmission-only customers. Native load customers are the bundled retail customers of both Nevada Power and Sierra. Native load customers do not plan for and purchase transmission access directly from the BAA. Instead, Nevada Power and Sierra plan for and reserve transmission access on their behalf, consistent with the FERC’s open access transmission policies, and pursuant to the Companies’ Open Access Transmission Tariff or “OATT”. 2 See NAC § 704.9385(3). 3 At the time of the 2026 IRP filing, the cost estimates provided for the generation resources transmission service requests are based on system impact study results which are a rough order of magnitude estimate. When the facilities studies are completed a more refined cost estimate and construction forecasts will be available. 1 184 Page 188 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)