Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 184 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 184 of 245 10. Techren Solar IV Techren Solar IV is a 25 MW solar PV facility located in Boulder City, Nevada and declared commercial operation on October 7, 2020. The project was approved by the Commission in Docket No. 17-11004. The PPA is for 25 years. 14 Fleish Hydro Power Plant The Fleish facility, a/k/a TMWA Fleish, is a 2.4 MW hydro-electric project located on the California/Nevada border southwest of Reno, Nevada. The hydro facility is owned by Truckee Meadows Water Authority (“TMWA”) and went into commercial operation in 2008. Sierra has a 20-year PPA with the facility that expires on June 1, 2028. The Companies provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra. 15 Verdi Hydro Power Plant The Verdi facility, a/k/a TMWA Verdi, is a 2.4 MW hydro-electric project located in Washoe County, Nevada. The hydro facility is owned by the Truckee Meadows Water Authority (“TMWA”) and went into service in 2009. Sierra has a 20-year PPA with the facility that expires on June 1, 2029. Sierra provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra.. 16 Washoe Hydro Power Plant The Washoe facility, a/k/a TMWA Washoe, is a 2.5 MW hydro-electric project located in Washoe County, Nevada. The hydro facility is owned by TMWA and went into service in 2008. Sierra has a 20-year PPA with the facility that expires on June 1, 2028. Sierra provided a response to TMWA's Request for Offers concerning this hydroelectric facility on February 2nd, 2024. TMWA completed their reviews and informed the Companies of their decision to select a different counterparty for future offtake agreements following the expiration of the current agreement with Sierra. 17 Truckee Meadows Waste Water Facility (“TMWWF”) The TMWWF is 0.8 MW biogas facility with which Sierra has a PC-only purchase agreement. The agreement was approved by the Commission in 2006. The contract expires on September 1, 2026. 180 Page 184 of 245
  2. Page 185 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 185 of 245 18 Kingston Hydro Kingston Hydro is a small, 0.175 MW, hydro facility located in Lander County, Nevada. It is owned by Young Brothers. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program, the rights to the PCs are assigned to Sierra. The PCs from this facility are included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. 19 Mill Creek Hydro Mill Creek Hydro is a small, 0.037 MW, hydro facility located in Elko County, Nevada. It is owned by Van Norman Ranches, LLC. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program the rights to the PCs are assigned to Sierra. The PCs from this facility are included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. 20 RO Ranch Hydro RO Ranch Hydro is a small, 0.225 MW, hydro facility located in Churchill County, Nevada. It is owned by BTAZ Nevada, LLC. The facility received a rebate under Sierra’s Hydro Demonstration Program. Under the demonstration program the rights to the PCs are assigned to Sierra. The facility was shut down indefinitely, however, the PPA is still active. If the facility is re-powered, the PCs would be included in the “RENGEN” non-solar credit total designation reported in the RPS Annual Compliance filing. Figure REN-49 below is a map showing all renewable facilities owned by or contracted to Nevada Power and Sierra. The map includes Hoover Dam, which can now be used towards RPS compliance, as well as renewable facilities where the Companies are the counterparty to a PPA under which the PCs from the facilities are assigned to customers under an NGR agreement and cannot be used by the Companies to meet the RPS. Nevada Power is currently forecasting that the projected RPS credits generated from these resources will be 2.54 percent lower for Nevada Power and 0.55 percent lower at Sierra for the 2026 Joint IRP’s 2027-2029 action plan (“Action Plan”) period based on historical trends reflecting the most recent operating data. 181 Page 185 of 245
  3. Page 186 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 186 of 245 FIGURE REN-49 RENEWABLE ENERGY MAP 182 Page 186 of 245
  4. Page 187 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 187 of 245 I. Informational Updates Valmy Geothermal Resources Update As of the date of this filing, the Companies have received the following two bilateral proposals: the Nevada Geothermal Portfolio, and the North Nevada Geothermal Portfolio, each consisting of a portfolio of geothermal resources that include one or more proposed geothermal project sites that are located near the Valmy region. Both bilateral proposals were brought to the Companies in conjunction with a sleeved PPAs for offtake dedicated to specific customers, and are discussed in detail in this Renewables Section’s Part E above. The Companies will continue to pursue any bilateral opportunities as well as continue to solicit RFPs for renewable energy, including geothermal resources, in areas including, but not limited to, the Valmy region. 183 Page 187 of 245
  5. Page 188 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 188 of 245 E. TRANSMISSION PLAN A. INTRODUCTION The regulations governing integrated resource planning require that the Companies include in their triennial IRPs (Integrated Resource Plan) a 20-year plan to meet the transmission needs of native load customers 1 and service requests from third parties. 2 This transmission plan is built upon the load forecasts, system characteristics, existing and future transmission facilities and obligations as described in this section. Based in part on these key system characteristics, the transmission plan examines the capabilities of the existing transmission system to determine the need for and timing of any additional transmission facilities. In order to meet increasing large customer needs, the transmission plan includes several new projects. Transmission projects driven by customers have controls in place at each phase, meant to reduce the financial risk to both the Companies and native load customers. These project controls include the customer providing an advance subject to potential refund (ASTPR), security, construction deposits, reduction in service charges, and customer construction milestones. These controls are defined in each customer’s Rule 9 agreement. The transmission plan includes projects that will positively impact reliability and future load growth capabilities. These have been identified during the annually recurring North American Electric Reliability Corporation (NERC) TPL-001-5.1 transmission planning reliability requirements standard annual study assessment’s corrective action plan (CAP). Some violations and the associated mitigation may not meet the definition of Bulk Electric System (BES) because they are under 100 kV but are consistent with the intent and requirements of NERC transmission reliability standards. These include projects that are of particular concern to the affected rural communities because they reduce outage durations, increase overall reliability and improve power quality issues such as voltage stability. In section C, the Companies request approval of the various transmission projects, explain the need for each project and the project estimates. The projects are required to serve customer load growth, new generation resources 3, transmission service requests, transmission interconnection requests and reliability improvements. The term “Native Load Customer” comes from regulations established by the Federal Energy Regulatory Commission (“FERC”) creating and maintain their open access transmission policies. Nevada Power and Sierra operate a single Balancing Area Authority or (“BAA”), which is responsible for serving both native load and transmission-only customers. Native load customers are the bundled retail customers of both Nevada Power and Sierra. Native load customers do not plan for and purchase transmission access directly from the BAA. Instead, Nevada Power and Sierra plan for and reserve transmission access on their behalf, consistent with the FERC’s open access transmission policies, and pursuant to the Companies’ Open Access Transmission Tariff or “OATT”. 2 See NAC § 704.9385(3). 3 At the time of the 2026 IRP filing, the cost estimates provided for the generation resources transmission service requests are based on system impact study results which are a rough order of magnitude estimate. When the facilities studies are completed a more refined cost estimate and construction forecasts will be available. 1 184 Page 188 of 245
  6. Page 189 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 189 of 245 B. OVERVIEW OF THE COMPANIES’ TRANSMISSION SYSTEM Section 704.9321(3)(e) of the NAC requires the Companies to provide maps depicting facilities required for the transmission of electric energy. This information is set forth in the map marked as Figure TP-2 below. This map shows the transmission system in both the northern and southern parts of Nevada, at each voltage. The consolidated Nevada Power and Sierra transmission balancing authority area (“BAA”) encompasses approximately 45,000 square miles. The Nevada Power service area covers approximately 4,500 square miles, with approximately 1,071,000 electric customers and 1,969 miles of FERC-jurisdictional transmission lines with voltages ranging from 69 kV to 525 kV. The Sierra transmission service area encompasses more than 40,000 square miles, with approximately 386,000 electric customers and 3,036 miles of FERC-jurisdictional transmission lines ranging from 55 kV to 525 kV. 4 4 Total Sierra transmission line mileage for both FERC-jurisdictional and Nevada-jurisdictional facilities is 4,157 miles with voltages ranging from 55 kV to 345 kV. This excludes the 235-mile, 500 kV One Nevada Transmission Line (“ON Line”). ON Line is included as part of Nevada Power’s overall transmission system. 185 Page 189 of 245
  7. Page 190 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 190 of 245 FIGURE TP-1 NV ENERGY TRANSMISSION SYSTEM DIAGRAM 186 Page 190 of 245
  8. Page 191 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 191 of 245 a. NEVADA POWER TRANSMISSION SYSTEM The Nevada Power transmission system can be described in three sections, each shown in Figure TP-2, TP-3, and TP-4. The first section, generally referred to as the Nevada Power internal system, is designated by the “#1,” and is shown as the area between the cut plane lines (the heavy dashed lines). A cut plane is a reference to a combination of lines, either internal or external to a transmission system, which due to loading capabilities are collectively monitored or examined for limitations. The Nevada Power internal system is located within the Las Vegas Valley where the majority of Nevada Power’s customers reside. The second section, designated with a “#2,” is identified by the dashed line on the bottom-right of Figure TP-2. This transmission path is known as the Southern Cut Plane (“SCP”) and shows the transmission lines Nevada Power uses to transfer power through major substations on the southern interface of its transmission system – namely Mead, McCullough, and Eldorado – located south of Las Vegas in the Eldorado Valley. As detailed later under the Transmission Path Ratings portion of this plan, the SCP has been replaced by the formally accepted Western Electricity Coordinating Council (“WECC”) path known as the Southern Nevada Transmission Interface (“SNTI”). The SNTI is composed of numerous transmission lines electrically situated in parallel with each other. These lines are connected to the Mead, McCullough, and Eldorado Substations, which are prominent trading hubs south of Nevada Power’s transmission system and are used to import and export energy that is scheduled across this rated path. The third section is represented by the dashed line on the top-right of Figure TP-2, designated with a “#3,” is referred to as the Northern Cut Plane (“NCP”), and comprises the Red Butte-Harry Allen 345 kV interconnection with PacifiCorp, and the Crystal interconnection with the Navajo-CrystalMcCullough 525 kV line. 187 Page 191 of 245
  9. Page 192 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 192 of 245 FIGURE TP-2 NEVADA POWER TRANSMISSION SYSTEM DIAGRAM 188 Page 192 of 245
  10. Page 193 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 193 of 245 b. SIERRA TRANSMISSION SYSTEM The Sierra system is best described as two sections as shown in the map in Figure TP-3. The first section, depicted as the area within the circle, encompasses the Reno, Tracy, and Carson City areas. Designated with a “1”, this section represents the majority of the Sierra system load and is where the majority of Sierra’s customers reside. The second section of the Sierra service area is the area outside the inner circle, designated with the “2”, in the northern portion of the state. This section is characterized by long transmission lines serving heavy industrial (i.e., mining) and rural load widely dispersed throughout the northern portion of the state. FIGURE TP-3 SIERRA TRANSMISSION SYSTEM DIAGRAM 189 Page 193 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)