Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 189 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 189 of 245 B. OVERVIEW OF THE COMPANIES’ TRANSMISSION SYSTEM Section 704.9321(3)(e) of the NAC requires the Companies to provide maps depicting facilities required for the transmission of electric energy. This information is set forth in the map marked as Figure TP-2 below. This map shows the transmission system in both the northern and southern parts of Nevada, at each voltage. The consolidated Nevada Power and Sierra transmission balancing authority area (“BAA”) encompasses approximately 45,000 square miles. The Nevada Power service area covers approximately 4,500 square miles, with approximately 1,071,000 electric customers and 1,969 miles of FERC-jurisdictional transmission lines with voltages ranging from 69 kV to 525 kV. The Sierra transmission service area encompasses more than 40,000 square miles, with approximately 386,000 electric customers and 3,036 miles of FERC-jurisdictional transmission lines ranging from 55 kV to 525 kV. 4 4 Total Sierra transmission line mileage for both FERC-jurisdictional and Nevada-jurisdictional facilities is 4,157 miles with voltages ranging from 55 kV to 345 kV. This excludes the 235-mile, 500 kV One Nevada Transmission Line (“ON Line”). ON Line is included as part of Nevada Power’s overall transmission system. 185 Page 189 of 245
  2. Page 190 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 190 of 245 FIGURE TP-1 NV ENERGY TRANSMISSION SYSTEM DIAGRAM 186 Page 190 of 245
  3. Page 191 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 191 of 245 a. NEVADA POWER TRANSMISSION SYSTEM The Nevada Power transmission system can be described in three sections, each shown in Figure TP-2, TP-3, and TP-4. The first section, generally referred to as the Nevada Power internal system, is designated by the “#1,” and is shown as the area between the cut plane lines (the heavy dashed lines). A cut plane is a reference to a combination of lines, either internal or external to a transmission system, which due to loading capabilities are collectively monitored or examined for limitations. The Nevada Power internal system is located within the Las Vegas Valley where the majority of Nevada Power’s customers reside. The second section, designated with a “#2,” is identified by the dashed line on the bottom-right of Figure TP-2. This transmission path is known as the Southern Cut Plane (“SCP”) and shows the transmission lines Nevada Power uses to transfer power through major substations on the southern interface of its transmission system – namely Mead, McCullough, and Eldorado – located south of Las Vegas in the Eldorado Valley. As detailed later under the Transmission Path Ratings portion of this plan, the SCP has been replaced by the formally accepted Western Electricity Coordinating Council (“WECC”) path known as the Southern Nevada Transmission Interface (“SNTI”). The SNTI is composed of numerous transmission lines electrically situated in parallel with each other. These lines are connected to the Mead, McCullough, and Eldorado Substations, which are prominent trading hubs south of Nevada Power’s transmission system and are used to import and export energy that is scheduled across this rated path. The third section is represented by the dashed line on the top-right of Figure TP-2, designated with a “#3,” is referred to as the Northern Cut Plane (“NCP”), and comprises the Red Butte-Harry Allen 345 kV interconnection with PacifiCorp, and the Crystal interconnection with the Navajo-CrystalMcCullough 525 kV line. 187 Page 191 of 245
  4. Page 192 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 192 of 245 FIGURE TP-2 NEVADA POWER TRANSMISSION SYSTEM DIAGRAM 188 Page 192 of 245
  5. Page 193 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 193 of 245 b. SIERRA TRANSMISSION SYSTEM The Sierra system is best described as two sections as shown in the map in Figure TP-3. The first section, depicted as the area within the circle, encompasses the Reno, Tracy, and Carson City areas. Designated with a “1”, this section represents the majority of the Sierra system load and is where the majority of Sierra’s customers reside. The second section of the Sierra service area is the area outside the inner circle, designated with the “2”, in the northern portion of the state. This section is characterized by long transmission lines serving heavy industrial (i.e., mining) and rural load widely dispersed throughout the northern portion of the state. FIGURE TP-3 SIERRA TRANSMISSION SYSTEM DIAGRAM 189 Page 193 of 245
  6. Page 194 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 194 of 245 TRANSMISSION PATH RATINGS Per NAC §704.9385(3)(a), the Transmission Plan must provide a summary of the capabilities of the transmission system, including import and export capabilities and the rating of significant transmission paths. NAC §704.9321(3)(d) requires the Companies to provide information regarding interconnections with other utilities and independent power producers. Nevada Power owns five significant rated transmission paths, as shown below in Figure TP-4 and TP-5, each consisting of one or more transmission lines that are granted a rating by the WECC. Nevada Power is a partial owner of one additional WECC-rated transmission path, that being the WECC East of River (“EOR”) Path 49. 190 Page 194 of 245
  7. Page 195 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 195 of 245 FIGURE TP-4 DIAGRAM OF NEVADA POWER TIE LINES, EXISTING COMPANY-OWNED GENERATION, AND EXISTING INDEPENDENT GENERATION 191 Page 195 of 245
  8. Page 196 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 196 of 245 Crystal 525 / 230 kV Path (WECC Path # 77). The Crystal 525/230 kV path allows energy to be moved from the Navajo-Crystal-McCullough 525 kV transmission line into the northeast boundary of the Nevada Power system via its Crystal Substation. This path is rated for 950 MW of inbound flow measured at the Crystal Substation. This is a 230 kV phase shifter-controlled path. Harry Allen – Red Butte 345 kV Path (WECC Path # 35 – TOT2C). The Harry Allen to Red Butte 345 kV path allows energy to be moved to and from Utah (PacifiCorp – East) and the northeast corner of the Nevada Power system at the Harry Allen switching station. The two phase shifters at Harry Allen control the flow on this path and they are occasionally used to mitigate unscheduled flow in the WECC interconnection. This path has a north to south rating of 600 MW and a south to north rating of 580 MW Southern Nevada Transmission Interface (WECC Path #81). Nevada Power owns and operates the Southern Nevada Transmission Interface, or SNTI, shown below in Figure TP-5. SNTI is comprised of 21 transmission tie-lines between the Nevada Power/Sierra combined BAA and the neighboring BAAs in southern Nevada (Western Area Power Administration, Lower Colorado, Los Angeles Department of Water and Power or “LADWP”, and the California Independent System Operator Corporation (“CAISO”). This can be seen in Figure TP-5. The SNTI represents existing lines, and the path is routinely evaluated and annually updated as a part of the NV Energy seasonal operating studies. The accepted SNTI rating as approved by WECC is 4,533 MW Northto-South and 3,970 MW South-to-North. Harry Allen – Eldorado 525 kV Path (WECC Path #84). The Harry Allen to Eldorado 525 kV path connects Nevada Power and Southern California Edison. It represents a connection between Nevada Power and CAISO Balancing Authorities. This path is represented in Figure TP-5 below. The path has a North-to-South rating of 3,496 MW and a South-to-North rating of 1,390 MW. Southern Nevada Transmission Interface+ (WECC Path #89). Nevada Power owns and operates the Southern Nevada Transmission Interface+, or SNTI+, which is SNTI (WECC Path #81) and Harry Allen to Eldorado 525 kV (WECC Path #84) combined. The SNTI represents existing lines, and the path is routinely evaluated and annually updated as a part of the NV Energy seasonal operating studies. The accepted SNTI+ rating as approved by WECC is 6,257 MW Northto-South and 4,681 MW South-to-North. 192 Page 196 of 245
  9. Page 197 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 197 of 245 FIGURE TP-5 SOUTHERN NEVADA TRANSMISSION INTERFACES Sierra owns five WECC rated transmission paths, each consisting of one or more transmission lines. Rated transmission paths are identified in Figure TP-6 below. Ratings are established through the WECC process on a non-simultaneous basis. These transmission path ratings may be subject to change over the twenty-year planning period, depending on changes to the system configuration. Operation of the paths are based on simultaneous limits described as Operational Transfer Capabilities and are posted on Sierra’s Open Access Same-time Information System (“OASIS”). 193 Page 197 of 245
  10. Page 198 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 198 of 245 FIGURE TP-6 SIERRA RATED TRANSMISSION PATHS 194 Page 198 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)