Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 190 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 190 of 245 FIGURE TP-1 NV ENERGY TRANSMISSION SYSTEM DIAGRAM 186 Page 190 of 245Page 191 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 191 of 245 a. NEVADA POWER TRANSMISSION SYSTEM The Nevada Power transmission system can be described in three sections, each shown in Figure TP-2, TP-3, and TP-4. The first section, generally referred to as the Nevada Power internal system, is designated by the “#1,” and is shown as the area between the cut plane lines (the heavy dashed lines). A cut plane is a reference to a combination of lines, either internal or external to a transmission system, which due to loading capabilities are collectively monitored or examined for limitations. The Nevada Power internal system is located within the Las Vegas Valley where the majority of Nevada Power’s customers reside. The second section, designated with a “#2,” is identified by the dashed line on the bottom-right of Figure TP-2. This transmission path is known as the Southern Cut Plane (“SCP”) and shows the transmission lines Nevada Power uses to transfer power through major substations on the southern interface of its transmission system – namely Mead, McCullough, and Eldorado – located south of Las Vegas in the Eldorado Valley. As detailed later under the Transmission Path Ratings portion of this plan, the SCP has been replaced by the formally accepted Western Electricity Coordinating Council (“WECC”) path known as the Southern Nevada Transmission Interface (“SNTI”). The SNTI is composed of numerous transmission lines electrically situated in parallel with each other. These lines are connected to the Mead, McCullough, and Eldorado Substations, which are prominent trading hubs south of Nevada Power’s transmission system and are used to import and export energy that is scheduled across this rated path. The third section is represented by the dashed line on the top-right of Figure TP-2, designated with a “#3,” is referred to as the Northern Cut Plane (“NCP”), and comprises the Red Butte-Harry Allen 345 kV interconnection with PacifiCorp, and the Crystal interconnection with the Navajo-CrystalMcCullough 525 kV line. 187 Page 191 of 245Page 192 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 192 of 245 FIGURE TP-2 NEVADA POWER TRANSMISSION SYSTEM DIAGRAM 188 Page 192 of 245Page 193 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 193 of 245 b. SIERRA TRANSMISSION SYSTEM The Sierra system is best described as two sections as shown in the map in Figure TP-3. The first section, depicted as the area within the circle, encompasses the Reno, Tracy, and Carson City areas. Designated with a “1”, this section represents the majority of the Sierra system load and is where the majority of Sierra’s customers reside. The second section of the Sierra service area is the area outside the inner circle, designated with the “2”, in the northern portion of the state. This section is characterized by long transmission lines serving heavy industrial (i.e., mining) and rural load widely dispersed throughout the northern portion of the state. FIGURE TP-3 SIERRA TRANSMISSION SYSTEM DIAGRAM 189 Page 193 of 245Page 194 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 194 of 245 TRANSMISSION PATH RATINGS Per NAC §704.9385(3)(a), the Transmission Plan must provide a summary of the capabilities of the transmission system, including import and export capabilities and the rating of significant transmission paths. NAC §704.9321(3)(d) requires the Companies to provide information regarding interconnections with other utilities and independent power producers. Nevada Power owns five significant rated transmission paths, as shown below in Figure TP-4 and TP-5, each consisting of one or more transmission lines that are granted a rating by the WECC. Nevada Power is a partial owner of one additional WECC-rated transmission path, that being the WECC East of River (“EOR”) Path 49. 190 Page 194 of 245Page 195 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 195 of 245 FIGURE TP-4 DIAGRAM OF NEVADA POWER TIE LINES, EXISTING COMPANY-OWNED GENERATION, AND EXISTING INDEPENDENT GENERATION 191 Page 195 of 245Page 196 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 196 of 245 Crystal 525 / 230 kV Path (WECC Path # 77). The Crystal 525/230 kV path allows energy to be moved from the Navajo-Crystal-McCullough 525 kV transmission line into the northeast boundary of the Nevada Power system via its Crystal Substation. This path is rated for 950 MW of inbound flow measured at the Crystal Substation. This is a 230 kV phase shifter-controlled path. Harry Allen – Red Butte 345 kV Path (WECC Path # 35 – TOT2C). The Harry Allen to Red Butte 345 kV path allows energy to be moved to and from Utah (PacifiCorp – East) and the northeast corner of the Nevada Power system at the Harry Allen switching station. The two phase shifters at Harry Allen control the flow on this path and they are occasionally used to mitigate unscheduled flow in the WECC interconnection. This path has a north to south rating of 600 MW and a south to north rating of 580 MW Southern Nevada Transmission Interface (WECC Path #81). Nevada Power owns and operates the Southern Nevada Transmission Interface, or SNTI, shown below in Figure TP-5. SNTI is comprised of 21 transmission tie-lines between the Nevada Power/Sierra combined BAA and the neighboring BAAs in southern Nevada (Western Area Power Administration, Lower Colorado, Los Angeles Department of Water and Power or “LADWP”, and the California Independent System Operator Corporation (“CAISO”). This can be seen in Figure TP-5. The SNTI represents existing lines, and the path is routinely evaluated and annually updated as a part of the NV Energy seasonal operating studies. The accepted SNTI rating as approved by WECC is 4,533 MW Northto-South and 3,970 MW South-to-North. Harry Allen – Eldorado 525 kV Path (WECC Path #84). The Harry Allen to Eldorado 525 kV path connects Nevada Power and Southern California Edison. It represents a connection between Nevada Power and CAISO Balancing Authorities. This path is represented in Figure TP-5 below. The path has a North-to-South rating of 3,496 MW and a South-to-North rating of 1,390 MW. Southern Nevada Transmission Interface+ (WECC Path #89). Nevada Power owns and operates the Southern Nevada Transmission Interface+, or SNTI+, which is SNTI (WECC Path #81) and Harry Allen to Eldorado 525 kV (WECC Path #84) combined. The SNTI represents existing lines, and the path is routinely evaluated and annually updated as a part of the NV Energy seasonal operating studies. The accepted SNTI+ rating as approved by WECC is 6,257 MW Northto-South and 4,681 MW South-to-North. 192 Page 196 of 245Page 197 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 197 of 245 FIGURE TP-5 SOUTHERN NEVADA TRANSMISSION INTERFACES Sierra owns five WECC rated transmission paths, each consisting of one or more transmission lines. Rated transmission paths are identified in Figure TP-6 below. Ratings are established through the WECC process on a non-simultaneous basis. These transmission path ratings may be subject to change over the twenty-year planning period, depending on changes to the system configuration. Operation of the paths are based on simultaneous limits described as Operational Transfer Capabilities and are posted on Sierra’s Open Access Same-time Information System (“OASIS”). 193 Page 197 of 245Page 198 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 198 of 245 FIGURE TP-6 SIERRA RATED TRANSMISSION PATHS 194 Page 198 of 245Page 199 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 199 of 245 Idaho – Sierra (WECC Path # 16). This path is rated for 525 MW of inbound flow and 360 MW of outbound flow. The path is a 345 kV line from Idaho Power’s Midpoint Substation, near Twin Falls, Idaho that connects to Sierra’s Humboldt Substation in the northeast corner of Sierra’s transmission system. Pacific Gas and Electric – Sierra (WECC Path # 24). This path has two 120 kV lines and one 60 kV line and is rated for a total flow of 160 MW in-bound and 150 MW out-bound. The path connects Pacific Gas and Electric’s 115 kV system near Donner Summit, California, to Sierra’s 120 kV and 60 kV transmission near Truckee, California. This path has a 150 MVA phase shifter at California Substation near Verdi, Nevada, to control the path flow. Pavant – Gonder 230 kV and Intermountain – Gonder 230 kV (WECC Path #32). This path has two 230 kV tie lines. Total flow is rated 440 MW in-bound and 235 MW out-bound. PacifiCorp’s Pavant and Los Angeles Department of Water and Power’s Intermountain substations are both in Utah and each has a 230 kV line that connects to the Gonder Substation near Ely, Nevada. A 150 MVA 120 kV phase shifter at the Ft. Churchill Substation near Yerington, Nevada, has some control of the line flows on this rated path. Silver Peak – Control 55 kV (WECC Path #52). This path is rated 17 MW bi-directionally. The path starts at Silver Peak, Nevada and ends at SCE’s Control Substation, which is located near Bishop, California. This path includes two 60 kV lines and two 17 MVA phase shifters in series to control the path flows. Alturas Project (WECC Path # 76). This path is rated at 300 MW bi-directionally. The Alturas path is connected to Bonneville Power Authority’s 230 kV transmission at Hilltop 230 kV Substation near Alturas, California. Voltage is stepped up to 345 kV at Hilltop with a 300 MVA transformer. From Hilltop, the path continues south where it interconnects with Ft. Sage Substation. This path has a 300 MVA phase shifter at Bordertown Substation to control the path flows. IMPORT CAPABILITY Section §704.9385(3)(a) of the NAC requires that the Transmission Plan describe the import capability of the transmission system. The term “import capability” is defined as the energy that can be transferred into a BAA. Import capability is determined in accordance with WECC, and North American Electric Reliability Corporation (“NERC”) reliability criteria. Accordingly, the system must be capable of meeting all performance criteria for steady state and single contingency outage conditions at the stated import level. The Companies’ system import capability is dependent on transmission line flows, generation dispatch patterns, and system loads. Figure TP-7 below shows the individual system import capabilities using the FERC’s prescribed methods. These values reflect the system import limit using balanced line flows with internal generation adjusted to allow maximum system import capability. This figure does not provide a complete representation of each system’s real-time import capabilities, as imports are dependent on load and the generation used to meet such load. Imports equal the load plus losses minus internal generation, or: 195 Page 199 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026