Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 192 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 192 of 245 FIGURE TP-2 NEVADA POWER TRANSMISSION SYSTEM DIAGRAM 188 Page 192 of 245Page 193 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 193 of 245 b. SIERRA TRANSMISSION SYSTEM The Sierra system is best described as two sections as shown in the map in Figure TP-3. The first section, depicted as the area within the circle, encompasses the Reno, Tracy, and Carson City areas. Designated with a “1”, this section represents the majority of the Sierra system load and is where the majority of Sierra’s customers reside. The second section of the Sierra service area is the area outside the inner circle, designated with the “2”, in the northern portion of the state. This section is characterized by long transmission lines serving heavy industrial (i.e., mining) and rural load widely dispersed throughout the northern portion of the state. FIGURE TP-3 SIERRA TRANSMISSION SYSTEM DIAGRAM 189 Page 193 of 245Page 194 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 194 of 245 TRANSMISSION PATH RATINGS Per NAC §704.9385(3)(a), the Transmission Plan must provide a summary of the capabilities of the transmission system, including import and export capabilities and the rating of significant transmission paths. NAC §704.9321(3)(d) requires the Companies to provide information regarding interconnections with other utilities and independent power producers. Nevada Power owns five significant rated transmission paths, as shown below in Figure TP-4 and TP-5, each consisting of one or more transmission lines that are granted a rating by the WECC. Nevada Power is a partial owner of one additional WECC-rated transmission path, that being the WECC East of River (“EOR”) Path 49. 190 Page 194 of 245Page 195 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 195 of 245 FIGURE TP-4 DIAGRAM OF NEVADA POWER TIE LINES, EXISTING COMPANY-OWNED GENERATION, AND EXISTING INDEPENDENT GENERATION 191 Page 195 of 245Page 196 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 196 of 245 Crystal 525 / 230 kV Path (WECC Path # 77). The Crystal 525/230 kV path allows energy to be moved from the Navajo-Crystal-McCullough 525 kV transmission line into the northeast boundary of the Nevada Power system via its Crystal Substation. This path is rated for 950 MW of inbound flow measured at the Crystal Substation. This is a 230 kV phase shifter-controlled path. Harry Allen – Red Butte 345 kV Path (WECC Path # 35 – TOT2C). The Harry Allen to Red Butte 345 kV path allows energy to be moved to and from Utah (PacifiCorp – East) and the northeast corner of the Nevada Power system at the Harry Allen switching station. The two phase shifters at Harry Allen control the flow on this path and they are occasionally used to mitigate unscheduled flow in the WECC interconnection. This path has a north to south rating of 600 MW and a south to north rating of 580 MW Southern Nevada Transmission Interface (WECC Path #81). Nevada Power owns and operates the Southern Nevada Transmission Interface, or SNTI, shown below in Figure TP-5. SNTI is comprised of 21 transmission tie-lines between the Nevada Power/Sierra combined BAA and the neighboring BAAs in southern Nevada (Western Area Power Administration, Lower Colorado, Los Angeles Department of Water and Power or “LADWP”, and the California Independent System Operator Corporation (“CAISO”). This can be seen in Figure TP-5. The SNTI represents existing lines, and the path is routinely evaluated and annually updated as a part of the NV Energy seasonal operating studies. The accepted SNTI rating as approved by WECC is 4,533 MW Northto-South and 3,970 MW South-to-North. Harry Allen – Eldorado 525 kV Path (WECC Path #84). The Harry Allen to Eldorado 525 kV path connects Nevada Power and Southern California Edison. It represents a connection between Nevada Power and CAISO Balancing Authorities. This path is represented in Figure TP-5 below. The path has a North-to-South rating of 3,496 MW and a South-to-North rating of 1,390 MW. Southern Nevada Transmission Interface+ (WECC Path #89). Nevada Power owns and operates the Southern Nevada Transmission Interface+, or SNTI+, which is SNTI (WECC Path #81) and Harry Allen to Eldorado 525 kV (WECC Path #84) combined. The SNTI represents existing lines, and the path is routinely evaluated and annually updated as a part of the NV Energy seasonal operating studies. The accepted SNTI+ rating as approved by WECC is 6,257 MW Northto-South and 4,681 MW South-to-North. 192 Page 196 of 245Page 197 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 197 of 245 FIGURE TP-5 SOUTHERN NEVADA TRANSMISSION INTERFACES Sierra owns five WECC rated transmission paths, each consisting of one or more transmission lines. Rated transmission paths are identified in Figure TP-6 below. Ratings are established through the WECC process on a non-simultaneous basis. These transmission path ratings may be subject to change over the twenty-year planning period, depending on changes to the system configuration. Operation of the paths are based on simultaneous limits described as Operational Transfer Capabilities and are posted on Sierra’s Open Access Same-time Information System (“OASIS”). 193 Page 197 of 245Page 198 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 198 of 245 FIGURE TP-6 SIERRA RATED TRANSMISSION PATHS 194 Page 198 of 245Page 199 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 199 of 245 Idaho – Sierra (WECC Path # 16). This path is rated for 525 MW of inbound flow and 360 MW of outbound flow. The path is a 345 kV line from Idaho Power’s Midpoint Substation, near Twin Falls, Idaho that connects to Sierra’s Humboldt Substation in the northeast corner of Sierra’s transmission system. Pacific Gas and Electric – Sierra (WECC Path # 24). This path has two 120 kV lines and one 60 kV line and is rated for a total flow of 160 MW in-bound and 150 MW out-bound. The path connects Pacific Gas and Electric’s 115 kV system near Donner Summit, California, to Sierra’s 120 kV and 60 kV transmission near Truckee, California. This path has a 150 MVA phase shifter at California Substation near Verdi, Nevada, to control the path flow. Pavant – Gonder 230 kV and Intermountain – Gonder 230 kV (WECC Path #32). This path has two 230 kV tie lines. Total flow is rated 440 MW in-bound and 235 MW out-bound. PacifiCorp’s Pavant and Los Angeles Department of Water and Power’s Intermountain substations are both in Utah and each has a 230 kV line that connects to the Gonder Substation near Ely, Nevada. A 150 MVA 120 kV phase shifter at the Ft. Churchill Substation near Yerington, Nevada, has some control of the line flows on this rated path. Silver Peak – Control 55 kV (WECC Path #52). This path is rated 17 MW bi-directionally. The path starts at Silver Peak, Nevada and ends at SCE’s Control Substation, which is located near Bishop, California. This path includes two 60 kV lines and two 17 MVA phase shifters in series to control the path flows. Alturas Project (WECC Path # 76). This path is rated at 300 MW bi-directionally. The Alturas path is connected to Bonneville Power Authority’s 230 kV transmission at Hilltop 230 kV Substation near Alturas, California. Voltage is stepped up to 345 kV at Hilltop with a 300 MVA transformer. From Hilltop, the path continues south where it interconnects with Ft. Sage Substation. This path has a 300 MVA phase shifter at Bordertown Substation to control the path flows. IMPORT CAPABILITY Section §704.9385(3)(a) of the NAC requires that the Transmission Plan describe the import capability of the transmission system. The term “import capability” is defined as the energy that can be transferred into a BAA. Import capability is determined in accordance with WECC, and North American Electric Reliability Corporation (“NERC”) reliability criteria. Accordingly, the system must be capable of meeting all performance criteria for steady state and single contingency outage conditions at the stated import level. The Companies’ system import capability is dependent on transmission line flows, generation dispatch patterns, and system loads. Figure TP-7 below shows the individual system import capabilities using the FERC’s prescribed methods. These values reflect the system import limit using balanced line flows with internal generation adjusted to allow maximum system import capability. This figure does not provide a complete representation of each system’s real-time import capabilities, as imports are dependent on load and the generation used to meet such load. Imports equal the load plus losses minus internal generation, or: 195 Page 199 of 245Page 200 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 200 of 245 Imports = load + losses – internal generation In real time, when all available generating units are being used to serve system load, imports will be equal to the difference between load, losses and generation. Whether the system has the capacity to perform a system wheel (i.e., an import at one location in the system with a corresponding export at a different location in the system) under these circumstances is determined through studies, which the Companies routinely complete in response to transmission service requests. Nevada Power Sierra FIGURE TP-7 SUMMARY OF SYSTEM IMPORT CAPABILITY Summary of Import Capability (MW) 2026 2027 2028 2029 5200 1275 5200 2000 6200 2000 6200 2800 2030 6200 2800 Maximum import capability should not be confused with long-term, firm transmission capability under the OATT. Maximum import capability is measured using maximum load and minimum generation, where actual imports are highly dependent on load, generation, and available voltage support. Long-term, firm transmission service under the OATT must be available without limits imposed by load variations or other transmission customers’ actions. EXPORT CAPABILITY Section 704.9385(3)(a) of the NAC also requires that the Transmission Plan describe the export capability of the transmission system. Nevada Power’s and Sierra’s system export capability are set forth in Figure TP-8 below. Export capability is limited by the capability of the transmission system, including load and generation. Export capability of the system is limited by the loss of the highest rated intertie. Maximum export capability should not be confused with the Companies’ long-term, firm transmission capability under the OATT. Each system’s maximum export capability is determined by using minimum load and maximum generation resources within the system. Actual exports are highly dependent on load and generation. Long-term, Firm Transmission Service under the OATT must be deliverable without limits imposed by load variations or other transmission customers’ actions. Nevada Power Sierra FIGURE TP-8 SUMMARY OF EXPORT CAPABILITY Summary of Export Capability (MW) 2026 2027 2028 2029 4120 1125 4120 1125 196 7090 2000 7090 2800 2030 7090 2800 Page 200 of 245Page 201 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 201 of 245 TRANSMISSION SERVICE OBLIGATIONS Per NAC §704.9385(3)(c) and NAC §704.9385(3)(d), the Transmission Plan must identify the transmission capacity required to serve bundled and unbundled retail transmission customers, and wholesale transmission customers the Companies are obligated to serve, as well as all existing and proposed transmission service agreements (“TSAs”), with transmission customers, the expiration dates of those obligations and their impacts on the transmission capacity available for use by bundled retail customers. Nevada Power and Sierra are obligated to provide transmission-only service to several transmission-only customers under TSAs. Existing Nevada Power TSAs are listed in Figures TP-9, TP-10 (not confirmed), TP-11 (not confirmed) and TP-12. Figure TP-9 lists Nevada Power’s long-term transmission obligations for import into the BAA. TP-12 lists Nevada Power’s long-term transmission obligations for exports out of the BAA. Existing Sierra TSAs are listed in Figures TP-13 and TP-14. Figure TP-13 shows Sierra’s long-term transmission obligations for import into the BAA, and Figure TP-14 shows Sierra’s long-term transmission obligations for exports out of the BAA. The impact of these combined TSAs on the amount of import transmission capacity available for use by bundled retail customers is reflected in the Transmission portion of the Load & Resource tables in Figures TP-15 and TP-16. 197 Page 201 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026