Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 199 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 199 of 245 Idaho – Sierra (WECC Path # 16). This path is rated for 525 MW of inbound flow and 360 MW of outbound flow. The path is a 345 kV line from Idaho Power’s Midpoint Substation, near Twin Falls, Idaho that connects to Sierra’s Humboldt Substation in the northeast corner of Sierra’s transmission system. Pacific Gas and Electric – Sierra (WECC Path # 24). This path has two 120 kV lines and one 60 kV line and is rated for a total flow of 160 MW in-bound and 150 MW out-bound. The path connects Pacific Gas and Electric’s 115 kV system near Donner Summit, California, to Sierra’s 120 kV and 60 kV transmission near Truckee, California. This path has a 150 MVA phase shifter at California Substation near Verdi, Nevada, to control the path flow. Pavant – Gonder 230 kV and Intermountain – Gonder 230 kV (WECC Path #32). This path has two 230 kV tie lines. Total flow is rated 440 MW in-bound and 235 MW out-bound. PacifiCorp’s Pavant and Los Angeles Department of Water and Power’s Intermountain substations are both in Utah and each has a 230 kV line that connects to the Gonder Substation near Ely, Nevada. A 150 MVA 120 kV phase shifter at the Ft. Churchill Substation near Yerington, Nevada, has some control of the line flows on this rated path. Silver Peak – Control 55 kV (WECC Path #52). This path is rated 17 MW bi-directionally. The path starts at Silver Peak, Nevada and ends at SCE’s Control Substation, which is located near Bishop, California. This path includes two 60 kV lines and two 17 MVA phase shifters in series to control the path flows. Alturas Project (WECC Path # 76). This path is rated at 300 MW bi-directionally. The Alturas path is connected to Bonneville Power Authority’s 230 kV transmission at Hilltop 230 kV Substation near Alturas, California. Voltage is stepped up to 345 kV at Hilltop with a 300 MVA transformer. From Hilltop, the path continues south where it interconnects with Ft. Sage Substation. This path has a 300 MVA phase shifter at Bordertown Substation to control the path flows. IMPORT CAPABILITY Section §704.9385(3)(a) of the NAC requires that the Transmission Plan describe the import capability of the transmission system. The term “import capability” is defined as the energy that can be transferred into a BAA. Import capability is determined in accordance with WECC, and North American Electric Reliability Corporation (“NERC”) reliability criteria. Accordingly, the system must be capable of meeting all performance criteria for steady state and single contingency outage conditions at the stated import level. The Companies’ system import capability is dependent on transmission line flows, generation dispatch patterns, and system loads. Figure TP-7 below shows the individual system import capabilities using the FERC’s prescribed methods. These values reflect the system import limit using balanced line flows with internal generation adjusted to allow maximum system import capability. This figure does not provide a complete representation of each system’s real-time import capabilities, as imports are dependent on load and the generation used to meet such load. Imports equal the load plus losses minus internal generation, or: 195 Page 199 of 245
  2. Page 200 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 200 of 245 Imports = load + losses – internal generation In real time, when all available generating units are being used to serve system load, imports will be equal to the difference between load, losses and generation. Whether the system has the capacity to perform a system wheel (i.e., an import at one location in the system with a corresponding export at a different location in the system) under these circumstances is determined through studies, which the Companies routinely complete in response to transmission service requests. Nevada Power Sierra FIGURE TP-7 SUMMARY OF SYSTEM IMPORT CAPABILITY Summary of Import Capability (MW) 2026 2027 2028 2029 5200 1275 5200 2000 6200 2000 6200 2800 2030 6200 2800 Maximum import capability should not be confused with long-term, firm transmission capability under the OATT. Maximum import capability is measured using maximum load and minimum generation, where actual imports are highly dependent on load, generation, and available voltage support. Long-term, firm transmission service under the OATT must be available without limits imposed by load variations or other transmission customers’ actions. EXPORT CAPABILITY Section 704.9385(3)(a) of the NAC also requires that the Transmission Plan describe the export capability of the transmission system. Nevada Power’s and Sierra’s system export capability are set forth in Figure TP-8 below. Export capability is limited by the capability of the transmission system, including load and generation. Export capability of the system is limited by the loss of the highest rated intertie. Maximum export capability should not be confused with the Companies’ long-term, firm transmission capability under the OATT. Each system’s maximum export capability is determined by using minimum load and maximum generation resources within the system. Actual exports are highly dependent on load and generation. Long-term, Firm Transmission Service under the OATT must be deliverable without limits imposed by load variations or other transmission customers’ actions. Nevada Power Sierra FIGURE TP-8 SUMMARY OF EXPORT CAPABILITY Summary of Export Capability (MW) 2026 2027 2028 2029 4120 1125 4120 1125 196 7090 2000 7090 2800 2030 7090 2800 Page 200 of 245
  3. Page 201 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 201 of 245 TRANSMISSION SERVICE OBLIGATIONS Per NAC §704.9385(3)(c) and NAC §704.9385(3)(d), the Transmission Plan must identify the transmission capacity required to serve bundled and unbundled retail transmission customers, and wholesale transmission customers the Companies are obligated to serve, as well as all existing and proposed transmission service agreements (“TSAs”), with transmission customers, the expiration dates of those obligations and their impacts on the transmission capacity available for use by bundled retail customers. Nevada Power and Sierra are obligated to provide transmission-only service to several transmission-only customers under TSAs. Existing Nevada Power TSAs are listed in Figures TP-9, TP-10 (not confirmed), TP-11 (not confirmed) and TP-12. Figure TP-9 lists Nevada Power’s long-term transmission obligations for import into the BAA. TP-12 lists Nevada Power’s long-term transmission obligations for exports out of the BAA. Existing Sierra TSAs are listed in Figures TP-13 and TP-14. Figure TP-13 shows Sierra’s long-term transmission obligations for import into the BAA, and Figure TP-14 shows Sierra’s long-term transmission obligations for exports out of the BAA. The impact of these combined TSAs on the amount of import transmission capacity available for use by bundled retail customers is reflected in the Transmission portion of the Load & Resource tables in Figures TP-15 and TP-16. 197 Page 201 of 245
  4. Page 202 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 202 of 245 FIGURE TP-9 NEVADA POWER’S LONG-TERM BAA TRANSMISSION IMPORT OBLIGATIONS (NETWORK CUSTOMERS) Agreement SNWA LVVWD City of Las Vegas City of Henderson City of North Las Vegas Clark County Water Reclamation District Wynn Las Vegas MGM Resorts Inc. Switch Ltd. Caesar’s Enterprises Sahara Las Vegas Georgia Pacific Gypsum Rio Las Vegas Hard Rock Air Liquide Overton Power District Circus Circus LV Delivery Interface SouthSys SouthSys SouthSys SouthSys SouthSys MW 30 60 8 12 4 Term 6/1/2013 - 5/31/2028 6/1/2013 - 5/31/2028 6/1/2013 - 5/31/2028 6/1/2013 - 5/31/2028 6/1/2013 - 5/31/2028 SouthSys 13 6/1/2013 - 5/31/2028 SouthSys SouthSys SouthSys SouthSys SouthSys SouthSys SouthSys SouthSys SouthSys SouthSys SouthSys 31 161 360 83* 5 4 9* 14 14 221 13 10/1/2021 - 10/1/2032 10/1/2021 - 10/1/2026 6/1/2017 - 6/1/2047 11/1/2023 - 9/1/2027 1/1/2020 – 1/1/2025 2/1/2020 – 2/1/2025 11/1/2023 - 11/1/2028 1/1/2023 - 1/1/2028 6/1/2021 - 4/1/2025 7/1/2025 – 1/1/2035 10/1/2020 – 10/1/2031 198 Page 202 of 245
  5. Page 203 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 203 of 245 Customer LAWM FIGURE TP-10 TRANSMISSION SERVICE REQUESTS, NOT CONFIRMED POR Gonder IPP POD HA500 MW 83 Start Date 1/1/2028 Stop Date 1/1/2030 FIGURE TP-11 DESIGNATED NETWORK RESOURCE REQUESTS, NOT CONFIRMED Customer POR POD MW Start Date Stop Date Truckee Donner PUD Gonder NorthSys 48 12/1/2027 8 years Pavant Switch - Firm Power 2030 Mead 230 kV SouthSys 500 4/1/2030 7 years Switch Midpoint NorthSys 176 1/1/2028 8 years Switch - Fulcrum NorthSys NorthSys 400 1/1/2029 6 years Switch - Naniwa NorthSys NorthSys 600 10/1/2028 5 years NVPM - Dodge Flats NorthSys NorthSys 200 7/1/2027 20 years BESS Charging NVPM - Blue Mountain NorthSys NorthSys 30 1/1/1930 18 years Geo NVPM – Fish Springs NorthSys NorthSys 100 12/1/2027 21 years Battery Charge NVPM - LUX Solar with NorthSys NorthSys 125 7/1/2028 25 years Battery) NVPM - Trego Grid NorthSys NorthSys 200 6/1/2028 20 years NVPM - Trego Grid NorthSys NorthSys 200 6/1/2028 20 years BESS Charging NVPM - Jersey Valley NorthSys NorthSys 67 11/1/2027 25 years PV+BESS NVPM - White Pine Solar NorthSys NorthSys 350 12/1/2028 26 years & Battery NVPM - Winston Solar NorthSys NorthSys 400 10/1/2029 25 years NVPM - Winston Solar NorthSys NorthSys 400 10/1/2029 25 years Grid Charge BESS NVPM - Sleepy Orange NorthSys NorthSys 500 5/1/1930 26 years NVPM - Rose of Snowville NorthSys NorthSys 20 10/1/1930 21 years NVPM - Stony Point NorthSys NorthSys 20 10/1/2029 22 years NVPM - Pumpernickel NorthSys NorthSys 20 12/1/1930 21 years NVPM - Trexler NorthSys NorthSys 20 12/1/1930 21 years NVPM - Big Smoky NorthSys NorthSys 20 12/1/1930 21 years NVPM - Baltazor NorthSys NorthSys 25 12/1/2029 17 years NVPM - Whirlwind NorthSys NorthSys 30 12/1/2029 17 years 199 Page 203 of 245
  6. Page 204 of 245

    Customer NVPM - Dixie Valley West NVPM - McGee NVPM - Excelsior NVPM - Mason NVPM - Hot Pot Solar & Storage NVPM - Iron Point Solar & Storage NVPM - Dry Lake East II Grid Charging BESS NVPM - Southern Bighorn 1 and 2 NVPM - Coyote Springs Solar and Storage NVPM - Commerce Station Energy Storage NVPM - Commerce Station Energy Storage BESS Charging NVPM - Dry Lake East Energy Storage II Fort Churchill 11 and 12 Fort Churchill 3 thru 10 Fort Churchill 15 and 16 Fort Churchill 13 and 14 Harry Allen 8 and 9 Silverhawk Units 7 thru 9 Silverhawk Units 5 and 6 Silverhawk Units 10 thru 12 POR NorthSys NorthSys NorthSys NorthSys NorthSys POD NorthSys NorthSys NorthSys NorthSys NorthSys MW 35 25 25 25 350 NorthSys NorthSys SouthSys CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 204 of 245 Start Date 12/1/2028 12/1/2028 12/1/1930 12/1/1930 10/1/2029 Stop Date 18 years 18 years 16 years 16 years 21 years 250 12/1/2029 21 years SouthSys 150 12/1/2027 20 years SouthSys SouthSys 400 7/1/2028 25 years Harry Allen 500 kV SouthSys SouthSys 600 12/1/1930 26 years SouthSys 100 5/1/2028 20 years SouthSys SouthSys 100 5/1/2028 20 years SouthSys SouthSys 150 12/1/2027 20 years NorthSys NorthSys 440 2/1/2031 30 years NorthSys NorthSys NorthSys SouthSys Harry Allen 500 kV Harry Allen 500 kV Harry Allen 500 kV NorthSys NorthSys NorthSys SouthSys SouthSys 400 440 440 440 1266 2/1/2030 2/1/2032 2/1/2031 2/1/2032 2/1/2032 30 years 30 years 30 years 30 years 30 years SouthSys 440 2/1/2031 30 years SouthSys 700 6/1/2032 30 years 200 Page 204 of 245
  7. Page 205 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 205 of 245 FIGURE TP-12 NEVADA POWER POINT OF DELIVERY LONG-TERM BAA TRANSMISSION EXPORT OBLIGATIONS TSA MW POD Term Energy Keepers 25 MEAD230 12/01/2025-12/01/2026 Morgan Stanley 50 ELDORADO230 03/01/2021-03/01/2031 OME - Whitegrass No. 1 3 MCCULLOUG230 01/01/2027-01/01/2032 OME - Fish Lake 13 ELDORADO230 01/01/2028-01/01/2033 OME - Humboldt House 1 20 ELDORADO230 06/01/2027-06/01/2032 ONGP 2 CRYSTAL500 12/01/2023-02/01/2028 ONGP 3 CRYSTAL500 01/01/2026-01/01/2031 ONGP 3 MEAD230 10/01/2016-01/01/2034 ONGP 6 CRYSTAL500 01/01/2025-01/01/2030 ONGP 8 CRYSTAL500 01/01/2025-01/01/2030 ONGP 10 CRYSTAL500 01/01/2027-01/01/2032 ONGP 12 CRYSTAL500 02/01/2023-02/01/2028 ONGP 16 CRYSTAL500 08/01/2022-08/01/2027 ONGP 16 CRYSTAL500 01/01/2025-01/01/2030 ONGP 18 MEAD230 01/01/2026-01/01/2031 ONGP 24 MEAD230 01/01/2014-01/01/2034 ONGP 24 CRYSTAL500 12/01/2022-12/01/2027 ONGP 24 CRYSTAL500 09/01/2022-09/01/2027 ONGP 24 CRYSTAL500 01/01/2024-01/01/2029 ONGP 24 CRYSTAL500 01/01/2025-01/01/2030 ONGP 24 CRYSTAL500 01/01/2026-01/01/2031 ONGP 25 CRYSTAL500 12/01/2026-12/01/2031 ONGP 25 CRYSTAL500 01/01/2027-01/01/2032 ONGP 30 CRYSTAL500 12/01/2023-12/01/2028 SCAPPA 500 MCCULLOUG500 08/01/2023-08/01/2030 Salt River Project 25 NAVAJO500 12/01/2023-12/01/2028 STPK - Star Peak 6 MCCULLOUG500 12/01/2022-12/01/2027 STPK - Whitegrass No. 2 6 ELDORADO230 06/01/2027-06/01/2032 STPK - Star Peak 8 MCCULLOUG500 01/01/2027-01/01/2032 STPK - Humboldt House 2 25 ELDORADO230 01/01/2027-01/01/2032 Tenaska 50 MEAD230 01/01/2027-01/01/2032 201 Page 205 of 245
  8. Page 206 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 206 of 245 FIGURE TP-13 SIERRA LONG TERM BALANCING AREA TRANSMISSION IMPORT OBLIGATIONS Agreement Delivery Interface MW Term Truckee Donner PUD NorthSys 43 11/1/2016 - 12/1/2027 City of Fallon NorthSys 22 4/1/2022 - 5/1/2029 Barrick NorthSys 25 1/1/2014 - 1/1/2041 Barrick NorthSys 12 1/1/2014 - 1/1/2033 Barrick NorthSys 156 1/1/2016 - 1/1/2040 Barrick NorthSys 55 1/1/2025 – 1/1/2041 Mt Wheeler NorthSys 25 1/26/2017 - 1/1/2029 Mt Wheeler NorthSys 80 6/1/2016 - 1/1/2029 BPA – Wells NorthSys 111 10/1/2016 - 10/1/2044 BPA – Wells NorthSys 6 1/1/2028 - 10/1/2044 BPA – Harney NorthSys 35 10/1/2016 - 10/1/2028 BPA – Harney NorthSys 86 5/1/2027 – 10/1/2044 BPA – Harney NorthSys 7 10/1/2016 - 10/1/2028 Caesar’s Enterprises NorthSys 7 9/1/2017 - 1/1/2033 Peppermill Resorts NorthSys 9 1/1/2018 - 1/1/2028 Liberty Utilities NorthSys 145 5/1/2027 - 1/1/2029 LMUD NorthSys 30 10/1/2025 - 10/1/2045 Switch Ltd. - M345 NorthSys 31 1/1/2029 - 1/1/2032 Switch Ltd. NorthSys 58 6/1/2017 - 1/1/2028 Newmont NorthSys 100 6/1/2027 – 2/1/2062 Newmont NorthSys 12 6/1/2027 – 1/1/2041 Newmont NorthSys 43 6/1/2027 – 2/1/2062 Plumas Sierra NorthSys 28 1/1/2029 – 1/1/2056 All Agreements with a term of 5 or more years are subject to roll over rights. The following clarifications are applicable to all of the above Long Term import obligations listed above: Network Customers import rights are equal to Designated Network Resources (“DNRs”) and may not have a termination date based on contract and roll-over rights. Subject to availability. Capacity reservations change by month for Network Customers; peak values provided are for the specified path. 202 Page 206 of 245
  9. Page 207 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 207 of 245 FIGURE TP-14 NORTHERN POINT OF DELIVERY LONG TERM BAA TRANSMISSION EXPORT OBLIGATIONS TSA OME-Humboldt House OME-Silverpeak OME-Whitegrass Ormat-Baltazor Ormat-Beowawe Ormat-Dixie Comstock Amor Soda Lake Amor Soda Lake Patua Project LLC Patua Project LLC Puget Sound Puget Sound Philips 66 Puget Sound Puget Sound Amp Renew Midpoint Ormat-Dixie Comstock West Point RNG Idaho Valmy - MW POD 20 GON.IPP 03/01/2026-03/01/2031 13 6 20 24 GON.IPP GON.IPP GON.IPP GON.IPP 10/01/2026-10/01/2031 12/01/2028-12/01/2033 06/01/2024-06/01/2029 01/01/2027-01/01/2032 15 GON.IPP 06/01/2027-06/01/2032 13 7 1 18 181 181 50 48 48 GON.PAV GON.PAV HILLTOP345 HILLTOP345 HILLTOP345 HILLTOP345 MIDPOINT345 MIDPOINT345 MIDPOINT345 10/01/2021-10/01/2031 10/01/2021-10/01/2031 10/01/2021-10/01/2031 01/01/2025-01/01/2030 01/01/2028-01/01/2029 01/01/2030-01/01/2035 10/01/2025-10/01/2030 06/01/2027-01/01/2029 01/01/2030-01/01/2035 2 SUMMIT120 10/01/2025-10/01/2030 15 SUMMIT120 01/01/2027-01/01/2032 2 SUMMIT120 262 Term 10/01/2021-10/01/2031 4/1/2023-termination pursuant to the MIDPOINT345 Valmy Agreement with Idaho Power All Agreements with a term of 5 or more years are subject to roll over rights. Figure TP-15 below is a summary of the long-term transmission import and export obligations at each point of delivery in Figures TP-10 through TP-14. 203 Page 207 of 245
  10. Page 208 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 208 of 245 FIGURE TP-15 LONG TERM BAA TRANSMISSION OBLIGATIONS SUMMARY Import Obligations Nevada Power Export Obligations Import Obligations Sierra Export Obligations Point of Delivery Mead 230 kV Crystal 525 kV Eldorado 230 kV McCullough 230/525 kV Mead 230 kV Navajo 525 kV Gonder/ Pavant 230 kV Gonder IPP Hilltop 345 kV Midpoint 345 kV Mead 230 kV Red Butte Hilltop 345 kV Gonder/ Pavant 230 kV Gonder IPP Summit 120 kV Midpoint 345 kV MW Total 1042 273 114 517 120 25 210 55 245 406 167 43 381 20 98 19 408 NAC 704.9385(3)(e) requires the Companies provide “a table identifying all the transmission capacity that the utility has secured for its bundled retail transmission customers on both its transmission system and the transmission systems of other utilities.” Figure TP-16 and TP-17 below show the Companies’ long-term secured transmission capacity for bundled retail customers. NAC 704.9385(3)(e) requires the Companies provide “a table identifying all the transmission capacity that the utility has secured for its bundled retail transmission customers on both its transmission system and the transmission systems of other utilities.” Figure TP-16 and TP-17 below show the Companies’ long-term secured transmission capacity for bundled retail customers. 204 Page 208 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)