Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 203 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 203 of 245 Customer LAWM FIGURE TP-10 TRANSMISSION SERVICE REQUESTS, NOT CONFIRMED POR Gonder IPP POD HA500 MW 83 Start Date 1/1/2028 Stop Date 1/1/2030 FIGURE TP-11 DESIGNATED NETWORK RESOURCE REQUESTS, NOT CONFIRMED Customer POR POD MW Start Date Stop Date Truckee Donner PUD Gonder NorthSys 48 12/1/2027 8 years Pavant Switch - Firm Power 2030 Mead 230 kV SouthSys 500 4/1/2030 7 years Switch Midpoint NorthSys 176 1/1/2028 8 years Switch - Fulcrum NorthSys NorthSys 400 1/1/2029 6 years Switch - Naniwa NorthSys NorthSys 600 10/1/2028 5 years NVPM - Dodge Flats NorthSys NorthSys 200 7/1/2027 20 years BESS Charging NVPM - Blue Mountain NorthSys NorthSys 30 1/1/1930 18 years Geo NVPM – Fish Springs NorthSys NorthSys 100 12/1/2027 21 years Battery Charge NVPM - LUX Solar with NorthSys NorthSys 125 7/1/2028 25 years Battery) NVPM - Trego Grid NorthSys NorthSys 200 6/1/2028 20 years NVPM - Trego Grid NorthSys NorthSys 200 6/1/2028 20 years BESS Charging NVPM - Jersey Valley NorthSys NorthSys 67 11/1/2027 25 years PV+BESS NVPM - White Pine Solar NorthSys NorthSys 350 12/1/2028 26 years & Battery NVPM - Winston Solar NorthSys NorthSys 400 10/1/2029 25 years NVPM - Winston Solar NorthSys NorthSys 400 10/1/2029 25 years Grid Charge BESS NVPM - Sleepy Orange NorthSys NorthSys 500 5/1/1930 26 years NVPM - Rose of Snowville NorthSys NorthSys 20 10/1/1930 21 years NVPM - Stony Point NorthSys NorthSys 20 10/1/2029 22 years NVPM - Pumpernickel NorthSys NorthSys 20 12/1/1930 21 years NVPM - Trexler NorthSys NorthSys 20 12/1/1930 21 years NVPM - Big Smoky NorthSys NorthSys 20 12/1/1930 21 years NVPM - Baltazor NorthSys NorthSys 25 12/1/2029 17 years NVPM - Whirlwind NorthSys NorthSys 30 12/1/2029 17 years 199 Page 203 of 245Page 204 of 245
Customer NVPM - Dixie Valley West NVPM - McGee NVPM - Excelsior NVPM - Mason NVPM - Hot Pot Solar & Storage NVPM - Iron Point Solar & Storage NVPM - Dry Lake East II Grid Charging BESS NVPM - Southern Bighorn 1 and 2 NVPM - Coyote Springs Solar and Storage NVPM - Commerce Station Energy Storage NVPM - Commerce Station Energy Storage BESS Charging NVPM - Dry Lake East Energy Storage II Fort Churchill 11 and 12 Fort Churchill 3 thru 10 Fort Churchill 15 and 16 Fort Churchill 13 and 14 Harry Allen 8 and 9 Silverhawk Units 7 thru 9 Silverhawk Units 5 and 6 Silverhawk Units 10 thru 12 POR NorthSys NorthSys NorthSys NorthSys NorthSys POD NorthSys NorthSys NorthSys NorthSys NorthSys MW 35 25 25 25 350 NorthSys NorthSys SouthSys CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 204 of 245 Start Date 12/1/2028 12/1/2028 12/1/1930 12/1/1930 10/1/2029 Stop Date 18 years 18 years 16 years 16 years 21 years 250 12/1/2029 21 years SouthSys 150 12/1/2027 20 years SouthSys SouthSys 400 7/1/2028 25 years Harry Allen 500 kV SouthSys SouthSys 600 12/1/1930 26 years SouthSys 100 5/1/2028 20 years SouthSys SouthSys 100 5/1/2028 20 years SouthSys SouthSys 150 12/1/2027 20 years NorthSys NorthSys 440 2/1/2031 30 years NorthSys NorthSys NorthSys SouthSys Harry Allen 500 kV Harry Allen 500 kV Harry Allen 500 kV NorthSys NorthSys NorthSys SouthSys SouthSys 400 440 440 440 1266 2/1/2030 2/1/2032 2/1/2031 2/1/2032 2/1/2032 30 years 30 years 30 years 30 years 30 years SouthSys 440 2/1/2031 30 years SouthSys 700 6/1/2032 30 years 200 Page 204 of 245Page 205 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 205 of 245 FIGURE TP-12 NEVADA POWER POINT OF DELIVERY LONG-TERM BAA TRANSMISSION EXPORT OBLIGATIONS TSA MW POD Term Energy Keepers 25 MEAD230 12/01/2025-12/01/2026 Morgan Stanley 50 ELDORADO230 03/01/2021-03/01/2031 OME - Whitegrass No. 1 3 MCCULLOUG230 01/01/2027-01/01/2032 OME - Fish Lake 13 ELDORADO230 01/01/2028-01/01/2033 OME - Humboldt House 1 20 ELDORADO230 06/01/2027-06/01/2032 ONGP 2 CRYSTAL500 12/01/2023-02/01/2028 ONGP 3 CRYSTAL500 01/01/2026-01/01/2031 ONGP 3 MEAD230 10/01/2016-01/01/2034 ONGP 6 CRYSTAL500 01/01/2025-01/01/2030 ONGP 8 CRYSTAL500 01/01/2025-01/01/2030 ONGP 10 CRYSTAL500 01/01/2027-01/01/2032 ONGP 12 CRYSTAL500 02/01/2023-02/01/2028 ONGP 16 CRYSTAL500 08/01/2022-08/01/2027 ONGP 16 CRYSTAL500 01/01/2025-01/01/2030 ONGP 18 MEAD230 01/01/2026-01/01/2031 ONGP 24 MEAD230 01/01/2014-01/01/2034 ONGP 24 CRYSTAL500 12/01/2022-12/01/2027 ONGP 24 CRYSTAL500 09/01/2022-09/01/2027 ONGP 24 CRYSTAL500 01/01/2024-01/01/2029 ONGP 24 CRYSTAL500 01/01/2025-01/01/2030 ONGP 24 CRYSTAL500 01/01/2026-01/01/2031 ONGP 25 CRYSTAL500 12/01/2026-12/01/2031 ONGP 25 CRYSTAL500 01/01/2027-01/01/2032 ONGP 30 CRYSTAL500 12/01/2023-12/01/2028 SCAPPA 500 MCCULLOUG500 08/01/2023-08/01/2030 Salt River Project 25 NAVAJO500 12/01/2023-12/01/2028 STPK - Star Peak 6 MCCULLOUG500 12/01/2022-12/01/2027 STPK - Whitegrass No. 2 6 ELDORADO230 06/01/2027-06/01/2032 STPK - Star Peak 8 MCCULLOUG500 01/01/2027-01/01/2032 STPK - Humboldt House 2 25 ELDORADO230 01/01/2027-01/01/2032 Tenaska 50 MEAD230 01/01/2027-01/01/2032 201 Page 205 of 245Page 206 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 206 of 245 FIGURE TP-13 SIERRA LONG TERM BALANCING AREA TRANSMISSION IMPORT OBLIGATIONS Agreement Delivery Interface MW Term Truckee Donner PUD NorthSys 43 11/1/2016 - 12/1/2027 City of Fallon NorthSys 22 4/1/2022 - 5/1/2029 Barrick NorthSys 25 1/1/2014 - 1/1/2041 Barrick NorthSys 12 1/1/2014 - 1/1/2033 Barrick NorthSys 156 1/1/2016 - 1/1/2040 Barrick NorthSys 55 1/1/2025 – 1/1/2041 Mt Wheeler NorthSys 25 1/26/2017 - 1/1/2029 Mt Wheeler NorthSys 80 6/1/2016 - 1/1/2029 BPA – Wells NorthSys 111 10/1/2016 - 10/1/2044 BPA – Wells NorthSys 6 1/1/2028 - 10/1/2044 BPA – Harney NorthSys 35 10/1/2016 - 10/1/2028 BPA – Harney NorthSys 86 5/1/2027 – 10/1/2044 BPA – Harney NorthSys 7 10/1/2016 - 10/1/2028 Caesar’s Enterprises NorthSys 7 9/1/2017 - 1/1/2033 Peppermill Resorts NorthSys 9 1/1/2018 - 1/1/2028 Liberty Utilities NorthSys 145 5/1/2027 - 1/1/2029 LMUD NorthSys 30 10/1/2025 - 10/1/2045 Switch Ltd. - M345 NorthSys 31 1/1/2029 - 1/1/2032 Switch Ltd. NorthSys 58 6/1/2017 - 1/1/2028 Newmont NorthSys 100 6/1/2027 – 2/1/2062 Newmont NorthSys 12 6/1/2027 – 1/1/2041 Newmont NorthSys 43 6/1/2027 – 2/1/2062 Plumas Sierra NorthSys 28 1/1/2029 – 1/1/2056 All Agreements with a term of 5 or more years are subject to roll over rights. The following clarifications are applicable to all of the above Long Term import obligations listed above: Network Customers import rights are equal to Designated Network Resources (“DNRs”) and may not have a termination date based on contract and roll-over rights. Subject to availability. Capacity reservations change by month for Network Customers; peak values provided are for the specified path. 202 Page 206 of 245Page 207 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 207 of 245 FIGURE TP-14 NORTHERN POINT OF DELIVERY LONG TERM BAA TRANSMISSION EXPORT OBLIGATIONS TSA OME-Humboldt House OME-Silverpeak OME-Whitegrass Ormat-Baltazor Ormat-Beowawe Ormat-Dixie Comstock Amor Soda Lake Amor Soda Lake Patua Project LLC Patua Project LLC Puget Sound Puget Sound Philips 66 Puget Sound Puget Sound Amp Renew Midpoint Ormat-Dixie Comstock West Point RNG Idaho Valmy - MW POD 20 GON.IPP 03/01/2026-03/01/2031 13 6 20 24 GON.IPP GON.IPP GON.IPP GON.IPP 10/01/2026-10/01/2031 12/01/2028-12/01/2033 06/01/2024-06/01/2029 01/01/2027-01/01/2032 15 GON.IPP 06/01/2027-06/01/2032 13 7 1 18 181 181 50 48 48 GON.PAV GON.PAV HILLTOP345 HILLTOP345 HILLTOP345 HILLTOP345 MIDPOINT345 MIDPOINT345 MIDPOINT345 10/01/2021-10/01/2031 10/01/2021-10/01/2031 10/01/2021-10/01/2031 01/01/2025-01/01/2030 01/01/2028-01/01/2029 01/01/2030-01/01/2035 10/01/2025-10/01/2030 06/01/2027-01/01/2029 01/01/2030-01/01/2035 2 SUMMIT120 10/01/2025-10/01/2030 15 SUMMIT120 01/01/2027-01/01/2032 2 SUMMIT120 262 Term 10/01/2021-10/01/2031 4/1/2023-termination pursuant to the MIDPOINT345 Valmy Agreement with Idaho Power All Agreements with a term of 5 or more years are subject to roll over rights. Figure TP-15 below is a summary of the long-term transmission import and export obligations at each point of delivery in Figures TP-10 through TP-14. 203 Page 207 of 245Page 208 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 208 of 245 FIGURE TP-15 LONG TERM BAA TRANSMISSION OBLIGATIONS SUMMARY Import Obligations Nevada Power Export Obligations Import Obligations Sierra Export Obligations Point of Delivery Mead 230 kV Crystal 525 kV Eldorado 230 kV McCullough 230/525 kV Mead 230 kV Navajo 525 kV Gonder/ Pavant 230 kV Gonder IPP Hilltop 345 kV Midpoint 345 kV Mead 230 kV Red Butte Hilltop 345 kV Gonder/ Pavant 230 kV Gonder IPP Summit 120 kV Midpoint 345 kV MW Total 1042 273 114 517 120 25 210 55 245 406 167 43 381 20 98 19 408 NAC 704.9385(3)(e) requires the Companies provide “a table identifying all the transmission capacity that the utility has secured for its bundled retail transmission customers on both its transmission system and the transmission systems of other utilities.” Figure TP-16 and TP-17 below show the Companies’ long-term secured transmission capacity for bundled retail customers. NAC 704.9385(3)(e) requires the Companies provide “a table identifying all the transmission capacity that the utility has secured for its bundled retail transmission customers on both its transmission system and the transmission systems of other utilities.” Figure TP-16 and TP-17 below show the Companies’ long-term secured transmission capacity for bundled retail customers. 204 Page 208 of 245Page 209 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 209 of 245 FIGURE TP-16 NEVADA POWER TRANSMISSION CAPACITY SECURED FOR BUNDLED RETAIL TRANSMISSION CUSTOMERS Firm Capacity Reserved by Nevada Power for Native Load 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Mead (Hoover) 375 375 375 375 375 375 375 375 375 375 Red Butte 0 0 0 0 0 0 0 0 0 0 McCullough 0 0 0 0 0 0 0 0 0 0 Crystal (Navajo) 260 260 260 260 260 260 260 260 260 260 Eldorado 0 0 0 0 0 0 0 0 0 0 54 54 54 54 54 54 54 54 54 54 526 526 526 526 526 526 526 526 526 526 0 836 836 836 836 836 1207 1207 1207 1207 2051 2051 2051 2051 2051 2422 2422 2422 Firm Capacity Reserved by Nevada Power on Other Systems 2027 2028 2029 2030 2031 2032 2033 2034 0 0 0 0 0 0 0 0 2422 Mohave (Laughlin) ON Line (Sierra) GL Nevada Projects Total 1215 2026 0 205 2035 0 Page 209 of 245Page 210 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 210 of 245 Nevada Power (ON Line) GL Nevada Projects Total FIGURE TP-17 SIERRA TRANSMISSION CAPACITY SECURED FOR BUNDLED RETAIL TRANSMISSION CUSTOMERS Firm Capacity Reserved by Sierra for Native Load 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 600 600 600 600 600 600 600 600 600 600 0 0 0 44 44 623 623 623 844 844 600 600 600 644 644 1223 1223 1223 1444 Firm Capacity Reserved by Sierra on Other Systems 2025 2026 2027 2028 2029 2030 2031 2032 0 0 0 0 0 0 0 0 1444 2024 0 2033 0 NAC § 704.945(4) requires “a graph or table” that depicts “the allocation of the capacity of the transmission system of the utility between bundled retail transmission customers, unbundled retail transmission customers and wholesale transmission customers.” This information is provided for the Companies in TP-18, below. FIGURE TP-18 NV ENERGY TRANSMISSION SYSTEM CAPACITY ALLOCATION Nevada Power Sierra Transmission Allocation MW Percentage MW Percentage Unbundled/ Wholesale 626 11.70% 500 41.20% Transmission Bundled Transmission 1215 23.80% 600 47.10% Transmission Reliability Margin 200 3.40% 175 11.80% Unallocated Transmission 3214 61.80% 0 0.00% Total Import Capacity 5,200 1,275 C. SPECIFIC REQUESTS FOR COMMISSION APPROVAL FOR NEW TRANSMISSION PROJECTS NAC § 704.9385(3)(b) requires that the Transmission Plan include a description of transmission projects that the Companies are considering expanding or upgrading. NAC § 704.9355(1)(b) and (1)(c) require that the utilities develop a set of analyses of their options for supply to be considered for meeting the expected future demand on its system. These analyses must include an examination of the environmental impact of each option, considering the best available technologies and the environmental benefit of renewable resources, including construction of new transmission 206 Page 210 of 245Page 211 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 211 of 245 facilities or upgrades to existing transmission facilities and purchase of long-term transmission rights on third-party transmission facilities. The Companies are requesting Action Plan Approval to begin network upgrades required to support the development of the following. SAPPHIRE 230/12 KV SUBSTATION Sapphire substation, with two (2) 230/12 kV 37 MVA transformers, is required in 2027. Sapphire substation is a distribution area upgrade project that will provide relief to existing facilities at Gypsum substation to serve new loads in the north side of the Apex area of Las Vegas. Additionally, a Rule 9 agreement for 84 MVA has been executed with a Master Plan Developer agreement, requiring two (2) 230/12 kV 37 MVA transformers. The Sapphire substation will be connected to the existing 230 kV transmission system by folding the existing Harry Allen – Pecos 230 kV line #2. The Companies request approval to construct the Sapphire 230/12 kV substation with two transformers and to construct the line fold of existing Harry Allen – Pecos 230 kV line #2, considered Sapphire phase 1. A Rule 9 agreement for 500 MW has been executed requiring a High Voltage Distribution (HVD) 230 kV line terminal at Sapphire and HVD line to the customer. An optional requirement may be constructed, if funded by the customer, a redundant 230 kV HVD line terminal and HVD line. The Companies request approval to construct the corresponding 230 kV line terminals and HVD lines, considered Sapphire phase 2. A Rule 9 agreement, with the same customer described in phase 2 and for an additional 500 MW, has been executed requiring the construction of Basin 525/230 kV substation with a 525/230 kV 1,500 MVA transformer at Basin. The Basin substation is described and requested below. The agreement requires the Basin-Sapphire 230 kV line, which is to be terminated in the 230 kV HVD line terminal position which was built in phase 2. After which, the customer will be served from two (2) new HVD lines from Basin. The Companies request approval to re-terminate the HVD line terminal at Basin described in phase 2, creating the Sapphire-Basin 230 kV line, considered Sapphire phase 3. A Rule 9 agreement for 855 MW is expected to be executed, before the PUCN issues a ruling on the 2026 IRP. The agreement requires two (2) HVD 230 kV line terminals at Sapphire and a second 525/230 kV 1,500 MVA transformer at Basin. The Companies request approval to construct the two HVD lines at Sapphire, considered Sapphire phase 4. A Rule 9 agreement for 375 MW is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The agreement requires the HGIII-Opal-Sapphire 230 kV line with a new 230 kV line terminal at Sapphire. The agreement also requires the construction of the Opal substation, 207 Page 211 of 245Page 212 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 212 of 245 which is described and requested below. The customer will be served from new HVD lines from Opal. The Companies request approval to construct the 230 kV line terminal at Sapphire for the HGIII-Opal-Sapphire 230 kV lines, considered Sapphire phase 5. Construction Scope: Phases 1 & 2 will construct a line fold of the Harry Allen – Pecos 230 kV line #2, with two (2) 230/12 kV 37 MVA transformers, with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD line and control equipment. Phases 3, 4, & 5 will construct 230 kV line terminals for HVD lines and a 230 kV line terminal for HGIII-Opal-Sapphire 230 kV line, with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. FIGURE TP-19 ONE LINE DIAGRAM OF SAPPHIRE PHASES 1 & 2 208 Page 212 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026