Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 206 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 206 of 245 FIGURE TP-13 SIERRA LONG TERM BALANCING AREA TRANSMISSION IMPORT OBLIGATIONS Agreement Delivery Interface MW Term Truckee Donner PUD NorthSys 43 11/1/2016 - 12/1/2027 City of Fallon NorthSys 22 4/1/2022 - 5/1/2029 Barrick NorthSys 25 1/1/2014 - 1/1/2041 Barrick NorthSys 12 1/1/2014 - 1/1/2033 Barrick NorthSys 156 1/1/2016 - 1/1/2040 Barrick NorthSys 55 1/1/2025 – 1/1/2041 Mt Wheeler NorthSys 25 1/26/2017 - 1/1/2029 Mt Wheeler NorthSys 80 6/1/2016 - 1/1/2029 BPA – Wells NorthSys 111 10/1/2016 - 10/1/2044 BPA – Wells NorthSys 6 1/1/2028 - 10/1/2044 BPA – Harney NorthSys 35 10/1/2016 - 10/1/2028 BPA – Harney NorthSys 86 5/1/2027 – 10/1/2044 BPA – Harney NorthSys 7 10/1/2016 - 10/1/2028 Caesar’s Enterprises NorthSys 7 9/1/2017 - 1/1/2033 Peppermill Resorts NorthSys 9 1/1/2018 - 1/1/2028 Liberty Utilities NorthSys 145 5/1/2027 - 1/1/2029 LMUD NorthSys 30 10/1/2025 - 10/1/2045 Switch Ltd. - M345 NorthSys 31 1/1/2029 - 1/1/2032 Switch Ltd. NorthSys 58 6/1/2017 - 1/1/2028 Newmont NorthSys 100 6/1/2027 – 2/1/2062 Newmont NorthSys 12 6/1/2027 – 1/1/2041 Newmont NorthSys 43 6/1/2027 – 2/1/2062 Plumas Sierra NorthSys 28 1/1/2029 – 1/1/2056 All Agreements with a term of 5 or more years are subject to roll over rights. The following clarifications are applicable to all of the above Long Term import obligations listed above: Network Customers import rights are equal to Designated Network Resources (“DNRs”) and may not have a termination date based on contract and roll-over rights. Subject to availability. Capacity reservations change by month for Network Customers; peak values provided are for the specified path. 202 Page 206 of 245
  2. Page 207 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 207 of 245 FIGURE TP-14 NORTHERN POINT OF DELIVERY LONG TERM BAA TRANSMISSION EXPORT OBLIGATIONS TSA OME-Humboldt House OME-Silverpeak OME-Whitegrass Ormat-Baltazor Ormat-Beowawe Ormat-Dixie Comstock Amor Soda Lake Amor Soda Lake Patua Project LLC Patua Project LLC Puget Sound Puget Sound Philips 66 Puget Sound Puget Sound Amp Renew Midpoint Ormat-Dixie Comstock West Point RNG Idaho Valmy - MW POD 20 GON.IPP 03/01/2026-03/01/2031 13 6 20 24 GON.IPP GON.IPP GON.IPP GON.IPP 10/01/2026-10/01/2031 12/01/2028-12/01/2033 06/01/2024-06/01/2029 01/01/2027-01/01/2032 15 GON.IPP 06/01/2027-06/01/2032 13 7 1 18 181 181 50 48 48 GON.PAV GON.PAV HILLTOP345 HILLTOP345 HILLTOP345 HILLTOP345 MIDPOINT345 MIDPOINT345 MIDPOINT345 10/01/2021-10/01/2031 10/01/2021-10/01/2031 10/01/2021-10/01/2031 01/01/2025-01/01/2030 01/01/2028-01/01/2029 01/01/2030-01/01/2035 10/01/2025-10/01/2030 06/01/2027-01/01/2029 01/01/2030-01/01/2035 2 SUMMIT120 10/01/2025-10/01/2030 15 SUMMIT120 01/01/2027-01/01/2032 2 SUMMIT120 262 Term 10/01/2021-10/01/2031 4/1/2023-termination pursuant to the MIDPOINT345 Valmy Agreement with Idaho Power All Agreements with a term of 5 or more years are subject to roll over rights. Figure TP-15 below is a summary of the long-term transmission import and export obligations at each point of delivery in Figures TP-10 through TP-14. 203 Page 207 of 245
  3. Page 208 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 208 of 245 FIGURE TP-15 LONG TERM BAA TRANSMISSION OBLIGATIONS SUMMARY Import Obligations Nevada Power Export Obligations Import Obligations Sierra Export Obligations Point of Delivery Mead 230 kV Crystal 525 kV Eldorado 230 kV McCullough 230/525 kV Mead 230 kV Navajo 525 kV Gonder/ Pavant 230 kV Gonder IPP Hilltop 345 kV Midpoint 345 kV Mead 230 kV Red Butte Hilltop 345 kV Gonder/ Pavant 230 kV Gonder IPP Summit 120 kV Midpoint 345 kV MW Total 1042 273 114 517 120 25 210 55 245 406 167 43 381 20 98 19 408 NAC 704.9385(3)(e) requires the Companies provide “a table identifying all the transmission capacity that the utility has secured for its bundled retail transmission customers on both its transmission system and the transmission systems of other utilities.” Figure TP-16 and TP-17 below show the Companies’ long-term secured transmission capacity for bundled retail customers. NAC 704.9385(3)(e) requires the Companies provide “a table identifying all the transmission capacity that the utility has secured for its bundled retail transmission customers on both its transmission system and the transmission systems of other utilities.” Figure TP-16 and TP-17 below show the Companies’ long-term secured transmission capacity for bundled retail customers. 204 Page 208 of 245
  4. Page 209 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 209 of 245 FIGURE TP-16 NEVADA POWER TRANSMISSION CAPACITY SECURED FOR BUNDLED RETAIL TRANSMISSION CUSTOMERS Firm Capacity Reserved by Nevada Power for Native Load 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Mead (Hoover) 375 375 375 375 375 375 375 375 375 375 Red Butte 0 0 0 0 0 0 0 0 0 0 McCullough 0 0 0 0 0 0 0 0 0 0 Crystal (Navajo) 260 260 260 260 260 260 260 260 260 260 Eldorado 0 0 0 0 0 0 0 0 0 0 54 54 54 54 54 54 54 54 54 54 526 526 526 526 526 526 526 526 526 526 0 836 836 836 836 836 1207 1207 1207 1207 2051 2051 2051 2051 2051 2422 2422 2422 Firm Capacity Reserved by Nevada Power on Other Systems 2027 2028 2029 2030 2031 2032 2033 2034 0 0 0 0 0 0 0 0 2422 Mohave (Laughlin) ON Line (Sierra) GL Nevada Projects Total 1215 2026 0 205 2035 0 Page 209 of 245
  5. Page 210 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 210 of 245 Nevada Power (ON Line) GL Nevada Projects Total FIGURE TP-17 SIERRA TRANSMISSION CAPACITY SECURED FOR BUNDLED RETAIL TRANSMISSION CUSTOMERS Firm Capacity Reserved by Sierra for Native Load 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 600 600 600 600 600 600 600 600 600 600 0 0 0 44 44 623 623 623 844 844 600 600 600 644 644 1223 1223 1223 1444 Firm Capacity Reserved by Sierra on Other Systems 2025 2026 2027 2028 2029 2030 2031 2032 0 0 0 0 0 0 0 0 1444 2024 0 2033 0 NAC § 704.945(4) requires “a graph or table” that depicts “the allocation of the capacity of the transmission system of the utility between bundled retail transmission customers, unbundled retail transmission customers and wholesale transmission customers.” This information is provided for the Companies in TP-18, below. FIGURE TP-18 NV ENERGY TRANSMISSION SYSTEM CAPACITY ALLOCATION Nevada Power Sierra Transmission Allocation MW Percentage MW Percentage Unbundled/ Wholesale 626 11.70% 500 41.20% Transmission Bundled Transmission 1215 23.80% 600 47.10% Transmission Reliability Margin 200 3.40% 175 11.80% Unallocated Transmission 3214 61.80% 0 0.00% Total Import Capacity 5,200 1,275 C. SPECIFIC REQUESTS FOR COMMISSION APPROVAL FOR NEW TRANSMISSION PROJECTS NAC § 704.9385(3)(b) requires that the Transmission Plan include a description of transmission projects that the Companies are considering expanding or upgrading. NAC § 704.9355(1)(b) and (1)(c) require that the utilities develop a set of analyses of their options for supply to be considered for meeting the expected future demand on its system. These analyses must include an examination of the environmental impact of each option, considering the best available technologies and the environmental benefit of renewable resources, including construction of new transmission 206 Page 210 of 245
  6. Page 211 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 211 of 245 facilities or upgrades to existing transmission facilities and purchase of long-term transmission rights on third-party transmission facilities. The Companies are requesting Action Plan Approval to begin network upgrades required to support the development of the following. SAPPHIRE 230/12 KV SUBSTATION Sapphire substation, with two (2) 230/12 kV 37 MVA transformers, is required in 2027. Sapphire substation is a distribution area upgrade project that will provide relief to existing facilities at Gypsum substation to serve new loads in the north side of the Apex area of Las Vegas. Additionally, a Rule 9 agreement for 84 MVA has been executed with a Master Plan Developer agreement, requiring two (2) 230/12 kV 37 MVA transformers. The Sapphire substation will be connected to the existing 230 kV transmission system by folding the existing Harry Allen – Pecos 230 kV line #2. The Companies request approval to construct the Sapphire 230/12 kV substation with two transformers and to construct the line fold of existing Harry Allen – Pecos 230 kV line #2, considered Sapphire phase 1. A Rule 9 agreement for 500 MW has been executed requiring a High Voltage Distribution (HVD) 230 kV line terminal at Sapphire and HVD line to the customer. An optional requirement may be constructed, if funded by the customer, a redundant 230 kV HVD line terminal and HVD line. The Companies request approval to construct the corresponding 230 kV line terminals and HVD lines, considered Sapphire phase 2. A Rule 9 agreement, with the same customer described in phase 2 and for an additional 500 MW, has been executed requiring the construction of Basin 525/230 kV substation with a 525/230 kV 1,500 MVA transformer at Basin. The Basin substation is described and requested below. The agreement requires the Basin-Sapphire 230 kV line, which is to be terminated in the 230 kV HVD line terminal position which was built in phase 2. After which, the customer will be served from two (2) new HVD lines from Basin. The Companies request approval to re-terminate the HVD line terminal at Basin described in phase 2, creating the Sapphire-Basin 230 kV line, considered Sapphire phase 3. A Rule 9 agreement for 855 MW is expected to be executed, before the PUCN issues a ruling on the 2026 IRP. The agreement requires two (2) HVD 230 kV line terminals at Sapphire and a second 525/230 kV 1,500 MVA transformer at Basin. The Companies request approval to construct the two HVD lines at Sapphire, considered Sapphire phase 4. A Rule 9 agreement for 375 MW is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The agreement requires the HGIII-Opal-Sapphire 230 kV line with a new 230 kV line terminal at Sapphire. The agreement also requires the construction of the Opal substation, 207 Page 211 of 245
  7. Page 212 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 212 of 245 which is described and requested below. The customer will be served from new HVD lines from Opal. The Companies request approval to construct the 230 kV line terminal at Sapphire for the HGIII-Opal-Sapphire 230 kV lines, considered Sapphire phase 5. Construction Scope: Phases 1 & 2 will construct a line fold of the Harry Allen – Pecos 230 kV line #2, with two (2) 230/12 kV 37 MVA transformers, with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD line and control equipment. Phases 3, 4, & 5 will construct 230 kV line terminals for HVD lines and a 230 kV line terminal for HGIII-Opal-Sapphire 230 kV line, with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. FIGURE TP-19 ONE LINE DIAGRAM OF SAPPHIRE PHASES 1 & 2 208 Page 212 of 245
  8. Page 213 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 213 of 245 FIGURE TP-20 ONE LINE DIAGRAM OF SAPPHIRE – PHASES 3, 4, & 5 Budget and Cost Responsibility: The Master Planned Community developer (signed in 2023) has provided security for the Utility investment of the construction of Sapphire phase 1. The HVD customers will provide the funding as an ASTPR for the Utility investment for phase 2, phase 3, phase 4 and phase 5. FIGURE TP-21 PROJECTED CASH FLOWS FOR SAPPHIRE 230/12 KV SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 53.51 10.10 26.03 1.98 2.00 30.01 13.4 209 Page 213 of 245
  9. Page 214 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 214 of 245 BASIN 525/230 KV SUBSTATION Basin substation is required to serve a Rule 9 customer with a signed for an additional 500 MW HVD agreement for a total of 1,000 MW, to be served from Basin substation by two (2) 230 kV HVD lines. Basin substation is located near the Sapphire substation in the Apex area. Basin will be connected to the existing transmission system by folding the Silver Hawk – Harry Allen 525 kV line, addition of 525/230 kV 1,500 MVA transformer and re-termination of the previously discussed HVD line from Sapphire into Basin, creating the new Basin – Sapphire 230 kV line. The Companies request approval to construct the Basin substation, including the line fold of the existing Silver Hawk – Harry Allen 525 kV line, 525/230 kV 1,500 MVA transformer and the two (2) HVD lines, considered Basin phase 1. A second Rule 9 agreement for 855 MW is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The agreement requires a second 525/230 kV 1,500 MVA transformer at Basin. This customer will take delivery from the two HVD lines that are described in Sapphire phase 4. The Companies request approval to construct the second 525/230 kV 1,500 MVA transformer at Basin, considered Basin phase 2. Construction Scope: Construct new Basin substation by folding Silver Hawk – Harry Allen 525 kV line. Construct a 525 kV and 230 kV ring buses, with two (2) 525/230 kV 1,500 MVA transformer banks, and a line position for the re-termination of the 230 kV HVD line for the Basin – Sapphire 230 kV line(s), new HVD line terminals, with all the associated line disconnect switches, breakers, bus work, control house protection panels, communications, two HVD 230 kV lines and control equipment. 210 Page 214 of 245
  10. Page 215 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 215 of 245 FIGURE TP-22 ONE LINE DIAGRAM OF BASIN PHASE 1 211 Page 215 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026