Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 210 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 210 of 245 Nevada Power (ON Line) GL Nevada Projects Total FIGURE TP-17 SIERRA TRANSMISSION CAPACITY SECURED FOR BUNDLED RETAIL TRANSMISSION CUSTOMERS Firm Capacity Reserved by Sierra for Native Load 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 600 600 600 600 600 600 600 600 600 600 0 0 0 44 44 623 623 623 844 844 600 600 600 644 644 1223 1223 1223 1444 Firm Capacity Reserved by Sierra on Other Systems 2025 2026 2027 2028 2029 2030 2031 2032 0 0 0 0 0 0 0 0 1444 2024 0 2033 0 NAC § 704.945(4) requires “a graph or table” that depicts “the allocation of the capacity of the transmission system of the utility between bundled retail transmission customers, unbundled retail transmission customers and wholesale transmission customers.” This information is provided for the Companies in TP-18, below. FIGURE TP-18 NV ENERGY TRANSMISSION SYSTEM CAPACITY ALLOCATION Nevada Power Sierra Transmission Allocation MW Percentage MW Percentage Unbundled/ Wholesale 626 11.70% 500 41.20% Transmission Bundled Transmission 1215 23.80% 600 47.10% Transmission Reliability Margin 200 3.40% 175 11.80% Unallocated Transmission 3214 61.80% 0 0.00% Total Import Capacity 5,200 1,275 C. SPECIFIC REQUESTS FOR COMMISSION APPROVAL FOR NEW TRANSMISSION PROJECTS NAC § 704.9385(3)(b) requires that the Transmission Plan include a description of transmission projects that the Companies are considering expanding or upgrading. NAC § 704.9355(1)(b) and (1)(c) require that the utilities develop a set of analyses of their options for supply to be considered for meeting the expected future demand on its system. These analyses must include an examination of the environmental impact of each option, considering the best available technologies and the environmental benefit of renewable resources, including construction of new transmission 206 Page 210 of 245Page 211 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 211 of 245 facilities or upgrades to existing transmission facilities and purchase of long-term transmission rights on third-party transmission facilities. The Companies are requesting Action Plan Approval to begin network upgrades required to support the development of the following. SAPPHIRE 230/12 KV SUBSTATION Sapphire substation, with two (2) 230/12 kV 37 MVA transformers, is required in 2027. Sapphire substation is a distribution area upgrade project that will provide relief to existing facilities at Gypsum substation to serve new loads in the north side of the Apex area of Las Vegas. Additionally, a Rule 9 agreement for 84 MVA has been executed with a Master Plan Developer agreement, requiring two (2) 230/12 kV 37 MVA transformers. The Sapphire substation will be connected to the existing 230 kV transmission system by folding the existing Harry Allen – Pecos 230 kV line #2. The Companies request approval to construct the Sapphire 230/12 kV substation with two transformers and to construct the line fold of existing Harry Allen – Pecos 230 kV line #2, considered Sapphire phase 1. A Rule 9 agreement for 500 MW has been executed requiring a High Voltage Distribution (HVD) 230 kV line terminal at Sapphire and HVD line to the customer. An optional requirement may be constructed, if funded by the customer, a redundant 230 kV HVD line terminal and HVD line. The Companies request approval to construct the corresponding 230 kV line terminals and HVD lines, considered Sapphire phase 2. A Rule 9 agreement, with the same customer described in phase 2 and for an additional 500 MW, has been executed requiring the construction of Basin 525/230 kV substation with a 525/230 kV 1,500 MVA transformer at Basin. The Basin substation is described and requested below. The agreement requires the Basin-Sapphire 230 kV line, which is to be terminated in the 230 kV HVD line terminal position which was built in phase 2. After which, the customer will be served from two (2) new HVD lines from Basin. The Companies request approval to re-terminate the HVD line terminal at Basin described in phase 2, creating the Sapphire-Basin 230 kV line, considered Sapphire phase 3. A Rule 9 agreement for 855 MW is expected to be executed, before the PUCN issues a ruling on the 2026 IRP. The agreement requires two (2) HVD 230 kV line terminals at Sapphire and a second 525/230 kV 1,500 MVA transformer at Basin. The Companies request approval to construct the two HVD lines at Sapphire, considered Sapphire phase 4. A Rule 9 agreement for 375 MW is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The agreement requires the HGIII-Opal-Sapphire 230 kV line with a new 230 kV line terminal at Sapphire. The agreement also requires the construction of the Opal substation, 207 Page 211 of 245Page 212 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 212 of 245 which is described and requested below. The customer will be served from new HVD lines from Opal. The Companies request approval to construct the 230 kV line terminal at Sapphire for the HGIII-Opal-Sapphire 230 kV lines, considered Sapphire phase 5. Construction Scope: Phases 1 & 2 will construct a line fold of the Harry Allen – Pecos 230 kV line #2, with two (2) 230/12 kV 37 MVA transformers, with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD line and control equipment. Phases 3, 4, & 5 will construct 230 kV line terminals for HVD lines and a 230 kV line terminal for HGIII-Opal-Sapphire 230 kV line, with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. FIGURE TP-19 ONE LINE DIAGRAM OF SAPPHIRE PHASES 1 & 2 208 Page 212 of 245Page 213 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 213 of 245 FIGURE TP-20 ONE LINE DIAGRAM OF SAPPHIRE – PHASES 3, 4, & 5 Budget and Cost Responsibility: The Master Planned Community developer (signed in 2023) has provided security for the Utility investment of the construction of Sapphire phase 1. The HVD customers will provide the funding as an ASTPR for the Utility investment for phase 2, phase 3, phase 4 and phase 5. FIGURE TP-21 PROJECTED CASH FLOWS FOR SAPPHIRE 230/12 KV SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 53.51 10.10 26.03 1.98 2.00 30.01 13.4 209 Page 213 of 245Page 214 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 214 of 245 BASIN 525/230 KV SUBSTATION Basin substation is required to serve a Rule 9 customer with a signed for an additional 500 MW HVD agreement for a total of 1,000 MW, to be served from Basin substation by two (2) 230 kV HVD lines. Basin substation is located near the Sapphire substation in the Apex area. Basin will be connected to the existing transmission system by folding the Silver Hawk – Harry Allen 525 kV line, addition of 525/230 kV 1,500 MVA transformer and re-termination of the previously discussed HVD line from Sapphire into Basin, creating the new Basin – Sapphire 230 kV line. The Companies request approval to construct the Basin substation, including the line fold of the existing Silver Hawk – Harry Allen 525 kV line, 525/230 kV 1,500 MVA transformer and the two (2) HVD lines, considered Basin phase 1. A second Rule 9 agreement for 855 MW is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The agreement requires a second 525/230 kV 1,500 MVA transformer at Basin. This customer will take delivery from the two HVD lines that are described in Sapphire phase 4. The Companies request approval to construct the second 525/230 kV 1,500 MVA transformer at Basin, considered Basin phase 2. Construction Scope: Construct new Basin substation by folding Silver Hawk – Harry Allen 525 kV line. Construct a 525 kV and 230 kV ring buses, with two (2) 525/230 kV 1,500 MVA transformer banks, and a line position for the re-termination of the 230 kV HVD line for the Basin – Sapphire 230 kV line(s), new HVD line terminals, with all the associated line disconnect switches, breakers, bus work, control house protection panels, communications, two HVD 230 kV lines and control equipment. 210 Page 214 of 245Page 215 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 215 of 245 FIGURE TP-22 ONE LINE DIAGRAM OF BASIN PHASE 1 211 Page 215 of 245Page 216 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 216 of 245 FIGURE TP-23 ONE LINE DIAGRAM OF BASIN PHASE 2 Budget and Cost Responsibility: The customers have provided funding as an ASTPR for the construction of Basin substation. FIGURE TP-24 PROJECTED CASH FLOWS FOR BASIN SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 163.60 16.00 10.00 8.50 46.10 64.60 83.00 SAND DUNE 230 KV SWITCHING STATION South of the Apex area, a fold of the Harry Allen – Pecos 230 kV line #2 into the new Sand Dune switching station is required to serve a Rule 9 customer with a signed 550 MW HVD agreement. The addition of this load causes overloads on the Harry Allen – Pecos #1 230 kV line so that the existing line from Harry Allen to Sand Dune must be reconductored to bundled 1026 ACCC. The 212 Page 216 of 245Page 217 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 217 of 245 Companies request approval to construct the Sand Dune switching station and reconductor a portion of the Harry Allen – Pecos 230 kV line #1 and two HVD 230 kV lines, considered Sand Dune phase 1. A second Rule 9 agreement for 340 MW has been executed, requiring a 230 kV terminal as well as the reconductor of a portion of the existing Harry Allen – Pecos #1 230 kV line, from Sand Dune to Pecos must be reconductored to bundled 1026 ACCC. The addition of two (2) stage voltage controlled 48 MVAR capacitors are necessary to maintain transmission system voltage. The Companies request approval to construct a 230 kV terminal at Sand Dune switching station, reconductor a portion of the Harry Allen – Pecos 230 kV line #1 and one HVD 230 kV line, considered Sand Dune phase 2. A third customer Rule 9 agreement for 432 MW, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The customer requires a 230 kV line terminal at Sand Dune to connect the 230 kV line to Navigator switching station, creating Sand Dune-NavigatorHGIII 230 kV line. Navigator is described and requested below. The customer will take delivery from two HVD lines from Navigator switching station, which is described and requested below. The Companies request approval to construct a 230 kV terminal at Sapphire for the Sand Dune – Navigator – HGIII 230 kV line, considered Sand Dune phase 3. Construction Scope: Construct new Sand Dune switching station by folding Harry Allen-Pecos 230 kV line #1. Sand Dune switching station includes 230 kV breaker and a half bus with associated line disconnect switches, breakers, bus work, control house protection panels, communications, three HVD 230 kV lines and control equipment. Reconductor Harry Allen to Pecos 230 kV line #1 with double bundled 1026 ACCC. Install 230 kV two (2) stage voltage controlled capacitor bank. Construct Sand Dune-Navigator-HGIII 230 kV line with associated 230 kV line terminals at Navigator and HGII and Sand Dune. 213 Page 217 of 245Page 218 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 218 of 245 FIGURE TP-25 ONE LINE DIAGRAM OF SAND DUNE SWITCHING STATION PHASE 1 AND PHASE 2 214 Page 218 of 245Page 219 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 219 of 245 FIGURE TP-26 ONE LINE DIAGRAM SAND DUNE PHASE 3 Budget and Cost Responsibility: The customers have provided funding as an ASTPR for the construction of Sand Dune switching station for Phase 1, Phase 2 and Phase 3. FIGURE TP-27 PROJECTED CASH FLOWS FOR SAND DUNE SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 75.20 4.00 4.50 34.60 28.50 67.60 3.60 OPAL 230 KV SWITCHING STATION It is now required to construct Opal (originally called Belcher) switching station near Basin substation in Apex. This new switching station is required to serve a Rule 9 customer 375 MW HVD agreement, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The customer will take redundant power delivery from two (2) 230 kV HVD lines from Opal. Opal will be connected to the existing transmission system by constructing HGIII-Opal-Sapphire 230 kV line. The Companies request approval to construct the Opal switching station, HVD lines and to construct HGIII – Opal – Sapphire 230 kV line. 215 Page 219 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026